ATTACHMENT A - CONSTRUCTION AND DESIGN EXPERIENCE PROJECT DATA SHEET.docx
DOCX document 14 KB Posted
- Attached to
- P-5001 DBB, JOINT AIR DEFENSE OPERATIONS PHASE II, JOINT BASE ANACOSTIA-BOLLING, WASHINGTON, DC
- Solicitation number
- N4008021R3502
About this file
This document contains an attachment for collecting construction and design experience project data to be submitted in response to solicitation number N4008021R3502. The solicitation is for the completion of the second phase of a two-story Joint Air Defense Operations Center at Joint Base Anacostia-Bolling in Washington, D.C. The project scope includes a concrete foundation, structural steel frame, concrete masonry walls, roofing system, pavements, utilities, site improvements, security fencing, and communication routing. Special requirements include construction in accordance with Intelligence Community standards for controlled space and use of exterior finishes meeting the base architectural design. The facility must also comply with Department of Defense antiterrorism and force protection criteria. Submissions are due by the date specified in the solicitation issued through the Navy Facilities Engineering Command for this military construction project.
View the file
Other files
Show all 50
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT A
CONSTRUCTION & DESIGN EXPERIENCE PROJECT DATA SHEET
Project No. (check one) : |_| DES #1 |_| DES #2 |_| DES #3 |_| DES #4 |_| DES #5
|_| CON #1 |_| CON #2 |_| CON #3 |_| CON #4 |_| CON #5
1. Experience for: |_| Offeror |_| Joint-Venture |_| Other (Explain)
Firm Name:
Address:
Phone Number:
DUNS Number:
Point of Contact: Contact Phone Number:
2. Work Performed as: |_| Prime Contractor |_| Sub Contractor |_| Joint Venture |_| Other (Explain)
Percent of project work performed:
If subcontractor, who was prime (Name/Phone #):
3. Contract Number: Delivery/Task Order Number:
Title:
Location:
4. Award Date (mm/dd/yy): Completion Date (mm/dd/yy):
5. Type of work:
|_| New Construction |_| Renovation |_| Repair |_| Alteration |_| Other (explain):
6. Type of Contract/Task Order: (Check ALL that apply)
|_| Firm-Fixed Price |_| Cost/Time and Material |_| Other (explain):
Complete Block 7 for Construction Projects. Complete Block 8 for Design Projects.
7. Construction Project:
Award Amount: Final Price:
Type of Contract/Task Order: (Check ALL that apply)
|_| Design-Build |_| Design-Bid-Build |_| Delivery/Task Order (IDIQ) |_| Other (explain):
If Design-Build, identify the Lead Design Firm:______________________________________________
8. Design Project:
A/E Design Fee: Total Construction Value:
Type of Contract/Task Order: (Check ALL that apply)
|_| Design-Build |_| RFP Development |_| Designer of Record |_| Engineering Services |_| Full Plans & Specs
|_| Other (explain):
9. Provide a detailed description of the project and the relevancy to the project requirements of this RFP (i.e.: unique features, square footage, construction methods), including any sustainable features or USGBC LEED certifications. If design-build, include a description of the design-effort.
10. Provide a detailed description of what work your firm self-performed on this project:
File details come from the government source that posted it. Updated .