~WRL0001.tmp

101 KB Posted

Attached to
High School Roof Replacement
Solicitation number
RFP MASO 260000002613 1
Issued by
Genesee County, Edmore Village, Michigan

About this file

This is a bid form for a roofing replacement project issued by Mason Consolidated Schools for Mason High School located at 2400 Mason Eagle Dr, Erie, MI 48133. The project encompasses roofing replacements scheduled for summer 2027, with work required to be completed by August 20th, 2027. The base bid includes replacement of Roofs 1, 7, 8, 10, 11, 12, 13, 14, and 15 using THERMastic 80 and TremPly KEE installation as specified. Alternate Bid #1 expands the scope to include Roofs 2 and 9 in addition to those listed in the base bid. Sealed bids must be submitted to Eric Hoogendoorn at Mason High School by September 24th, 2026, at 11:00 a.m., with public opening and reading of bids immediately following the deadline. Bidders are required to have visited the site and familiarized themselves with all conditions and requirements.

The bid requires unit pricing for metal deck work per square foot, nailer replacement for 2x4, 2x6, and 2x8 lumber per linear foot, new clamping rings, cracked drain bowl replacement, and re-tapping of drain bolts. A material escalation allowance of $100,000 is included to cover documented increases in material costs occurring after the bid date and approved by the owner, with unused amounts reverting to the owner. Bidders must submit a bid guarantee equal to five percent of the base bid amount in the form of cash, check, or bid bond. A duly licensed contractor in the state of Michigan is required, and the bidder must execute a contract and furnish surety within 10 days of Notice of Award if offered within 60 days of bid receipt.

Text of this file

This TremcoSpec document serves as the bid form for public and private projects. Edit in conjunction with Owner. Owner’s counsel should review document.

DOCUMENT 00401 – BID FORM

Mason Consolidated Schools - Bidder: _________________________________ Mason High School

(Bidder enter name here)

Summer of 2027 Roofing Replacements

BASE BID CONTRACT

The undersigned Bidder, having carefully examined the Bidding and Contract Requirements, Conditions of the Contract, Drawings, Specifications, dated 08/13/2026 and all subsequent Addenda, all as issued by the Owner, having visited the site, and being familiar with all conditions and requirements of the Work, hereby agrees to furnish all miscellaneous materials, labor, equipment and services as described in the above documents, without exception, including all scheduled allowances if any, necessary to complete the work. Bids are to be delivered to Eric Hoogendoorn at Mason High School 2400 Mason Eagle Dr, Erie, MI 48133 by September 24th, 2026, no later than 11:00 a.m.. Sealed bids must be received by the bid deadline. Bids received after the deadline will not be accepted or considered. Bids will be publicly opened and read aloud immediately following the bid due time.

BASE BID #1 Mason High School Roofing Replacements (Roofs 1, 7, 8, 10, 11, 12, 13, 14, and 15) THERMastic 80 and TremPly KEE installation as specified.

Dollars ($

Alternate BID #1 Mason High School Roofing Replacements (Roofs 1, 2, 7, 8, 9, 10, 11, 12, 13, 14, and 15) THERMastic 80 and TremPly KEE installation as specified.

Dollars ($

Unit Pricing

Metal Deck

$_________________, per square foot

Nailer Replacement 2 x 4 $___________________, per linear foot

2 x 6 $___________________, per linear foot

2 x 8 $___________________, per linear foot

New Clamping ring $_________

Replace Cracked Drain Bowl $_________

Re-tap drain bolts $_________ Contingency Allowance

Include a Material Escalation Allowance in the amount of $100,000. Allowance shall be used only for documented increases in material costs occurring after bid date and approved by Owner. Unused amounts shall revert to Owner.

BID GUARANTEE

The undersigned Bidder agrees to execute a contract for this Work in the above amount and to furnish surety as specified within 10 days after Notice of Award, if offered within 60 days after receipt of bids, and upon failure to do so agrees to forfeit to the Owner the attached cash, cashier's check, certified check, U. S. money order, or bid bond, as liquidated damages for such failure, in the amount of:

Dollars ($

This stated amount constituting five percent (5%) of the Base Bid amount above; otherwise, the cash, cashier's check, certified check, U. S. money order, or bid bond shall be returned to the undersigned.

TIME OF COMPLETION

The undersigned Bidder proposes and agrees hereby to commence the Work of the Contract Documents on a date specified in a written “Notice to Proceed” to be issued by the OWNER and shall fully complete the work within the required time allowed. The owner requires work to be completed by August 20th, 2027.

ACKNOWLEDGEMENT OF ADDENDA

The undersigned Bidder acknowledges receipt of and use of the following Addenda in the preparation of this Bid:

Addendum No. 1, dated _____________, Addendum No. 2, dated ____________

BID FORM SUPPLEMENTS

Attached to this Bid Form and incorporated herein are the following documents, completed in full by the undersigned:

CONTRACTOR'S LICENSE

The undersigned further states that they are a duly licensed Contractor, for the type of work proposed, in the State of Michigan, and that all fees, permits, etc., pursuant to the submission of this proposal have been paid in full.

SUBMISSION OF BID

Respectfully submitted this ____ day of ____________, 2026.

By:

(Name of bidding firm or corporation)

Witness:

(Signature)

Attest:

(Signature)

(Type or print name)

Title:

(Type or print name)

(Owner/Partner/President/Vice Pres.)

Title:

Address:

(Corporate Secretary or Assistant Secretary Only) Phone:

License:

Federal ID No.:

(Affix Corporate Seal Here)

DOCUMENT 00411

00401 - 1

Other files

File Type Posted
Roof-System-Attachment-Slope,-Transition,-Change-in-Plane.pdf PDF
Gutter-Flashing-Model.pdf PDF
Roof-Drain-with-Gravel-Guard.pdf PDF
Hot-Stack-Penetration.pdf PDF
Door-Threshold-Model.pdf PDF
Flashing-for-Non-Wall-Supported (1).pdf PDF
Roof-Hatch-Model.pdf PDF
Metal-Sleeve-and-Storm-Collar.pdf PDF
Metal-Flashing,-Round-to-Square.pdf PDF
Piping-Through-Roof-Deck.pdf PDF
Typical-Covers-at-Membrane-T-Laps-Model.pdf PDF
2-Piece-Shop-Fabricated-Metal-Edge-Flashing-Model.pdf PDF
Field-Fabricated-Pipe-Flashing-Model.pdf PDF
Curb-for-Air-Handling-Unit.pdf PDF
Wood-Curb-Model.pdf PDF
Base-Sheet-Fastener-7-Inch.pdf PDF
Roof 13 to 15 Detail.pdf PDF
Mason Middle School- Alternate AOC.pdf PDF
Mason High School- AOC.pdf PDF
Mason High School Summer of 2027 Roofing Scope of Work.docx DOCX document
TremPly-KEE-at-Fascia-System-Raised-Cant-Edge-Model.pdf PDF
Composite-Roof-System-Cross-Section-Adhered-ISO-Hot-Model.pdf PDF
Pre-Molded-Pipe-Flashing-Model.pdf PDF
Typical-Edge-Flashing-Model.pdf PDF
Light-Metal-Parapet-Cap.pdf PDF
Notice To Bidders Mason High School Summer of 2027.docx DOCX document
AFFIDAVIT OF COMPLIANCE IRAN.docx DOCX document
Familial Relationship Disclosure.docx DOCX document
Mason High School Summer of 2027 Roofing Bid Form.doc DOC document
Project-Mason High School THERMastic 80 Roofing Replacements.pdf PDF
Plumbing-Vent-Model.pdf PDF
Equipment-Stand-Rain-Collar.pdf PDF
TLRFIA-over-Steel-Model.pdf PDF
Conduit-or-Piping-Support.pdf PDF
Gauge-or-Thickness-Guide.pdf PDF
Slip-Metal-Skirt-Flashing.pdf PDF
Dail-Water-Stop-Tie-In-Model.pdf PDF
Pitch-Pocket-with-Grout.pdf PDF
Show all 38

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .