JADOC II Drawings - Amendment 1 - 03.02.22.pdf

PDF 4 MB Posted

Attached to
P-5001 DBB, JOINT AIR DEFENSE OPERATIONS PHASE II, JOINT BASE ANACOSTIA-BOLLING, WASHINGTON, DC
Solicitation number
N4008021R3502
Issued by

About this file

This solicitation is for a construction project to complete the second phase of the Joint Air Defense Operations Center permanent facility. The project scope includes constructing a two-story facility with concrete foundation and structural steel frame, along with site improvements, security features, and communications infrastructure. Special construction requirements apply for controlled intelligence space and architectural finishes. The facility must comply with Department of Defense antiterrorism standards. The construction is located at Joint Base Anacostia-Bolling in Washington, DC. The solicitation is available through the Navy Electronic Commerce Online website.

View the file

Other files

File Type Posted
AMENDMENT0010JADOCPHASEII.pdf PDF
P5001JADOCPriceScheduleUpdatedAPRIL12.pdf PDF
AMENDMENT0008JADOCPHASEII.pdf PDF
AMENDMENT0009JADOCPHASEII.pdf PDF
AMENDMENT0007JADOCPHASEII.pdf PDF
AMENDMENT0007JADOCPHASEII.pdf PDF
P5001JADOCPriceSchedule-March312022.pdf PDF
SK004.pdf PDF
SK005.pdf PDF
P5001 JADOC Price Schedule - Updated.pdf PDF
amendment0006JADOC.pdf PDF
JADOC II Drawings - Amendment 1 - 03.02.22.pdf PDF
RFI 105 - 12 Stairwell.JPG JPG image
RFI 105 - 3 Exterior DOOR B Closeup.JPG JPG image
RFI 104 - ELECTRICAL ROOM 125 LOCATION OF SWITCHBOARD 20220225.pdf PDF
JADOC II Amendment 1 - 23 09 13 - INSTR... CONTROL DEVICES FOR HVAC 03-03-22.pdf PDF
RFI 105 - 8 Interior Room 2 B.JPG JPG image
RFI 105 - 3 Exterior DOOR B Closeup (2).JPG JPG image
RFI 105 - 11 Interior Room C.JPG JPG image
RFI 104 - 119 COMM AND DATA APPROXIMATES 20220225.pdf PDF
AMENDMENT0005JADOCPHASEII.pdf PDF
RFI 105 - 10 Interior Room B.JPG JPG image
RFI - Exterior and Interior Views 20220224 - Photos 1.pdf PDF
RFI 105 - 6 Interior Room - 223 No Names Inserted 2.JPG JPG image
P-5001 CSP Excerpts.pdf PDF
JADOC II - RFI 32 - Dumpster Enclosure Detail - 02.09.2022.pdf PDF
P-5001 CSP Excerpts.pdf PDF
AMENDMENT0004 JADOC PHASE II.pdf PDF
Site Visit Attendee Log.pdf PDF
AMENDMENT0003JADOC.pdf PDF
AMENDMENT0002P5001JADOC.pdf PDF
AMENDMENT0001JADOCPHASEII.pdf PDF
DWG_1673850DWG2OF4.pdf PDF
DWG_1673850DWG3OF4.pdf PDF
DWG_1673850DWG1OF4.pdf PDF
DWG_1673850DWG4OF4.pdf PDF
JADOC Visitor Request Form_Nov.2021.pdf PDF
Site Visit New Pass Registration.xlsx XLSX spreadsheet
ATTACHMENT A - CONSTRUCTION AND DESIGN EXPERIENCE PROJECT DATA SHEET.docx DOCX document
SF1442 - N4008021R3502.pdf PDF
Specifications 2.pdf PDF
ATTACHMENT B - Past Performance Questionnaire.doc DOC document
ATTACHMENT C-Safety Data Sheet.docx DOCX document
ATTACHMENT F - Small Business Subcontracting Plan Template.doc DOC document
ATTACHMENT G - RFI Form.docx DOCX document
Site Visit Excel file for information.xlsx XLSX spreadsheet
ATTACHMENT H- PRICE SCHEDULE.docx DOCX document
Specifications 1.pdf PDF
ATTACHMENT E - Small Business Participation and Commitment Strategy.docx DOCX document
ATTACHMENT D - SMALL BUSINESS SUBCONTRACTING RECORD.docx DOCX document
Show all 50

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SITE

NAVAL FACILITIES

ENGINEERING COMMAND ®

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

SATISFACTORY TO DATE 10/27/2021

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

OF

EPROJECT NO.:

A

B

C

D

D E P A R T M E N T

O F

TH

E

N A V Y

N A V A L

F A C

IL

IT

IE

S

E N G

IN

E E R

IN

G

C O M M A N D

DRAWFORM REVISION: 10 MARCH 2009

<<PM-DM>> MDR/MLR

BRANCH MANAGER HR

CHIEF ENG/ARCH TC

FIRE PROTECTION JG

1100 NORTH GLEBE ROAD

SUITE 500

ARLINGTON, VIRGINIA 22201

571.218.1000

FAX: 571.218.1600

A

B

C

D

1 2 3 4 5

1 2 3 4 5

FY22 MCON PROJECT P-5001

JOINT AIR DEFENSE OPERATIONS CENTER

(JADOC) PHASE II

FOUO

FOUO

Approved by AFCEC via email

NTS

2/

/2

1:

:5

PM

THE NAVY YARD

WASHINGTON D.C.

JOINT BASE ANACOSTIA BOLLING, WASHINGTON, D.C.

AMENDMENT #1: CHILLER RE-DESIGN

MARCH 2, 2022

NAVAL FACILITIES ENGINEERING COMMAND, WASHINGTON D.C.

CONTRACT NUMBER : N40080-21-R-3502

SOLICITATION NUMBER : N-40080-20-F4-310

G-001

W

AS

H

IN

GT

O N D

.C

13134470

N40080-21-R-3502

1673850

PS SL WS

C O

VE

R

SH

EE

T

JO

IN

T B

AS

E

AN

AC

O

ST

IA

B O

LL

IN

G

P-

JA

D

O C

P H

AS

E

II

N A

VA

L

FA

C

IL

IT

IE

S

EN

G

IN

EE

R

IN

G C

O M

M

AN

D , W

AS

H

IN

G

TO

N

D .C

W

AS

H

IN

GT

O N D

.C

TH

E

N

AV

Y

YA

RD

G -0

-C

O V

ER

S

H

EE

T

N

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

AP

PR

AM

EN

D

M

EN

T #1

: C H

IL

LE

R R

E- D

ES

IG

N

/0 2/

G

J

XXXXX

X

X X

X X

X X

X X

X X

X X

X X

X X

X X X X X X X X X

X X

X X X X X X X

X

X

X X

X X

X

X X X

X X

X X

X X

XXX

X

X

X

PIV

FDC

NO PARKING

C

O

D

C

O

C

B

CB

C

B

D

CO

C

O

CB

CB

C

O

C

O

C

O

C

O

C

O

C

O

C

O

S

S

C

O

S

S

D

R

R

R

R

R

TYP.

TYP.

TYP.

TYP.

TYP.

PRIMARY FACILITY

FFE: 19.50 (CIVIL)

FFE: 0.00 (ARCH)

BMP#1

BMP#2

BM

P#

13 12

8 28

9'

19'

9'

19'

9'

19'

B-4B-5

B-2

B-1

B-10

B-11

B-3

B-6

B-12

B-9

B-15

B-14

B-8

B-13

B-7

A

B

C

D

1 2 3 4 5

A

B

C

D

1100 NORTH GLEBE ROAD

SUITE 500

ARLINGTON, VIRGINIA 22201

571.218.1000

FAX: 571.218.1600

1 2 3 4 5

P

M

N A

V A

L

F

A C

I L I T

I E

S

E

N G

I N

E E

R I N

G

C

O M

M A

N D

W

A S

H I N

G T

O N

D

C

D E

S C

R I P

T I O

N D

A T

E A

P P

R

P -5

- J A

D O

C P

H A

S E

II

M A

R K

A M

E N

D M

E N

T

C

H I L L E

R

R

E D

E S

I G

N

Approved by AFCEC via email

FOUO

FOUO

ASPHALT PAVEMENT

CONCRETE PAVEMENT

CONCRETE SIDEWALK

STORMWATER MANAGEMENT AREA

1. UNDERGROUND FACILITIES, STRUCTURES AND UTILITIES HAVE BEEN

PLOTTED FROM AVAILABLE SURVEYS AND RECORDS; AND

THEREFORE THEIR LOCATIONS MUST BE CONSIDERED APPROXIMATE

ONLY. IT IS POSSIBLE THERE MAY BE OTHERS. THE EXISTENCE OF

WHICH IS PRESENTLY NOT KNOWN OR SHOWN. DETERMINE THEIR

EXISTENCE AND EXACT LOCATION AND TO AVOID DAMAGE THERETO.

1" = 40'A1 SITE PLAN

CS101

N

GENERAL NOTES

LEGEND

GRAPHIC SCALE

KEYED NOTES

0 40' 80'

1" = 40'

20' 120'

ASPHALT PAVEMENT, REFER TO C1/C-501

CONCRETE PAVEMENT, REFER TO B1/C-501

CONCRETE SIDEWALK, REFER TO C2/C-501

ACCESSIBLE CURB RAMP, REFER TO A3/C-502

CONCRETE CURB AND GUTTER, REFER TO C5/C-502

STORMWATER MANAGEMENT AREA, REFER TO CG301

CABLE REINFORCED SINGLE CANTILEVERED SLIDING ORNAMENTAL

GATE, REFER TO C-509

8-FT TALL CABLE REINFORCED ORNAMENTAL FENCE, REFER TO C-505

CONCRETE FILLED BOLLARD, REFER TO B1/C-502

CONCRETE WHEEL STOP, REFER TO A1/C-502

CONCRETE EQUIPMENT PAD WITH RELOCATED DIESEL FUEL TANK

INCLUDING ASSOCIATED CONTROL PANELS AND FUEL CONDITIONING

EQUIPMENT, PAD SIZE TO MATCH EXISTING. TANK MUST BE LOCATED

MINIMUM 25' FEET FROM BUILDING STRUCTURE.

8-FT TALL CABLE REINFORCED ORNAMENTAL FENCE WITH 10-FT WIDE

DOUBLE SWING GATE, REFER TO C-509

DUMPSTER ENCLOSURE ADDITION WITH 10' X 10' CONCRETE APRON

TANDEM CONTROLLED ACCESS TURNSTILE AND ABA ACCESSIBLE SIDE

GATE W/ CANOPY. PROVIDE ABA PUSH PLATE PEDESTAL AND CAC

CARD READER, REFER TO C-504

PEDESTRIAN EGRESS ONLY SINGLE SWING GATE, REFER TO C-509

CONCRETE VALLEY GUTTER, REFER TO D1/C-502

MEET AND MATCH EXISTING CURB AND GUTTER

MEET AND MATCH EXISTING PAVEMENT

CONCRETE FLUSH CURB, REFER TO D3/C-502

CONCRETE CURB TAPER, REFER TO B2/C-501

STOP SIGN AND STOP BAR, REFER TO A1, D2/C-503

"NO PARKING" PAVEMENT MARKINGS, REFER TO D1/C-503

CONCRETE HEADER CURB, REFER TO D2/C-502

TWO - 9'-3" x 5'-3" CONCRETE EQUIPMENT PAD FOR MECHANICAL

EQUIPMENT. REFER TO STRUCTURAL DWGS DETAIL A3/S503

HANDICAP PARKING SYMBOL PAVEMENT MARKING, REFER TO D2/C-503.

ACCESSIBLE PARKING SIGNAGE, REFER TO A3/C-503

SITE LIGHTING FIXTURE, REFER TO ELECTRICAL DWGS

BRICK COLUMN WITH WOOD INFILL FENCE TO MATCH EXISTING

RELOCATED CONEX CONTAINER (3 EA.) COORDINATE FINAL LOCATION

WITH CONTRACTING OFFICER.

RELOCATED FUSION PAD. REFER TO ELECTRICAL DWGS A3/E-401 AND

TELECOMMUNICATIONS DWGS T-100

RETRACTABLE MANUAL BOLLARD, REFER TO A5/C-502

GRAVEL DIAPHRAGM, REFER TO D1/CG501

03/02/2022

G

J

XXXXX

X X X X X X X X

X X

X

X X X X X X X X X X

X

X

X X

X X

X X

X X X X X

X X

X X

X X

X X

X

XXXX

PIV

FDC

NO PARKING

C

O

D

C

O

C

B

CB

C

B

C O

C

O

C

O

C

O

S

S

C

O

S

S

D

R

R

R

R

R

PRIMARY FACILITY

FFE: 19.50 (CIVIL)

FFE: 0.00 (ARCH)

R20.0'

R6.0'

R23.0'

R25.0'

R30.0'

186 187

5' (T

YP

3+00

L

L2

C

5' (T

YP

CL ROAD A

R15.5'

5'

5'

34'

28'

7.7

7.7

5'

5'

5'

7.7'

6'

6'

6'

263 264

6'

12.5'

20'

6'

A

B

C

D

1 2 3 4 5

A

B

C

D

1100 NORTH GLEBE ROAD

SUITE 500

ARLINGTON, VIRGINIA 22201

571.218.1000

FAX: 571.218.1600

1 2 3 4 5

P

M

N A

V A

L

F

A C

I L I T

I E

S

E

N G

I N

E E

R I N

G

C

O M

M A

N D

W

A S

H I N

G T

C

D E

S C

R I P

T I O

N D

A T

E A

P P

R

P -5

- J A

D O

C P

H A

S E

II

M A

R K

A M

E N

D M

E N

T

C

H I L L E

R

R

E D

E S

I G

N

Approved by AFCEC via email

FOUO

FOUO

CS103

0 20' 40'

1" = 20'

10' 60'

1" = 20'A1 LAYOUT PLAN

1. REFER TO SHEET CS104 FOR PINT COORDINATE POINT DATA.

2. SITE DIMENSIONS ARE TO FACE OF CURB, PROPERTY LINE OR FACE

OF BUILDING UNLESS OTHERWISE NOTED. ALL DIMENSIONS AND

RADII TO OR FROM CURB LINES ARE TO FACE OF CURB.

MA

TC

HL

IN

E

RE

FE

R

TO

C

S1

GENERAL NOTES

GRAPHIC SCALE

POINT TABLE

DESC

FACE OF CURB

FACE OF CURB

FACE OF CURB

FACE OF CURB

FACE OF CURB

FACE OF CURB

FACE OF CURB

FACE OF CURB

FACE OF CURB

FACE OF CURB

FACE OF CURB

FACE OF CURB

FACE OF CURB

FACE OF CURB

FACE OF CURB

FACE OF CURB

FACE OF CURB

FACE OF CURB

FACE OF CURB

FACE OF CURB

FACE OF CURB

FACE OF CURB

FACE OF CURB

FACE OF CURB

FACE OF CURB

FACE OF CURB

FACE OF CURB

FACE OF CURB

FACE OF CURB

FACE OF CURB

FACE OF CURB

FACE OF CURB

FACE OF CURB

FACE OF CURB

FACE OF CURB

FACE OF CURB

FACE OF CURB

FACE OF CURB

FACE OF CURB

FACE OF CURB

FACE OF CURB

FACE OF CURB

FACE OF CURB

FACE OF CURB

DUMPSTER ENCLOSURE

FACE OF CURB

FACE OF CURB

FACE OF CURB

FACE OF CURB

FENCE

NORTHING

423680.31

423785.94

423786.67

423790.54

423806.07

423838.19

423843.53

423828.09

423823.11

423701.84

423672.81

423658.38

423486.76

423260.94

423234.74

423213.95

423240.55

423286.71

423310.96

423342.85

423341.03

423350.44

423720.09

423763.78

423768.64

423769.25

423766.24

423750.74

423779.71

423792.84

423799.05

423786.51

423765.51

423768.50

423781.74

423737.18

423722.56

423717.69

423716.96

423719.70

423728.62

423742.16

423748.39

423743.53

423715.72

423701.25

423704.09

423717.28

423706.14

423604.26

EASTING

1305223.42

1305196.46

1305199.32

1305202.33

1305198.50

1305323.88

1305379.89

1305378.97

1305383.52

1305525.92

1305533.33

1305557.65

1305580.78

1305570.43

1305601.68

1305522.42

1305544.71

1305548.44

1305519.65

1305539.52

1305550.35

1305553.59

1305238.04

1305226.88

1305229.77

1305232.66

1305236.54

1305240.50

1305353.86

1305350.50

1305354.84

1305427.99

1305429.25

1305421.74

1305418.36

1305243.96

1305247.70

1305244.81

1305241.94

1305433.71

1305468.58

1305465.12

1305469.61

1305480.13

1305495.97

1305491.88

1305484.14

1305480.77

1305437.17

1305573.54

POINT TABLE

DESC

FENCE

FENCE

FENCE

FENCE

FENCE

FENCE

FENCE

FENCE

DUMPSTER ENCLOSURE

FACE OF CURB

SIDEWALK

SIDEWALK

SIDEWALK

SIDEWALK

SIDEWALK

SIDEWALK

SIDEWALK

SIDEWALK

SIDEWALK

SIDEWALK

SIDEWALK

SIDEWALK

SIDEWALK

SIDEWALK

SIDEWALK

SIDEWALK

SIDEWALK

FACE OF CURB

FACE OF CURB

FACE OF CURB

FACE OF CURB

FACE OF CURB

EDGE OF PAVEMENT

EDGE OF PAVEMENT

EDGE OF PAVEMENT

EDGE OF PAVEMENT

EDGE OF PAVEMENT

EDGE OF PAVEMENT

EDGE OF PAVEMENT

EDGE OF PAVEMENT

SIDEWALK

SIDEWALK

SIDEWALK

EDGE OF PAVEMENT

EDGE OF PAVEMENT

FACE OF CURB

EDGE OF PAVEMENT

FENCE

FACE OF CURB

EDGE OF PAVEMENT

NORTHING

423310.32

423254.88

423269.76

423289.24

423562.42

423635.28

423620.84

423478.08

423662.08

423659.61

423352.68

423433.59

423433.79

423436.03

423408.94

423407.49

423402.65

423400.22

423360.22

423350.84

423591.08

423567.29

423566.06

423570.50

423587.99

423613.27

423603.58

423284.82

423235.72

423262.24

423274.73

423307.72

423647.98

423642.54

423695.49

423598.91

423603.94

423580.99

423587.09

423480.90

423382.65

423378.78

423376.35

423351.80

423347.32

423336.94

423341.74

423337.45

423242.86

423686.86

EASTING

1305517.75

1305531.90

1305335.08

1305302.24

1305196.20

1305482.15

1305506.48

1305542.93

1305572.15

1305562.46

1305337.59

1305295.84

1305288.57

1305297.29

1305302.14

1305304.57

1305305.81

1305304.36

1305314.57

1305330.38

1305267.96

1305271.97

1305267.17

1305260.32

1305255.85

1305375.25

1305377.72

1305415.77

1305428.30

1305467.20

1305516.00

1305507.58

1305565.43

1305544.11

1305475.92

1305560.68

1305554.44

1305559.27

1305562.88

1305557.83

1305489.35

1305474.17

1305472.73

1305479.00

1305461.43

1305412.27

1305431.51

1305510.82

1305456.24

1305442.10

POINT TABLE

DESC

SIDEWALK

SIDEWALK

FENCE

FENCE

EDGE OF PAVEMENT

EDGE OF PAVEMENT

EDGE OF PAVEMENT

EDGE OF PAVEMENT

FACE OF CURB

FACE OF CURB

FACE OF CURB

FACE OF CURB

COLUMN LINE G2.5

COLUMN LINE G6.8

COLUMN LINE J2.5

COLUMN LINE J6.8

FENCE

FENCE

FENCE

FENCE

FENCE

CONCRETE BOLLARD

CONCRETE BOLLARD

CONCRETE BOLLARD

SIDEWALK

SIDEWALK

EQUIP. PAD

EQUIP. PAD

EQUIP. PAD

EQUIP. PAD

NORTHING

423223.81

423244.61

423426.01

423371.62

423683.27

423706.17

423718.71

423365.76

423226.19

423229.23

423242.41

423239.56

423441.06

423419.37

423354.09

423332.41

423410.12

423401.42

423288.66

423227.51

423608.72

423344.56

423348.90

423336.98

423555.62

423573.60

423454.30

423437.29

423410.41

423395.61

EASTING

1305520.24

1305599.57

1305556.22

1305551.38

1305235.05

1305251.89

1305248.68

1305533.68

1305529.34

1305540.91

1305591.13

1305580.34

1305427.63

1305342.69

1305449.83

1305364.89

1305271.38

1305237.30

1305409.11

1305424.72

1305590.98

1305454.70

1305447.00

1305416.90

1305274.95

1305272.43

1305491.66

1305485.68

1305497.47

1305501.25

ALIGNMENT LINE TABLE

L#

L5

L4

L3

L2

L1

LENGTH

255.97'

124.39'

78.81'

228.08'

228.30'

BEARING

S75° 40' 04.85"W

S75° 40' 04.85"W

S14° 19' 55.15"E

N14° 19' 17.47"W

N04° 37' 06.99"E

BEGIN (N,E)

(423764.10,1305478.61)

(423807.10,1305331.82)

(423776.31,1305211.30)

(423477.89,1305570.71)

(423218.86,1305555.00)

END (N,E)

(423700.74,1305230.61)

(423776.31,1305211.30)

(423699.95,1305230.81)

(423698.88,1305514.29)

(423446.41,1305573.38)

ALIGNMENT CURVE TABLE

C#

C2

C1

P.I. (N,E)

(423844.24,1305477.18)

(423462.37,1305574.67)

P.C. (N,E)

(423698.88,1305514.29)

(423446.41,1305573.38)

P.T. (N,E)

(423807.10,1305331.82)

(423477.89,1305570.71)

Δ

090° 00' 37.67"

018° 56' 24.46"

DIRECTION

N59° 19' 36.31"W

N04° 51' 05.24"W

RADIUS

150.00'

96.00'

LENGTH

235.65'

31.73'

A

B

C

D

1 2 3 4 5

A

B

C

D

1100 NORTH GLEBE ROAD

SUITE 500

ARLINGTON, VIRGINIA 22201

571.218.1000

FAX: 571.218.1600

1 2 3 4 5

P

M

N A

V A

L

F

A C

I L I T

I E

S

E

N G

I N

E E

R I N

G

C

O M

M A

N D

W

A S

H I N

G T

C

D E

S C

R I P

T I O

N D

A T

E A

P P

R

P -5

- J A

D O

C P

H A

S E

II

M A

R K

A M

E N

D M

E N

T

C

H I L L E

R

R

E D

E S

I G

N

Approved by AFCEC via email

FOUO

FOUO

CS104

T

T

T

135 4910 7 6 2.18 3.7

8.9 6.8

4.9

4.9

4.4

4.4

3.8

3.8

3.1

3.1

2.5

2.5

2.05

2.05

H

I

G1

W ORKSHOP &

ASSEMBLY

STORAGE

ARMY DUTY DESK

OFFICE

STAIR C

100C

ARMS

MAINTENANCE

AREA

ARMS VAULT

182A

REUSABLE

CONTAINER AREA

SHIPPING &

RECEIVING

176 COMM

ELECTRICAL

STAIR D

100D

MECHANICAL

FIELD

ENGINEERING

OPS & PLANNING

171B

LASER & CAMERA

LAB

171A

ACCESSIBLE

SHOW ER/TOILET

ACCESSIBLE

SHOW ER/TOILET

ACCESSIBLE

SHOW ER/TOILET

194ACCESSIBLE

SHOW ER/TOILET

ACCESSIBLE

SHOW ER/TOILET

STOR.

JAN

C3 M-301

C4 M-302

B1 M-302

A1

M-302 VAV

VAV

VAV

VAV

VAV

VAV

VAV

EF

VAV

A3 M-301

C2 M-301

A4 M-302

UH

UH

3/ 4" ø H

W S/

R

FCU

FCU

1/ 2" ø H

W S/

R

3/ 4" ø C

H W

S 3/

4" ø

C H

W R

1/ 2" ø C

H W

S/ R

1/ 2" ø H

W S/

R

1/2"ø

HWS/R

1/ 2" ø H

W S/

R

1 1/4"ø

HWS

1 1/4"ø

HWR

1/2"ø

HWS/R

A1 M-301

1 1/4"ø

HWR

1 1/4"ø

HWS

1/2"ø

CHWS/R

M-401 A1

1/ 2" ø H

W S/

R

1/ 2" ø H

W S/

R

1/2"ø

HWS/R

C4 M-301

C1 M-302

FC

U

1"ø C

1" ø C

1" ø C

1"ø C

3/4"ø

CHWS/R

1 1/4"ø

HWS/R

1"Ø C UP

1"Ø C

DOWN

1/2"ø

HWS/R

1/ 2" ø H

W S

1/ 2" ø H

W R

1/

4" ø

H W

R

1/

4" ø

H W

S

GUIDE

GUIDE

GUIDE GUIDE

GU

ID

E

GU

ID

E

EXL-1

EXL-3

EXL-4

EXL-2

R

S/ R

L

B3 M-301

FLUSHING

BYPASS

1 1/4"ø

HWS/R

100D

1/

4" ø

H W

S/ R

FLUSHING BYPASS

1 1/4"ø

HWS/R 1

1/ 4" ø H

W S/

R

N

A

B

C

D

1 2 3 4 5

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

SATISFACTORY TO DATE 10/27/2021

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

OF

EPROJECT NO.:

A

B

C

D

D E P A R T M E N T

O F

TH

E

N A V Y

N A V A L

F A C

IL

IT

IE

S

E N G

IN

E E R

IN

G

C O M M A N D

DRAWFORM REVISION: 10 MARCH 2009

<<PM-DM>> MDR/MLR

BRANCH MANAGER RS

CHIEF ENG/ARCH TC

FIRE PROTECTION JG

1100 NORTH GLEBE ROAD

SUITE 500

ARLINGTON, VIRGINIA 22201

571.218.1000

FAX: 571.218.1600

AS NOTED

1 2 3 4 5

FOUO

FOUO

Approved by AFCEC via email

2/

/2

2:

:0

PM

M P

1-

FI

R

S T

FL

O

O R

P

LA

N

M E

C H

A N

IC

A

L P

IP

IN

G

MP101

302209

W

AS

H

IN

GT

O N D

.C

13134678

N40080-21-R-3502

1673850

DT DT JL

FI

RS

T

FL

O O R

P

LA

N

M

EC

H

AN

IC

AL

PI

P

IN

G

JO

IN

T B

AS

E

AN

AC

O

ST

IA

B O

LL

IN

G

P-

JA

D

O C

P H

AS

E

II

N A

VA

L

FA

C

IL

IT

IE

S

EN

G

IN

E

ER

IN

G C

O M

M

AN

D , W

AS

H

IN

G

TO

N

W

AS

H

IN

GT

O N D

.C

TH

E

N

AV

Y

YA

RD

1/8" = 1'-0"A1 FIRST FLOOR PLAN - MECHANICAL PIPING

GENERAL NOTES

GRAPHIC SCALE(S)

KEY PLAN

NEW WORK KEYED NOTES#

GRAPHIC SCALE 1/8" = 1'-0"

24'4' 8' 16'

1. REFER TO SHEET M-001 FOR MECHANICAL SYMBOLS,

ABBREVIATIONS, AND GENERAL NOTES.

1. PROVIDE ENCLOSURE W ITH STEP DOW N TRANSFORMER TO

POWER VAV BACNET CONTROLLERS AND ASSOCIATED CONTROL

DEVICES. ENCLOSURE MUST BE MOUNTED 9' 4" AFF.

2. BAS PANEL ASSOCIATED WITH FCU-11.

3. INSTALL RELOCATED CONDENSING UNIT ON 4" TO 6" TALL

SUPPORTS WITH VIBRATION ISOLATION PER MANUFACTURERS

INSTALLATION INSTRUCTIONS.

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

AP

PR

AM

EN

D

M

EN

T #1

C

H

IL

LE

R

R E-

D

ES

IG

N

/0

2/

2.05

Level 1 0' - 0"

Level 2 13' - 4"

ROOF

27' - 4"

2.05 12.05

C1 M-301

C2 M-301

A4 M-302

BT

AHU

P

P

3"ø

CHWS

3"ø

CHWR

P

16x28 RA x1

R

A

P

BAS PANEL

BAS PANEL

3" ø

C H

W R

3" ø

H W

R

CPF

1/

2" ø

H W

S

3/4"ø

HWS

2" ø

H W

S

2" ø

H W

S

3/4"ø

HWS

2"ø

HWS

2"ø

HWS

1 1/2"ø

HWR

CPF

3/ 4" ø C

H W

S

3/ 4" ø C

H W

R

I

Level 2 13' - 4"

ROOF

27' - 4"

I

Service Hatch

Hoist Needed

C2 M-302

A1 M-301

34x24 RA24x20 SA

6ø OA 6ø OA

DOAS

2"ø

CHWS

1 1/2"ø

HWS

2"ø

CHWR

32x24 OA 1 1/2"ø

HWR

Level 1 0' - 0"

Level 2 13' - 4"

A1 M-301

P

3"ø

HWR

3"ø

CHWS

3"ø CHWR 3"ø

HWR

1/

4" N

G

3" ø

H W

R

6.86.8

Level 1 0' - 0"

6.86.86.8

14x10 EA

10x8 SA

8x10 EA

2"

DCW

3/4"

DHWR

1"

DHW

ACCESSIBLE

SHOW ER/TOILET

4" FSP

FD

II

Level 1 0' - 0"

Level 2 13' - 4"

II

14/12 EA

12ø SA

10/8 OA

1 1/4"ø

HWR

1 1/4"ø

HWS

6x6 OA

STORAGE

CABLE TRAY

4" FSP

1 1/4"

NG

3"

DCW

GG

Level 1 0' - 0"

Level 2 13' - 4"

GG

14/12 SA

12ø SA

12ø OA

16x14 RA

1 1/4"ø

HWR

1 1/4"ø

HWS

14/10 EA

4" FSP

CABLE TRAY

II

Level 1 0' - 0"

Level 2 13' - 4"

III

C1 M-302

14/12 EA

1 1/4"ø HWR 1 1/4"ø

HWS 12/10 OA

16/10 SA

3"

DCW

1 1/4"

NG

CABEL TRAY

4" FSP

2.052.052.052.052.05

B1 M-302

28x16 RA

14/10 EA

10x12 SA x1

S

A

3/ 4" C A

10x8 SA

VAV

CABLE TRAY

4" FSP

26/16 SA

III

A1 M-301

2 1/2"ø

HWR

2 1/2"ø

CHWS/R

3" ø

H W

R

3" ø

H W

R

3" ø

C H

W R

3" ø

C H

W S

8' - 6"

A

B

C

D

1 2 3 4 5

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

SATISFACTORY TO DATE 10/27/2021

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

OF

EPROJECT NO.:

A

B

C

D

D E P A R T M E N T

O F

TH

E

N A V Y

N A V A L

F A C

IL

IT

IE

S

E N G

IN

E E R

IN

G

C O M M A N D

DRAWFORM REVISION: 10 MARCH 2009

<<PM-DM>> MDR/MLR

BRANCH MANAGER RS

CHIEF ENG/ARCH TC

FIRE PROTECTION JG

1100 NORTH GLEBE ROAD

SUITE 500

ARLINGTON, VIRGINIA 22201

571.218.1000

FAX: 571.218.1600

AS NOTED

1 2 3 4 5

FOUO

FOUO

Approved by AFCEC via email

2/

/2

2:

:0

PM

M -3

-M

EC

H

A N

IC

A

L B

U

IL

D

IN

G S

EC

TI

O N

M-301 302211

W

AS

H

IN

GT

O N D

.C

13134680

N40080-21-R-3502

1673850

DT DT JL

M

EC

H

AN

IC

AL

B

U

IL

DI

N G

SE

C

TI

O N

JO

IN

T B

AS

E

AN

AC

O

ST

IA

B O

LL

IN

G

P-

JA

D

O C

P H

AS

E

II

N A

VA

L

FA

C

IL

IT

IE

S

EN

G

IN

E

ER

IN

G C

O M

M

AN

D , W

AS

H

IN

G

TO

N

W

AS

H

IN

GT

O N D

.C

TH

E

N

AV

Y

YA

RD

1/4" = 1'-0"A1 MECHANICAL ROOM SECTION

1/4" = 1'-0"C1 MECHANICAL ROOM SECTION - SECOND FLOOR DUCT MAIN PENETRATIONS

1/4" = 1'-0"C2 FIRST FLOOR MECHANICAL ROOM W ALL - EAST

1/4" = 1'-0"A3 FIRST FLOOR W EST CORRIDOR AND EXHAUST PENETRATION

1/4" = 1'-0"B4 FIRST FLOOR SOUTH STORAGE ROOM

1/4" = 1'-0"C3 FIRST FLOOR NORTH STORAGE ROOM

1/4" = 1'-0"C4 DUCT CLEARANCES SE CORNER STORAGE

GRAPHIC SCALE 1/4" = 1'-0"

2' 4' 8' 12'

1/4" = 1'-0"B3 FIRST FLOOR W ORKSHOP ASSEMBLY VAV DUCT

1/4" = 1'-0"A2 EXTERIOR PIPING TO CHILLERS

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

AP

PR

AM

EN

D

M

EN

T #1

C

H

IL

LE

R

R E-

D

ES

IG

N

/0

2/

2.05

I

C2 M-301

AHU

A4 M-302

MECHANICAL

CH

AS

3/4"ø

CHWS/R

1 1/4"ø

HWS/R1

1/ 4" ø H

W S/

R

1/

2" ø

H W

S/ R

3"ø

HWR

P

3"ø

HWR3"

ø C

H W

S

P

1BT

2" ø

C H

W S 2" ø H

W S/

R

ET

14/12 EA

A1 M-301

P

SW

16x16 EA UP

16x16 OA UP

1 1/4"ø C

4'x6' SERVICE

HATCH ABOVE

1"Ø C DN

3"ø

CHWR

2"ø

HWS

CPF

1 1/2" HWR UP

1 1/4" C TO

NEAREST FD

1 1/2" HWS UP

28x16 RA 22x20 OA

20x14 OA UP

2" CHWS/R UP 2" HWS/R UP

HOT WATER SYSTEM

BYPASS WITH VALVE

1/ 2" ø H

W S/

R

1/ 2" ø H

W R

1 1/4"ø

HWR

1 1/4"ø

HWS/R

/1

E

A

CHILLED WATER SYSTEM

BYPASS WITH VALVE

UH

1"Ø C UP

1/

2" ø

H W

S

1/

2" ø

H W

R

FLOW METER

FL

OW

M

ET

ER

2" ø

C H

W R

2"ø

HWR

T

CH

A2 M-301

1/

2" ø

C H

W S/

R

3"ø

HWR

1/

2" ø

C H

W S/

R

2 1/2"ø

HWR

2 1/2"ø

HWR

1/

2" ø

C H

W S/

R

3"ø

HWR

3"ø

CHWS/R

M

M M M

MM

FL

OW

M

ET

ER

12.05

I

C1 M-301

A4 M-302

P

P

AHU

ET

SF

32x24 OA

16x16

24x24 EA

34x24 RA 4ø

24x20 SA

C2 M-302

4ø

4ø4ø

AFMS

8ø O

A x7

O

A

24x24 EA UP

16X16

EA DN

16/20 OA DN

32x24 OA UP

B

B

4" INLET

4'X6' SERVICE

HATCH

22x22 RA

2"ø

CHWS/R

1 1/2"ø

HWS

AS

2 A1

M-301

16x16

4" EXHAUST 6

1"ø C

1 1/4"ø C

CPF

2" HWS DN

16x16 DN

M

TS

HSTS

N

A

B

C

D

1 2 3 4 5

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

SATISFACTORY TO DATE 10/27/2021

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

OF

EPROJECT NO.:

A

B

C

D

D E P A R T M E N T

O F

TH

E

N A V Y

N A V A L

F A C

IL

IT

IE

S

E N G

IN

E E R

IN

G

C O M M A N D

DRAWFORM REVISION: 10 MARCH 2009

<<PM-DM>> MDR/MLR

BRANCH MANAGER RS

CHIEF ENG/ARCH TC

FIRE PROTECTION JG

1100 NORTH GLEBE ROAD

SUITE 500

ARLINGTON, VIRGINIA 22201

571.218.1000

FAX: 571.218.1600

AS NOTED

1 2 3 4 5

FOUO

FOUO

Approved by AFCEC via email

2/

/2

2:

:1

PM

M -4

-E

N

LA

R G

E D

M

EC

H A

N

IC

AL

R

O O

M P

LA

N

M-401 302213

W

AS

H

IN

GT

O N D

.C

13134682

N40080-21-R-3502

1673850

DT DT JL

EN

LA

R

GE

D M

EC

H

AN

IC

AL

RO

O M

PL

AN

JO

IN

T B

AS

E

AN

AC

O

ST

IA

B O

LL

IN

G

P-

JA

D

O C

P H

AS

E

II

N A

VA

L

FA

C

IL

IT

IE

S

EN

G

IN

E

ER

IN

G C

O M

M

AN

D , W

AS

H

IN

G

TO

N

W

AS

H

IN

GT

O N D

.C

TH

E

N

AV

Y

YA

RD

1/4" = 1'-0"A1 FIRST FLOOR MECHANICAL ROOM

1/4" = 1'-0"C1 SECOND FLOOR MECHANICAL ROOM

GENERAL NOTES

GRAPHIC SCALE(S)

KEYED NOTES#

GRAPHIC SCALE 1/4" = 1'-0"

2' 4' 8' 12'

1. PUMPS, EXPANSION TANK AND AIR SEPARATOR ARE BELOW THE

STAIRS. PUMPS ARE STACKED ONE ABOVE THE OTHER AGAINST

THE WALL.

2. BAS PANEL ASSOCIATED WITH AHU-1.

3. BAS NETWORK PANEL.

4. BAS PANEL ASSOCIATED WITH HEATING HOT WATER SYSTEM.

5. PROVIDE MANUALLY OPERATED REMOTE SHUTDOWN SW ITCH AS

SHOWN ON THE FLOOR PLAN AND MARKED FOR EASY

IDENTIFICATION. CONSIDERATION MUST BE GIVEN TO THE TYPE

AND LOCATION OF THE SWITCH IN ORDER TO SAFEGUARD

AGAINST TAMPERING. ACTIVATION OF THE EMERGENCY SHUT

DOW N SWITCH MUST IMMEDIATELY SHUT OFF FUEL SUPPLY TO

EACH BOILER. THE BAS MUST MONITOR STATUS OF THE SWITCH

AND STOP HOT WATER PUMP(S) WHEN EMERGENCY SWITCH IS

ACTIVATED.

6. PROVIDE REMOVABLE BIRD SCREENS ON BOILER INLET AIR AND

FLUE TERMINATIONS. TERMINATE INLET AIR THROUGH A DOWN

TURNED ELBOW.

7. PROVIDE AIRFLOW MEASURING STATION IN VERTICAL 16x16

EXHAUST DUCT. SEE M-302/A4. INTERLOCK WITH MOTORIZED

RELIEF DAMPER. SEE M-706 & M-707 FOR SEQUENCE.

8. PROVIDE BOILER BYPASS W ITH VALVE BETWEEN RETURN AND

SUPPLY PIPING. SEE M-801 FOR MORE INFORMATION.

9. PROVIDE SELF-REGULATING HEAT TRACE AND CONTROLS FOR

OUTDOOR PIPING. INSTALL PER MANUFACTURER

RECOMMENDATIONS.

10. OPEN END DUCT WITH REMOVABLE BIRD SCREEN AT DISCHARGE

11. BAS PANEL ASSOCIATED WITH CHILLED W ATER SYSTEM.

12. BAS PANEL ASSOCIATED WITH AHU-2.

13. PROVIDE HEAT TRACE CONTROL PANEL WITH A WEATHER RATED

ENCLOSURE. MOUNT ON UNISTRUT STAND IN FRONT OF FENCE.

14. PROVIDE ENCLOSURE WITH STEP DOWN TRANSFORMER TO

POWER CHILLER CONTROL VALVES, FLOW METERS, ETC. MOUNT

ON UNISTRUT STAND AS SHOWN ON E-401/A3.

15. PROVIDE INSERTION TYPE ELECTROMAGNETIC FLOW METER.

INSTALL AND CONNECT FLOW METER IN ACCORDANCE WITH

REQUIREMENTS AND INSTRUCTIONS PROVIDED BY FLOW METER

MANUFACTURER.

16. PROVIDE IN-LINE TYPE ELECTROMAGNETIC FLOW METER. INSTALL

AND CONNECT FLOW METER IN ACCORDANCE W ITH

REQUIREMENTS AND INSTRUCTIONS PROVIDED BY FLOW METER

MANUFACTURER.

17. MOUNT PIPES 8' ABOVE GRADE

1. REFER TO SHEET M-001 FOR MECHANICAL SYMBOLS, ABBREVIATIONS,

AND GENERAL NOTES.

N

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

AP

PR

AM

EN

D

M

EN

T #1

C

H

IL

LE

R

R E-

D

ES

IG

N

/0

2/

VIBRATION ISOLATOR

(TYP)

BALL VALVE

CHECK VALVE

PRESSURE GAGE USE GAGE

TAPPINGS WHERE AVAILABLE

REDUCER (TYP)

STRAINER

BALL VALVE

UNION (TYP)

THERMOMETER

PRESSURE AND THERMOMETER

PORT (TYP)

SUPPORTS TO STRUCTURE

ABOVE (TYPICAL)

AIR SEPARATOR

TO PUMP

TO FLOOR DRAIN

ANTI-THERMO

SYPHON LOOP

12" MINIMUM

DROP

TO FLOOR DRAIN

GATE VALVE (TYP)

PRESSURE REDUCING VALVE

THROTTLING VALVE

SIZE AS SHOWN

ON PLANS

CHECK VALVE

STRAINER

1"

AIR VENT

ASME RELIEF VALVE. PIPE

TO FLOOR DRAIN FULL

SIZE OF RELIEF OPENING

EXPANSION TANK

FIN FLOOR

AIR VENT

PRESSURE GAGE W/COCK

1" DOMESTIC WATER

SEE PLUMBING

3/4"

EQUIPMENT PAD

HANGER ROD

LOCKING NUT

SUPPORT NUT

INSULATION

PIPE

HEAVY DUTY

CLEVIS HANGER

14 GAUGE SHIELD 18"

LONG TO PROTECT

INSULATION

TO STRUCTURE

M

1/2" MANUAL AIR VENT

CONTROL VALVE

CONCENTRIC REDUCER

UNION, TYP BALL VALVE

STRAINER

3/4" HOSE END

DRAIN VALVE

USE COIL VENT & DRAIN TAPPINGS WHERE AVAILABLE.

DELETE REDUCERS AT COILS IF COIL CONNECTION IS SAME SIZE AS PIPE.

INSTALL PRESSURE-TEMPERATURE TEST PLUG.

INSTALL CALIBRATED BALANCING VALVE AND SHUT-OFF VALVE WITH FLOW

READOUT (GPM) CAPABILITIES.

NOTES:

1. COIL MUST BE PIPED FOR COUNTERFLOW OPERATION.

2. COILS MUST BE PIPED AND PITCHED TO DRAIN, AND TO ALLOW EASY

REMOVAL.

1 3

BALANCING VALVE

ISOLATION VALVE

EXISTING CONCRETE SLAB

1/2"ø ANCHOR

BOLTS (TYP OF 4)

2" X 2" X 1/4"

ANGLE TYP.

SERVICE PIPE

(2) 1/2"

BOLTS

TYPICAL

ANCHOR

BOLTS (TYP

OF 4)

SHOP WELD

(NO WELDING

INSIDE BUILDING IS

ALLOWED)

3" X 3" X 1/4"

ANGLE TYP.

3" X 3" X 1/4"

ANGLE

SHOP

WELD

(2) 1/2" BOLTS

TYPICAL

PIPE CLAMP

MINIMUM 18 GA STEEL DUCT SLEEVE

SPOT WELD

SPOT WELD IN

FIELD

TO SLEEVE

SECURE SIDE

OF WALL OR

ROOF

NON SECURE OR

LESS SECURE

SIDE OF WALL

OR ROOF

MINIMUM 1/2"∅ COLD ROLL STEEL

BAR AT 6"

ON CENTERS WELDED TO

1-1/2"x1-1/2"x1/8" FLAT STOCK BAR

NO MORE THAN 3/8" IN ANY

DIRECTION

SPOT WELD AT 6" FREQUENCY.

1-1/2"x1/8"

FLAT STOCK

DIELECTRIC

BREAK /

FLEXIBLE

CONNECTION

AIR COOLED

CHILLER

FLEXIBLE CONNECTOR.

1/2" MANUAL AIR VENT.

PRESSURE GAUGE.

THERMOMETER.

PRESSURE AND TEMPERATURE PORT.

1" DRAIN VALVE WITH HOSE END CONNECTION AND CAP.

BUTTERFLY ISOLATION VALVE.

STRAINER

CHECK VALVE

FLOW METER. SEE CONTROL DRAWINGS

MOTORIZED ISOLATION VALVE

CHWS

CHWR

HWS

HWR

M M

11 11

AIR COOLED

CONDENSING UNIT

GENERAL NOTES:

1. MOUNT CONDENSING UNIT TO CONCRETE SIDEWALK. SHIM TO LEVEL.

2. ATTACHING AND SECURING OF EQUIPMENT TO SIDEWALK MUST BE IN ACCORDANCE

WITH MANUFACTURER'S INSTALLATION GUIDELINES.

3. PROVIDE NEOPRENE COVERED MOUNTS TO PREVENT CORROSION.

REFRIGERANT PIPING

CONCRETE

SIDEWALK

MOUNTING

ISOLATORS

A

B

C

D

1 2 3 4 5

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

SATISFACTORY TO DATE 10/27/2021

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

OF

EPROJECT NO.:

A

B

C

D

D E P A R T M E N T

O F

T H E

N A V Y

N A V A L

F A C

IL

IT

IE

S

E N G

IN

E E R

IN

G

C O M M A N D

DRAWFORM REVISION: 10 MARCH 2009

<<PM-DM>> MDR/MLR

BRANCH MANAGER RS

CHIEF ENG/ARCH TC

FIRE PROTECTION JG

1100 NORTH GLEBE ROAD

SUITE 500

ARLINGTON, VIRGINIA 22201

571.218.1000

FAX: 571.218.1600

AS NOTED

1 2 3 4 5

FOUO

FOUO

Approved by AFCEC via email

/2

/2

:1

:3

A

M

M -5

M E

C H

A N

IC

A

L D

E T

A

IL

S

M-501 302214

W

AS

H

IN

G

TO

N

D .C

13134683

N40080-21-R-3502

1673850

DT DT JL

M E C H

AN

IC

AL

D E

TA

IL

S

JO

IN

T B

AS

E

AN

AC

O S

TI

A B O

LL

IN

G

P -5

J A

D O

C P

H A

S E

I I

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G C

O M

M A

N D

W

A S

H

IN

G T

O N

W A S H

IN

G

TO

N

D .C

TH

E

N

AV

Y

YA

R D

NTSA4

IN-LINE PUMP DETAIL

NTSC2

EXPANSION TANK/AIR SEPARATOR PIPING

NTSA3

CLEVIS HANGER DETAIL

NTSB1

COIL CONNECTION DETAIL (2-WAY VALVE)

NTSD4

PIPE ANCHOR

NTSB4

MANBAR INSTALLATION DETAIL

NTSA1

AIR COOLED CHILLER CONNECTION

NTSB2

CONDENSING UNIT ON MOUNTING ISOLATORS

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E A

P P

R

A

M E

N D

M E

N T

C

H

IL

L E

R R

E -D

E S

IG

N

/0 /2

DUCT SILENCER SCHEDULE

TAG TYPE

DIMENSIONS

NOTES

RDDS-1,2,3,4,5,6 36

BASIS FOR DESIGN

VIBRO-ACOUSTICS ALL

(NOTE 1) DUCT

WIDTH, IN

MINIMUM DYNAMIC INSERTION LOSS, dB (NOTE 5)

AIRFLOW RANGE,

CFM

50-270

NOTES :

1. TYPE R - RECTANGULAR D - DISSIPATIVE

2. VELCOCITY SHOWN IS + (FORWARD FLOW ) OR - (REVERSE FLOW) AS DEFINED BY ASTM E477-13.

3. IDEAL PRESSURE DROP AS DETERMINED PER ASTM E488-13 IN NVLAP-ACCREDITED ACOUSTICAL LABORATORY.

4. PRESSURE DROP PER ASTM E477-13 PLUS SYSTEM EFFECTS FOR NEARBY DUCT ELEMENTS.

5. MINIMUM DYNAMIC INSERTION LOSS DETERMINED PER ASTM E477-13 IN NVLAP-ACCREDITED ACOUSTICAL LABORATORY.

6. MANUFACTURER MUST PROVIDE SOUND TESTING DATA TO CONFIRM COMPLIANCE W ITH THE SCHEDULE.

MODEL

RD-ULV-26624

OCTAVE BAND CENTER FREQUENCY, HZ

DUCT

HEIGHT, IN LENGTH, IN

IDEAL DP,

IN. WG.

(NOTE 3)

.05

63 125 250 500 1000 2000 4000 8000

8 12 18 22 29 24 16 13

CONDENSATE PUMP SCHEDULE

TAG

DIMENSIONS (IN)

NOTES

CDP-1 7

BASIS FOR DESIGN

LITTLE GIANT ALL

LENGTH

FLOW (GPH) @ HEAT (FT)

FLOW (GPH)

48-80

NOTES :

1. PROVIDE 0.5 GALLON MINIMUM RECEIVER TANK.

MODEL

VCMA

WIDTH HEIGHT

HEAD (FT)

1-10

1' 5' 10' 20'

80 70 48 0

CDP-2 7 LITTLE GIANT ALL48-80 VCMA511 1-10 80 70 48 0

ELECTRICAL

HP

1/30

1/30

V

HZ

P

FLA

1.5

1.5

A

B

C

D

1 2 3 4 5

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

SATISFACTORY TO DATE 10/27/2021

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

OF

EPROJECT NO.:

A

B

C

D

D E P A R T M E N T

O F

TH

E

N A V Y

N A V A L

F A C

IL

IT

IE

S

E N G

IN

E E R

IN

G

C O M M A N D

DRAWFORM REVISION: 10 MARCH 2009

<<PM-DM>> MDR/MLR

BRANCH MANAGER RS

CHIEF ENG/ARCH TC

FIRE PROTECTION JG

1100 NORTH GLEBE ROAD

SUITE 500

ARLINGTON, VIRGINIA 22201

571.218.1000

FAX: 571.218.1600

AS NOTED

1 2 3 4 5

FOUO

FOUO

Approved by AFCEC via email

2/

/2

2:

:1

PM

M -6

-M

EC

H

A N

IC

A

L S

C H

E D

U

LE

S

M-601 302217

W

AS

H

IN

GT

O N D

.C

13134686

N40080-21-R-3502

1673850

DT DT JL

M

EC

H

AN

IC

AL

S

C H

ED

U

LE

S

JO

IN

T B

AS

E

AN

AC

O

ST

IA

B O

LL

IN

G

P-

JA

D

O C

P H

AS

E

II

N A

VA

L

FA

C

IL

IT

IE

S

EN

G

IN

E

ER

IN

G C

O M

M

AN

D , W

AS

H

IN

G

TO

N

W

AS

H

IN

GT

O N D

.C

TH

E

N

AV

Y

YA

RD

PUMP SCHEDULE

MARK SERVING LOCATION GPM MIN. FLOW

GPM

PUMP HEAD (FT

H2O)

DUTY POINT

EFF (%) RPM TYPE SUCT SIZE DISCH SIZE IMPELLER

DIA. HP BHP

ELECTRICAL DATA BASIS OF DESIGN WEIGHT

(LBS) NOTESV PH MANUFACTURER MODEL

P-1 CHILLED WATER MECH. ROOM 130 48.0 60 76.7 2998 CLOSE COUPLED

IN-LINE

2" 2" 4 7/8" 5.0 2.540 460 3 Bell & Gossett E-90 67 ALL

P-2 CHILLED WATER MECH. ROOM 130 48.0 60 76.7 2998 CLOSE COUPLED

IN-LINE

2" 2" 4 7/8" 5.0 2.540 460 3 Bell & Gossett E-90 67 ALL

P-3 HEATING HOT WATER MECH. ROOM 40 10.0 50 62 3390 CLOSE COUPLED

IN-LINE

1 1/4" 1 1/4" 3 3/4" 1.5 0.800 460 3 Bell & Gossett E-90 63 ALL

P-4 HEATING HOT WATER MECH. ROOM 40 10.0 50 62 3390 CLOSE COUPLED

IN-LINE

1 1/4" 1 1/4" 3 3/4" 1.5 0.800 460 3 Bell & Gossett E-90 63 ALL

P-5 HEAT RECOVERY CHILLER MECH. ROOM 80 40.0 30 71.3 1565 CLOSE COUPLED

IN-LINE

2" 2" 6 1/4" 1.5 0.836 460 3 Bell & Gossett E-90 100 ALL

BOILER SCHEDULE

MARK LOCATION SERVING

NET

CAPACITY

(MBH)

DESIGN

FLOW (GPM) MIN FLOW

(GPM)

EWT °F LWT °F MAX PD (FT) DESIGN

PRESS. (PSI) INPUT MBH MIN. PRESS. (IN

WG)

MAX PRESS.

(IN WG)

GAS INLET

(IN)

ELECTRICAL DATA FLU VENT

SIZE (IN)

COMBUSTION AIR

INTAKE SIZE (IN)

DRY WEIGHT

(LBS)

BASIS OF DESIGN

NOTESV PH MOP MANUFACTURER MODEL

B-1 MECH. ROOM BUILDING 380 30 10 100 130 5 50 400 5.0 14 1" 120 1 15.0 4 4 435 LOCHINVAR FTX ALL B-2 MECH. ROOM BUILDING 380 30 10 100 130 5 50 400 5.0 14 1" 120 1 15.0 4 4 435 LOCHINVAR FTX ALL

NOTES:

1. PROVIDE WITH GAS PRESSURE REGULATOR (VENTED TO THE OUTDOORS).

2. 10:1 NATURAL GAS TURNDOWN WITH FM COMPLIANT GAS TRAIN..

3. MINIMUM FLOW 10 GPM.

4. MINIMUM 95% COMBUSTION EFFICIENCY.

5. PROVIDE WITH CONDENSATE NEUTRALIZER KIT.

NOTES:

1. PROVIDE W ITH VFD COMPATIBLE TEFC MOTORS.

2. 125 PSI MAX. WORKING PRESSURE.

3. PROVIDE MECHANICAL SEALS FOR PUMPS.

4. PUMPS MUST BE NON-OVERLOADING.

6. PROVIDE BACNET COMMUNICIATIONS PROTOCOL INTERFACE.

7. HOT WATER SUPPLY TEMPERATURE RANGE = 68 to 180 DEG F.

8. SINGLE POINT POWER CONNECTION.

9. PROVIDE FLOW SWITCH.

10. PROVIDE 13 GALLON OR LESS HEAT EXCHANGER WATER VOLUME.

AIR TERMINAL SCHEDULE

MARK TYPE CFM RANGE NECK SIZE (IN) NOTES

EG-1 EXHAUST GRILLE 0-149 6x6 1,2,4 EG-1 EXHAUST GRILLE 0-249 8x8 1,2,4 EG-1 EXHAUST GRILLE 400-599 12x12 1,2,4 RD-1 SQUARE RETURN DIFFUSER 0-400 10ø 2,6 RD-1 SQUARE RETURN DIFFUSER 405-1600 22x22 2,6 RG-1 RETURN GRILLE 0-249 8x8 1,2,4 RG-1 RETURN GRILLE 250-399 10x10 1,2,4 RG-1 RETURN GRILLE 400-550 12x12 1,2,4 SD-1 SQUARE CEILING DIFFUSER 0-199 6ø 2,4 SD-1 SQUARE CEILING DIFFUSER 200-349 8ø 2,4 SD-1 SQUARE CEILING DIFFUSER 350-499 10ø 2,4 SD-1 SQUARE CEILING DIFFUSER 500-649 12ø 2,4 SG-1 SUPPLY GRILLE 0-149 6x6 1,2,3 SG-1 SUPPLY GRILLE 150-199 8x6 1,2,3 SG-1 SUPPLY GRILLE 200-249 10x6 1,2,3 SG-1 SUPPLY GRILLE 250-300 12x6 1,2,3 SG-2 SUPPLY GRILLE 0-149 6x6 1,2,3,7

AIR COOLED CHILLER SCHEDULE

MARK LOCATION TONS EER

CONDENSER

DATA EVAPORATOR DATA COMPRESSOR DATA ELECTRICAL DATA HEAT RECOVERY BASIS OF DESIGN

EAT (°F) GPM EWT (°F) LWT (°F)

PRESSURE

DROP (FT

WG)

FOULING

FACTOR FLUID

NO. MODEL RLA EACH

CKT.

FAN MOTORS UNIT

INPUT

KW

UNIT

MCA

UNIT

MOCP

FLA PER

FAN V P Hz

GPM

PD (FT

WG) EWT (°F) LWT (°F)

CAPACITY

(MBH) MANUFACTURER

MODELNO. kW

CH-1 CHILLER

YARD

39.27 11.15 95 °F 57.6 59 44 3.1 0.0001 WATER 2 DSH240 33 1 3.35 42.26 78.7 110 5.17 460 3 60 40.0 0.90 100 130 575.8 JETSON ACC-040

CH-2 CHILLER

YARD

39.27 11.15 95 °F 57.6 59 44 3.1 0.0001 WATER 2 DSH240 33 1 3.35 42.26 78.7 110 5.17 460 3 60 40.0 0.90 100 130 575.8 JETSON ACC-040

EXPANSION TANK SCHEDULE

Mark SYSTEM SERVED TANK TYPE

TANK VOLUME

(GAL)

MINIMUM TANK

CHARGE (PSI)

ET-1 CHILLED WATER BLADDER - FULL

ACCEPTANCE

10 15

ET-2 HOT WATER BLADDER - FULL

ACCEPTANCE

53 15

AIR CURTAIN SCHEDULE

MARK NUMBER AREA SERVED DIMENSIONS (W x H) (IN) SOUND (dBA) MOTOR (HP) VOLT/PH/FLA NOTES ACD 1 176 SHIPPING & RECEIVING 96 x 12 68 2 @ 1/2 HP EACH 460V/3PH/2.5A ALL ACD 2 176 SHIPPING & RECEIVING 96 x 12 68 2 @ 1/2 HP EACH 460V/3PH/2.5A ALL

NOTES:

1. PROVIDE W ALL MOUNTING HARDWARE WITH VIBRATION DAMPENING.

2. PROVIDE DOOR SW ITCHES AND CONTROL PANEL AND INTERLOCK WITH AIR CURTAIN FANS.

3. PROVIDE OUTDOOR INSTALLATION WITH MATERIALS SUITABLE FOR DIRECT EXPOSURE TO SUN, RAIN, AND SNOW.

NOTES:

1. PROVIDE OPPOSED BLADE DAMPERS FOR GRILLES.

2. PROVIDE ALUMINUM GRILLES AND DIFFUSERS.

3. PROVIDE 1/2" SPACED DOUBLE DEFLECTION BLADES, INDIVIDUALLY ADJUSTABLE, LONG DIMENSION

BLADES IN FRONT.

4. PROVIDE 1/2" SPACED SINGLE DEFLECTION, INDIVIDUALLY ADJUSTABLE, LONG DIMENSION BLADES.

5. PROVIDE PLAQUE TYPE DIFFUSER WITH 4-WAY THROW PATTERN.

6. PROVIDE PERFORATED FACE RETURN.

7. PROVIDE REMOTE CABLE ADJUSTMENT FOR DAMPERS.

NOTES:

1. PROVIDE A MINIMUM OF 4 STAGES OF COOLING

2. PROVIDE HOT GAS BYPASS TO ENABLE OPERATION DOWN TO 10% CAPACITY. ONLY OPERATE HOT GAS BYPASS WHEN COOLING REQUIREMENT IS BELOW 25% CAPACITY.

3. PROVIDE VARIABLE SPEED ELECTRONICALLY COMMUTATED MOTOR DRIVEN CONDENSER FANS.

4. PROVIDE BACNET COMMUNICIATIONS PROTOCOL INTERFACE

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

AP

PR

AM

EN

D

M

EN

T #1

C

H

IL

LE

R

R E-

D

ES

IG

N

/0

2/

DUCTWORK CONSTRUCTION AND LEAKAGE TESTING SCHEDULE

DUCT SYSTEM

DUCT PRESSURE CLASS

INCHES OF WATER COLUMN

DUCTWORK

DUCT TEST

PRESSURE

(IN WC)

NOTES

ROUND/OVAL RECTANGULAR

SUPPLY

DUCT

RETURN

DUCT

EXHAUST

DUCT

OUTSIDE

AIR DUCT

DUCT

SEAL

CLASS

DUCT

LEAK

CLASS

DUCT

SEAL CLASS

DUCT

LEAK

CLASS

DOAS/VAV AHU

DUCTWORK (UPSTREAM

OF TERMINAL BOXES)

4 A 3 A 6 4.0 1

- A 6 A 12 2.0 1

EXHAUST DUCTS 2 A 3 A 12 2.0 1

NOTES:

1. TEST IN ACCORDANCE WITH UFGS 23 05 93, TESTING, ADJUSTING AND BALANCING FOR HVAC AND THE PROCEDURES IN SMACNA'S "HVAC AIR DUCT LEAKAGE

TEST MANUAL."

- 2 -

2 A 3 A 12 2.0 1- - -

- A 6 A 12 4.0 1- - 4

DOWNSTREAM OF

VAV BOX - A 3 A 6 4.0 14 - -

A

B

C

D

1 2 3 4 5

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

SATISFACTORY TO DATE 10/27/2021

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

OF

EPROJECT NO.:

A

B

C

D

D E P A R T M E N T

O F

TH

E

N A V Y

N A V A L

F A C

IL

IT

IE

S

E N G

IN

E E R

IN

G

C O M M A N D

DRAWFORM REVISION: 10 MARCH 2009

<<PM-DM>> MDR/MLR

BRANCH MANAGER RS

CHIEF ENG/ARCH TC

FIRE PROTECTION JG

1100 NORTH GLEBE ROAD

SUITE 500

ARLINGTON, VIRGINIA 22201

571.218.1000

FAX: 571.218.1600

AS NOTED

1 2 3 4 5

FOUO

FOUO

Approved by AFCEC via email

2/

/2

2:

:1

PM

M -6

-M

EC

H

A N

IC

A

L S

C H

E D

U

LE

S

M-603 302219

W

AS

H

IN

GT

O N D

.C

13134688

N40080-21-R-3502

1673850

DT DT JL

M

EC

H

AN

IC

AL

S

C H

ED

U

LE

S

JO

IN

T B

AS

E

AN

AC

O

ST

IA

B O

LL

IN

G

P-

JA

D

O C

P H

AS

E

II

N A

VA

L

FA

C

IL

IT

IE

S

EN

G

IN

E

ER

IN

G C

O M

M

AN

D , W

AS

H

IN

G

TO

N

W

AS

H

IN

GT

O N D

.C

TH

E

N

AV

Y

YA

RD

UH-3 1/2 1.3 2 HOT WATER 2-WAY 2-POSITION

UH-2 1/2 1.3 2 HOT WATER 2-WAY 2-POSITION

UH-1 1-1/4 2.2 2 HOT WATER 2-WAY 2-POSITION

FCU-11 5/8 1.22 2 HOT WATER 2-WAY MODULATING

FCU-11 5/8 1.8 2 CHILLED WATER 2-WAY MODULATING

FCU-10 5/8 0.6 2 CHILLED WATER 2-WAY MODULATING

FCU-9 5/8 1.8 2 CHILLED WATER 2-WAY MODULATING

FCU-8 5/8 1.8 2 CHILLED WATER 2-WAY MODULATING

FCU-7 5/8 2.9 2 CHILLED WATER 2-WAY MODULATING

FCU-6 5/8 2.9 2 CHILLED WATER 2-WAY MODULATING

FCU-5 5/8 2.4 2 CHILLED WATER 2-WAY MODULATING

FCU-4 5/8 2.4 2 CHILLED WATER 2-WAY MODULATING

FCU-3 5/8 2.4 2 CHILLED WATER 2-WAY MODULATING

FCU-2 5/8 2.4 2 CHILLED WATER 2-WAY MODULATING

FCU-1 5/8 2.4 2 CHILLED WATER 2-WAY MODULATING

VAV-219 1/2 0.60 2 HOT WATER 2-WAY MODULATING

VAV-218 1/2 0.23 2 HOT WATER 2-WAY MODULATING

VAV-217 1/2 0.60 2 HOT WATER 2-WAY MODULATING

VAV-216 1/2 0.42 2 HOT WATER 2-WAY MODULATING

VAV-215 1/2 0.60 2 HOT WATER 2-WAY MODULATING

VAV-214 1/2 0.55 2 HOT WATER 2-WAY MODULATING

VAV-213 1/2 0.25 2 HOT WATER 2-WAY MODULATING

VAV-212 1/2 0.73 2 HOT WATER 2-WAY MODULATING

VAV-211 1/2 0.33 2 HOT WATER 2-WAY MODULATING

VAV-210 1/2 0.33 2 HOT WATER 2-WAY MODULATING

VAV-209 1/2 0.33 2 HOT WATER 2-WAY MODULATING

VAV-208 1/2 0.25 2 HOT WATER 2-WAY MODULATING

VAV-207 1/2 0.72 2 HOT WATER 2-WAY MODULATING

VAV-206 1/2 0.1 2 HOT WATER 2-WAY MODULATING

VAV-205 1/2 0.1 2 HOT WATER 2-WAY MODULATING

VAV-204 1/2 0.4 2 HOT WATER 2-WAY MODULATING

VAV-203 1/2 0.47 2 HOT WATER 2-WAY MODULATING

VAV-202 1/2 0.72 2 HOT WATER 2-WAY MODULATING

VAV-201 1/2 0.73 2 HOT WATER 2-WAY MODULATING

VAV-113 1/2 0.5 2 HOT WATER 2-WAY MODULATING

VAV-108 1/2 0.72 2 HOT WATER 2-WAY MODULATING

VAV-107 1/2 0.72 2 HOT WATER 2-WAY MODULATING

VAV-106 1/2 0.52 2 HOT WATER 2-WAY MODULATING

VAV-105 1/2 0.6 2 HOT WATER 2-WAY MODULATING

VAV-104 1/2 0.73 2 HOT WATER 2-WAY MODULATING

VAV-103 1/2 0.72 2 HOT WATER 2-WAY MODULATING

VAV-102 1/2 0.47 2 HOT WATER 2-WAY MODULATING

VAV-101 1/2 0.6 2 HOT WATER 2-WAY MODULATING

AHU-2 1-1/2 20 4 CHILLED WATER 2-WAY MODULATING

AHU-1 1-1/2 12 4 CHILLED WATER 2-WAY MODULATING

DOAS-1 1-1/2 11 4 HOT WATER 2-WAY MODULATING

DOAS-1 2 44 6 CHILLED WATER 2-WAY MODULATING

DOAS-1 2 22.2 4 HOT WATER 2-WAY MODULATING

CHW SYSTEM BYPASS 2 48 6 CHILLED WATER 2-WAY MODULATING

HHW SYSTEM BYPASS 1 10 4 HOT WATER 2-WAY MODULATING

BOILERS BYPASS VALVE 2 40 1 HOT WATER 2-WAY 2-POSITION

CH-2 2-1/2 57.6 1 HOT WATER 2-WAY MODULATING

CH-2 2-1/2 62.5 1 CHILLED WATER 2-WAY MODULATING

CH-1 2-1/2 57.6 1 HOT WATER 2-WAY MODULATING

CH-1 2-1/2 62.5 1 CHILLED WATER 2-WAY MODULATING

B-2 2 30 1 HOT WATER 2-WAY 2-POSITION

B-1 2 30 1 HOT WATER 2-WAY 2-POSITION

SYSTEM/EQUIPMENT DESIGN

PIPE (IN.)

DESIGN

FLOW (GPM)

MAXIMUM

PRESSURE

DROP (PSI)

SERVICE CONFIGURATION ACTION

CONTROL VALVE SCHEDULE

PIPE EXPANSION LOOP SCHEDULE

LOOP TAG LOCATION SERVICE

PIPE

DIAMETER

IN)

MAX THERMAL EXPANSION

DISTANCE

DISTANCE

MINIMUM EXPANSION LOOP

WIDTH "A" (IN)

MINIMUM EXPANSION LOOP

HEIGHT "B" (IN)

PIPE

MATERIAL

BASIS OF

DESIGN

EXL-1 171 HWS 1.25 4 16.75 20 COPPER METRAFLEX

EXL-2 171 HWR 1.25 1.5 13.5 13.375 COPPER METRAFLEX

EXL-3 175 HWS 1.25 1.5 13.5 13.375 COPPER METRAFLEX

EXL-4 175 HWR 1.25 1.5 13.5 13.375 COPPER METRAFLEX

1. DAMPER PROVIDED WITH THE UNIT.

NOTES:

EF-1 EXHAUST AIR 24 12 OPPOSED CLOSE MODULATING 24 VAC YES

SF-1 EXHAUST AIR 40 72 OPPOSED CLOSE MODULATING 24 VAC YES

SF-1 OUTSIDE AIR 40 72 OPPOSED CLOSE MODULATING 24 VAC YES

AHU-2 RELIEF AIR DAMPER 22 22 OPPOSED CLOSE MODULATING 24 VAC YES

DOAS-1 HEAT EXCHANGER OUTSIDE AIR BYPASS DAMPER 10 29 PARALLEL OPEN MODULATING 24 VAC YES 1

DOAS-1 EXHAUST AIR 24 24 OPPOSED CLOSE MODULATING 24 VAC YES 1

DOAS-1 OUTSIDE AIR 32 24 OPPOSED CLOSE MODULATING 24 VAC YES 1

WIDTH (INCHES) HIGHT (INCHES) CONTROL SIGNAL CONTROL

VOLTAGE

POSITION

FEEDBACK

SYSTEM

EQUIPMENT DESCRIPTION DESIGN DUCT SIZE BLADE ACTION FAIL

POSITION

CONTROL ACTUATOR

NOTES

DAMPER SCHEDULE

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

AP

PR

AM

EN

D

M

EN

T #1

C

H

IL

LE

R

R E-

D

ES

IG

N

/0

2/

GENERAL:

1. THE BAS MUST FULLY CONTROL THE CHILLED WATER SYSTEM TO SATISFY LOAD REQUIREMENTS FOR CHILLED WATER TO THE

FACILITY. THE CHILLED WATER SYSTEM CONSISTS OF TWO AIR-COOLED CHILLERS AND TWO CHILLED WATER PUMPS. EACH CHILLER MUST HAVE CAPABILITY TO COMMUNICATE WITH THE BAS VIA BACNET COMMUNICATION AND MUST OPERATE ON INTERNAL CONTROLS AND SAFETIES WHEN IT IS ENABLED BY THE BAS. EACH CHILLER HAS A CONTROL VALVE TO ISOLATE THE CHILLER WHEN ITS USE IS NOT REQUIRED. THE CHILLED WATER PUMPS EMPLOY VARIABLE SPEED DRIVES CONTROLLED BY THE BAS.

2. THE CONTROLS MUST INCLUDE REMOTE SET POINT, EQUIPMENT ENABLE/DISABLE, EQUIPMENT LEAD/ LAG OR STANDBY CONFIGURATION, AND EQUIPMENT AUTOMATIC ROTATION TO MAXIMIZE CHILLED WATER SYSTEM OPERATING EFFICIENCIES. ONE AIR- COOLED CHILLER MUST BE DESIGNATED AS LEAD CHILLER AND THE OTHER AIR-COOLED CHILLER MUST BE DESIGNATED AS LAG CHILLER. ONE CHILLED WATER PUMP MUST BE DESIGNATED AS THE LEAD PUMP AND THE OTHER CHILLED WATER PUMP MUST BE

DESIGNATED AS THE STANDBY PUMP.

3. THE AIR-COOLED CHILLERS MUST BE OPERATED IN TWO DISTINCT MODES - COOLING MODE OR HEAT RECOVERY MODE. IN COOLING MODE, CHILLER IS USED TO PROVIDE CHILLED WATER TO THE BUILDING COOLING LOAD. IN HEAT RECOVERY MODE, CHILLER IS USED TO PROVIDE CHILLED WATER TO THE BUILDING COOLING LOAD AND HOT WATER TO THE BUILDING HEATING LOAD. REFER TO HEATING

HOT WATER CONTROL DIAGRAM AND SEQUENCES OF OPERATION FOR ADDITIONAL INFORMATION.

4. THE EQUIPMENT MUST BE DISTRIBUTED ACROSS MULTIPLE CONTROLLERS IN SUCH A MANNER THAT NO MORE THAN ONE AIR-COOLED CHILLER, ONE ISOLATION CONTROL VALVE, ONE WATER FLOW METER, AND ONE CHILLED WATER PUMP MUST BE CONTROLLED AND MONITORED USING A SINGLE CONTROLLER. LOSS OF ONE CONTROLLER MUST NOT CAUSE THE LOSS OF THE ENTIRE CHILLED WATER SYSTEM. PROGRAM BAS EQUIPMENT TO MEET THE REQUIRED OPERATION OF THE CHILLED WATER SYSTEM AS DESCRIBED HERE.

CHILLED WATER SYSTEM ENABLE MODE: WHEN THERE IS AT LEAST ONE REQUEST (ADJ.) FOR COOLING FROM ANY HVAC EQUIPMENT SUPPLIED

WITH CHILLED WATER, THE CHILLED WATER SYSTEM MUST BE ENABLED BY THE BAS.

1. CHILLER LOADING: INITIALLY, ONE CHILLER MUST OPERATE TO SATISFY THE CHILLED WATER LOAD AT START-UP. WHEN THE CHILLED

WATER SYSTEM IS ENABLED BY THE BAS, THE FOLLOWING MUST OCCUR:

A. LEAD CHILLER:

a. BAS MUST OPEN THE LEAD CHILLER ISOLATION VALVE. WHEN ISOLATION VALVE HAS BEEN PROVEN FULLY OPEN, THE

BAS MUST START THE LEAD CHILLED WATER PUMP.

b. WHEN THE LEAD CHILLED WATER PUMP HAS BEEN PROVEN TO BE ON AS SENSED BY DIFFERENTIAL PRESSURE SWITCH, THE BAS MUST ENABLE THE PUMP SPEED CONTROL AS DESCRIBED IN THE “CHILLED WATER PUMP SPEED CONTROL”.

c. ONCE MINIMUM CHILLED WATER FLOW RATE AS SENSED BY FLOW METER CH-#-CHWS-FM FOR LEAD AIR-COOLED CHILLER IS REACHED FOR 30 SECONDS (ADJ.), ENABLE THE CHILLER. MINIMUM CHILLED WATER FLOW RATE SETTING MUST BE SET AT THE VALUE CORRESPONDING TO THE FLOW RATE REQUIRED FOR THE CHILLER, WHICH MUST BE

PROVIDED BY THE CHILLER MANUFACTURER.

d. AFTER CHILLER INTERNAL SAFETIES ARE SATISFIED, THE LEAD CHILLER'S SELF-CONTAINED PACKAGED CONTROL SYSTEM MUST START AND OPERATE THE CHILLER TO MAINTAIN THE CHILLED WATER SUPPLY TEMPERATURE SET POINT.

B. LAG CHILLER: IF THE CHILLED W ATER SUPPLY TEMPERATURE AS SENSED BY TEMPERATURE SENSOR CHWS-T IS ABOVE CHILLED WATER SUPPLY TEMPERATURE SETPOINT FOR 15 MINUTES (ADJ.), THE BAS MUST EXECUTE THE FOLLOWING

OPERATIONS:

a. BAS MUST OPEN THE LAG CHILLER ISOLATION VALVE TO 100% IN 5% INCREMENTS (ADJ.). INCREMENTS ARE TO BE 10

SECONDS (ADJ.) EACH.

b. THE PID SPEED CONTROL SEQUENCE FOR THE LEAD CHILLED WATER PUMP MUST ADJUST THE PUMP SPEED TO

MAINTAIN THE CHILLED WATER DIFFERENTIAL PRESSURE AS SENSED BY PRESSURE SENSOR CHW-SYS-P AT THE

SETPOINT.

c. ONCE MINIMUM CHILLED WATER FLOW RATE AS SENSED BY FLOW METER CH-#-CHWS-FM FOR LAG AIR-COOLED CHILLER IS REACHED FOR 30 SECONDS (ADJ.), ENABLE THE CHILLER. MINIMUM CHILLED WATER FLOW RATE SETTING MUST BE SET AT THE VALUE CORRESPONDING TO THE FLOW RATE REQUIRED FOR THE CHILLER, WHICH MUST BE

PROVIDED BY THE CHILLER MANUFACTURER.

d. AFTER CHILLER INTERNAL SAFETIES ARE SATISFIED, THE LAG CHILLER'S SELF-CONTAINED PACKAGED CONTROL SYSTEM MUST START AND OPERATE THE CHILLER TO MAINTAIN THE CHILLED WATER SUPPLY TEMPERATURE SET POINT.

2. CHILLER UNLOADING:

A. LAG CHILLER: IF THE CHILLED W ATER SUPPLY TEMPERATURE AS SENSED BY TEMPERATURE SENSOR CHWS-T IS BELOW

CHILLED WATER SUPPLY TEMPERATURE SETPOINT FOR 15 MINUTES (ADJ.), THE BAS MUST EXECUTE THE FOLLOWING

OPERATIONS:

a. THE BAS MUST DISABLE THE LAG CHILLER.

b. AFTER A USER-DEFINED TIME DELAY, INITIALLY SET AT 120 SECONDS (ADJ.), CLOSE THE LAG CHILLER ISOLATION VALVE

TO 0% IN 5% INCREMENTS (ADJ.). INCREMENTS ARE TO BE 10 SECONDS (ADJ.) EACH.

c. THE PID SPEED CONTROL SEQUENCE FOR THE LEAD CHILLED WATER PUMP MUST ADJUST THE PUMP SPEED TO

MAINTAIN THE CHILLED WATER DIFFERENTIAL PRESSURE SETPOINT.

B. LEAD CHILLER: REFER TO CHILLED WATER SYSTEM DISABLE MODE SEQUENCE BELOW FOR LEAD CHILLER UNLOADING.

CHILLED WATER SYSTEM SEQUENCES OF OPERATION

CHILLED WATER SYSTEM DISABLE MODE: WHEN THERE IS NO REQUEST FOR COOLING FROM ANY HVAC EQUIPMENT SUPPLIED WITH CHILLED

WATER, THE CHILLED WATER SYSTEM MUST BE DISABLED BY THE BAS.

1. LEAD CHILLER: WHEN THE CHILLED WATER SYSTEM IS DISABLED BY THE BAS, THE FOLLOWING MUST OCCUR:

A. THE BAS MUST DISABLE THE LEAD CHILLER.

B. AFTER A USER-DEFINED TIME DELAY, INITIALLY SET AT 120 SECONDS (ADJ.), THE BAS MUST SET THE LEAD CHILLED WATER PUMP

SPEED TO 0 HZ AND STOP THE PUMP.

C. ONCE THE LEAD CHILLED WATER PUMP HAS BEEN PROVEN TO BE OFF THROUGH THE OUTPUT FROM THE PUMP VFD, THE BAS

MUST CLOSE THE LEAD CHILLER ISOLATION VALVE.

CHILLED WATER SUPPLY TEMPERATURE CONTROL: EACH CHILLER MUST BE CONTROLLED BY ITS PACKAGED CONTROLS TO MAINTAIN THE CHILLED WATER SUPPLY TEMPERATURE AT 44 °F (ADJ.). THE SET POINT MUST BE ADJUSTABLE THROUGH THE BAS.

LOSS OF CONTROL SIGNAL: UPON LOSS OF CONTROL SIGNAL BETWEEN BAS AND CHILLER, CHILLER MUST RUN INDEPENDENTLY AND OPERATE TO MAINTAIN ITS OWN CHILLED WATER SUPPLY TEMPERATURE SET POINT. A CRITICAL ALARM MUST BE GENERATED AT THE BAS OPERATOR’S

WORKSTATION.

CHILLER CYCLE: PROVIDE A TIME DELAY WHICH PREVENTS THE BAS FROM ATTEMPTING TO START OR STOP ANOTHER CHILLER FOR AN ADJUSTABLE TIME PERIOD AFTER A CHILLER IS STARTED OR STOPPED. THE TIME DELAY MUST NOT PREVENT THE BAS FROM IMMEDIATELY STARTING AN AVAILABLE CHILLER IN RESPONSE TO A FAILED CHILLER. THE TIME DELAY MUST BE INITIALLY SET AT 15 MINUTES (ADJ.), TO PREVENT RAPID CYCLING OF THE CHILLERS. COORDINATE WITH CHILLER MANUFACTURER AND ADJUST THE TIMING OF SYSTEM COMPONENTS TO PROVIDE

A STABLE YET RESPONSIVE FULLY OPERATIONAL SYSTEM.

CHILLER ROTATION:

1. THE BAS MUST TOTALIZE RUNTIME FOR CHILLERS AND MUST ROTATE CHILLERS IN A MANNER THAT EQUALIZES RUNTIME. THE BAS MUST, AT AN OPERATOR DEFINED INTERVAL INITIALLY SET TO WEEKLY, OR UPON OPERATOR REQUEST, EVALUATE THE LEAD CHILLER SELECTION AND RESELECT SO AS TO EQUALIZE RUNTIME. DURING THE ROTATION OF THE CHILLERS, THE LEAD CHILLER MUST BECOME THE LAG

CHILLER AND THE LAG CHILLER MUST BECOME THE LEAD CHILLER.

2. WHEN THE LEAD CHILLER IS ROTATED WITH LAG CHILLER, THE FOLLOWING MUST OCCUR:

A. A BAS MUST DISABLE THE LEAD AIR-COOLED CHILLER.

B. BAS MUST OPEN THE LAG CHILLER ISOLATION VALVE TO 100% TO 5% INCREMENTS (ADJ.). INCREMENTS ARE TO BE 10 SECONDS

(ADJ.) EACH.

C. BAS MUST CLOSE THE LEAD CHILLER ISOLATION VALVE TO 0% IN 5% INCREMENTS (ADJ.). INCREMENTS ARE TO BE 10 SECONDS

(ADJ.) EACH.

D. DURING OPENING/CLOSING OF ISOLATION VALVES, THE OPERATING LEAD CHILLED WATER PUMP MUST RAMP UP OR DOWN AS

REQUIRED TO MAINTAIN THE CHILLED WATER DIFFERENTIAL PRESSURE.

E. ONCE MINIMUM CHILLED WATER FLOW RATE AS SENSED BY FLOW METER CH-#-CHWS-FM FOR LAG AIR-COOLED CHILLER IS

REACHED FOR 30 SECONDS (ADJ.), ENABLE THE LAG CHILLER.

CHILLER FAILURE:

1. IF THE LEAD AIR-COOLED CHILLER SHOULD FAIL, AN ALARM MUST BE GENERATED AT THE BAS. ASSUMING THE LAG AIR-COOLED CHILLER IS

AVAILABLE FOR OPERATION, THE FOLLOWING MUST OCCUR:

A. BAS MUST DISABLE THE LEAD AIR-COOLED CHILLER.

B. BAS MUST OPEN THE LAG CHILLER ISOLATION VALVE TO 100% IN 5% INCREMENTS (ADJ.). INCREMENTS ARE TO BE 10 SECONDS

(ADJ.) EACH.

C. BAS MUST CLOSE THE LEAD CHILLER ISOLATION VALVE TO 0% IN 5% INCREMENTS (ADJ.). INCREMENTS ARE TO BE 10 SECONDS

(ADJ.) EACH.

D. DURING OPENING/CLOSING OF ISOLATION VALVES, THE OPERATING LEAD CHILLED WATER PUMP MUST RAMP UP OR DOWN AS

REQUIRED TO MAINTAIN THE CHILLED WATER DIFFERENTIAL PRESSURE.

E. ONCE MINIMUM CHILLED WATER FLOW RATE AS SENSED BY FLOW METER CH-#-CHWS-FM FOR LAG AIR-COOLED CHILLER IS

REACHED FOR 30 SECONDS (ADJ.), ENABLE THE LAG CHILLER.

2. A CHILLER THAT FAILS DURING OPERATION MUST AUTOMATICALLY BE ASSIGNED A DESIGNATION OF “FAILED” BY THE BAS. A CHILLER MUST

BE CONSIDERED “FAILED” IF: THE BAS SENSES A LOSS OF STATUS AT THE ASSOCIATED CHILLER OR THE BAS RECEIVES A FAULT ALARM

FROM THE CHILLER.

3. ANY CHILLER THAT IS TAKEN OUT OF OPERATION FOR MAINTENANCE MUST BE ASSIGNED A “FAILED” DESIGNATION BY THE OPERATOR. THE BAS MUST NOT ATTEMPT TO START A CHILLER WITH AN ASSIGNED DESIGNATION OF “FAILED”.

