This document is a draft subcontract for the design, manufacture, inspection, test, and delivery of EIC HSR BPM Button Assemblies for Brookhaven National Laboratory (BNL).
The subcontract requires the contractor to provide 35 base units (design verification components) and up to 1,355 option units (production components). Key details include: the period of performance is 76 weeks after award, the firm fixed price is to be determined, payment is tied to a milestone schedule, and freight terms are FOB/DAP BNL. The contractor must follow the attached Statement of Work, Technical Specification, Drawing, and Quality Assurance Requirements. The subcontract is issued under BNL's prime contract with the U.S. Department of Energy Office of Science.
View the file
Other files
Show all 24
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Buyer Amount Contract Number
William Koncelik TBD 438477
BROOKHAVEN NATIONAL LABORATORY
Brookhaven Science Associates
P.O. Box 5000
UPTON, L.I., N.Y. 11973-5000
Name and Address of Contractor
SUBCONTRACT
This Contract (the "Contract") is between the party named above (the "Contractor"), and
Brookhaven Science Associates, LLC. ("BSA"), the latter acting under a Prime Contract with the
United States of America (the "Government") represented by the United States Department of
Energy ("DOE”).
I. SCOPE OF WORK
All work shall be conducted in strict accordance with the attached BSA:
Attachment B – Statement of Work, “EIC HSR BPM Button Assembly”, Doc No. EIC-
ISG-SOW-008, Rev. 03, Dated April 16, 2024
Attachment C – Technical Specification, “EIC HSR BPM Button Assembly”, Doc No.
EIC-ISG-SPC-005, Rev. 02, Dated May 29, 2024
Attachment D – DWG No. 2551M0003, Rev 2, dated May 29, 2024.
Attachment (E) – BNL-QA-101 Supplier Quality Assurance Requirements, dated 04/2024
The Contractor shall design, manufacture, inspect, test and deliver the following:
Line Qty Description
1 35 Base - EIC HSR BPM Button Assembly
(design verification component)
Line Qty Description
2 1,355 Option - EIC HSR BPM Button Assembly
(production component)
A. Reports/Deliverables: The Contractor shall provide the following deliverable(s) to and as directed by BSA’s Technical Representative:
Item Deliverable Due SOW section BSA
Approval
1 Program Plan 2 weeks after award of contract
3.3.1 Yes
2 Manufacturing/Ins pection/Test Plan
3 weeks after award of contract
3.3.2 Yes
3 Final design drawings
5 weeks after award of contract
3.4.3 Yes
4 Final design approval by BSA
7 weeks after award of contract
3.4.2 Yes
5 Final design review report
8 weeks after award of contract
3.5.1 Yes
6 Delivery of pre-production units and plating sample coupons
As set forth in approved manufacturing plan
3.3.2 Yes
7 Pre-production units end-item documentation
As set forth in approved manufacturing plan
3.5.3 Yes
8 Delivery of production units and plating sample coupons
As set forth in approved manufacturing plan
3.3.2 Yes
9 Production end-item documentation
As set forth in approved manufacturing plan
3.5.3 Yes
(Service or Item) and Description Due Date
Milestone Calendar weeks after award, milestone completed
Duration weeks
Contract award 0
Program plan 2 2
Manufacturing/inspection/test plan 3 1
Final design review 5 2
Final design approval by BNL 7 2
Contractor preparation & pre-production units delivery (35) with plating sample coupons
25 18
BSA review & final approval of pre-production units & documentation complete, assuming no problems. Start production run.
28 3
Contractor prepares for production quantity fabrication
46 18
Delivery of first batch of 150 production units to BNL with plating sample coupons
50 4
Batch 2 (150) with plating sample coupons
54 4
Batch 3 (150) with plating sample coupons
58 4
Batch 4 (150) with plating sample coupons
62 4
Batch 5 (150) with plating sample coupons
66 4
Batch 6 (150) with plating sample coupons
70 4
Batch 7 (100) with plating sample coupons
74 4
Delivery of end documentation 76 2
Completion 76
II. PERIOD OF PERFORMANCE:
This Subcontract shall be effective as of the date executed by BSA provided that the
Subcontractor executes the Subcontract without exception or alteration. It shall remain in effect through xx/xx/xxxx.
If all quantity options are exercised, the anticipated period of performance shall remain in effect
76 weeks after award of contract.
III. FIRM FIXED PRICE AND PAYMENT
A. Firm Fixed Price: In full consideration of the Contractor's performance hereunder
BSA shall pay the Contractor the firm fixed price of TBD. The said sum shall constitute full compensation for all services and materials furnished hereunder.
B. B. Remaining Balance of EIC HSR BPM Button Assembly (Option): The option to provide the remaining quantity of 1,355 EIC HSR BPM Button Assembly has been priced at XXXX USD ($XXXX) and remains unfunded at time of award. BSA retains the right, should funds become available and it is determined to be in its best interest to do so, to unilaterally exercise this option within 5 months after contract award. The pricing for these services shall remain valid through the award and execution of the
Contract. If the option is exercised, the anticipated period of performance will be XX months.
C. Payment: Payment will be made upon receipt and approval of properly certified invoices. Payment will be in accordance with the following milestone payment schedule:
Cumulative
Milestone Amount Amount
Total $.00 $.00
Payment terms are Net TBD.
Invoices shall be directed to BSA’s Accounts Payable Section via electronic or regular mail.
Electronic invoice submittal is preferred by BSA. The Contractor shall make every effort to have systems in place that allow for electronic invoice transmittal.
Invoices shall be submitted in PDF format, via e-mail, to apinvoices@bnl.gov.
Hard copy invoices, in duplicate, shall be directed to BSA's Accounts Payable
Section, Contracts Division, Bldg. No. 400d.
The Contractor shall indicate the final invoice by clearly marking such invoice as
"FINAL". A copy of the final invoice must be submitted to BSA’s Contractual
Representative.
D. Freight: Freight terms shall be (for North American shipments insert: ) FOB BSA
National Laboratory, 98 Rochester Street, Upton, Long Island, New York. Freight
Prepaid, (for foreign shipments insert :) “DAP” Delivered At Place, BSA National
Laboratory, 98 Rochester Street, Upton, Long Island, New York.
E. Shipping and Labeling: Unless otherwise specified, standard Shipping
Instructions apply. Standard Shipping Instructions are provided at https://www.bnl.gov/shipping/.
Two (2) weeks prior to delivery of all items the contractor shall contact BSA as to the type of freight carrier that will be used.
Delivery Hours:
All deliveries must arrive at BSA National Laboratory (BNL), at the above address, Building 98 between the hours of 8:00 am to 11:45 am or from 12:30 pm to 4:00 pm EST, Monday through Friday. Any delivery outside normal delivery hours will
NOT be accepted unless advanced notification was provided and arrangements were made through Receiving (631-344-2310, 631-344-4336, or 631-344-2300 or via email at: warehouseoperations@bnl.gov.
Special Notification of Delivery:
Advanced Notice, within 72 hours of expected delivery to BNL, shall be provided by the supplier or shipper to BSA’s Receiving department either by telephone at:
631-344-2310, 631-344-4336, or 631-344-2300, OR via email at:
warehouseoperations@bnl.gov due to weight, size, and/or volume parameters of the end item(s) requiring special material handling/rigging by BSA personnel.
Failure to contact BSA will result in delays during delivery and demurrage will be at the supplier’s/shipper’s expense.
Package Labeling Requirements:
All packages delivered to BNL must be labeled with the complete Purchase
Order/Contract Number as a minimum. Each shipping container (transport package) with a gross weight equal to or greater than 400 pounds (180 kilograms) must be marked with the center of gravity and gross weight on at least one side, or end panel in addition to meeting the requirements of the latest revision of ASTM
Standard D 3951-98, Standard Practice for Commercial Packaging. This applies to any item shipped (originally packaged or repackaged) to BNL or other locations cited in the purchase order or contract.
Ocean Shipments:
https://www.bnl.gov/shipping/ mailto:warehouseoperations@bnl.gov mailto:warehouseoperations@bnl.gov
For foreign shipments that will be transported via ocean freight the 10-2
REQUIREMENTS Form located at https://www.bnl.gov/shipping/files/pdf/10-2-security-filing-bnl-interfreight.pdf must be completed by the supplier 72 hours before departure of the vessel. The form can either be faxed to Interfreight
Harmonized Logistics, Inc. at 516-371-6880 or emailed to tom@interfreight.net. A copy should also be emailed to warehouseoperations@bnl.gov. Once the form is submitted to customs an acceptance number will be given. No freight will be loaded on a vessel without this acceptance number.
Special notice regarding 10-2 Form: On July 9, 2013 US Customs and Border
Protection began full enforcement of Importer Security Filing (ISF) and will assess liquidated damages for violations. Failure to submit the 10-2 Form may result in fines from $5,000 up to $15,000. It is the Contractor’s responsibility to make sure
Form 10-2 is submitted 72 hours prior to the vessel sailing. BSA shall withhold payment from the Contractor’s final invoice for any penalties incurred by BSA due to late or incorrect ISF filing by the Contractor. For more information go to https://www.cbp.gov/border-security/ports-entry/cargo-security/importer-security-filing-102.
All Ocean Bill of Ladings and Airway Bills must be addressed to:
Brookhaven National Laboratory
Bldg. 98
Upton, New York 11973
In addition, the Contractor must notify:
Interfreight Harmonized Logistics Inc.
221 Sheridan Blvd.
Inwood, NY 11096 / USA
Phone 1-516-371-0775
The Contractor must fax or e-mail immediately to Interfreight copies of:
Ocean Bill of lading or Airway Bill
Commercial Invoice
Packing List
Fax 1-516-371-6880 e-mail Tom@interfreight.net
IV. AUTHORIZED REPRESENTATIVES
A. BSA’s Technical Representative: (He/She) of the Electron Ion Collider (EIC), located in Building 911A is BSA's Technical Representative, hereunder. He shall act as liaison between BSA and the Contractor in technical matters only. He can be reached at (631) xxx-xxxx (phone), __________(e-mail).
B. BSA’s Contractual Representative: William Koncelik, located in Building
1005S, telephone no. (631) 344-5281, wkoncelik@bnl.gov (e-mail), is BSA's
Contractual Representative. Any change or modification in the terms and conditions of this contract shall require the written approval of BSA's Procurement https://www.bnl.gov/shipping/files/pdf/10-2-security-filing-bnl-interfreight.pdf https://www.bnl.gov/shipping/files/pdf/10-2-security-filing-bnl-interfreight.pdf mailto:warehouseoperations@bnl.gov https://www.cbp.gov/border-security/ports-entry/cargo-security/importer-security-filing-102 https://www.cbp.gov/border-security/ports-entry/cargo-security/importer-security-filing-102 mailto:wkoncelik@bnl.gov and Property Management Division’s Manager, or his designee.
C. Contractor’s Technical Representative: ________ is the Contractor’s authorized
Technical Representative, hereunder. (He/She) shall act as point of contact between
BSA and the Contractor in technical matters only. (He/She) can be reached at
________(phone), _____(e-mail).
D. Contractor’s Contractual Representative: ______________is the Contractor’s authorized Contractual Representative, hereunder. (He/She) shall act as liaison between BSA and the Contractor. (He/She) can be reached at _______(phone), ____________(e-mail).
V. PATENT CERTIFICATION
Upon contract expiration and completion of all work authorized under this contract, the
Contractor shall complete and execute the attached “Patent Certification” clearance form and forward it to the Contractual Representative. Failure to do so may result in the withholding of final payment or a portion thereof.
VI. ADDITIONAL TERMS
The provisions of Brookhaven Science Associates, LLC General Terms and Conditions for
Non-Commercial Items, Rev 22.0 Sept 2022 are incorporated herein and made a part hereof.
This Contract is issued pursuant to Brookhaven Science Associates General and/or
Supplemental terms and conditions listed above which are incorporated herein by reference. The complete text of these terms and conditions can be viewed via the internet at: https://www.bnl.gov/ppm/terms-and-conditions.php. Should the Contractor have any questions and/or not have access to these terms and conditions, contact the buyer or contracts specialist immediately.
The following documents attached hereto and made a part hereof, contain additional provisions of this contract:
Attachment (A) – BSA General Terms and Conditions for Non-Commercial Items, Rev. 22.0; (Sep.
2022)
Attachment (B) – Statement of Work – “EIC HSR BPM Button Assembly” Doc No. EIC-ISG-
SOW-008, Rev. 03, Dated April 16, 2024
Attachment (C) – Technical Specification – “EIC HSR BPM Button Assembly” Doc No. EIC-
ISG-SPC-005, Rev. 02, Dated May 29, 2024
Attachment (D) – DWG No. 2551m0003, Rev 2., Dated May 29, 2024
Attachment (E) – BNL-QA-101 Supplier Quality Assurance Requirements, dated 04/2024
Attachment (F) – Patent Certification, AMS Form 032 (Rev 1), dated 7/19/17
Attachment (G) - Specification for Fabrication and Cleaning of CAD Vacuum Chamber
Assemblies and Vacuum Components CAD-1119, Rev B, 01/12/2012
This Contract does not bind nor purport to bind the Government of the United States.
ACCEPTED:
CONTRACTOR BROOKHAVENSCIENCE
ASSOCIATES, LLC.
By: By:
Name: Name:
Title: Title:
Date: Date:
Should you accept this Contract without exception or alteration, one copy of the Contract executed by both parties shall be returned to BSA's Contractual Representative. Should you take any exceptions or attempt to alter the Contract in any manner, BSA's execution thereof shall be null and void. Should you wish to take exception(s)/alteration(s), you shall notify BSA's Contractual
Representative. BSA will consider the requested exception(s)/alteration(s) and notify you accordingly. No Contract shall exist unless and until such differences are resolved.
File details come from the government source that posted it. Updated .