RFP 438477 - Amendment No. 6 22NOV24.pdf

PDF 95 KB Posted

Attached to
EIC HSR BPM Button Assembly
Solicitation number
438477
Issued by

About this file

This document is Amendment No. 6 to Request for Proposal (RFP) No. 438477 for the EIC HSR BPM Button Assembly. The amendment extends the proposal due date to December 16, 2024 and incorporates a clarification that Teflon cannot be used as an insulator for the button assembly, as specified in Section 3.2.2 of the EIC HSR BPM Button Assembly specification. The amendment also notes a change in the connector type from SMA Female to RP SMA Female to simplify the mechanical design and eliminate the risk of reduced elasticity of the female petals after brazing. All other terms and conditions of the RFP remain unchanged.

The related federal contract opportunity is for the design and fabrication of the EIC HSR BPM Button Assembly, with the Department of Energy Office of Science as the procuring agency. BSA shall award up to three subcontracts for 35 preproduction components each, with an option for up to 1,355 production components per subcontract, and will exercise an option on one of the subcontracts for the production components.

View the file

Other files

File Type Posted
RFP 438477 - Amendment No. 7 12DEC24.pdf PDF
Attachment C - Technical Specification for the EIC HSR BPM Button Assembly.pdf PDF
Attachment G - EIC-VSG-SPC-023 Tech Spec Rev 0 04-18-2024.pdf PDF
Attachment B - SOW for the EIC HSR BPM Button Assembly.pdf PDF
Attachment D - DWG 2551m0003 Rev 5.pdf PDF
1. RFP 438477 - Amendment No. 5 07AUG24.pdf PDF
Attachment H - Changes to DWG 2551M0003 Rev 2 - 5.pdf PDF
Enclosure 3 - Proposal Pricing Page.pdf PDF
RFP 438477 - Amendment No. 4 07AUG24.pdf PDF
RFP 438477 - Amendment No. 3 05AUG24.pdf PDF
RFP 438477 - Amendment No. 2 26JUL24.pdf PDF
RFP 438477 - Amendment No. 1 19JUL24.pdf PDF
Attachment G - Specification for Fabrication and Cleaning CAD-1119.pdf PDF
Attachment A - BSA_NonCommercial_Items_Rev22_Sep_2022.pdf PDF
Attachment C Technical Specification for the EIC HSR BPM Button Assembly Rev 2.pdf PDF
Attachment D - DWG 2551m0003 Rev 2 5-29-2024.pdf PDF
Attachment F - Patent Certification.pdf PDF
1. Request for Proposal 438477.pdf PDF
2. Enclosure 1 - Draft Subcontract.pdf PDF
4. Enclosure 3 - Proposal Pricing Page.pdf PDF
Attachment E - BNL QA 101 Form - 438477.pdf PDF
3. Enclosure 2 - Annual Representations - Certifications.pdf PDF
Attachment B - SOW for the EIC HSR BPM Button Assembly.pdf PDF
Attachment G - Specification for Fabrication and Cleaning of CAD Vacuum Chamber Assemblies and Vacuum Components CAD-1119.pdf PDF
Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Property and Procurement Management Division

Building 1005S P.O. Box 5000

Upton, NY 11973-5000

Date: 11/22/2024

Amendment No. 6 to

Request for Proposal (RFP) No. 438477

For

HSR BPM Button Assembly

GENERAL: This Amendment No. 6 is to amend Request for Proposal RFP No. 438477 as follows.

1. Extend the proposal due date through Monday, December 16, 2024, 5:00PM EST.

2. Incorporate the following clarification question into the RFP by reference.

Can Teflon be use as an insulator?

Answer: Section 3.2.2 of the EIC HSR BPM Button Assembly specification (EIC-ISG- SPC-005) states Teflon cannot be used:

A clarification regarding the Button Assembly connector:

In drawing 2551M0003 (Hadron Storage Ring, Beam Instrumentation, 18 mm Button BPM, Rev 2) the connector was indicated as SMA Female, this has been changed to RP SMA Female in the Rev 5 drawing. The two types of connectors mentioned are shown in the picture below for comparison. The motivation to change the connector type to RP SMA Female was to eliminate the female petals and have a post instead. This design change simplifies the mechanical design of the BPM Assembly and eliminates the risk of the female petals having reduced elasticity after a brazing process. The insulator shown in the pictures below is not needed/required on the Button Assembly.

All other terms, conditions, and provisions of this RFP shall remain unchanged.

Material, work, and workmanship, except where specified otherwise in this Amendment shall conform to all requirements of Contract Documents and become a part thereof.

Please confirm receipt of this Amendment No. 6 via email to the following.

Bill Koncelik wkoncelik@bnl.gov

(631) 344-5281 mailto:wkoncelik@bnl.gov

File details come from the government source that posted it. Updated .