CHILLED WATER BYPASS VALVE CONTROL:

1. WHEN CHILLED WATER SYSTEM HAS BEEN ENABLED FOR 30 MINUTES AND THE MINIMUM CHILLED WATER FLOW RATE FOR ANY

ENABLED CHILLER IS BELOW THE SETPOINT, THE CHILLED WATER BYPASS VALVE, CHW -BYP-V-3, MUST BE MODULATED TO MAINTAIN THE

MINIMUM FLOW AT THE CHILLER WITH THE LEAST FLOW.

CHILLED WATER PUMP CONTROL:

1. CHILLED WATER PUMP HAND-OFF-AUTO OPERATION: HAND-OFF-AUTO SETTINGS MUST BE PROVIDED AS PART OF THE VARIABLE

FREQUENCY DRIVE THROUGH THE DRIVE’S KEYPAD. IN THE OFF MODE, THE PUMP MUST BE STOPPED. IN THE HAND MODE, THE PUMP MUST RUN CONTINUOUSLY. IN THE AUTO MODE, THE PUMP MUST BE STARTED AND STOPPED BY THE BAS.

2. CHILLED WATER PUMP LOCAL-REMOTE SPEED CONTROL: LOCAL–REMOTE SETTINGS MUST BE PROVIDED AS PART OF VARIABLE FREQUENCY DRIVE THROUGH THE DRIVE'S KEYPAD. IN THE LOCAL MODE, THE PUMP'S SPEED MUST BE CONTROLLED THROUGH A MANUAL SPEED CONTROL LOCATED AT THE RESPECTIVE DRIVE CONTROL PANEL. THE BAS MUST INDICATE PUMP THAT IS IN LOCAL CONTROL MODE BY ADDING "MANUAL" TO THE GRAPHIC FOR THAT PUMP AND CHANGE THE COLOR OF THE SPEED SHOWN ON THE GRAPHICS PAGE. IN THE REMOTE MODE, THE PUMP'S SPEED MUST BE CONTROLLED BY THE BAS.

3. CHILLED WATER PUMP START/STOP OPERATION: CHILLED WATER PUMPS MUST BE STARTED ACCORDING TO THE “ENABLE MODE” AND

STOPPED ACCORDING TO THE “DISABLE MODE” SEQUENCES.

4. CHILLED WATER PUMP ROTATION: A PROGRAM WILL BE PROVIDED TO AUTOMATICALLY ALTERNATE THE PUMPS WEEKLY (ADJUSTABLE) TO MAINTAIN EVEN USE. WHEN SW ITCHING THE LEAD AND STAND-BY PUMPS, THE STAND-BY PUMP MUST BE STARTED BEFORE THE LEAD PUMP IS STOPPED IN ORDER TO MAINTAIN MINIMUM FLOW THROUGH THE OPERATING CHILLER. DURING THE ROTATION OF THE CHILLED WATER PUMPS, THE LEAD PUMP MUST BECOME THE STANDBY PUMP AND THE STANDBY PUMP MUST BECOME THE LEAD PUMP.

5. CHILLED WATER PUMP STATUS: A DIFFERENTIAL PRESSURE SWITCH MUST BE USED TO MONITOR THE STATUS OF THE CHILLED WATER PUMP. IF THE STATUS INDICATED DOES NOT MATCH THE COMMANDED OUTPUT FOR THE PUMP AFTER A 60 SECONDS (ADJUSTABLE) TIME DELAY, A FAILURE ALARM MUST BE ISSUED, AND THE START COMMAND MUST BE CANCELED.

6. CHILLED WATER PUMP FAILURE:

A. IF A CHILLED WATER PUMP MUST FAIL, AN ALARM MUST BE GENERATED. ASSUMING THE STANDBY CHILLED WATER PUMP IS IDLE

AND AVAILABLE FOR OPERATION, THE BAS MUST AUTOMATICALLY ENABLE THAT PUMP TO REPLACE THE FAILED PUMP. AFTER

THE NEWLY STARTED PUMP IS IN OPERATION, THE FAILED PUMP MUST BE DISABLED.

B. CHILLED WATER PUMP THAT FAILS DURING OPERATION MUST AUTOMATICALLY BE ASSIGNED A DESIGNATION OF “FAILED”.

CHILLED WATER PUMP FAILURE MUST INCLUDE: LOSS OF STATUS AND VFD FAULT.

C. A CHILLED WATER PUMP THAT IS TAKEN OUT OF OPERATION FOR MAINTENANCE MUST BE ASSIGNED A DESIGNATION OF “FAILED” BY THE OPERATOR. THE BAS MUST NOT ATTEMPT TO START PUMPS WITH AN ASSIGNED DESIGNATION OF “FAILED”.

7. CHILLED WATER PUMP SPEED CONTROL:

A. THE BAS MUST MONITOR THE DIFFERENTIAL PRESSURE BETWEEN THE CHILLED WATER SUPPLY AND CHILLED WATER RETURN

PIPING THROUGH DIFFERENTIAL PRESSURE SENSOR AS SHOWN ON MECHANICAL DRAWINGS.

B. THE BAS MUST CONTROL THE SPEED OF THE LEAD CHILLED WATER PUMP VFD TO MAINTAIN THE CHILLED WATER DIFFERENTIAL

PRESSURE SETPOINT AT ALL TIMES.

C. IF THE DIFFERENTIAL PRESSURE AS SENSED BY DIFFERENTIAL PRESSURE SENSOR CHW-SYS-P DROPS BELOW THE

DIFFERENTIAL PRESSURE SET POINT, WHICH MUST BE INITIALLY SET AT 5 PSI (ADJUSTABLE), THE VFD SPEED MUST BE INCREASED. IF THE DIFFERENTIAL PRESSURE RISES ABOVE THE DIFFERENTIAL PRESSURE SET POINT, THE VFD SPEED MUST BE DECREASED. IF THE DIFFERENTIAL PRESSURE SENSOR MUST FAIL, AN ALARM MUST BE DISPLAYED AT THE BAS FRONT-END AND

THE BAS MUST RUN THE PUMP AT THE LAST SPEED COMMAND.

D. THE CHILLED WATER PUMP VFD MUST HAVE MINIMUM AND MAXIMUM SPEED SETTINGS. THE MAXIMUM AND MINIMUM PUMP SPEED MUST BE DETERMINED IN CONSULTING WITH THE BALANCING CONTRACTOR DURING THE TAB PROCESS.

E. WHEN A PUMP IS STOPPED, THE BAS SIGNAL MUST RETURN THE PUMP TO A SPEED OF ZERO.

8. LOSS OF CONTROL SIGNAL: UPON LOSS OF CONTROL SIGNAL BETW EEN PUMP VFD AND BAS, A CRITICAL ALARM MUST BE GENERATED

AT THE BAS OPERATOR’S WORKSTATION. PUMP VFD MUST RUN INDEPENDENTLY AND OPERATE AT THE DEFAULT SPEED, WHICH MUST

BE INITIALLY SET AT 70% (ADJUSTABLE).

LOSS OF COMMUNICATION: UPON LOSS OF COMMUNICATIONS BETWEEN CHILLER OR VFD AND BAS, AN ALARM MUST BE ACTIVATED AT THE BAS

FRONT-END.

CHWS-T

CHWS TO

BUILDING

CHWR FROM

BUILDING

CHW-SYS-P

P H L

CHWR

CHWS

CHWR-T

V-3

CHW-BYP-V-3

NC

CHWR

CH-1

CH-1-CHWR-T

CH-1-CHWS-T

TO BAS

NETWORK

CH-1-CHW S-FM

CH-1-CHW S-FS

CH-2

CH-2-CHWR-T

CH-2-CHWS-T

TO BAS

NETWORK

CH-2-CHWS-FM

CH-2-CHW S-FS

N.C.

N.C.

V-1

V-2

VFD P-1-SSP-1-C

DDC

VFD

P-2-SSP-2-C

P-1

P-2

CH-2-S

CH-2-SS

CH-2-C

DDC

CH-2-V-2-C

CH-2-V-2-POS

DDC

TO BAS

NETWORK

TO BAS

NETWORK

CH-1-S

CH-1-SS

CH-1-C

CH-1-V-1-C

CH-1-V-1-POS

DDC

CHW-BYP-V-3-C

CHW-BYP-V-3-POS

CHWS

P-1-DPS

P

P-2-DPS

P H L

P-1-VFD FAULT

P-2-VFD FAULT

A

B

C

D

1 2 3 4 5

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

SATISFACTORY TO DATE 10/27/2021

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

OF

EPROJECT NO.:

A

B

C

D

D E P A R T M E N T

O F

TH

E

N A V Y

N A V A L

F A C

IL

IT

IE

S

E N G

IN

E E R

IN

G

C O M M A N D

DRAWFORM REVISION: 10 MARCH 2009

<<PM-DM>> MDR/MLR

BRANCH MANAGER RS

CHIEF ENG/ARCH TC

FIRE PROTECTION JG

1100 NORTH GLEBE ROAD

SUITE 500

ARLINGTON, VIRGINIA 22201

571.218.1000

FAX: 571.218.1600

AS NOTED

1 2 3 4 5

FOUO

FOUO

Approved by AFCEC via email

2/

/2

2:

:3

PM

M -7

-C

O N

TR

O

L D

IA

G

R A

M S

A N

D S

E Q

U E

N C

E S

M-702 302221

W

AS

H

IN

GT

O N D

.C

13134690

N40080-21-R-3502

1673850

DT DT JL

C O N

TR

O L

DI

AG

RA

M S

AN

D

SE

Q U

EN

C

ES

JO

IN

T B

AS

E

AN

AC

O

ST

IA

B O

LL

IN

G

P-

JA

D

O C

P H

AS

E

II

N A

VA

L

FA

C

IL

IT

IE

S

EN

G

IN

E

ER

IN

G C

O M

M

AN

D , W

AS

H

IN

G

TO

N

W

AS

H

IN

GT

O N D

.C

TH

E

N

AV

Y

YA

RD

NTSB1 CHILLED W ATER SYSTEM - CONTROL DIAGRAM

1. CONNECT CHILLER BACNET COMMUNICATION INTERFACE TO BAS

BACNET NETWORK. PROVIDE CHILLER MONITORING POINTS

INDICATED IN THE POINTS LIST TO THE BAS THROUGH THE

COMMUNICATION INTERFACE.

2. CHILLER CHILLED WATER INLET/OUTLET TEMPERATURE SENSORS

AND FLOW SWITCH ARE PROVIDED WITH CHILLER CONTROL

PANEL BY CHILLER MANUFACTURER.

3. CONNECT VFD BACNET COMMUNICATION INTERFACE TO BAS

BACNET NETWORK. PROVIDE VFD MONITORING POINTS

INDICATED IN THE POINTS LIST TO THE BAS THROUGH THE

COMMUNICATION INTERFACE.

4. PROVIDE TW O-WAY CONTROL VALVE ACTUATED BY MODULATING

ELECTRIC ACTUATOR FOR CHILLED WATER BYPASS. SEE SHEET

M-401 FOR CHILLED WATER BYPASS VALVE LOCATION.

5. PROVIDE DIFFERENTIAL PRESSURE TRANSMITTER FOR CHILLED

WATER PUMP SPEED CONTROL. SEE SHEET MP-102 FOR

DIFFERENTIAL PRESSURE TRANSMITTER LOCATION.

6. PROVIDE IN-LINE TYPE ELECTROMAGNETIC FLOW METER.

INSTALL AND CONNECT FLOW METER IN ACCORDANCE WITH

REQUIREMENTS AND INSTRUCTIONS PROVIDED BY FLOW METER

MANUFACTURER.

1. REFER TO SHEET M-001 AND M-701 FOR LEGENDS AND GENERAL

NOTES.

2. REFER TO SHEET M-713 FOR CHILLED WATER SYSTEM POINTS

SCHEDULE.

NEW WORK KEYED NOTES

GENERAL NOTES

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

AP

PR

AM

EN

D

M

EN

T #1

C

H

IL

LE

R

R E-

D

ES

IG

N

/0

2/

HHWS

B-2

B-1

HHWR-T

HHWR

V-1

V-2

HHW-SYS-P

P H L

HHWS TO

BUILDING

HHWR FROM

BUILDING

N.C.

N.C.

HHWS-T

TO BAS

NETWORK

V-3

N.C.

HHW-BYP-V-3-POS

HHW-BYP-V-3-C

P-3

P-4

DDC

P-4-SS…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .