Attachment C Technical Specification for the EIC HSR BPM Button Assembly Rev 2.pdf

PDF 490 KB Posted

Attached to
EIC HSR BPM Button Assembly
Solicitation number
438477
Issued by

About this file

This document is a technical specification for the Electron-Ion Collider (EIC) Hadron Storage Ring (HSR) Beam Position Monitor (BPM) Button Assembly to be used at the Electron-Ion Collider at Brookhaven National Laboratory.

The specification defines the technical requirements for the BPM Button Assembly, including electrical requirements, SMA connector contact mating requirements, vacuum requirements, mechanical requirements, materials, construction, and verification testing. Key details include a voltage rating of 700 VDC, VSWR less than 1.2:1 from 20 MHz to 3 GHz, contact resistance less than 4 milliohms, and operation in an ultra-high vacuum environment. The document also references applicable drawings, standards, and cleaning specifications. The related federal contract opportunity is for the design and fabrication of up to 1,390 EIC HSR BPM Button Assemblies, to be awarded by the Department of Energy Office of Science.

View the file

Other files

File Type Posted
RFP 438477 - Amendment No. 7 12DEC24.pdf PDF
RFP 438477 - Amendment No. 6 22NOV24.pdf PDF
Attachment B - SOW for the EIC HSR BPM Button Assembly.pdf PDF
Attachment D - DWG 2551m0003 Rev 5.pdf PDF
1. RFP 438477 - Amendment No. 5 07AUG24.pdf PDF
Attachment H - Changes to DWG 2551M0003 Rev 2 - 5.pdf PDF
Enclosure 3 - Proposal Pricing Page.pdf PDF
Attachment C - Technical Specification for the EIC HSR BPM Button Assembly.pdf PDF
Attachment G - EIC-VSG-SPC-023 Tech Spec Rev 0 04-18-2024.pdf PDF
RFP 438477 - Amendment No. 4 07AUG24.pdf PDF
RFP 438477 - Amendment No. 3 05AUG24.pdf PDF
RFP 438477 - Amendment No. 2 26JUL24.pdf PDF
RFP 438477 - Amendment No. 1 19JUL24.pdf PDF
Attachment G - Specification for Fabrication and Cleaning CAD-1119.pdf PDF
Attachment D - DWG 2551m0003 Rev 2 5-29-2024.pdf PDF
Attachment F - Patent Certification.pdf PDF
3. Enclosure 2 - Annual Representations - Certifications.pdf PDF
Attachment B - SOW for the EIC HSR BPM Button Assembly.pdf PDF
Attachment G - Specification for Fabrication and Cleaning of CAD Vacuum Chamber Assemblies and Vacuum Components CAD-1119.pdf PDF
1. Request for Proposal 438477.pdf PDF
2. Enclosure 1 - Draft Subcontract.pdf PDF
4. Enclosure 3 - Proposal Pricing Page.pdf PDF
Attachment E - BNL QA 101 Form - 438477.pdf PDF
Attachment A - BSA_NonCommercial_Items_Rev22_Sep_2022.pdf PDF
Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Electron-Ion Collider, Brookhaven National Laboratory

Doc No. EIC-ISG-SPC-005 Author: R. Hulsart Effective Date: May 29, 2024 Review Frequency: N/A

Specification Title: EIC HSR BPM Button Assembly Revision: 02

TECHNICAL SPECIFICATION

for the

EIC HSR BPM Button Assembly

Quality Classification: A2

Prepared by:

__________________________________________ Date: __________________ Robert Hulsart, EIC Instrumentation Engineer Electron-Ion Collider Brookhaven National Laboratory

Reviewed By:

Joseph Tuozzolo, Technical Division Group Leader

David Gassner, EIC Instrumentation Group Leader

Matthew Paniccia, C-AD Instrumentation Engineer

Charlie Hetzel, EIC Vacuum Group Leader Electron-Ion Collider Brookhaven National Laboratory

DocuSign Envelope ID: B1C6D7B0-9764-4D54-AA67-3CE6A4B7BCD5

5/29/2024

5/29/2024

5/29/2024

5/31/2024

Joe Zipper, Quality Assurance

Chuck Schaefer, ESH

Cindy Galdamez, Procurement Liaison Engineer

Approved By:

Vadim Ptitsyn, HSR L2 Manager

DocuSign Envelope ID: B1C6D7B0-9764-4D54-AA67-3CE6A4B7BCD5

5/29/2024

5/29/2024

REVISION HISTORY

Revision # Effective Date Summary of Change

00 9/25/2023 Initial Release

01 2/6/2024 Added option for solid copper button, added two plating related document references, and made a few other minor edits/corrections.

02 5/29/2024 Added option for reducing the gap size between the button, and the collar around the button outer edge.

Table of Contents

1 SCOPE

2 APPLICABLE DOCUMENTS

3 REQUIREMENTS

4 VERIFICATION

LIST OF ACRONYMS

ATP Acceptance Test Procedure BNL Brookhaven National Laboratory BPM Beam Position Monitor BSA Brookhaven Science Associates CF ConFlat (Vacuum Flange Type) EIC Electron-Ion Collider ESH Environment, Safety and Health HSR Hadron Storage Ring

OFE

RRR

SOW

Oxygen-Free Electronic Residual Resistivity Ratio Statement of Work

UHV Ultra-High Vacuum VSWR Voltage Standing Wave Ratio

Technical Specification for the EIC HSR BPM Button Assembly

1 SCOPE

This specification defines the technical requirements for the Hadron Storage Ring (HSR) Beam Position Monitor (BPM) Button Assembly to be used at the Electron-Ion Collider (EIC) at Brookhaven National Laboratory (BNL) managed by Brookhaven Science Associates (BSA).

1.1 Background

The EIC Project will design, build, and install the accelerator hardware for a new electron storage ring, a new electron accelerator synchrotron ring with an electron injector, and modifications to the hadron storage ring required to produce an electron ion collider and associated infrastructure.

It will include one interaction region with a complete detector. The EIC is being designed to reserve space for a second interaction region with a second detector. The facility is designed to meet requirements to ensure high reliability and availability for the user program.

The HSR BPM Button Assemblies (Button Assemblies hereafter) will be procured by BSA for installation in the HSR of the EIC. The Button Assemblies will be an integral part of the HSR beam pipe vacuum envelope and will be used to carry radio frequency electrical signals from the interior vacuum region of the storage ring to the cryostat insulating vacuum region.

2 APPLICABLE DOCUMENTS

The following specifications, standards and drawings form a part of this specification to the extent specified herein. Unless otherwise specified, the issues of these documents shall be those in effect on the date of the solicitation or contract. Exceptions must be approved in writing by BSA.

In the event of a conflict between the applicable documents and this specification, the Contractor shall immediately notify the BSA Contractual Representative who shall in each instance determine which document takes precedence and advise the Contractor accordingly. Failure to notify BSA of a document conflict shall not relieve the Contractor’s responsibility to ensure full compliance to all requirements.

Document Number Document Title

2551M0003 Hadron Storage Ring, Beam Instrumentation, 18 mm Button

BPM

Spec. CAD-1119 Specification for fabrication, materials & cleaning of vacuum chamber and components

MIL-STD-348

MIL-PRF-39102

Specifications for SMA Female Connectors

MIL-C-14450B Class 0 Copper Plating

ASTM Standard B571 Standard Practice for Qualitative Adhesion Testing of Metallic Coatings

29 CFR 1910.1200 Hazard Communication

BNL-QA-101 Brookhaven National Laboratory Supplier Quality Assurance Requirements

3 REQUIREMENTS

3.1 Technical/Performance Characteristics

3.1.1 Electrical Requirements

3.1.1.1 Voltage Rating

The Button Assembly shall hold off 700 VDC from the center pin to the flange for 60 seconds duration.

3.1.1.2 Electrical Leakage Resistance – The electrical resistance from the Button Assembly center conductor to the outer housing shall be greater than 107 ohms at 500 VDC.

3.1.1.3 Voltage Standing Wave Ratio (VSWR) - Because of the 50 ohm characteristic impedance of the signal cables, it will be necessary for each Button Assembly to have 50 ohm impedance.

The degree of impedance mismatch shall be quantified by the VSWR which shall be less than 1.2:1 from 20 MHz through 3 GHz.

3.1.1.4 Contact Resistance - The maximum resistance through the center contact shall be less than or equal to 4 milliohms. The contact resistance shall remain less than or equal to 4 milliohms after 300 degrees centigrade bakeout and completion of the contact insert and withdrawal tests described in Section 4.1.2.2 of this Specification.

3.1.1.5 Button Capacitance - Unit-to-unit variation of button capacitance as measured at 100 MHz, at the SMA connector shall be less than 10%.

3.1.2 SMA Connector Contact Mating Requirements

3.1.2.1 Insertion Force Test

• Steel test pin diameter: 0.0365 + 0.0001/-0.0000 in.

• Insertion depth: 0.10 in.

• Test pin finish: 16 micro inches

• Insertion force: 3 pounds, maximum

• Number of insertions: 100

3.1.2.2 Withdrawal Force Test

• Steel test pin diameter: 0.0365 +0.0000/- 0.0001 in.

• Insertion depth: 0.10 in.

• Test pin finish: 16 micro inches

• Withdrawal force: 1 ounce, minimum

• Number of withdrawals: 100

3.1.3 Vacuum Requirements

3.1.3.1 Ultra High Vacuum Environment – The Button Assembly will be used in an ultra-high vacuum (UHV) environment. The flange seal side will be exposed to the beam vacuum (<10-10 Torr). All design details, fabrication techniques, and materials shall be in accordance with this application, as specified in Spec. CAD-1119. The Button Assembly flange is to be used in conjunction with a copper CF gasket vacuum seal.

3.1.3.2 Bake-out – The Button Assembly shall be capable of baking to 300°C without developing leaks and without degradation of its electrical performance. All design details and materials shall be consistent with this application.

3.1.3.3 Cryo-Temperature – The Button Assembly shall be capable of maintaining UHV at 4 K without degradation of its electrical performance. All design details and materials shall be consistent with this application.

3.1.3.3 Leak Rate – The Button Assembly shall have a leak rate of less than 2×10-10 std. cc/sec He when tested with a helium mass spectrometer leak detector with a minimum sensitivity of 1×10-

10 std. cc/sec He, at room temperature and at cryogenic temperature. All leak checking shall be carried out in an UHV-compatible clean environment using oil-free roughing pumps, as specified in Spec. CAD-1119.

3.1.3.4 Cleaning and Handling – During and after fabrication, all components shall be cleaned, free of hydrocarbon contaminants, and handled in accordance with their intended use in UHV systems, as specified in Spec. CAD-1119.

3.1.4 Mechanical Requirements

3.1.4.1 Button material option - The surface of the button as indicated in drawing 2551M0003 shall be copper in order to meet the thermal design requirements of the assembly. The Contractor shall have the option to provide either a solid copper button (preferred) or a copper plated stainless-steel button. The method used to fasten the conductor pin to the button shall ensure a reliable mechanical connection that can withstand repeated thermal cycles over a temperature range of 4 K (-269° C) to 573 K (300° C).

3.1.4.2 Button copper plating option

3.1.4.2.1 Plating Contractor Qualification - If the Contractor prefers to provide a copper plated button, BSA will recommend a qualified plating contractor that has demonstrated a plating method that can produce a copper purity high enough to meet the specifications and achieve a Residual Resistivity Ratio (RRR) greater than 10. The Contractor can suggest an alternate plating subcontractor. In this scenario, BSA will provide unplated coupon blanks to that plating subcontractor. After several coupons are plated, BSA will test the plating characteristics to determine if the plating meets the specifications and RRR requirement. The alternate plating subcontractor can be used only after they are qualified and approved by BSA in writing.

3.1.4.2.2 Surface Plating Requirements - If the button will be copper plated it shall be plated as per MIL-C-14450 Class 0 and ASTM Standard B571 to the mechanical dimensions (thickness, tolerance) defined in drawing 2551M0003. The types of plating metal shall be copper C10100 or C10200 OFE. The plating metal choice, method, and subcontractor (if applicable), shall be approved by BSA in writing.

3.1.4.2.3 Plating Samples – If the button will be copper plated, BSA will provide unplated sample coupons to be used as plating samples during the fabrication process of the preproduction and production units. The plated coupons shall be sent to BNL for testing to ensure the plating meets the specifications. Sample coupons shall be plated at the same time as the buttons using the same metal, method, and subcontractor (if applicable) as the plating for the of the button.

3.1.4.3 Button gap reduction option – The radial gap between the outer edge of the button and the surrounding collar is specified to be 0.020” on drawing 2551M003, region D-4, and indicated as “RADIAL GAP”. As the gap is decreased from 0.020”, the performance of the button increases.

It is preferred that the gap be reduced from 0.020” to a gap that can be as small as 0.010”. It is understood that there are challenges during the fabrication process to provide a smaller gap that ensures concentricity between the button and the surrounding collar. The Contractor may propose a Button Assembly with a radial gap less than 0.020”. If so, the Contractor shall identify any additional cost for the gap reduction.

3.2 Materials

3.2.1 Hazardous Materials - Materials which may be defined as hazardous in accordance with 29 CFR 1910.1200, Hazard Communication shall not be used.

3.2.2 Materials – Written material certification shall be provided for each of the following materials. Materials used shall be non-magnetic.

• Button Assembly – All stainless-steel material shall be AISI 316L as per Spec. CAD- 1119.

• Solid copper button option – Copper C10100 or C10200 OFE material shall be used if solid copper is used for the button.

• Dielectric – The dielectric material used to electrically isolate the center conductor from the outer housing and to mechanically isolate the high vacuum side from the ambient atmosphere side and form a hermetic seal, shall be glass-ceramic (devitrified Si02 plus dopants) or alumina. The use of other materials shall be approved in writing by BSA.

• Insulators - The Button Assembly is to be used in a radiation environment with a maximum rate of about one megarad per year. All materials shall be consistent with this application. Use of Teflon® is specifically prohibited. Insulator materials shall be approved by BSA in writing.

• Conductor pin – The conductor pin that connects the button to the SMA connector shall be a material determined by the Contractor and shall be approved by BSA in writing.

• Conductor pin adapter – The detailed design, material used (beryllium copper C17300 is recommended), and attachment method used for the flexible female pin adapter that is attached to the end of the conductor pin shall be provided by the Contractor and approved by BSA in writing.

3.3 Construction Requirements

3.3.1 Fabrication Requirements – The Button Assembly shall be fabricated in accordance with document Spec. CAD-1119.

3.4 Code/Standard Compliance

3.4.1 SMA Connector – The SMA connector shall be in accordance with the applicable portions of MIL-STD-348 and MIL-PRF-39102, Specifications for SMA Female Connectors.

3.5 Marking and Serialization

3.5.1 Serial Numbers – Each Button Assembly shall be assigned a unique serial number by the Contractor. The serial number shall be laser engraved on the Button Assembly on the non-vacuum surface by the Contractor.

3.5.2 Part Numbers – Each Button Assembly shall be assigned BSA’s part number, as specified on the corresponding drawing. The part number and revision letter shall be laser engraved on the Button Assembly on the non-vacuum surface by the Contractor.

3.6 Packaging/Shipping

Each BPM Assembly shall be individually packaged in a way to ensure protection during the shipping process and put into clean transparent polyethylene bags back-filled with clean, dry nitrogen. Knife-edge flanges and other vacuum-sealing faces shall be protected to prevent damage during transit. The BPM Assemblies shall be shipped to BNL in boxes which are durable enough to facilitate subsequent storage at BNL after completion of incoming inspection. Plastic “peanuts” or other such loose packing material shall not be used by the Contractor in the packaging of the BPMs.

4 VERIFICATION

Appropriate inspection/tests shall be performed to ensure unit conforms to all requirements in section 3 of this specification.

4.1 Classification of inspections

Items covered by this specification shall be subjected to the following tests to determine compliance with all applicable requirements:

4.1.1. Preproduction Tests (of pre-production units)

4.1.1.1 Acceptance Test Performed at Contractor – Compliance with the specification shall be verified using the Acceptance Test Procedure (ATP) generated by the Contractor and approved by BSA in writing. Testing and inspection shall be conducted at the Contractor’s facility. The Contractor shall not commence fabrication of the production units until receiving notification of pre-production unit acceptance and authorization in writing from BSA.

4.1.2. Acceptance Tests

4.1.2.1 Acceptance Tests Performed at Contractor - The Contractor shall submit ATPs for BSA written approval that are in accordance with this specification and all reference documents noted herein. Each BPM Button Assembly shall be tested at the Contractor’s facility to demonstrate compliance with this specification. All data shall be documented and delivered to BSA for review prior to acceptance. In addition, the following tests shall be conducted on each Button Assembly at the Contractor’s facility in accordance with the ATP, prior to delivery to BNL:

• Dimensional Measurement – Dimensions of the Button Assemblies shall be measured for conformance to the drawing requirements. The list of required dimensions that shall be measured will be indicated in the BSA approved ATP.

• Cleanliness - The Button Assemblies shall be inspected for cleanliness and free of hydrocarbon contaminants, see section 3.1.3.4.

• Leak Checking - Shall be performed at room temperature in accordance with this specification.

• Surface Plating – If the button is copper plated, the plated portion of the Button Assembly shall be inspected to ensure a uniform plating thickness of plating metal, good plating adhesion, and no indication of pitting or flaking, see section 3.1.4.2.2.

4.1.2.2 Acceptance Tests Performed at BNL - In addition to the acceptance tests performed at the Contractor’s facility, the Button Assemblies will be acceptance tested at the BNL. Any Button Assemblies that fail to pass these tests shall be returned to the Contractor for analysis and corrective action. The Contractor is responsible for incorporating any configuration changes if it is determined that the failure is caused by a design or manufacturing flaw. The Contractor’s responsibility includes shipping, labor, and materials.

• Electrical Tests - All the Button Assemblies will be tested for conformance with Section

3.1.1 of this Specification. Failure to meet the requirements of that section shall be grounds for rejection.

• Mechanical Tests – Mechanical dimension of the Buttons assemblies will be inspected to ensure they are within the tolerances shown on the mechanical drawing.

• Surface Plating – If the button is copper plated, the plated portion of the Button Assembly will be inspected to ensure compliance with tolerances shown on the mechanical drawing, see section 3.1.4.2.2. Thickness and adhesion measurements will be performed using the test methods called out in ASTM Standard B571. In addition, BSA provided unplated sample coupons that are plated by the plating Contractor at the same time as the button plating, then returned to BNL, will be inspected by BSA for thickness, adhesion, and Residual Resistivity Ratio (RRR) >10, see section 3.1.4.2.2.

• SMA Connector Mating Tests - The SMA connector will be tested for conformance with the insertion and withdrawal force specifications in Section 3.1.2.1 and 3.1.2.2, respectively. The contact resistance will be measured before and after the test to verify conformance with Section 3.1.1.4.

• Cryogenic Thermal Cycling – the Button Assemblies will be thermal cycled multiple times (~10) from room temperature to cryo temperature. Electrical, mechanical, connector, copper plating, and leak checks will be done before and after the sequence of thermal cycling.

• Leak Checking – Button Assemblies will be vacuum baked at >150 degrees Centigrade for a minimum of one hour to remove water vapor prior to leak checking. Leak checking will be performed at room temperature and at cryogenic temperature with a Helium Mass Spectrometer leak detector to determine conformance with paragraph 3.1.3 of this Specification. Failure to meet the requirements of that paragraph shall be grounds for rejection.

• Cleanliness - The Button Assemblies shall be inspected for cleanliness and free of hydrocarbon contaminants, see section 3.1.3.4.

1 SCOPE
1.1 Background
2 APPLICABLE DOCUMENTS
3 REQUIREMENTS
3.1 Technical/Performance Characteristics
3.1.1 Electrical Requirements
3.1.2 SMA Connector Contact Mating Requirements
3.1.3 Vacuum Requirements
3.1.4 Mechanical Requirements
3.2 Materials
3.3 Construction Requirements
3.4 Code/Standard Compliance
3.5 Marking and Serialization
3.6 Packaging/Shipping
4 VERIFICATION
4.1 Classification of inspections
2024-05-31T08:32:15-0700