AMENDMENT0007JADOCPHASEII.pdf
PDF 316 KB Posted
- Attached to
- P-5001 DBB, JOINT AIR DEFENSE OPERATIONS PHASE II, JOINT BASE ANACOSTIA-BOLLING, WASHINGTON, DC
- Solicitation number
- N4008021R3502
About this file
This amendment to a solicitation provides additional details for a construction project. The solicitation is for a two-phase construction of a permanent Joint Air Defense Operations Center facility at Joint Base Anacostia-Bolling in Washington, DC. The amendment extends the proposal due date to April 7, 2022, provides responses to contractor questions, a revised price schedule, and a site sketch. Key project details include constructing a two-story operations center with a concrete foundation, structural steel frame, masonry walls, and sloped roof. The facility must meet intelligence community standards for controlled spaces and special exterior finishes to match the base's architectural requirements.
View the file
Other files
Show all 50
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
SOLICITATION: N4008021R3502 P5001 JOINT AIR DEFENSE OPERATIONS PHASE II
The purpose of this amendment is to provide the follow ing:
1. The proposal due date is hereby extended to 7 April 2022 at 2:00.
2. RFI Responses
3. Revised Price Schedule
4. Specifications Sketch (SK-001)
5. Wage Rate Determination
CONTINUED ON PAGE 2
1. CONTRACT ID CODE PAGE OF PAGES
J 1 17
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 31-Mar-2022
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N4008021R3502
X 9B. DATED (SEE ITEM 11)
06-Jan-2022
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
31-Mar-2022
CODE
NAVAL FACILITIES ENG COMMAND WASHINGTON
1314 HARWOOD ST
WASHINGTON DC 20374
N40080 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N4008021R3502
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
The following items are applicable to this modification:
SUMMARY OF CHANGES
1. Detail C4 on A‐540 seems to be mislabeled w/ Keyed Notes 11. Can you please revise to reflect the correct Keyed Note references?
GOVERNMENT RESPONSE: See attached sketches (SK‐004; SK005).
2. As noted on the Structural Notes (S‐001), please confirm that the Helical Piles should have a Lateral Shear working design capacity of 10 kips.”
GOVERNMENT RESPONSE: In accordance with S‐001, Foundations and Earthwork Note 6B, design helical piles for the unfactored (ASD) loads of 50 kips (axial compression) and 10 kips (lateral shear) concurrently.
3. Detail A5 on page C‐507 has a note for tab plates. This is an unusual fence detail. What is the intent of the detail?
GOVERNMENT RESPONSE: Question answered in Amendment 0005. Page 3. Number 6.
4. The government response to questions #4, regarding government sponsorship of contractors for US Secret Clearance states the question must be responded to by the DoD Security Office.
Note, for workers to submit for their US Secret clearance they must be sponsored or have a reason for requesting clearance. Thus, we need to confirm NAVFAC will act as a sponsor for additional workers to request clearance.
GOVERNMENT RESPONSE: Per the JADOC Chief of Intelligence and Security and ICD‐750 Chapter 3.B.5, there is no requirement for the construction contractor to have active security clearance. Consequently US Security Clearance sponsorship is not needed for the project.
5. Please advise who we should contact in the DoD Security Office to confirm NAVFAC can sponsor workers for this project?
GOVERNMENT RESPONSE: Refer to RFI question # 4.
6. Please confirm the “secure areas” which requires US‐Secret Cleared personnel when performing work per specification 01 14 00 is only for work within the existing building and the ICD‐705 Areas on the 2nd floor (Room 251, 251A, and 251B) as noted on the Security Drawings.
GOVERNMENT RESPONSE: Refer RFI question # 4.
7. Will the fall protection system noted on A‐130 under Keyed Note 15 need to be supplied w/ harnesses? If so, how many?
GOVERNMENT RESPONSE: No less than 10.
8. For Factor 1 – Experience it states to provide applicable documentation on projects that were validated and/or certified through USGBC or equivalent. Please confirm this documentation is not included within the 2‐page limit per project data sheet.
GOVERNMENT RESPONSE: Certificates through USGBC or equivalent is not part of the two‐page limit per project data sheet.
9. 01 30 01.00 23 – 1.5a states the Contractor’s Interior Designer must be responsible for inventorying existing FF&E to be relocated to the new facility. The drawings do not identify any new furniture for the existing building nor furniture to be relocated from the existing facility to the new building.
GOVERNMENT RESPONSE: There are no plans to relocate furniture from the existing to the new building.
10. Please confirm there is no FF&E to be relocated to the new facility that requires inventorying.
11. Please confirm any FF&E/AV or other equipment in the existing facility will be relocated by the government prior to construction. If any equipment relocation is required by the contractor please provide a list of what is to be relocated and where it is to be stored.
12. General note #8 on I‐400, I‐600, I‐900 states to coordinate electrical, plumbing, and Audio‐Visual (AV) requirements with Furniture Specification.
GOVERNMENT RESPONSE: Please refer to the solicitation.
13. 01 30 01.00 23 does not note any requirement for AV nor is there a typical Planned MOD for AV. The only item noted as AV is the Public Address Systems.
GOVERNMENT RESPONSE: There is no Planned MOD for AV systems. The Public Address System and all those components on note 12 sheet T‐401 should be included in the base BID, CLIN 001AA.
14. Please confirm the Contractor is not responsible for any AV design or procurement except for the Public Address Systems.
GOVERNMENT RESPONSE: Confirmed
15. In amendment 3, RFI #5 states see the CSP files “JADOC CSP2021‐10‐05‐114956.pdf.” However, this document was not provided with Amendment 3 nor Amendment 4. Only an except was provided. Please provide the entire file or confirm a complete file will not be provided as noted in Amendment 3.
GOVERNMENT RESPONSE: File issued with Amendment 0004.
16. The Price Schedule includes, CLIN 0002 – Option 1: Electronic Security Systems Equipment: Bid Option for CLIN 0002 shall be the entire work for the Electronic Security Systems Equipment in accordance with the specifications and drawings of the project.
17. In Amendment 4, the Government’s Response to RFI #60 states, “the ESS installation by the GC is limited to "rough in". Meaning conduit with pull strings and back boxes as described in the General Notes. Therefore, systems specifications are not required.”
GOVERNMENT RESPONSE: See attached revised price schedule.
18. Please confirm CLIN 0002 should not be price and will be removed from the Price Schedule. All “rough in” for the ESS will be in the Base Bid CLIN 0001AA.
GOVERNMENT RESPONSE: CLIN002 is valid. Construction contractor is to purchase ESS equipment. All "rough in" are included in CLIN001AA.
19. 09 69 13 – Rigid Grid Access Flooring paragraph 3.4 – Fire Safety, identifies an Automatic detection system below the raised floor.
20. This system is not designed or identified in the fire protection/alarm specification nor the fire protection drawings.
GOVERNMENT RESPONSE: Refer back to the construction documents (Plans and specifications).
21. Please confirm this system is not required, otherwise please provide a design and specifications.
GOVERNMENT RESPONSE: Refer back to the construction documents (Plans and specifications).
22. Amendment 4 included a sketch (SK‐001) for the dumpster enclosure foundation and showed a portion of the masonry wall. Please provide a architectural plan showing this Dumpster Enclosure with full sections showing the wall make‐up. For instance, will any architectural block or caps be required?
GOVERNMENT RESPONSE: See attached sketch.
23. Section 41 22 23.19 Monorail Hoists, Paragraph 2.2.1 Monorail Track System states to provide monorail and support structure for underrunning monorail of rolled steel shapes confirming to CMA 74, patented track beams conforming to MHI MH27.1, or enclosed track beams conforming to MHI MH27.2. The general specification from wbdg.org which this is extracted from notes under Paragraph 2.2.2 Monorail Track System that Monorail tracks may be of three types. "Patented track" as defined in the definitions section and built IAW MHI MH27.1, "enclosed track" built IAW MHI MH27.2 and "rolled steel shapes" which is defined in CMAA 74. The activity may decide the track type to be used or allow the provider to decide, except ordinance handling cranes require patented track.
GOVERNMENT RESPONSE: Please consider "patented track" monorail track system for bidding purposes.
24. 41 22 23.19 opens by referencing the NAVCRANECEN INSTRUCTION 11450.2A for design criteria and requirements. 11450.2A, 2‐1.5.2.1 Rails Paragraph (a) states that the recommended monorail beam design is the “patented track” type beam designed in accordance with MMA MH27.1. Rolled structural steel shape monorails shall be designed in accordance with CMAA #74. Enclosed track monorail systems are not recommended, but if utilized, shall be designed in accordance with MMA MH27.2. 11450.2A, B‐1.2.2 notes that the NCC specifies patented track rails, and B‐1.2.4 notes that the standard patented track is governed by MH27.1, and enclosed beams under MH27.2 should only be considered for capacities less than 2,000 lbs.
GOVERNMENT RESPONSE: Please consider "patented track" monorail track system for bidding purposes.
25. There is a SIGNIFCIANT price difference between patented track and enclosed track rails. Please confirm that enclosed track per MHI MH27.2 is acceptable to the end users, or if they would rather the NCI standard patented track rails.
Note 5 and Note 9 on Sheet AD100 state to remove approximately three (3) and eight (8) access floor panels, respectively. Note 21 on Sheet A‐102 states to replace approximately eight (8) access floor panels per modified partition similar in type and make of existing access floor system. There is no note on A‐102 that calls for the remaining three (3) panels to be replaced. Please confirm that along with Note 21 on Sheet A‐ 102, the remaining three (3) panels from AD100 also need to be replaced.
GOVERNMENT RESPONSE: Refer to RFI Question #23 MHI MH27.2 , RFI question #25 which refers to monorail track systems. Refer to RFI question #26 floor panel and RFI question #25 which refers to access floor panels.
26. Note 21 on Sheet A‐102 states to replace approximately eight (8) access floor panels per modified partition similar in type and make of existing access floor system. Please provide the type and make of the existing raised access floor system.
GOVERNMENT RESPONSE: Type and make of the existing access floor system that they currently have in JADOC II’s Tate raised access floor.
27. Sheet A‐612 provides the details for Wall Type 1W, SW, and 0W. Sheet A‐613 shows another wall type that is tagged as 0W. Please confirm that the Wall Type 0W on Sheet A‐613 is supposed to be Wall Type 0AE being that is listed between Wall Types 0AD and 0AF.
GOVERNMENT RESPONSE: Confirmed, partition type 0W on sheet A‐613 is supposed to be Partition Type
0AE.
28. Wall Type 0H on Sheet A‐610 calls for a minimum of 3‐1/2” sound attenuation blanket insulation but no insulation is shown on the detail. Please confirm whether Wall Type 0H should have blanket insulation.
GOVERNMENT RESPONSE: Insulation in partition Type 0H & 0F are not required.
29. Referencing the amended price schedule in amendment 06. Please clarify the price and scope to be carried in CLIN 02 as the Electronic Security Systems are clarified to be provided by a government contractor and the infrastructure is to be carried in CLIN 01AA. Is the "Government's ESS contractor" to be carried as an allowance?
GOVERNMENT RESPONSE: Please refer to question #18.
30. Amendment 03 deleted amendment 02 stating “The following have been deleted: AMENDMENT 0002” This amendment included the latest wage determination. Please provide an updated wage determination.
GOVERNMENT RESPONSE: See attached current wage rate determination.
31. A previously submitted RFI & response stated: “Please clarify if we are to provide a unit price or lump sum price for CLINs 0003 and 0004. If we are to provide a lump sum price, then please provide the quantity that should be included for each CLIN. GOVERNMENT RESPONSE: Please provide a unit price for CLINs 0003 and 0004.” Are bidders to simply insert a unit cost in that line (ie $/ton) or was there supposed to be a unit price, quantity and extension line on the bid form for CLIN03 and 04?
GOVERNMENT RESPONSE: See attached revised price schedule.
32. . A previously submitted RFI & response stated: “GOVERNMENT RESPONSE: The Site Security Manager prepared a CSP for the project. Please see the "JADOC CSP2021‐10‐05‐114956.pdf” This document does not appear to be included in the amendment. Please provide.
GOVERNMENT RESPONSE: Already answered in #005. “The Site Security Manager prepared a CSP for the project. Security procedures are detailed in the specifications. Personnel requirements from the CSP can be shared. See pdf "P‐5001 CSP Excerpt"”
33. . Please confirm that the Contractor is to include the TY series infrastructure in the base bid offer.
34. . Please clarify: If the “Government's ESS contractor will provide and install the ESS equipment” presumably under a separate contract per the RFI response, then what equipment (or other cost items) are the contractors to include with CLIN 0002 ‐ Option 1: Electronic Security Systems Equipment:”?
GOVERNMENT RESPONSE: Please refer to question 29.
35. Can the Government confirm that the “option” columns in (1) the chart on the last page of Attachment E (p.
5) and (2) the chart on the last page of Attachment F (p. 12) the Individual Small Business Subcontracting Plan template apply to option years (which are inapplicable to this project and are related more to a MATOC submission) rather than the optional scopes of work associated with this project? Each chart includes text that indicates that these “option” columns apply to years only (specifically, the footer in item 1 above and the header in item 2 above) and are therefore inapplicable to this submission.
GOVERNMENT RESPONSE: Please submit attachments and documents in accordance to the solicitation.
36. Reference RFI # 19 response related to CLIN 0002 Option 1 for the ESS ‐ the response references Note 13 which we assume to be referring to Note # 10 on TY‐001. Please confirm. The response to the RFI reads:
“GOVERNMENT RESPONSE: The intent of the TY series of drawings is to depict an ESS INFRASTRUCTURE ONLY design. The breakout of responsibilities is discussed in Note 13 of TY‐001. The Government's ESS contractor will provide and install the ESS equipment.”
GOVERNMENT RESPONSE: Please refer to question 29.
37. Regarding RFI Response 16 in Amendment 003, please confirm that the cost for providing the gas meter and the gas main extensions as noted on CU101 shall be included in our base price for CLIN 001A.
GOVERNMENT RESPONSE: Gas service relocation and extension are to be provided by natural gas provider.
Installation cost for the work is to be determined and coordinated with natural gas provider. The intent is for the bidding contractor to have any and all cost for the gas service line extension and meter included in their bid.
38. Page 10 – please confirm that the three (3) complete fiscal year financial statements can be 2018, 2019, 2020, whereas complete financial statement for 2021 may not be completed yet.
GOVERNMENT RESPONSE: Confirmed, years 2018, 2019 and 2020 are acceptable.
39. Factor 1 (Experience): Would the government consider increasing the look‐back period for relevant projects from 5 years to 10 years? 10 years is an increasingly common look‐back period in solicitations and the difference between 5 and 10 years is negligible, while the adjustment may allow offerors to provide more relevant projects for the government’s consideration, with no reduction in the government’s ability to evaluate relevancy.
GOVERNMENT RESPONSE: Factor 1 Experience is hereby revised: Projects submitted for the offeror shall be completed within the past ten (10) years prior to the date of issue of this RFP.
GOVERNMENT RESPONSE: Factor 4, Past Performance: Recency and relevancy is defined as:
Recency is projects submitted for the Offeror shall be completed within the past ten (10) years prior to the date of issuance of this RFP.
"General Decision Number: DC20220002 03/25/2022 Superseded General Decision Number: DC20210002 State: District of Columbia Construction Type: Building County: District of Columbia Statewide.
BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).
Note: Contracts subject to the Davis-Bacon Act are generally required to pay at least the applicable minimum wage rate required under Executive Order 14026 or Executive Order 13658.
Please note that these Executive Orders apply to covered contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but do not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60).
|If the contract is entered |. Executive Order 14026 | |into on or after January 30, | generally applies to the | |2022, or the contract is | contract. | |renewed or extended (e.g., an |. The contractor must pay | |option is exercised) on or | all covered workers at | |after January 30, 2022: | least $15.00 per hour (or | | | the applicable wage rate | | | listed on this wage | | | determination, if it is | | | higher) for all hours | | | spent performing on the | | | contract in 2022. | |If the contract was awarded on|. Executive Order 13658 | |or between January 1, 2015 and| generally applies to the | |January 29, 2022, and the | contract. | |contract is not renewed or |. The contractor must pay all| |extended on or after January | covered workers at least | |30, 2022: | $11.25 per hour (or the | | | applicable wage rate listed| | | on this wage determination,| | | if it is higher) for all | | | hours spent performing on | | | that contract in 2022. |
The applicable Executive Order minimum wage rate will be adjusted annually. If this contract is covered by one of the Executive Orders and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must still submit a conformance request.
Additional information on contractor requirements and worker protections under the Executive Orders is available at https://www.dol.gov/agencies/whd/government-contracts.
Modification Number Publication Date
0 01/07/2022 1 01/14/2022 2 02/11/2022 3 02/18/2022 4 02/25/2022 5 03/25/2022
ASBE0024-007 04/01/2021
Rates Fringes
ASBESTOS WORKER/HEAT & FROST
INSULATOR........................$ 39.27 18.67+a
Includes the application of all insulating materials, protective coverings, coatings and finishes to all types of mechanical systems
a. PAID HOLIDAYS: New Year's Day, Martin Luther King Day, Memorial Day, Independence Day, Labor Day, Veterans' Day, Thanksgiving Day,the day after Thanksgiving and Christmas Day provided the employee works the regular work day before and after the paid holiday.
ASBE0024-008 04/01/2021
Rates Fringes
ASBESTOS WORKER: HAZARDOUS
MATERIAL HANDLER.................$ 24.46 8.69+a
Includes preparation, wetting, stripping, removal, scrapping, vacuuming, bagging and disposing of all insulation materials, whether they contain asbestos or not, from mechanical systems
a. PAID HOLIDAYS: New Year's Day, Martin Luther King Day, Memorial Day, Independence Day, Labor Day, Veterans' Day, Thanksgiving Day,the day after Thanksgiving and Christmas Day provided the employee works the regular work day before and after the paid holiday.
ASBE0024-014 04/01/2021
Rates Fringes
FIRESTOPPER......................$ 29.41 8.73+a
Includes the application of materials or devices within or around penetrations and openings in all rated wall or floor assemblies, in order to prevent the pasage of fire, smoke of other gases. The application includes all components involved in creating the rated barrier at perimeter slab edges and exterior cavities, the head of gypsum board or concrete walls, joints between rated wall or floor components, sealing of penetrating items and blank openings.
a. PAID HOLIDAYS: New Year's Day, Martin Luther King Day, Memorial Day, Independence Day, Labor Day, Veterans' Day, Thanksgiving Day,the day after Thanksgiving and Christmas Day provided the employee works the regular work day before and after the paid holiday.
BRDC0001-002 05/02/2021
Rates Fringes
BRICKLAYER.......................$ 34.00 12.59
CARP0197-011 05/01/2021
Rates Fringes
CARPENTER, Includes Drywall Hanging, Form Work, and Soft Floor Laying-Carpet..............$ 30.34 13.80
CARP0219-001 05/01/2021
Rates Fringes
MILLWRIGHT.......................$ 35.34 13.53
CARP0441-001 05/01/2021
Rates Fringes
PILEDRIVERMAN....................$ 33.62 12.73
* ELEC0026-016 12/06/2021
Rates Fringes
ELECTRICIAN, Includes Installation of HVAC/Temperature Controls........$ 50.00 20.49
ELEC0026-017 09/07/2020
Rates Fringes
ELECTRICAL INSTALLER (Sound & Communication Systems).........$ 29.05 11.39
SCOPE OF WORK: Includes low voltage construction, installation, maintenance and removal of teledata facilities (voice, data and video) including outside plant, telephone and data inside wire, interconnect, terminal equipment, central offices, PABX, fiber optic cable and equipment, railroad communications, micro waves, VSAT, bypass, CATV, WAN (Wide area networks), LAN (Local area networks) and ISDN (Integrated systems digital network).
WORK EXCLUDED: The installation of computer systems in industrial applications such as assembly lines, robotics and computer controller manufacturing systems. The installation of conduit and/or raceways shall be installed by Inside Wiremen. On sites where there is no Inside Wireman employed, the Teledata Technician may install raceway or conduit not greater than 10 feet. Fire alarm work is excluded on all new construction sites or wherever the fire alarm system is installed in conduit. All HVAC control work.
ELEV0010-001 01/01/2022
Rates Fringes
ELEVATOR MECHANIC................$ 50.27 36.885+a+b
a. PAID HOLIDAYS: New Year's Day, Memorial Day, Independence Day, Labor Day, Veterans' Day, Thanksgiving Day, Christmas Day and the Friday after Thanksgiving.
b. VACATIONS: Employer contributes 8% of basic hourly rate for 5 years or more of service; 6% of basic hourly rate for 6 months to 5 years of service as vacation pay credit.
IRON0005-005 06/01/2021
Rates Fringes
IRONWORKER, STRUCTURAL AND
ORNAMENTAL.......................$ 33.90 24.19
IRON0005-012 05/01/2021
Rates Fringes
IRONWORKER, REINFORCING..........$ 29.20 22.83
LABO0011-009 06/01/2021
Rates Fringes
LABORER: Skilled................$ 26.60 8.87
FOOTNOTE: Potmen, power tool operator, small machine operator, signalmen, laser beam operator, waterproofer (excluding roofing), open caisson, test pit, underpinning, pier hole and ditches, laggers and all work associated with lagging that is not expressly stated, strippers, operator of hand derricks, vibrator operators, pipe layers, or tile layers, operators of jackhammers, paving breakers, spaders or any machine that does the same general type of work, carpenter tenders, scaffold builders, operators of towmasters, scootcretes, buggymobiles and other machines of similar character, operators of tampers and rammers and other machines that do the same general type of work, whether powered by air, electric or gasoline, builders of trestle scaffolds over one tier high and sand blasters, power and chain saw operators used in clearing, installers of well points, wagon drill operators, acetylene burners and licensed powdermen, stake jumper,demolition.
MARB0002-004 05/02/2021
Rates Fringes
MARBLE/STONE MASON...............$ 40.81 19.43
INCLUDING pointing, caulking and cleaning of All types of masonry, brick, stone and cement EXCEPT pointing, caulking, cleaning of existing masonry, brick, stone and cement (restoration work)
MARB0003-006 05/02/2021
Rates Fringes
TERRAZZO WORKER/SETTER...........$ 31.18 12.60
MARB0003-007 05/02/2021
Rates Fringes
TERRAZZO FINISHER................$ 25.81 11.55
MARB0003-008 05/02/2021
Rates Fringes
TILE SETTER......................$ 31.18 12.60
MARB0003-009 05/02/2021
Rates Fringes
TILE FINISHER....................$ 25.81 11.55
PAIN0051-014 06/01/2021
Rates Fringes
GLAZIER
Glazing Contracts $2 million and under...........$ 29.02 12.80 Glazing Contracts over $2 million.....................$ 33.26 12.80
PAIN0051-015 06/01/2021
Rates Fringes
PAINTER
Brush, Roller, Spray and Drywall Finisher............$ 25.50 11.27
PLAS0891-005 07/01/2021
Rates Fringes
PLASTERER........................$ 30.53 7.93
PLAS0891-006 02/01/2020
Rates Fringes
CEMENT MASON/CONCRETE FINISHER...$ 28.82 11.68
PLAS0891-007 08/01/2016
Rates Fringes
FIREPROOFER
Handler.....................$ 16.50 4.89 Mixer/Pump..................$ 18.50 4.89 Sprayer.....................$ 23.00 4.89
Spraying of all Fireproofing materials. Hand application of Fireproofing materials. This includes wet or dry, hard or soft. Intumescent fireproofing and refraction work, including, but not limited to, all steel beams, columns, metal decks, vessels, floors, roofs, where ever fireproofing is required. Plus any installation of thermal and acoustical insulation. All that encompasses setting up for Fireproofing, and taken down. Removal of fireproofing materials and protection. Mixing of all materials either by hand or machine following manufactures standards.
PLUM0005-010 08/01/2021
Rates Fringes
PLUMBER..........................$ 45.92 20.35+a
a. PAID HOLIDAYS: Labor Day, Veterans' Day, Thanksgiving Day and the day after Thanksgiving, Christmas Day, New Year's Day, Martin Luther King's Birthday, Memorial Day and the Fourth of July.
PLUM0602-008 08/01/2021
Rates Fringes
PIPEFITTER, Includes HVAC Pipe Installation................$ 45.39 23.12+a
a. PAID HOLIDAYS: New Year's Day, Martin Luther King's Birthday, Memorial Day, Independence Day, Labor Day, Veterans' Day, Thanksgiving Day and the day after Thanksgiving and Christmas Day.
ROOF0030-016 07/01/2021
Rates Fringes
ROOFER...........................$ 31.26 14.56
SFDC0669-002 01/01/2022
Rates Fringes
SPRINKLER FITTER (Fire Sprinklers)......................$ 36.95 24.66
SHEE0100-015 11/01/2021
Rates Fringes
SHEET METAL WORKER (Including HVAC Duct Installation)..........$ 44.37 21.33+a
a. PAID HOLIDAYS: New Year's Day, Martin Luther King's Birthday, Memorial Day, Independence Day, Labor Day, Veterans Day, Thanksgiving Day and Christmas Day
* SUDC2009-003 05/19/2009
Rates Fringes
LABORER: Common or General......$ 13.04 ** 2.80
LABORER: Mason Tender - Cement/Concrete..................$ 15.40 2.85
LABORER: Mason Tender for pointing, caulking, cleaning of existing masonry, brick, stone and cement structures (restoration work); excludes pointing, caulking and cleaning of new or replacement masonry, brick, stone and cement.................$ 11.67 **
POINTER, CAULKER, CLEANER,
Includes pointing, caulking, cleaning of existing masonry, brick, stone and cement structures (restoration work); excludes pointing, caulking, cleaning of new or replacement masonry, brick, stone or cement...........................$ 18.88
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
** Workers in this classification may be entitled to a higher minimum wage under Executive Order 14026 ($15.00) or 13658 ($11.25). Please see the Note at the top of the wage determination for more information.
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at https://www.dol.gov/agencies/whd/government-contracts.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of ""identifiers"" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).
Union Rate Identifiers
A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than ""SU"" or ""UAVG"" denotes that the union classification and rate were prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.
Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.
Survey Rate Identifiers
Classifications listed under the ""SU"" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.
Survey wage rates are not updated and remain in effect until a new survey is conducted.
Union Average Rate Identifiers
Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.
A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour National Office because National Office has responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION
(End of Summary of Changes)