This document is an amendment to a solicitation for the Joint Air Defense Operations Phase II project at Joint Base Anacostia-Bolling in Washington, DC. The project involves constructing a two-story Joint Air Defense Operations Center facility including a structural steel frame, concrete masonry unit shear walls, roofing system, site improvements, security fencing, and communication routing. Special construction requirements include a controlled space and exterior finishes to meet Joint Base architectural standards. The amendment provides responses to contractor questions, confirms a proposal due date of March 25, and includes a wage determination. Key details addressed include clarifying door and window specifications, confirming fencing and signage match existing, and sharing photos of areas to be modified like the fuel tank location.

View the file

Other files

File Type Posted
AMENDMENT0010JADOCPHASEII.pdf PDF
P5001JADOCPriceScheduleUpdatedAPRIL12.pdf PDF
AMENDMENT0008JADOCPHASEII.pdf PDF
AMENDMENT0009JADOCPHASEII.pdf PDF
AMENDMENT0007JADOCPHASEII.pdf PDF
AMENDMENT0007JADOCPHASEII.pdf PDF
P5001JADOCPriceSchedule-March312022.pdf PDF
SK004.pdf PDF
SK005.pdf PDF
P5001 JADOC Price Schedule - Updated.pdf PDF
amendment0006JADOC.pdf PDF
JADOC II Drawings - Amendment 1 - 03.02.22.pdf PDF
JADOC II Drawings - Amendment 1 - 03.02.22.pdf PDF
RFI 105 - 12 Stairwell.JPG JPG image
RFI 105 - 3 Exterior DOOR B Closeup.JPG JPG image
RFI 104 - ELECTRICAL ROOM 125 LOCATION OF SWITCHBOARD 20220225.pdf PDF
JADOC II Amendment 1 - 23 09 13 - INSTR... CONTROL DEVICES FOR HVAC 03-03-22.pdf PDF
RFI 105 - 8 Interior Room 2 B.JPG JPG image
RFI 105 - 3 Exterior DOOR B Closeup (2).JPG JPG image
RFI 105 - 11 Interior Room C.JPG JPG image
RFI 104 - 119 COMM AND DATA APPROXIMATES 20220225.pdf PDF
RFI 105 - 10 Interior Room B.JPG JPG image
RFI - Exterior and Interior Views 20220224 - Photos 1.pdf PDF
RFI 105 - 6 Interior Room - 223 No Names Inserted 2.JPG JPG image
P-5001 CSP Excerpts.pdf PDF
JADOC II - RFI 32 - Dumpster Enclosure Detail - 02.09.2022.pdf PDF
P-5001 CSP Excerpts.pdf PDF
AMENDMENT0004 JADOC PHASE II.pdf PDF
Site Visit Attendee Log.pdf PDF
AMENDMENT0003JADOC.pdf PDF
AMENDMENT0002P5001JADOC.pdf PDF
AMENDMENT0001JADOCPHASEII.pdf PDF
DWG_1673850DWG2OF4.pdf PDF
DWG_1673850DWG3OF4.pdf PDF
DWG_1673850DWG1OF4.pdf PDF
DWG_1673850DWG4OF4.pdf PDF
JADOC Visitor Request Form_Nov.2021.pdf PDF
Site Visit New Pass Registration.xlsx XLSX spreadsheet
ATTACHMENT A - CONSTRUCTION AND DESIGN EXPERIENCE PROJECT DATA SHEET.docx DOCX document
SF1442 - N4008021R3502.pdf PDF
Specifications 2.pdf PDF
ATTACHMENT B - Past Performance Questionnaire.doc DOC document
ATTACHMENT C-Safety Data Sheet.docx DOCX document
ATTACHMENT F - Small Business Subcontracting Plan Template.doc DOC document
ATTACHMENT G - RFI Form.docx DOCX document
Site Visit Excel file for information.xlsx XLSX spreadsheet
ATTACHMENT H- PRICE SCHEDULE.docx DOCX document
Specifications 1.pdf PDF
ATTACHMENT E - Small Business Participation and Commitment Strategy.docx DOCX document
ATTACHMENT D - SMALL BUSINESS SUBCONTRACTING RECORD.docx DOCX document
Show all 50

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PUBLIC WORKS DEPARTMENT

1013 O ST. SE

1ST FLOOR

WASHINGTON DC 20374

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

SOLICITATION: N4008021R3502 P5001 JOINT AIR DEFENSE OPERATIONS PHASE II

The purpose of this amendment is to provide the follow ing:

1. Proposal due date remains 25 March at 2:00.

2. RFI Responses

3. Wage Rate Determination

4. Amendment to the Specifications and Draw ings

CONTINUED ON PAGE 2

1. CONTRACT ID CODE PAGE OF PAGES

J 1 15

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 09-Mar-2022

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N4008021R3502

X 9B. DATED (SEE ITEM 11)

06-Jan-2022

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

09-Mar-2022

CODE

NAVAL FACILITIES ENG COMMAND WASHINGTON

1314 HARWOOD ST

WASHINGTON DC 20374

N40080 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE N40080

FACILITY CODECODE

EMAIL:TEL:

N4008021R3502

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)

The following have been added by full text:

RFI RESPONSES

1. Paragraphn 2.4.5 Patch paniels; page number 779 of 1116 in Specifications 2. Please provide exact quantities, lengths and colors for each patch cable type to be included in our base bid. If the information requested cannot be provided, are we to provide line-item alternates for each?

GOVERNMENT RESPONSE: Bid per the solicitation requirements, drawings and specs.

2. Sheet T-102 (2nd floor) shows all four Comm Rooms but with no indication as to what drops go to what rooms. Please provide a matrix or a segmented floorplan to indicate what areas each closet serves.

GOVERNMENT RESPONSE: Room 173 - drops from 1st floor with the exception of the Army Duty Desk Office Room 197 per Keyed Note 5 of T-101. Room 298 - terminate both classified and unclassified horizontal cable on the 2nd floor on the plan west side o fthe building starting at Column 3.8 moving left (Sheet T-102). If horizontal cable exceeds 100 meters from Room 298, home to the other side of building (Room 268). Room 268 - all horizontal cable on plan east side of building second floor. Room 241A (training room -training use only); Room 251B (horizontal cable confined to controlled space).

3. Please provide pictures of the following locations at JADOC for reference: the existing fuel tank to be relocated, the exterior wall locations at JADOC I to be demolished, and the tie in point locations for the electrical and communication systems within JADOC I.

GOVERNMENT RESPONSE: Please see attached sample photos and sample markups of room 119 & room 125.

4. Will the topsoil for the planting beds and turf, be spread by others? Are there specs for the Tree Protection?

Will there be soil in the Bioretention Ponds? Do we bid the Tree Replacements?

GOVERNMENT RESPONSE: Contractor to provide and prepare (spread) topsoil for plantings beds and turf areas. No spec for Tree Protection, however, guidance for Tree Protection is outlined extensively. Please refer to Sheet LS 502 "Tree Protection Notes" and Details A1 and C1 on same sheet. Yes, please refer to Sheet LS 501, Detail A1 and A4 for treatment at Bioretention Ponds. Yes

5. I am seeing contradicting language on the site plan, details and specifications on if the fence is supposed to be ornamental or chain-link. The site plan calls it out as ornamental which matches the drawing on the detail.

However, there is a note on the detail that reads “fence fabric not shown for clarity” which would correspond to chain link. There is language in the specification for both chain link and ornamental fence. How should I proceed in pricing the fence? Is there a preferred model of fence if ornamental?

GOVERNMENT RESPONSE: All fencing for the project must be ornamental.

6. Detail A5 on page C-507 has a note for tab plates. We haven’t seen this detail previously with milcon fencing.

What is the intent of the detail?

GOVERNMENT RESPONSE: The vertical tab plates is only required when using bollards for cable reinforcing along fenceline. If the chosen fencing layout does not opt for using bollards for cable reinforcing along fenceline then this detail does not apply.

7. C-507; Note 28, what is needed for pricing at this location? Is it wood fence and brick piers? Please provide detail.

GOVERNMENT RESPONSE: The wood infill fence and brick piers must match existing

8. 01 30 00 – 1.4.1 identifies the Joint Base Anacostia Bolling Communication requirements for building and site renovations and states it will be provided on request including the Engineering Technical Letter 12/02.

It further states to comply with the JBAB Environmental Standards.

These could not be located in the RFP documents. Please provide a copy.

GOVERNMENT RESPONSE: There is no 01 30 00 para 1.4.1 in the package..

9. 00 14 00; 01 46 Drawings: Please confirm whether all construction activities on the JADOC II project are to be performed by U.S Citizens only. Drawing AD101, Note 10 states to

“COORDINATE WITH COR REQUIREMENTS FOR ALTERNATIVE MEANS OF

EGRESS FOR BUILDING OCCUPANTS DURING THE WORK.” Please clarify the extent of expected measures, temporary walkways, overhead protection, etc. that should be assumed as part of this scope. Please confirm that the existing computer equipment, screens, telephones and all other furnishings will be relocated by the Government prior to mobilization for demolition.Drawing AD101, Note 5 – please clarify notification criteria for performing work in the existing facility. Note states “COORDINATE WITH COR AND

PROVIDE NOTIFICATION NOT LESS THAN [[## HOURS] [## DAYS] PRIOR TO

PERFORMING WORK.” Requesting a proposal extension to review pending RFI responses. Please clarify the dimension of the glazing for Type G doors. Regarding the 4-bay Bi-Fold and Coiling Overhead Door #s 176AX and 176B - Please confirm A-601 door schedule information for doors A176AX and A176B. Conflicts exist between door type, details and remarks. According to details on A-512, A-201, and A-101, it appears A176AX should be Type G and A176B should be Type F. Please confirm correct type designations should be used for bidding purposes. Reference specification 08 11 13 paragraph 2.4.4 for Bay Doors. Can individual operators for each door half be provided in lieu of single, center mounted pushrod style operators which typically do not allow for manual closing in the event of power/operator failure when open? Reference specification section 01 46 00 – Blast Resistance, paragraph 1.5-a. lists facility designed according to UFC 4-010-01 Low Level of Protection (LLOP). Are blast doors to be classified as low level of protection in lieu of Medium Level (MLOP)? Reference specification section 01 46 00 – Blast Resistance, paragraph 1.11. Does this negative pressure requirements remain? If so, the hardware cannot fail. If this is the design intent, will Level of Protection be changed to Medium/MLOP and ASTM damage Category changed to II? Reference specification section 01 46 00 – Blast Resistance, paragraph 2.1.1.e states hardware is not required for resistance of rebound loading as the door leaf may fail outward away from the building.

This contradicts negative pressure requirements of subsection 1.11. Please clarify.

Reference Drawing LS002. Please confirm planting quantities identified in the planting schedule shall govern over any conflicts that may be found in the subsequent LS drawings.

GOVERNMENT RESPONSE: Yes. See responses to previous inquiries including 4, 15, 16, etc. As general note states, the existing building will remain occupied and operational during construction. The extent of expected measures required to maintain the safety and operation of the existing building along with the construction of the addition need to be coordinated with the COR. The user will remove items like computer monitors and other furnishings prior to mobilization for demolition. For Note 5 on sheet AD101, notification to COR should be noted, "NOT LESS THAN 24 HOURS PRIOR TO BEGINNING WORK IN RESRICTED ACCESS AREAS". Also, in Note 6 on sheet AD101, Work areas will be "CLEANED DAILY

AND IN GOOD WORKING ORDER TO THE SATISFACTION OF THE COR PRIOR TO 6:00 AM".

Amendment 0004 extended the proposal due date. The two windows or door lights identified on the Bi-fold door must be blast resistant. Each window size is 12-inch horizontal x 10-inch vertical. Windows must be centered at the inner folding panels and the center of the window must be at 72-inches above the finish floor.

Note window sizes and provide dimensions as described here on sheet A-601. Correct, door 176AX is Door Type "G" and door 176B is Door Type "F". Refer to responses issued with amendment 0004 see response 17, 18, 52, 53 and 54 for additional information. Individual operators for each door half may be provided as long as they meet the performance requirements and do not impede on the clearaces for the door along with the clear horizontal and vertical opening when the door is in full open position. Doors must meet damage level category III per ASTM F 2247 and ASTM F 2927 as indicated per specification 01 46 00 section 1.5.b under Level of Protection Performance section. The doors must meet the negative pressure requirements indicated per specification section 01 46 00 section 1.11 for the damage level category III requirements. Per ASTM F 2247 and ASTM F 2927 with damage level category III, the door may get lodged into the frame from the blast force or the door may swing open in rebound. The door may be inoperable and may hinder ingress / egress. The door and hardware components are not permitted to detach from the frame and be thrown into the test structure witness area. The frame and frame anchorage must remain and integral system and attached to the test structure wall. Doors will experience noncatastrophic failure but will have permanent deformation and may be inoperable. The RFI referenced steel elements and anchorage must be included in the delegated design requirements of specification section 01 46 00. As indicated per 01 46 00 section 1.12.4, design, provide, and install any additional loading transfer connection element that may be required per the connection design to transfer the glazing, door and roof hatch, and louver system loading to the backup wall system. Please provide planting conflicts between Sheet LS002 and subsequent LS drawings.

While there should be no conflicts, the Individual sheets shall govern over LS002.

10. For the blast requirements at the windows indicated per spec section 014600, there is a need to provide steel plates at the head & sills of each window opening to accommodate the anchorage at the window and meet the required PSI loads. No steel is shown at these locations on the drawings. Please provide steel details that the windows will be anchored to.

GOVERNMENT RESPONSE: The RFI referenced steel elements and anchorage must be included in the delegated design requirements of specification section 01 46 00. As indicated per 01 46 00 section 1.12.4, design, provide, and install any additional loading transfer connection element that may be required per the connection design to transfer the glazing, door and roof hatch, and louver system loading to the backup wall system.

11. A previously submitted RFI & response stated: “GOVERNMENT RESPONSE: The Site Security Manager prepared a CSP for the project. Please see the "JADOC CSP2021-10-05- 114956.pdf” This document does not appear to be included in the amendment. Please provide.

GOVERNMENT RESPONSE: See Amendment 0004. “The Site Security Manager prepared a CSP for the project. Security procedures are detailed in the specifications. Personnel requirements from the CSP can be shared. See pdf "P-5001 CSP Excerpt"

12. The drawing general notes state: “ALL SIGN TYPES TO MATCH EXISTING SIGNAGE FINISHES WITHIN JADOC I EXISTING BUILD OUT. REFER TO EXISTING SIGNAGE FOR COLOR SELECTIONS.”

Do you have info and pictures of existing signage?

GOVERNMENT RESPONSE: Please refer to the attached photos of existing signage

WAGE DETERMINATION

"General Decision Number: DC20220002 02/25/2022

Superseded General Decision Number: DC20210002

State: District of Columbia

Construction Type: Building

County: District of Columbia Statewide.

BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).

Note: Contracts subject to the Davis-Bacon Act are generally required to pay at least the applicable minimum wage rate required under Executive Order 14026 or Executive Order 13658.

Please note that these Executive Orders apply to covered contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but do not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60).

|If the contract is entered |. Executive Order 14026 | |into on or after January 30, | generally applies to the | |2022, or the contract is | contract. | |renewed or extended (e.g., an |. The contractor must pay | |option is exercised) on or | all covered workers at | |after January 30, 2022: | least $15.00 per hour (or | | | the applicable wage rate | | | listed on this wage | | | determination, if it is | | | higher) for all hours | | | spent performing on the | | | contract in 2022. | |If the contract was awarded on|. Executive Order 13658 | |or between January 1, 2015 and| generally applies to the | |January 29, 2022, and the | contract. | |contract is not renewed or |. The contractor must pay all| |extended on or after January | covered workers at least | |30, 2022: | $11.25 per hour (or the |

| | applicable wage rate listed| | | on this wage determination,| | | if it is higher) for all | | | hours spent performing on | | | that contract in 2022. |

The applicable Executive Order minimum wage rate will be adjusted annually. If this contract is covered by one of the Executive Orders and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must still submit a conformance request.

Additional information on contractor requirements and worker protections under the Executive Orders is available at https://www.dol.gov/agencies/whd/government-contracts.

Modification Number Publication Date 0 01/07/2022 1 01/14/2022 2 02/11/2022 3 02/18/2022 4 02/25/2022

ASBE0024-007 04/01/2021

Rates Fringes

ASBESTOS WORKER/HEAT & FROST

INSULATOR........................$ 39.27 18.67+a

Includes the application of all insulating materials, protective coverings, coatings and finishes to all types of mechanical systems

a. PAID HOLIDAYS: New Year's Day, Martin Luther King Day, Memorial Day, Independence Day, Labor Day, Veterans' Day, Thanksgiving Day,the day after Thanksgiving and Christmas Day provided the employee works the regular work day before and after the paid holiday.

ASBE0024-008 04/01/2021

Rates Fringes

ASBESTOS WORKER: HAZARDOUS

MATERIAL HANDLER.................$ 24.46 8.69+a

Includes preparation, wetting, stripping, removal, scrapping, vacuuming, bagging and disposing of all insulation materials, whether they contain asbestos or not, from mechanical systems

a. PAID HOLIDAYS: New Year's Day, Martin Luther King Day, Memorial Day, Independence Day, Labor Day, Veterans' Day, Thanksgiving Day,the day after Thanksgiving and Christmas Day provided the employee works the regular work day before and after the paid holiday.

ASBE0024-014 04/01/2021

Rates Fringes

FIRESTOPPER......................$ 29.41 8.73+a

Includes the application of materials or devices within or around penetrations and openings in all rated wall or floor assemblies, in order to prevent the pasage of fire, smoke of other gases. The application includes all components involved in creating the rated barrier at perimeter slab edges and exterior cavities, the head of gypsum board or concrete walls, joints between rated wall or floor components, sealing of penetrating items and blank openings.

a. PAID HOLIDAYS: New Year's Day, Martin Luther King Day, Memorial Day, Independence Day, Labor Day, Veterans' Day, Thanksgiving Day,the day after Thanksgiving and Christmas Day provided the employee works the regular work day before and after the paid holiday.

BRDC0001-002 05/02/2021

Rates Fringes

BRICKLAYER.......................$ 34.00 12.59

CARP0197-011 05/01/2021

Rates Fringes

CARPENTER, Includes Drywall Hanging, Form Work, and Soft Floor Laying-Carpet..............$ 30.34 13.80

CARP0219-001 05/01/2021

Rates Fringes

MILLWRIGHT.......................$ 35.34 13.53

CARP0441-001 05/01/2021

Rates Fringes

PILEDRIVERMAN....................$ 33.62 12.73

ELEC0026-016 06/07/2021

Rates Fringes

ELECTRICIAN, Includes Installation of HVAC/Temperature Controls........$ 49.00 20.26

ELEC0026-017 09/07/2020

Rates Fringes

ELECTRICAL INSTALLER (Sound & Communication Systems).........$ 29.05 11.39

SCOPE OF WORK: Includes low voltage construction, installation, maintenance and removal of teledata facilities (voice, data and video) including outside plant, telephone and data inside wire, interconnect, terminal equipment, central offices, PABX, fiber optic cable and equipment, railroad communications, micro waves, VSAT, bypass, CATV, WAN (Wide area networks), LAN (Local area networks) and ISDN (Integrated systems digital network).

WORK EXCLUDED: The installation of computer systems in industrial applications such as assembly lines, robotics and computer controller manufacturing systems. The installation of conduit and/or raceways shall be installed by Inside Wiremen. On sites where there is no Inside Wireman employed, the Teledata Technician may install raceway or conduit not greater than 10 feet. Fire alarm work is excluded on all new construction sites or wherever the fire alarm system is installed in conduit. All HVAC control work.

ELEV0010-001 01/01/2022

Rates Fringes

ELEVATOR MECHANIC................$ 50.27 36.885+a+b

a. PAID HOLIDAYS: New Year's Day, Memorial Day, Independence Day, Labor Day, Veterans' Day, Thanksgiving Day, Christmas Day and the Friday after Thanksgiving.

b. VACATIONS: Employer contributes 8% of basic hourly rate for 5 years or more of service; 6% of basic hourly rate for 6 months to 5 years of service as vacation pay credit.

IRON0005-005 06/01/2021

IRONWORKER, STRUCTURAL AND

ORNAMENTAL.......................$ 33.90 24.19

IRON0005-012 05/01/2021

Rates Fringes

IRONWORKER, REINFORCING..........$ 29.20 22.83

LABO0011-009 06/01/2021

Rates Fringes

LABORER: Skilled................$ 26.60 8.87

FOOTNOTE: Potmen, power tool operator, small machine operator, signalmen, laser beam operator, waterproofer (excluding roofing), open caisson, test pit, underpinning, pier hole and ditches, laggers and all work associated with lagging that is not expressly stated, strippers, operator of hand derricks, vibrator operators, pipe layers, or tile layers, operators of jackhammers, paving breakers, spaders or any machine that does the same general type of work, carpenter tenders, scaffold builders, operators of towmasters, scootcretes, buggymobiles and other machines of similar character, operators of tampers and rammers and other machines that do the same general type of work, whether powered by air, electric or gasoline, builders of trestle scaffolds over one tier high and sand blasters, power and chain saw operators used in clearing, installers of well points, wagon drill operators, acetylene burners and licensed powdermen, stake jumper,demolition.

