About this opportunity

Brookhaven Science Associates (BSA) is seeking subcontractors to design and fabricate Electron-Ion Collider (EIC) Hadron Storage Ring (HSR) Beam Position Monitor (BPM) Button Assemblies for the Department of Energy Office of Science. The solicitation (RFP 438477) aims to award up to three subcontracts, with each contractor initially producing 35 preproduction components and having an option for up to 1,355 production components. Technical evaluation will focus on design capabilities, prior experience, manufacturing capabilities, and quality assurance, with pricing being a significant but unscored factor. Proposals were originally due by July 26, 2024, but have been extended multiple times, with the current deadline set for January 17, 2025, at 5:00 PM EST. The technical requirements are stringent, including ultra-high vacuum compatibility, specific electrical performance characteristics, and precise mechanical specifications.

The procurement has no specific set-aside designation and will be awarded to offerors providing the best overall value. The assemblies will be manufactured and delivered to Brookhaven National Laboratory in Upton, NY, with a total potential quantity of up to 1,390 button assemblies across all subcontracts. The period of performance is estimated at 76 weeks after award, with an anticipated award date of October 18, 2024. Each button assembly must meet complex technical requirements, including specific voltage ratings, impedance characteristics, and vacuum performance standards. The contract is categorized under NAICS code 334419 (Other Electronic Component Manufacturing) and PSC code 5945 (Relays and Solenoids), with a firm fixed price to be determined during the selection process. The Department of Energy will exercise an option on one of the subcontracts for the production components, providing the selected contractor with a significant manufacturing opportunity.

Notice text

9 versions

Update #9 · Latest ·

The scope is for the design and fabrication of the HSR BPM Button Assembly for the EIC. BSA shall award up to three (3) subcontracts for 35 each EIC HSR BPM Button Assemblies (preproduction components). Each subcontract shall include an option for up to 1,355 each EIC HSR BPM Button Assemblies (production components). BSA shall exercise an option on one of the subcontracts for the EIC HSR BPM Button Assemblies (production components).

Amendment No. 1 is being issued to incorporate clarification questions and answers into Request for Proposal 438477 by reference and extend the proposal due date through August 16, 2024, 4:00PM EST.

Amendment No. 2 is being issued to incorporate clarification question and answer into Request for Proposal 438477 by reference.

Amendment No. 3 is being issued to incorporate clarification questions and answers into Request for Proposal 438477 by reference.

Amendment No. 4 is being issued to incorporate a clarification question and answer into Request for Proposal 438477 by reference.

Amendment No. 5 is being issued to revise SOW, Technical Specification, and Drawing and incorporate into Request for Proposal 438477 by reference.

Amendment No. 6 is being issued to extend the proposal due date through 12/16/2024 and answer clarification question.  This Amendment shall be incorporated into Request for Proposal 438477 by reference.

Amendment No. 7 is being issued to extend the proposal due date through 1/17/2025.  This Amendment shall be incorporated into Request for Proposal 438477 by reference.

William Koncelik - Please copy the following on all communication since I am retiring on Friday, December 20, 2024.

  • Kevin Kirkendall
  •    kkirkenda@bnl.gov
  •    Phone Number 631-344-4605
  • Carmella Hornbeck
  •   chornbeck@bnl.gov
  •   Phone Number 631-344-7216
Update #8 ·

The scope is for the design and fabrication of the HSR BPM Button Assembly for the EIC. BSA shall award up to three (3) subcontracts for 35 each EIC HSR BPM Button Assemblies (preproduction components). Each subcontract shall include an option for up to 1,355 each EIC HSR BPM Button Assemblies (production components). BSA shall exercise an option on one of the subcontracts for the EIC HSR BPM Button Assemblies (production components).

Amendment No. 1 is being issued to incorporate clarification questions and answers into Request for Proposal 438477 by reference and extend the proposal due date through August 16, 2024, 4:00PM EST.

Amendment No. 2 is being issued to incorporate clarification question and answer into Request for Proposal 438477 by reference.

Amendment No. 3 is being issued to incorporate clarification questions and answers into Request for Proposal 438477 by reference.

Amendment No. 4 is being issued to incorporate a clarification question and answer into Request for Proposal 438477 by reference.

Amendment No. 5 is being issued to revise SOW, Technical Specification, and Drawing and incorporate into Request for Proposal 438477 by reference.

Amendment No. 6 is being issued to extend the proposal due date through 12/16/2024 and answer clarification question.  This Amendment shall be incorporated into Request for Proposal 438477 by reference.

Amendment No. 7 is being issued to extend the proposal due date through 1/17/2025.  This Amendment shall be incorporated into Request for Proposal 438477 by reference.

Update #7 ·

The scope is for the design and fabrication of the HSR BPM Button Assembly for the EIC. BSA shall award up to three (3) subcontracts for 35 each EIC HSR BPM Button Assemblies (preproduction components). Each subcontract shall include an option for up to 1,355 each EIC HSR BPM Button Assemblies (production components). BSA shall exercise an option on one of the subcontracts for the EIC HSR BPM Button Assemblies (production components).

Amendment No. 1 is being issued to incorporate clarification questions and answers into Request for Proposal 438477 by reference and extend the proposal due date through August 16, 2024, 4:00PM EST.

Amendment No. 2 is being issued to incorporate clarification question and answer into Request for Proposal 438477 by reference.

Amendment No. 3 is being issued to incorporate clarification questions and answers into Request for Proposal 438477 by reference.

Amendment No. 4 is being issued to incorporate a clarification question and answer into Request for Proposal 438477 by reference.

Amendment No. 5 is being issued to revise SOW, Technical Specification, and Drawing and incorporate into Request for Proposal 438477 by reference.

Amendment No. 6 is being issued to extend the proposal due date through 12/16/2024 and answer clarification question.  This Amendment shall be incorporated into Request for Proposal 438477 by reference.

Update #6 ·

The scope is for the design and fabrication of the HSR BPM Button Assembly for the EIC. BSA shall award up to three (3) subcontracts for 35 each EIC HSR BPM Button Assemblies (preproduction components). Each subcontract shall include an option for up to 1,355 each EIC HSR BPM Button Assemblies (production components). BSA shall exercise an option on one of the subcontracts for the EIC HSR BPM Button Assemblies (production components).

Amendment No. 1 is being issued to incorporate clarification questions and answers into Request for Proposal 438477 by reference and extend the proposal due date through August 16, 2024, 4:00PM EST.

Amendment No. 2 is being issued to incorporate clarification question and answer into Request for Proposal 438477 by reference.

Amendment No. 3 is being issued to incorporate clarification questions and answers into Request for Proposal 438477 by reference.

Amendment No. 4 is being issued to incorporate a clarification question and answer into Request for Proposal 438477 by reference.

Amendment No. 5 is being issued to revise SOW, Technical Specification, and Drawing and incorporate into Request for Proposal 438477 by reference.

Update #5 ·

The scope is for the design and fabrication of the HSR BPM Button Assembly for the EIC. BSA shall award up to three (3) subcontracts for 35 each EIC HSR BPM Button Assemblies (preproduction components). Each subcontract shall include an option for up to 1,355 each EIC HSR BPM Button Assemblies (production components). BSA shall exercise an option on one of the subcontracts for the EIC HSR BPM Button Assemblies (production components).

Amendment No. 1 is being issued to incorporate clarification questions and answers into Request for Proposal 438477 by reference and extend the proposal due date through August 16, 2024, 4:00PM EST.

Amendment No. 2 is being issued to incorporate clarification question and answer into Request for Proposal 438477 by reference.

Amendment No. 3 is being issued to incorporate clarification questions and answers into Request for Proposal 438477 by reference.

Amendment No. 4 is being issued to incorporate a clarification question and answer into Request for Proposal 438477 by reference.

Update #4 ·

The scope is for the design and fabrication of the HSR BPM Button Assembly for the EIC. BSA shall award up to three (3) subcontracts for 35 each EIC HSR BPM Button Assemblies (preproduction components). Each subcontract shall include an option for up to 1,355 each EIC HSR BPM Button Assemblies (production components). BSA shall exercise an option on one of the subcontracts for the EIC HSR BPM Button Assemblies (production components).

Amendment No. 1 is being issued to incorporate clarification questions and answers into Request for Proposal 438477 by reference and extend the proposal due date through August 16, 2024, 4:00PM EST.

Amendment No. 2 is being issued to incorporate clarification question and answer into Request for Proposal 438477 by reference.

Amendment No. 3 is being issued to incorporate clarification questions and answers into Request for Proposal 438477 by reference.

Update #3 ·

The scope is for the design and fabrication of the HSR BPM Button Assembly for the EIC. BSA shall award up to three (3) subcontracts for 35 each EIC HSR BPM Button Assemblies (preproduction components). Each subcontract shall include an option for up to 1,355 each EIC HSR BPM Button Assemblies (production components). BSA shall exercise an option on one of the subcontracts for the EIC HSR BPM Button Assemblies (production components).

Amendment No. 1 is being issued to incorporate clarification questions and answers into Request for Proposal 438477 by reference and extend the proposal due date through August 16, 2024, 4:00PM EST.

Amendment No. 2 is being issued to incorporate clarification question and answer into Request for Proposal 438477 by reference.

Update #2 ·

The scope is for the design and fabrication of the HSR BPM Button Assembly for the EIC. BSA shall award up to three (3) subcontracts for 35 each EIC HSR BPM Button Assemblies (preproduction components). Each subcontract shall include an option for up to 1,355 each EIC HSR BPM Button Assemblies (production components). BSA shall exercise an option on one of the subcontracts for the EIC HSR BPM Button Assemblies (production components).

Amendment No. 1 is being issued to incorporate clarification questions and answers into Request for Proposal 438477 by reference and extend the proposal due date through August 16, 2024, 4:00PM EST.

Update #1 ·

The scope is for the design and fabrication of the HSR BPM Button Assembly for the EIC. BSA shall award up to three (3) subcontracts for 35 each EIC HSR BPM Button Assemblies (preproduction components). Each subcontract shall include an option for up to 1,355 each EIC HSR BPM Button Assemblies (production components). BSA shall exercise an option on one of the subcontracts for the EIC HSR BPM Button Assemblies (production components).

Files

File Type Posted
RFP 438477 - Amendment No. 7 12DEC24.pdf PDF
RFP 438477 - Amendment No. 6 22NOV24.pdf PDF
Attachment B - SOW for the EIC HSR BPM Button Assembly.pdf PDF
Attachment D - DWG 2551m0003 Rev 5.pdf PDF
Attachment C - Technical Specification for the EIC HSR BPM Button Assembly.pdf PDF
Attachment G - EIC-VSG-SPC-023 Tech Spec Rev 0 04-18-2024.pdf PDF
1. RFP 438477 - Amendment No. 5 07AUG24.pdf PDF
Attachment H - Changes to DWG 2551M0003 Rev 2 - 5.pdf PDF
Enclosure 3 - Proposal Pricing Page.pdf PDF
RFP 438477 - Amendment No. 4 07AUG24.pdf PDF
RFP 438477 - Amendment No. 3 05AUG24.pdf PDF
RFP 438477 - Amendment No. 2 26JUL24.pdf PDF
RFP 438477 - Amendment No. 1 19JUL24.pdf PDF
Attachment G - Specification for Fabrication and Cleaning CAD-1119.pdf PDF
Attachment C Technical Specification for the EIC HSR BPM Button Assembly Rev 2.pdf PDF
Attachment D - DWG 2551m0003 Rev 2 5-29-2024.pdf PDF
Attachment F - Patent Certification.pdf PDF
1. Request for Proposal 438477.pdf PDF
2. Enclosure 1 - Draft Subcontract.pdf PDF
4. Enclosure 3 - Proposal Pricing Page.pdf PDF
Attachment E - BNL QA 101 Form - 438477.pdf PDF
Attachment A - BSA_NonCommercial_Items_Rev22_Sep_2022.pdf PDF
3. Enclosure 2 - Annual Representations - Certifications.pdf PDF
Attachment B - SOW for the EIC HSR BPM Button Assembly.pdf PDF
Attachment G - Specification for Fabrication and Cleaning of CAD Vacuum Chamber Assemblies and Vacuum Components CAD-1119.pdf PDF
Show all 25

Notice history

Notice Type Posted
This notice Latest solicitation Solicitation
EIC HSR BPM Cryo-Button Assembly Original Pre-Solicitation

Similar open opportunities

Opportunity Agency Set-aside Responses due
CPMU - HRD Insertion Device Upton, New York, United States · NAICS 335999 Office of Science No set-aside
PIP-II ssrs and LB650 vacuum gauge and readout Illinois 60510, United States · NAICS 334513 Fermi National Accelerator Laboratory No set-aside
LT-SPM Upton, New York 11973, United States · NAICS 334516 Office of Science No set-aside

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity