About this file

This is a technical specification document for field-fabricated pipe flashing, presenting detailed construction requirements for pipe penetration installations. The specification outlines the materials and assembly methods required for creating flashing membranes around pipe penetrations, with particular emphasis on the Tremply Plus system components. Key materials specified include non-reinforced Tremply Plus field-formed flashing membrane, Tremply Kee LV bonding adhesive, stainless steel worm gear clamps, approved sealant, and fasteners with stress plates (minimum four fasteners required). The installation process incorporates hot air welding techniques, with insulation attached per Tremply Kee membrane specifications and an 8-inch minimum clearance requirement. The document is identified as Drawing No. 27, with a scale notation of NTS (Not To Scale), and is dated 2023.

No pricing terms, contract award dates, response deadlines, site visit requirements, bidder conferences, set-asides, incumbents, or funding information is provided in this technical specification document. This appears to be a standard engineering drawing and specification reference document that would be incorporated into a larger contract or project specification package, rather than a standalone procurement or contract opportunity document.

View the file

Other files

File Type Posted
Roof-System-Attachment-Slope,-Transition,-Change-in-Plane.pdf PDF
Gutter-Flashing-Model.pdf PDF
Roof-Drain-with-Gravel-Guard.pdf PDF
Hot-Stack-Penetration.pdf PDF
Door-Threshold-Model.pdf PDF
Flashing-for-Non-Wall-Supported (1).pdf PDF
Roof-Hatch-Model.pdf PDF
Metal-Sleeve-and-Storm-Collar.pdf PDF
Metal-Flashing,-Round-to-Square.pdf PDF
Piping-Through-Roof-Deck.pdf PDF
Typical-Covers-at-Membrane-T-Laps-Model.pdf PDF
2-Piece-Shop-Fabricated-Metal-Edge-Flashing-Model.pdf PDF
Curb-for-Air-Handling-Unit.pdf PDF
Wood-Curb-Model.pdf PDF
Base-Sheet-Fastener-7-Inch.pdf PDF
Roof 13 to 15 Detail.pdf PDF
Mason Middle School- Alternate AOC.pdf PDF
Mason High School- AOC.pdf PDF
Mason High School Summer of 2027 Roofing Scope of Work.docx DOCX document
TremPly-KEE-at-Fascia-System-Raised-Cant-Edge-Model.pdf PDF
Composite-Roof-System-Cross-Section-Adhered-ISO-Hot-Model.pdf PDF
Pre-Molded-Pipe-Flashing-Model.pdf PDF
Typical-Edge-Flashing-Model.pdf PDF
Light-Metal-Parapet-Cap.pdf PDF
Notice To Bidders Mason High School Summer of 2027.docx DOCX document
AFFIDAVIT OF COMPLIANCE IRAN.docx DOCX document
Familial Relationship Disclosure.docx DOCX document
Mason High School Summer of 2027 Roofing Bid Form.doc DOC document
~WRL0001.tmp —
Project-Mason High School THERMastic 80 Roofing Replacements.pdf PDF
Plumbing-Vent-Model.pdf PDF
Equipment-Stand-Rain-Collar.pdf PDF
TLRFIA-over-Steel-Model.pdf PDF
Conduit-or-Piping-Support.pdf PDF
Gauge-or-Thickness-Guide.pdf PDF
Slip-Metal-Skirt-Flashing.pdf PDF
Dail-Water-Stop-Tie-In-Model.pdf PDF
Pitch-Pocket-with-Grout.pdf PDF
Show all 38

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PIPE PENETRATION

SPECIFICATION REQUIREMENTS

INSULATION ATTACHED PER

TREMPLY KEE MEMBRANE

WORM GEAR CLAMP

STAINLESS STEEL

APPROVED SEALANT

8" MIN.

TREMPLY PLUS FASTENER

& STRESS PLATE

(MIN. 4 FASTENERS)

HOT AIR WELD

NON-REINFORCED TREMPLY PLUS FIELD

FORMED FLASHING MEMBRANE

TREMPLY KEE LV BONDING ADHESIVE

NON-REINFORCED FTR FIELD

FORMED FLASHING MEMBRANE

HOT AIR WELD

SHEET TITLE:

DRAWING No.:

SCALE:

NTS

FIELD FABRICATED PIPE FLASHING

DWG NO. 27

Sheets and Views
Model

File details come from the government source that posted it. Updated .