MARB0002-004 05/02/2021

Rates Fringes

MARBLE/STONE MASON...............$ 40.81 19.43

INCLUDING pointing, caulking and cleaning of All types of masonry, brick, stone and cement EXCEPT pointing, caulking, cleaning of existing masonry, brick, stone and cement (restoration work)

MARB0003-006 05/02/2021

Rates Fringes

TERRAZZO WORKER/SETTER...........$ 31.18 12.60

MARB0003-007 05/02/2021

TERRAZZO FINISHER................$ 25.81 11.55

MARB0003-008 05/02/2021

Rates Fringes

TILE SETTER......................$ 31.18 12.60

MARB0003-009 05/02/2021

Rates Fringes

TILE FINISHER....................$ 25.81 11.55

PAIN0051-014 06/01/2021

Rates Fringes

GLAZIER

Glazing Contracts $2 million and under...........$ 29.02 12.80 Glazing Contracts over $2 million.....................$ 33.26 12.80

PAIN0051-015 06/01/2021

Rates Fringes

PAINTER

Brush, Roller, Spray and Drywall Finisher............$ 25.50 11.27

PLAS0891-005 07/01/2021

Rates Fringes

PLASTERER........................$ 30.53 7.93

PLAS0891-006 02/01/2020

Rates Fringes

CEMENT MASON/CONCRETE FINISHER...$ 28.82 11.68

PLAS0891-007 08/01/2016

Rates Fringes

FIREPROOFER

Handler.....................$ 16.50 4.89 Mixer/Pump..................$ 18.50 4.89 Sprayer.....................$ 23.00 4.89

Spraying of all Fireproofing materials. Hand application of Fireproofing materials. This includes wet or dry, hard or soft. Intumescent fireproofing and refraction work, including, but not limited to, all steel beams, columns, metal decks, vessels, floors, roofs, where ever fireproofing is required. Plus any installation of thermal and acoustical insulation. All that encompasses setting up for Fireproofing, and taken down. Removal of fireproofing materials and protection. Mixing of all materials either by hand or machine following manufactures standards.

PLUM0005-010 08/01/2021

Rates Fringes

PLUMBER..........................$ 45.92 20.35+a

a. PAID HOLIDAYS: Labor Day, Veterans' Day, Thanksgiving Day and the day after Thanksgiving, Christmas Day, New Year's Day, Martin Luther King's Birthday, Memorial Day and the Fourth of July.

PLUM0602-008 08/01/2021

Rates Fringes

PIPEFITTER, Includes HVAC Pipe Installation................$ 45.39 23.12+a

a. PAID HOLIDAYS: New Year's Day, Martin Luther King's Birthday, Memorial Day, Independence Day, Labor Day, Veterans' Day, Thanksgiving Day and the day after Thanksgiving and Christmas Day.

ROOF0030-016 07/01/2021

Rates Fringes

ROOFER...........................$ 31.26 14.56

SFDC0669-002 01/01/2022

Rates Fringes

SPRINKLER FITTER (Fire Sprinklers)......................$ 36.95 24.66

SHEE0100-015 11/01/2021

SHEET METAL WORKER (Including

HVAC Duct Installation)..........$ 44.37 21.33+a

a. PAID HOLIDAYS: New Year's Day, Martin Luther King's Birthday, Memorial Day, Independence Day, Labor Day, Veterans Day, Thanksgiving Day and Christmas Day

* SUDC2009-003 05/19/2009

Rates Fringes

LABORER: Common or General......$ 13.04 ** 2.80

LABORER: Mason Tender - Cement/Concrete..................$ 15.40 2.85

LABORER: Mason Tender for pointing, caulking, cleaning of existing masonry, brick, stone and cement structures (restoration work); excludes pointing, caulking and cleaning of new or replacement masonry, brick, stone and cement.................$ 11.67 **

POINTER, CAULKER, CLEANER,

Includes pointing, caulking, cleaning of existing masonry, brick, stone and cement structures (restoration work); excludes pointing, caulking, cleaning of new or replacement masonry, brick, stone or cement...........................$ 18.88

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

** Workers in this classification may be entitled to a higher minimum wage under Executive Order 14026 ($15.00) or 13658 ($11.25). Please see the Note at the top of the wage determination for more information.

Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.

Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at https://www.dol.gov/agencies/whd/government-contracts.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).

The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of ""identifiers"" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).

Union Rate Identifiers

A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than ""SU"" or ""UAVG"" denotes that the union classification and rate were prevailing for that classification in the survey. Example:

PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.

Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.

Survey Rate Identifiers

Classifications listed under the ""SU"" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.

Survey wage rates are not updated and remain in effect until a new survey is conducted.

Union Average Rate Identifiers

Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.

A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour National Office because National Office has responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISIO"

The following have been deleted:

AMENDMENT 0004

WAGE RATE DETERMINATION

(End of Summary of Changes)