RFI - Exterior and Interior Views 20220224 - Photos 1.pdf

PDF 8 MB Posted

Attached to
P-5001 DBB, JOINT AIR DEFENSE OPERATIONS PHASE II, JOINT BASE ANACOSTIA-BOLLING, WASHINGTON, DC
Solicitation number
N4008021R3502
Issued by

About this file

This document provides details for a federal solicitation to complete construction of a Joint Air Defense Operations Center. The solicitation will result in the construction of a two-story permanent facility at Joint Base Anacostia-Bolling in Washington, DC. Work will include a concrete slab-on-grade foundation, structural steel frame, concrete masonry unit shear walls, roofing system, pavements, utilities, site improvements, security fencing, and communication routing. Special requirements include construction of a controlled space per Intelligence Community standards and use of exterior finishes per the base's architectural requirements. The facility must also meet Department of Defense, Air Force, and Joint Base design standards. Construction must comply with antiterrorism and force protection criteria. The solicitation number is N4008021R3502 and was issued by the Naval Facilities Engineering Command.

View the file

Other files

File Type Posted
AMENDMENT0010JADOCPHASEII.pdf PDF
P5001JADOCPriceScheduleUpdatedAPRIL12.pdf PDF
AMENDMENT0008JADOCPHASEII.pdf PDF
AMENDMENT0009JADOCPHASEII.pdf PDF
AMENDMENT0007JADOCPHASEII.pdf PDF
AMENDMENT0007JADOCPHASEII.pdf PDF
P5001JADOCPriceSchedule-March312022.pdf PDF
SK004.pdf PDF
SK005.pdf PDF
P5001 JADOC Price Schedule - Updated.pdf PDF
amendment0006JADOC.pdf PDF
JADOC II Drawings - Amendment 1 - 03.02.22.pdf PDF
JADOC II Drawings - Amendment 1 - 03.02.22.pdf PDF
RFI 105 - 12 Stairwell.JPG JPG image
RFI 105 - 3 Exterior DOOR B Closeup.JPG JPG image
RFI 104 - ELECTRICAL ROOM 125 LOCATION OF SWITCHBOARD 20220225.pdf PDF
JADOC II Amendment 1 - 23 09 13 - INSTR... CONTROL DEVICES FOR HVAC 03-03-22.pdf PDF
RFI 105 - 8 Interior Room 2 B.JPG JPG image
RFI 105 - 3 Exterior DOOR B Closeup (2).JPG JPG image
RFI 105 - 11 Interior Room C.JPG JPG image
RFI 104 - 119 COMM AND DATA APPROXIMATES 20220225.pdf PDF
AMENDMENT0005JADOCPHASEII.pdf PDF
RFI 105 - 10 Interior Room B.JPG JPG image
RFI 105 - 6 Interior Room - 223 No Names Inserted 2.JPG JPG image
P-5001 CSP Excerpts.pdf PDF
JADOC II - RFI 32 - Dumpster Enclosure Detail - 02.09.2022.pdf PDF
P-5001 CSP Excerpts.pdf PDF
AMENDMENT0004 JADOC PHASE II.pdf PDF
Site Visit Attendee Log.pdf PDF
AMENDMENT0003JADOC.pdf PDF
AMENDMENT0002P5001JADOC.pdf PDF
AMENDMENT0001JADOCPHASEII.pdf PDF
DWG_1673850DWG2OF4.pdf PDF
DWG_1673850DWG3OF4.pdf PDF
DWG_1673850DWG1OF4.pdf PDF
DWG_1673850DWG4OF4.pdf PDF
JADOC Visitor Request Form_Nov.2021.pdf PDF
Site Visit New Pass Registration.xlsx XLSX spreadsheet
ATTACHMENT A - CONSTRUCTION AND DESIGN EXPERIENCE PROJECT DATA SHEET.docx DOCX document
SF1442 - N4008021R3502.pdf PDF
Specifications 2.pdf PDF
ATTACHMENT B - Past Performance Questionnaire.doc DOC document
ATTACHMENT C-Safety Data Sheet.docx DOCX document
ATTACHMENT F - Small Business Subcontracting Plan Template.doc DOC document
ATTACHMENT G - RFI Form.docx DOCX document
Site Visit Excel file for information.xlsx XLSX spreadsheet
ATTACHMENT H- PRICE SCHEDULE.docx DOCX document
Specifications 1.pdf PDF
ATTACHMENT E - Small Business Participation and Commitment Strategy.docx DOCX document
ATTACHMENT D - SMALL BUSINESS SUBCONTRACTING RECORD.docx DOCX document
Show all 50

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

KNOCK OUT PANELS (PLUS)

FLOOR PLAN, EXTERIOR VIEWS, DETAILS

FIRST FLOOR EXTERIOR WALL SHOWING KNOCKOUT PANELS – PH I AS-BUILT A101

1L 2L 3

L = LOWER / 1ST FLOOR

U=UPPER / 2ND FLOOR

FIRST FLOOR EXTERIOR WALL SHOWING KNOCKOUT PANELS – PH I AS-BUILT A101

THE REFERENCE NUMBERS 1, 2, 3 (“L” FOR LOWER “U” FOR UPPER WHERE APPLICABLE) ARE UNIQUE TO THIS SET OF IMAGES

SECOND FLOOR EXTERIOR WALL SHOWING KNOCKOUT PANELS – PH I AS-BUILT A101

SECOND FLOOR EXTERIOR WALL SHOWING KNOCKOUT PANELS – PH I AS-BUILT A101

1U 2U

L = LOWER / 1ST FLOOR

U=UPPER / 2ND FLOOR

KNOCK OUT PANELS – EXTERIOR IMAGES

1L

2L

1U

2U

FUEL TANK

[Shows West Side

(long) and South Side

1U

1U

2L

2U

2L

2U

File details come from the government source that posted it. Updated .