About this file

This is a Scope of Work document for the Mason High School roofing replacement project in Michigan. The project encompasses the replacement of roofing systems on thirteen roof sections (Roofs 1, 2, 7, 8, 9, 10, 11, 12, 13, 14, and 15) during the summer of 2027. The primary scope involves two distinct roofing system types: a THERMastic 80 Built-Up replacement system for Roofs 1, 7, 8, 10, 11, 12, and 13, and a TremPly KEE roofing replacement system for Roofs 14 and 15. The THERMastic 80 system includes removal of existing roofing and insulation, replacement of damaged decking and nailers, installation of polyisocyanurate insulation at R-20 average, multiple layers of felt and base sheets, elastomeric flashings, metal pitch pockets, and kynar-coated steel/aluminum counter flashings and coping caps. The TremPly KEE system involves similar removal and preparation work, followed by installation of composite ply base sheet, polyisocyanurate insulation, DensDeck, and 60-mil fleece-back membranes, with new aluminum edge metal, conductor heads, and downspouts. Roofs 2 and 9 may be installed using the THERMastic 80 system if an alternate bid is selected.

Both roofing systems include manufacturer 20-year quality assurance warranties with scheduled inspections during years 2, 5, 10, and 15, which provide online reports of findings and recommended maintenance. The contractor must meet all prevailing wage requirements for the State of Michigan. No specific pricing information, response deadlines, bidder conference dates, or funding sources are detailed in this scope document.

View the file

Other files

File Type Posted
Roof-Hatch-Model.pdf PDF
Flashing-for-Non-Wall-Supported (1).pdf PDF
Typical-Covers-at-Membrane-T-Laps-Model.pdf PDF
TremPly-KEE-at-Fascia-System-Raised-Cant-Edge-Model.pdf PDF
Mason High School- AOC.pdf PDF
AFFIDAVIT OF COMPLIANCE IRAN.docx DOCX document
Dail-Water-Stop-Tie-In-Model.pdf PDF
Metal-Sleeve-and-Storm-Collar.pdf PDF
Slip-Metal-Skirt-Flashing.pdf PDF
Conduit-or-Piping-Support.pdf PDF
2-Piece-Shop-Fabricated-Metal-Edge-Flashing-Model.pdf PDF
Roof 13 to 15 Detail.pdf PDF
Field-Fabricated-Pipe-Flashing-Model.pdf PDF
TLRFIA-over-Steel-Model.pdf PDF
Pitch-Pocket-with-Grout.pdf PDF
Plumbing-Vent-Model.pdf PDF
Door-Threshold-Model.pdf PDF
Roof-System-Attachment-Slope,-Transition,-Change-in-Plane.pdf PDF
Project-Mason High School THERMastic 80 Roofing Replacements.pdf PDF
Gutter-Flashing-Model.pdf PDF
Hot-Stack-Penetration.pdf PDF
Wood-Curb-Model.pdf PDF
Piping-Through-Roof-Deck.pdf PDF
Metal-Flashing,-Round-to-Square.pdf PDF
~WRL0001.tmp —
Mason High School Summer of 2027 Roofing Bid Form.doc DOC document
Roof-Drain-with-Gravel-Guard.pdf PDF
Gauge-or-Thickness-Guide.pdf PDF
Equipment-Stand-Rain-Collar.pdf PDF
Curb-for-Air-Handling-Unit.pdf PDF
Base-Sheet-Fastener-7-Inch.pdf PDF
Composite-Roof-System-Cross-Section-Adhered-ISO-Hot-Model.pdf PDF
Pre-Molded-Pipe-Flashing-Model.pdf PDF
Mason Middle School- Alternate AOC.pdf PDF
Familial Relationship Disclosure.docx DOCX document
Light-Metal-Parapet-Cap.pdf PDF
Typical-Edge-Flashing-Model.pdf PDF
Notice To Bidders Mason High School Summer of 2027.docx DOCX document
Show all 38

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

THERMastic 80 Built Up Replacement Scope of Work Mason High School Roofs 1, 7, 8, 10, 11, 12, and 13

1. Remove existing roofing and insulation down to structural deck.

2. Replace damaged decking on a cost unit basis.

3. Replace damaged wood nailers on a unit cost basis.

4. Mechanically attach first layer, and adhere subsequent layers of flat and tapered polyisocyanurate insulation systems (1/8”) at R-20 average in Premium III asphalt at 30 lbs/ sq.

a. Ensure insulation, crickets, and saddles do not allow any ponding.

5. Install 1/4” Tremboard AC adhered in Premium III asphalt at 30lbs/sq.

6. Install new 4 lb lead drain flashing with gravel stop and 4 lb lead flashing at all soil stacks.

7. Install Burmastic Comp Ply HT base sheet adhered in Premium III asphalt at a rate of 25lbs/sq.

8. Install 3 plies Thermglass Type IV felt with Premium III asphalt interply at rate of 25lbs per sq.

9. Install TRA Elastomeric flashings adhered in Thermastic 80 at rate of 30lbs/sq.

10. Bar terminate top of flashings and tie into existing metal roofing.

11. Strip-in Vertical laps with ELS and 6” BURmesh.

12. Apply Alumanation 301 at 2.5 gals per sq (40 wet mils) to all flashings and drains.

13. Install Thermastic 80 flood coat at 60 lb/ sq and gravel at rate of 400 lb/sq.

14. Install new metal pitch pockets with hoods. Fill with grout and Tremseal Pitch Pocket sealer.

15. Install new 24-gauge kynar coated steel/ aluminum counter flashings and flashings to match existing.

16. Install new 24-gauge kynar coated steel/ aluminum coping caps to match existing.

17. Provide manufacturer’s 20-year Quality Assurance warranty that includes inspections during years 2, 5, 10 and 15. Inspections shall include online report of findings and recommended maintenance.

· All prevailing wage requirements for the State of Michigan are to be met by the contractor.

· Roofs 2 and 9 are to be installed via a THERMastic 80 system should the alternate bid be selected.

TremPly KEE Roofing Replacement Scope of Work Mason High School Roofs 14 and 15

1. Remove existing roofing and insulation down to structural deck.

2. Replace damaged wood nailers on a unit cost basis.

3. Adhere BURmastic Composite Ply base sheet in Premium III asphalt at 30 lbs/ sq to concrete decking.

4. Adhere layers of polyisocyanurate insulation systems (1/8”) at R-20 average in Premium III asphalt at 30 lbs/ sq.

a. Ensure insulation, crickets, and saddles do not allow any ponding.

5. Adhere one layer of ¼” DensDeck in in Premium III asphalt at 30 lbs/ sq.

6. Adhere TremPly KEE 60 mil fleece back in Thermastic 80 at 30lbs/sq.

7. Install new 24-gauge kynar coated aluminum edge metal.

8. Install new 24-gage kynar coated aluminum conductor heads and downspouts.

9. Provide manufacturer’s 20-year quality assurance warranty that includes inspections during years 2, 5, 10, and 15. Inspections shall include online report of findings and recommended maintenance.

· All prevailing wage requirements for the State of Michigan are to be met by the contractor.