HSR HF Dipole and Quad SC Magnet PS and Quench
Open Pre-Solicitation Posted
- Solicitation number
- APP00730MB
- Agency
-
Office of Science
Department of Energy
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 335999 All Other Miscellaneous Electrical Equipment and Component Manufacturing
- PSC
- 6130 Converters, Electrical, Nonrotating
- Place of performance
- Upton, New York, United States
- Points of contact
Notice details come from SAM.gov. Updated .
About this opportunity
Brookhaven Science Associates, LLC, operator of Brookhaven National Laboratory under a Department of Energy Office of Science prime contract, is seeking expressions of interest through an RFI/Sources Sought for design, manufacture, inspection, testing, documentation, and delivery of two high-current power supply systems for the Electron-Ion Collider Hadron Storage Ring, with submittals due December 11, 2026 at 5:00 PM EST. No set-aside is used. The RFI is for planning purposes only and does not obligate the government to pay for information received.
Model A serves the HSR main arc dipole circuit at 7000 A maximum output and 400 V, and Model B serves the main arc quadrupole circuit at 7000 A and 100 V. Both are ramped, two-quadrant DC sources with short-term current stability of 10 ppm and long-term stability of 30 ppm, and stored magnetic energy of 110.25 MJ (Model A) and 17.15 MJ (Model B). Installation is at BNL building 1004B. Requirements include NRTL certification of all electrical equipment, an ISO 9001-compliant quality system, supplier quality requirements per BNL-QA-101, IEEE 1202 cables or equivalent, ASME B30.20-2018 lifting devices, a Siemens S7-1515-2PN PLC or equivalent, EPICS controls interfaces, and efficiency above 85% at full load.
Milestones run from award: Preliminary Design Review at 12 weeks, Final Design Review at 20 weeks, delivery at 173 weeks for the quadrupole supply and 186 weeks for the dipole supply. The warranty is a minimum of two years from final acceptance. No dollar value or ceiling is stated.
Responses go to Mark Bryan (mbryan@bnl.gov) and must include a Statement of Work Compliance Matrix, a Budgetary Pricing Table covering nonrecurring engineering and both systems, company background, technical capabilities, schedule, logistics, and any exceptions to BSA General Terms and Conditions for Noncommercial Items (Revision 25.0, September 2026). STEP geometry files are available by emailing the contract specialist; the source states these are simplified stripline kicker models, not mechanical construction files, and that substantial thermal analysis remains for the vendor.
Notice text
2 versions
Update #2 · Latest ·
This is an RFI/Sources Sought for HSR HF Dipole and Quad SC Magnet PS and Quench. Please review the three posted attachments for requested information from your company. All questions and submittals should be sent to the Contract Specialist listed in the RFI document and listed on this SAM.gov posting.
Submittals are due no later than 12/11/2026 at 5PM EST.
Update #1 ·
This is an RFI/Sources Sought for HSR HF Dipole and Quad SC Magnet PS and Quench. Please review the three posted attachments for requested information from your company. All questions and submittals should be sent to the Contract Specialist listed in the RFI document and listed on this SAM.gov posting.
STEP files are available but are unable to be loaded into this system. Please contact the Contract Specialist for those files to be emailed. A technical note for these files: These STEP geometry files are NOT mechanical construction files. The files show a simplified view the 3D stripline kicker geometry based on the electromagnetic design, as illustration for the mechanical implementation of a RF test mockup (no vacuum) and of a vacuum compatible prototype stripline kicker. Beside that, there still is substantial thermal analysis to be performed by the vendor.
Submittals are due no later than 12/11/2026 at 5PM EST.
Files
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| Electron Storage Ring D2 Dipole Magnets | Office of Science | No set-aside | |
| HSR 49.2 MHz RF System Power Amplifiers | Office of Science | No set-aside | |
| Prototype Stripline Kickers | Office of Science | No set-aside | |
| Booster Pol TAL Drive Mtr or its equivalent | Office of Science | No set-aside | |
| Advanced Light Source Upgrade (ALS-U) STORAGE RING (SR) BENDB AND BENDC MAGNETS | Department of Energy | No set-aside |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity