Roof-System-Attachment-Slope,-Transition,-Change-in-Plane.pdf

PDF 122 KB Posted

Attached to
High School Roof Replacement
Solicitation number
RFP MASO 260000002613 1
Issued by
Genesee County, Edmore Village, Michigan

About this file

This is a technical drawing specification document for roofing system attachment details at slope transitions and changes in plane. The document, designated as Drawing No. 85, provides standardized construction specifications for roofing installations. The specification mandates mechanical attachment of roofing systems at all transitions in plane or slope that exceed one-quarter inch per linear foot to prevent potential bridging of the membrane. The roofing system components specified include Tremply Kee membrane with machine direction orientation, Tremply Plus fasteners and stress plates installed at twelve-inch on-center spacing (typical), and hot air weld connections applied as standard practice. The drawing is presented at not-to-scale (NTS) and dated 2023.

No information regarding pricing terms, contract timeline, bidder meetings, award dates, contract term, set-asides, incumbents, or funding sources is contained within this technical specification document. This is a design and construction guideline document rather than a solicitation or contract award notice.

View the file

Other files

File Type Posted
Gutter-Flashing-Model.pdf PDF
Roof-Drain-with-Gravel-Guard.pdf PDF
Hot-Stack-Penetration.pdf PDF
Door-Threshold-Model.pdf PDF
Flashing-for-Non-Wall-Supported (1).pdf PDF
Roof-Hatch-Model.pdf PDF
Metal-Sleeve-and-Storm-Collar.pdf PDF
Metal-Flashing,-Round-to-Square.pdf PDF
Piping-Through-Roof-Deck.pdf PDF
Typical-Covers-at-Membrane-T-Laps-Model.pdf PDF
2-Piece-Shop-Fabricated-Metal-Edge-Flashing-Model.pdf PDF
Field-Fabricated-Pipe-Flashing-Model.pdf PDF
Curb-for-Air-Handling-Unit.pdf PDF
Wood-Curb-Model.pdf PDF
Base-Sheet-Fastener-7-Inch.pdf PDF
Roof 13 to 15 Detail.pdf PDF
Mason Middle School- Alternate AOC.pdf PDF
Mason High School- AOC.pdf PDF
Mason High School Summer of 2027 Roofing Scope of Work.docx DOCX document
TremPly-KEE-at-Fascia-System-Raised-Cant-Edge-Model.pdf PDF
Composite-Roof-System-Cross-Section-Adhered-ISO-Hot-Model.pdf PDF
Pre-Molded-Pipe-Flashing-Model.pdf PDF
Typical-Edge-Flashing-Model.pdf PDF
Light-Metal-Parapet-Cap.pdf PDF
Notice To Bidders Mason High School Summer of 2027.docx DOCX document
AFFIDAVIT OF COMPLIANCE IRAN.docx DOCX document
Familial Relationship Disclosure.docx DOCX document
Mason High School Summer of 2027 Roofing Bid Form.doc DOC document
~WRL0001.tmp —
Project-Mason High School THERMastic 80 Roofing Replacements.pdf PDF
Plumbing-Vent-Model.pdf PDF
Equipment-Stand-Rain-Collar.pdf PDF
TLRFIA-over-Steel-Model.pdf PDF
Conduit-or-Piping-Support.pdf PDF
Gauge-or-Thickness-Guide.pdf PDF
Slip-Metal-Skirt-Flashing.pdf PDF
Dail-Water-Stop-Tie-In-Model.pdf PDF
Pitch-Pocket-with-Grout.pdf PDF
Show all 38

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SHEET TITLE:

DRAWING No.:

SCALE:

NTS

ROOF SYSTEM ATTACHMENT AT SLOPE

TRANSITION AND CHANGE IN PLANE

DWG NO. 85

NOTES

TREMPLY KEE MEMBRANE

TREMPLY KEE MEMBRANE

MEMBRANE MACHINE DIRECTION

MEMBRANE MACHINE DIRECTION

TREMPLY PLUS FASTENER &

STRESS PLATE AT 12" O.C.

(TYPICAL)

HOT AIR WELD (TYPICAL)

1. ROOFING SYSTEMS SHALL BE MECHANICALLY ATTACHED AT ALL TRANSITIONS IN PLANE/SLOPE GREATER THAN 1/4" PER LINEAR FOOT TO ELIMINATE POTENTIAL BRIDGING OF THE MEMBRANE.

Sheets and Views
Model

File details come from the government source that posted it. Updated .