2-Piece-Shop-Fabricated-Metal-Edge-Flashing-Model.pdf

PDF 113 KB Posted

Attached to
High School Roof Replacement
Solicitation number
RFP MASO 260000002613 1
Issued by
Genesee County, Edmore Village, Michigan

About this file

This is a technical specification document for a 2-piece shop fabricated metal edge flashing system, with drawing number 01 prepared in 2023 at a scale of NTS (not to scale). The document provides detailed construction specifications for metal edge flashing installation, including the attachment of insulation per specification requirements, wood blocking secured at 250 pounds per linear foot, and a clip-on metal fascia system. The system incorporates Tremply Kee LV bonding adhesive, hot air welding of the Tremply Kee membrane, and fastening with galvanized annular ring shank nails spaced at 3 inches on center. The flashing assembly includes a continuous metal cant dam, Tremply Kee membrane flashing strips, and optional butyl sealing tape, with metal components specified at 1 gauge heavier than the fascia.

No pricing terms, bid response dates, contract award dates, contract term information, set-asides, incumbent contractors, or funding sources are specified in this technical drawing document. The file appears to be a standard detail sheet intended for use in construction specifications and bid documentation but does not contain procurement timeline information, budgetary parameters, or other commercial terms associated with the contract opportunity.

View the file

Other files

File Type Posted
Roof-System-Attachment-Slope,-Transition,-Change-in-Plane.pdf PDF
Gutter-Flashing-Model.pdf PDF
Roof-Drain-with-Gravel-Guard.pdf PDF
Hot-Stack-Penetration.pdf PDF
Door-Threshold-Model.pdf PDF
Flashing-for-Non-Wall-Supported (1).pdf PDF
Roof-Hatch-Model.pdf PDF
Metal-Sleeve-and-Storm-Collar.pdf PDF
Metal-Flashing,-Round-to-Square.pdf PDF
Piping-Through-Roof-Deck.pdf PDF
Typical-Covers-at-Membrane-T-Laps-Model.pdf PDF
Field-Fabricated-Pipe-Flashing-Model.pdf PDF
Curb-for-Air-Handling-Unit.pdf PDF
Wood-Curb-Model.pdf PDF
Base-Sheet-Fastener-7-Inch.pdf PDF
Roof 13 to 15 Detail.pdf PDF
Mason Middle School- Alternate AOC.pdf PDF
Mason High School- AOC.pdf PDF
Mason High School Summer of 2027 Roofing Scope of Work.docx DOCX document
TremPly-KEE-at-Fascia-System-Raised-Cant-Edge-Model.pdf PDF
Composite-Roof-System-Cross-Section-Adhered-ISO-Hot-Model.pdf PDF
Pre-Molded-Pipe-Flashing-Model.pdf PDF
Typical-Edge-Flashing-Model.pdf PDF
Light-Metal-Parapet-Cap.pdf PDF
Notice To Bidders Mason High School Summer of 2027.docx DOCX document
AFFIDAVIT OF COMPLIANCE IRAN.docx DOCX document
Familial Relationship Disclosure.docx DOCX document
Mason High School Summer of 2027 Roofing Bid Form.doc DOC document
~WRL0001.tmp —
Project-Mason High School THERMastic 80 Roofing Replacements.pdf PDF
Plumbing-Vent-Model.pdf PDF
Equipment-Stand-Rain-Collar.pdf PDF
TLRFIA-over-Steel-Model.pdf PDF
Conduit-or-Piping-Support.pdf PDF
Gauge-or-Thickness-Guide.pdf PDF
Slip-Metal-Skirt-Flashing.pdf PDF
Dail-Water-Stop-Tie-In-Model.pdf PDF
Pitch-Pocket-with-Grout.pdf PDF
Show all 38

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

INSULATION ATTACHED PER

SPECIFICATION REQUIREMENTS

WOOD BLOCKING

ATTACHED @ 250 LBF/FT

CLIP ON METAL FASCIA SYSTEM

TREMPLY KEE LV BONDING ADHESIVE

HOT AIR WELD

TREMPLY KEE MEMBRANE

FASTEN WITH GALVANIZED ANNULAR

RING SHANK NAILS (3" O.C.)

BUTYL SEALING TAPE (OPTIONAL)

(1 GA. HEAVIER THAN FASCIA)

CONTINUOUS METAL CANT DAM

TREMPLY KEE MEMBRANE FLASHING STRIP

SHEET TITLE:

DRAWING No.:

SCALE:

NTS

2-PIECE SHOP FABRICATED

METAL EDGE FLASHING

DWG NO. 01

Sheets and Views
Model

File details come from the government source that posted it. Updated .