P5001 JADOC Phase II

Closed Pre-Solicitation Posted

Not the latest version. See the latest solicitation from .

Solicitation number
N4008021R3502
Agency
Responses due
Set-aside
No set-aside

Opportunity facts

Place of performance
Bolling Afb Dc 20032, United States

Notice details come from SAM.gov. Updated .

About this opportunity

The Naval Facilities Engineering Command seeks to complete the second phase of construction of the permanent Joint Air Defense Operations Center facility at Joint Base Anacostia Bolling in Washington, D.C. The design-build project involves constructing the two-story facility including foundations, structural steel frame, masonry walls, sloping roof deck, pavements, utilities, site improvements, security measures, and communications routing. The facility must meet Intelligence Community, Department of Defense, Air Force, and Joint Base design standards while utilizing local materials when cost-effective. Interested parties must submit details on relevant past projects by May 28, 2021.

There is no set-aside designation for this opportunity. The Naval Facilities Engineering Command is seeking responses from small businesses by May 28, 2021 to determine if the subsequent solicitation can be set aside. The estimated construction value is between $10-25 million. Relevant NAICS codes include 236220 and PSC codes include S206 and S211. The opportunity involves the second phase of a permanent facility with an anticipated completion timeline in accordance with standard DoD design criteria.

Notice text

Complete the Joint Air Defense Operations Center permanent facility by providing the second phase of the Military Construction: Construction includes concrete slab-on-grade foundation with Concrete spread footings under steel columns, structural steel frame, concrete masonry unit shear walls, and roofing system with sloping roof deck. Includes pavements, all utilities, site improvements, passive force protection measures, security fencing, and diverse communication routing to eliminate single points of failure and ensure constant connectivity. Special Construction Requirements include Controlled Space in accordance with Intelligence Community Directive/Intelligence Community Standard 705 and use of special exterior finishes to meet Joint Base Anacostia Bolling’s architectural design requirements. The facility shall be compatible with applicable Department of Defense, Air Force, and Joint Base design standards. In addition, local materials and construction techniques shall be used where cost effective. Facilities will be designed as permanent construction in accordance with the Department of Defense Unified Facilities Criteria 1-200-01. This project will comply with Department of Defense antiterrorism/force protection requirements per Unified Facility Criteria 4-010-01.  

Files

Notice history

Similar open opportunities

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity