Conduit-or-Piping-Support.pdf
PDF 110 KB Posted
- Attached to
- High School Roof Replacement
- Solicitation number
- RFP MASO 260000002613 1
- Issued by
- Genesee County, Edmore Village, Michigan
About this file
This is a technical drawing specification document for roofing and conduit support infrastructure. The drawing (DWG No. 28) illustrates the installation requirements for built-up roofing (BUR) with hot and cold conduit or piping support systems mounted on a roof deck. The specification details the secure fastening of conduit and piping using clamps attached to wood blocking spaced at five-foot intervals across the roof surface. The design includes a specified insulation layer, a BUR membrane, and a treated sheet walk pad for maintenance access. The drawing is presented at a not-to-scale (NTS) ratio and was developed in 2023, serving as a technical reference for construction implementation.
No additional information regarding pricing terms, contract timeline, bidder requirements, funding sources, or contractual award details is contained within this technical specification document. The drawing functions solely as a construction standard and does not address procurement terms, set-asides, incumbent contractors, or other commercial contract provisions.
View the file
Other files
Show all 38
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DWG NO. 28
BUILT UP ROOFING
HOT/COLD CONDUIT OR
PIPING SUPPORT
ROOF DECK AS SPECIFIED
SECURE CONDUIT/ PIPING WITH CLAMP
TO WOOD BLOCKING
WOOD BLOCKING SPACED EVERY 5 FEET
SPECIFIED INSULATION
SPECIFIED BUR
MEMBRANE
WALK PAD
TREMTRED
SHEET TITLE:
DRAWING No.:
SCALE:
NTS
| Sheets and Views |
| Model |
File details come from the government source that posted it. Updated .