This is a technical drawing document that provides specifications for installing hot and cold piping through a built-up roofing (BUR) system. The drawing details the installation methodology for penetrating pipes through roof decks, including the layering sequence, fastening requirements, and weatherproofing measures necessary to ensure proper functionality and water resistance.

The specification requires wood nailers secured to the roof deck using appropriate fasteners in two staggered rows spaced 24 inches on center. The BUR insulation must be installed over the deck, followed by two-ply stripping flange set in specified asphalt cement and mechanically fastened at 3-inch intervals. A sheet metal collar and hood assembly must be installed with proper slope and drainage considerations, with fasteners spaced 8 inches on center. The metal work requires prime coating before stripping application, and pipes must slope downward and away from the hood. In cold climates, the interior of the metal work must be insulated. All joints and connections are sealed with asphalt cement, and metal screw seal closures are specified to complete the detail. The drawing is scaled as "not to scale" (NTS) and is dated 2023.

View the file

Other files

File Type Posted
Roof-System-Attachment-Slope,-Transition,-Change-in-Plane.pdf PDF
Gutter-Flashing-Model.pdf PDF
Roof-Drain-with-Gravel-Guard.pdf PDF
Hot-Stack-Penetration.pdf PDF
Door-Threshold-Model.pdf PDF
Flashing-for-Non-Wall-Supported (1).pdf PDF
Roof-Hatch-Model.pdf PDF
Metal-Sleeve-and-Storm-Collar.pdf PDF
Metal-Flashing,-Round-to-Square.pdf PDF
Typical-Covers-at-Membrane-T-Laps-Model.pdf PDF
2-Piece-Shop-Fabricated-Metal-Edge-Flashing-Model.pdf PDF
Field-Fabricated-Pipe-Flashing-Model.pdf PDF
Curb-for-Air-Handling-Unit.pdf PDF
Wood-Curb-Model.pdf PDF
Base-Sheet-Fastener-7-Inch.pdf PDF
Roof 13 to 15 Detail.pdf PDF
Mason High School Summer of 2027 Roofing Bid Form.doc DOC document
~WRL0001.tmp —
Project-Mason High School THERMastic 80 Roofing Replacements.pdf PDF
Plumbing-Vent-Model.pdf PDF
Equipment-Stand-Rain-Collar.pdf PDF
TLRFIA-over-Steel-Model.pdf PDF
Conduit-or-Piping-Support.pdf PDF
Gauge-or-Thickness-Guide.pdf PDF
Slip-Metal-Skirt-Flashing.pdf PDF
Dail-Water-Stop-Tie-In-Model.pdf PDF
Pitch-Pocket-with-Grout.pdf PDF
Mason Middle School- Alternate AOC.pdf PDF
Mason High School- AOC.pdf PDF
Mason High School Summer of 2027 Roofing Scope of Work.docx DOCX document
TremPly-KEE-at-Fascia-System-Raised-Cant-Edge-Model.pdf PDF
Composite-Roof-System-Cross-Section-Adhered-ISO-Hot-Model.pdf PDF
Pre-Molded-Pipe-Flashing-Model.pdf PDF
Typical-Edge-Flashing-Model.pdf PDF
Light-Metal-Parapet-Cap.pdf PDF
Notice To Bidders Mason High School Summer of 2027.docx DOCX document
AFFIDAVIT OF COMPLIANCE IRAN.docx DOCX document
Familial Relationship Disclosure.docx DOCX document
Show all 38

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DWG NO. 18

BUILT UP ROOFING

HOT/COLD PIPING THROUGH ROOF DECK

WOOD NAILER SECURED

SPECIFIED BUR

INSULATION

ROOF DECK

TO DECK w/ APPROPRIATE

FASTENERS, 2 ROWS

STAGGERED EACH

ROW 24'' O.C.

AS SPECIFIED

GRAVEL SURFACING

TWO-PLY STRIPPING

FLANGE SET IN SPECIFIED

ASPHALT CEMENT,

MECHANICALLY FASTENED

3'' O.C., PRIME METAL

FLANGE BEFORE STRIPPING

SLOPE PIPES DOWN

AND AWAY FROM

HOOD

FASTENERS 8'' O.C.

SHEET METAL

COLLAR

SEAL

INSULATE INSIDE OF

METAL WORK IN COLD

CLIMATES

SHEET METAL HOOD

CROSS BREAK

OR SLOPE FOR

DRAINAGE

METAL SCREW

SEAL

CLOSURE DETAIL

ASPHALT CEMENT

SEAL

MEMBRANE

SHEET TITLE:

DRAWING No.:

SCALE:

NTS

Sheets and Views
Model

File details come from the government source that posted it. Updated .