Composite-Roof-System-Cross-Section-Adhered-ISO-Hot-Model.pdf
PDF 134 KB Posted
- Attached to
- High School Roof Replacement
- Solicitation number
- RFP MASO 260000002613 1
- Issued by
- Genesee County, Edmore Village, Michigan
About this file
This is a technical drawing document for a composite roof system specification. The drawing illustrates a cross-sectional design for an adhered insulation roof system installed in Type III hot asphalt, designated as Drawing No. 18. The specification details a layered roof assembly consisting of a concrete deck primed with Tremply Kee membrane asphalt primer, followed by insulation layers applied in hot asphalt, an optional gypsum cover board also adhered in Type III hot asphalt, and a top layer secured via hot air weld. The design requires that the bottom layer of insulation be laid in a staggered profile with the top layer offset from the bottom layer to prevent aligned edges, ensuring structural integrity and weatherproofing performance.
The document contains no information regarding pricing, contract terms, timelines, bid submission dates, site visits, pre-bid meetings, funding sources, or award details. This is solely a technical specification drawing and does not include procurement-related contract opportunity information such as set-asides, incumbent contractors, or renewal options. The drawing serves as a reference standard for contractors and construction teams to properly install the composite roof system according to the specified assembly method and material requirements.
View the file
Other files
Show all 38
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SHEET TITLE:
DRAWING No.:
SCALE:
NTS
COMPOSITE ROOF SYSTEM
CROSS SECTION (ADHERED
INSULATION IN ASPHALT) DWG NO. 18
NOTES
1. BOTTOM LAYER OF INSULATION SHALL BE LAID DOWN IN A STAGGERED PROFILE. STAGGER AND OFFSET
TOP LAYER OF INSULATION FROM BOTTOM LAYER TO PREVENT ALIGNED EDGES.
HOT AIR WELD
(ADHERED PER SPECIFICATION)
(ADHERED IN TYPE III HOT ASPHALT)
INSULATION PER SPECIFICATION
CONCRETE DECK, PRIME WITH
TREMPLY KEE MEMBRANE
ASPHALT PRIMER (AS SPECIFIED)
GYPSUM COVER BOARD "OPTIONAL"
(ADHERED IN TYPE III HOT ASPHALT)
| Sheets and Views |