TLRFIA-over-Steel-Model.pdf
PDF 167 KB Posted
- Attached to
- High School Roof Replacement
- Solicitation number
- RFP MASO 260000002613 1
- Issued by
- Genesee County, Edmore Village, Michigan
About this file
This is a technical specification sheet for Tremco Low Rise Foam Insulation Adhesive application procedures related to a roofing project. The document provides detailed installation guidelines for applying foam insulation boards to steel roof decks. Key application requirements include placing insulation boards into the adhesive within 15 seconds of foam initiation, applying adhesive at 12 inches on center in the field of the roof at four beads per board, increasing to 6 inches on center in perimeter areas at eight beads per board, and 4 inches on center in corner areas at twelve beads per board. Ideal ambient temperature for application is 45 degrees Fahrenheit and rising, with material temperature maintained between 70 and 85 degrees Fahrenheit. Critical installation notes specify that boards must be stepped into place without repositioning once set, and adhesive must not be puddled or mounded to prevent excessive rise and uneven board surfaces.
The document does not contain information regarding pricing terms, contract duration, funding sources, bid submission dates, or other commercial terms associated with a procurement opportunity. This appears to be a technical specification drawing intended to establish installation standards for a roofing insulation project rather than a standalone bidding document.
View the file
Other files
Show all 38
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SHEET TITLE:
DRAWING No.:
SCALE:
NTS
TLRFIA-002
TREMCO LOW RISE FOAM
INSULATION ADHESIVE
NOTE:
1. INSULATION BOARDS MUST BE PLACED INTO THE ADHESIVE AS SOON AS IT STARTS TO FOAM (WITHIN 15 SECONDS). STEP BOARDS
INTO PLACE. DO NOT REPOSITION BOARDS ONCE THEY ARE SET. DO NOT PUDDLE OR MOUND THE ADHESIVE AS THIS CAN LEAD TO
EXCESSIVE RISE AND BOARD SURFACE UNEVENNESS.
2. IDEAL AMBIENT TEMPERATURE FOR APPLICATION IS 45F AND RISING. MATERIAL TEMPERATURE MUST BE BETWEEN 70F AND 85F.
3. APPLY ADHESIVE AT 12" O.C. AT THE FIELD OF THE ROOF (4 BEADS PER BOARD).
4. APPLY ADHESIVE AT 6" O.C. IN PERIMETER AREAS (8 BEADS PER BOARD) AND 4" O.C IN CORNER AREAS (12 BEADS PER BOARD).