W912GB-17-R-0020-0010_(Post-Closing).pdf

PDF 207 KB Posted

Attached to
Various Base Improvements Mihail Kogalniceanu Air Base, Romania
Solicitation number
W912GB-17-R-0020
Issued by

About this file

Solicitation Amendment 10 (Post-Closing). Issued 11 August 2017.

View the file

Other files

File Type Posted
W912GB-17-R-0020_0013.pdf PDF
W912GB-17-R-00020_0012.pdf PDF
ATTACHMENT_4_Price_schedule_Revised_29_Aug_2017.xlsx XLSX spreadsheet
Conformed_Section_00_10_00_Solicitation_CLIN_Schedule.pdf PDF
A.07.23_Atch_1_Experience_Overview_Sheet_Revised_08_August_17.docx DOCX document
Attachment_15_URBANISM_CERTIFICATIE_01011401[1].pdf PDF
W912GB-17-R-0020-00011.pdf PDF
Attachment H3 FSC 001-FSC X002.pdf PDF
Attachment H5 170809.MI GE 001 Scope Modification.pdf PDF
Attachment_14_SOW_Track_Changes.pdf PDF
Attachment H6 170814.MI RB 001 RB X001 RB X002 Modification_Annex 1.pdf PDF
Attachment H2 FSC 001-FSC X001.pdf PDF
Attachment H1 FSC 001-FSC 001.pdf PDF
Attachment H4 170809.MI GC 001 Scope Modification.pdf PDF
ATTACHMENT_4_Price_schedule.xlsx XLSX spreadsheet
Conform_Copy_W912GB-17-R-0020.pdf PDF
DRAWING_C0003-CIVIL_DETAIL.pdf PDF
W912GB-17-R-0020_0009.pdf PDF
SF1442_Section_00_10_00_Solicitation_Contract_Line_Item_Number_Schedule_Conformed.pdf PDF
W912GB-17-R-0020_0008.pdf PDF
01_SOW_Revised_19_July_2017.pdf PDF
Amendment_07.pdf PDF
Attachment_4_ERI_Revised_Price_Schedule_23_June_17_REVISED_1_JULY_2017.xlsx XLSX spreadsheet
SOW_5July2017.pdf PDF
AW_78-24-27.pdf PDF
W912GB-17-R-0020-0006.pdf PDF
Contingency_Design_Program.PDF PDF
MK_MI_SOW-A_DA.docx DOCX document
MK_FSC_SOW-A_DA.docx DOCX document
CX007-CX200.pdf PDF
W912GB-17-R-002005.pdf PDF
A.07.23_Atch_1_Experience_Overview_Sheet_Revised_23_June_17.docx DOCX document
RETENTION_POND_LOCATION__DRAWINGS_REVISED_23_June_17.pdf PDF
A.07.23_Atch_5_Resume_Revised_23Jun17.docx DOCX document
A.07.23_Attachment_4_ERI_Revised_Price_Schedule_23_June_17.xlsx XLSX spreadsheet
W912GB-17-R-0020-0004_FBO.pdf PDF
A.07.23_Attachment_4_ERI_Revised_Price_Schedule_13_June_17.xlsx XLSX spreadsheet
Att._12_Pre_Proposal_Conference_W912GB-17-R-0020_MK_Romania_-_6_June.ppt PPT presentation
Att._13_Pre_Proposal_Sign_In_Roster.pdf PDF
W912GB-17-R-0020-0003.pdf PDF
PPSV_Agenda__Logistic_Plan_with_Project_Site_Plan.pdf PDF
W912GB-17-R-0020_Amendment_02.pdf PDF
A.07.23_Attachment_4_ERI_Revised_Price_Schedule_24_MAY_17.xlsx XLSX spreadsheet
A.07.24_W912GB-17-R-0020_Amendment_01_23_May_2017.pdf PDF
SOW_Attachment_E1-E3_Design_Drawings_35_.zip ZIP file
A.01.13_USACE_Specifications_09_May_17.pdf PDF
A.07.23_W912GB-17-R-0020_Solicitation_9_May_17.pdf PDF
Instruction_to_Offerors_Attachments_1-11.zip ZIP file
SOW_Attachments_A-G.zip ZIP file
A.02.02 Atch_5_DRAFT PRE-SOL_FUEL STORAGE CAPACITY.pdf PDF
Show 40 more

Latest 50 of 57 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

Various Base Improvements MK Air Base Romania Post Closing Amendment - The purpose of this Post Closing Amendment is to change the follow ing:

1. SF1442 Section 00 21 00

2. SF1442 Section 00 22 00

3. SF1442 Section 00 10 00 - Delete all 1001 and 1002 CLINs/SCLINs

Please Note: There w ill be a follow up Post Closing Amendment providing revised Scope of Work, Price Schedule, and Draw ings. All w ork assoiciated w ith the Cargo Apron w ill be removed from this solicitation. Offerors are required to submit revised technical and price proposals as a result of this amendment. Proposal Due Date w ill be NLT 16:00 CEST 28 August 2017.

All changes in this document are identified by red text.

1. CONTRACT ID CODE PAGE OF PAGES

1 26

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 11-Aug-2017

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912GB-17-R-0020

X 9B. DATED (SEE ITEM 11)

09-May-2017

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

11-Aug-2017

CODE

CONTRACTING DIVISION

US ARMY CORPS OF ENGINEERS

KONRAD ADENAUER RING 39

D-65187 WIESBADEN GERMANY

WIESBADEN 65187

W912GB 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912GB-17-R-0020

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SECTION 00 00 00 - PROCUREMENT AND CONTRACTING REQUIRMENTS

SUMMARY OF CHANGES

SECTION 00 00 00 - PROCUREMENT AND CONTRACTING REQUIRMENTS

The required response date/time has changed from 14-Jul-2017 04:00 PM to 28-Aug-2017 04:00 PM.

The required performance has changed from Project: Various Base Improvements Mihail Kogalniceanu (MK) Air Base, Romania1. Construction Magnitude is between $25,000,000.00 to $100,000,000.002.

NAICS Code is 236220 -- Commercial and Institutional Building Construction3. Volume I (Technical) Proposals are due on 14 July 2017 by 16:00 Hours Central European Summer Time (CEST). Volume II (Price) Proposals are due on 21 July 2017 by 16:00 Hours Central European Summer Time (CEST). Proposals shall be received at U.S. Army Corps of Engineers – Europe District, Contracting Division in accordance with solicitation.Contractors are required to submit all questions to Mr. Jefferey Ball via email at Jefferey.A.Ball@usace.army.mil and Mr. Dean DeFord at Dean.P.DeFord@usace.army.mil and Mr. Robert Corkrum at Robert.E.Corkrum@usace.army.mil. See Section 00 00 00 – Site Visit for specific details required for the Pre-proposal Site Visit/ Briefing. to Project: Various Base Improvements Mihail Kogalniceanu (MK) Air Base, Romania1. Construction Magnitude is between $25,000,000.00 to $100,000,000.002. NAICS Code is 236220 -- Commercial and Institutional Building Construction3. Volume I (Technical) Revised Proposals are due on 28 August 2017 by 16:00 Hours Central European Summer Time (CEST). Volume II (Price) Revised Proposals are due on 28 August 2017 by 16:00 Hours Central European Summer Time (CEST). Proposals shall be received at U.S. Army Corps of Engineers – Europe District, Contracting Division in accordance with solicitation.Contractors are required to submit all questions to Mr. Jefferey Ball via email at Jefferey.A.Ball@usace.army.mil and Ms. Kristina Morrow at kristina.morrow@usace.army.mil.

SECTION 00 10 00 - SOLICITATION, CONTRACT LINE ITEM NUMBER (CLIN) SCHEDULE

CLIN 1001

The CLIN description has changed from Base Items Cargo Apron to CLIN Deleted.

The CLIN extended description has changed from:

Cargo Apron (CA) MK Air Base, Romania Base Line ItemsBase Line Items: The following base line items include providing all labor, materials, equipment, and services necessary to complete the design and construction of the work identified in the attached Plans, Specifications, Scope of Work (SOW), Solicitation / Request for Proposal, and Base Contract. It also includes preparation of all documents, submittals, and schedules; inspections; and compliance with all technical, quality control, administrative, regulatory, permitting and safety requirements. All work shall be performed in accordance with these documents.Period of Performance: A single Notice to Proceed will be issued for all awarded work. All work shall be completed within the number of calendar days indicated in each line item from the date of the Notice to Proceed. Included in the total Period of Performance is a period of up to 120 calendar days during which the host nation Ministry of Defense will review the 100% design submittals and provide review comments to the US government. Only upon completion of the host nation Ministry of Defense (MOD) review, will the designs be approved for construction.Liquidated Damages: Liquidated damages shall be assessed in the amount of €3.166,00 per calendar day of delay beyond the required completion date of the contract.

To:

CLIN Deleted

SUBCLIN 1001AA

The CLIN description has changed from A/E-provided Service to SCLIN Deleted - Do Not Price.

The CLIN extended description has changed from:

A/E-provided Service: All work and labor required to provide a Geotechnical Survey for the project site.All work on this base line item shall be completed within 780 calendar days from the date of the Notice to Proceed.

SCLIN Deleted - Do Not Price

The unit of issue Job has been deleted.

SUBCLIN 1001BA

The CLIN description has changed from A/E-provided Service to SCLIN Deleted - Do Not Price.

The CLIN extended description has changed from:

A/E-provided Service: All work and labor required to provide a Topographical Survey for the project site.All work on this base line item shall be completed within 780 calendar days from the date of the Notice to Proceed.

SUBCLIN 1001CA

The CLIN description has changed from Fixed Wing Parking Apron (Design) to SCLIN Deleted - Do Not Price.

The CLIN extended description has changed from:

Fixed Wing Parking Apron, Fixed Wing Taxiway, and Blast/Exhaust Deflector (Design): All work and labor required to design Fixed Wing Parking Apron, Fixed Wing Taxiway and Blast/Exhaust Deflector.All work on this base line item shall be completed within 780 calendar days from the date of the Notice to Proceed.

SUBCLIN 1001CB

The CLIN description has changed from Fixed Wing Parking Apron (Construction) to SCLIN Deleted - Do Not Price.

The CLIN extended description has changed from:

Fixed Wing Parking Apron (Construction): All work, materials, and labor required to construct Fixed Wing Parking Apron containing: Hardscape, Drainage, Base Courses, Shoulders, Marking, Grounding / Mooring, and Lighting.

Including supporting facilities: Electric Service, Storm Drainage, and Site Improvement Refer to plan(s) C002- C006All work on this base line item shall be completed within 780 calendar days from the date of the Notice to Proceed.

SUBCLIN 1001CC

The CLIN description has changed from Fixed Wing Taxiway (Construction) to SCLIN Deleted - Do Not Price.

The CLIN extended description has changed from:

Fixed Wing Taxiway (Construction): All work, materials, and labor required to construct Fixed Wing Taxiway including supporting facilities: Hardscape, Drainage, Base Courses, Shoulders, Marking, and Lighting. Including supporting facilities: Electric Service, Storm Drainage, Site Improvement.All work on this base line item shall be completed within 780 calendar days from the date of the Notice to Proceed.

SUBCLIN 1001CD

The CLIN description has changed from Blast/Exhaust Deflector (Construction) to SCLIN Deleted - Do Not Price.

The CLIN extended description has changed from:

Blast/Exhaust Deflector (Construction): All work, materials, and labor required to construct Blast/Exhaust Deflector.

Refer to plan(s) C002-C006All work on this base line item shall be completed within 780 calendar days from the date of the Notice to Proceed.

SUBCLIN 1001DA

The CLIN description has changed from Airfield Lighting Vault (Design) to SCLIN Deleted - Do Not Price.

The CLIN extended description has changed from:

Airfield Lighting Vault (ALV) (Design): All work and labor required to design Airfield Lighting Vault (ALV).All work on this base line item shall be completed within 780 calendar days from the date of the Notice to Proceed.

SUBCLIN 1001DB

The CLIN description has changed from Airfield Lighting Vault (Construction) to SCLIN Deleted - Do Not Price.

The CLIN extended description has changed from:

Airfield Lighting Vault (ALV) (Construction): All work, materials, and labor required to construct Airfield Lighting Vault (ALV), including: Electric Service.All work on this base line item shall be completed within 780 calendar days from the date of the Notice to Proceed.

SUBCLIN 1001EA

The CLIN description has changed from Additional Blast/Exhaust Deflect Design to SCLIN Deleted - Do Not Price.

The CLIN extended description has changed from:

Additional Blast/Exhaust Deflector(s) (Design) -All work, materials, and labor required to design additional Blast/Exhaust Deflector(s) Refer to plan(s) CX002-CX006All work on this base line item shall be completed within 780 calendar days from the date of the Notice to Proceed.

SUBCLIN 1001FA

The CLIN description has changed from Enlarge Fixed Wing Parking Apron Design to SCLIN Deleted - Do Not Price.

Enlarge Fixed Wing Parking Apron (Design): -All work, materials, and labor required to design Fixed Wing Parking Apron Refer to plan(s) CX002-CX006All work on this base line item shall be completed within 780 calendar days from the date of the Notice to Proceed.

CLIN 1002

The CLIN description has changed from Option Items Cargo Apron to CLIN Deleted.

The CLIN extended description has changed from:

Cargo Apron (CA) MK Air Base, Romania Optional Line Items Optional Line Items: The following optional line items include providing all labor, materials, equipment, and services necessary to complete the design and construction of the work identified in the attached Plans, Specifications, Scope of Work (SOW), Solicitation / Request for Proposal, and Base Contract. It also includes preparation of all documents, submittals, and schedules;

inspections; and compliance with all technical, quality control, administrative, regulatory, permitting and safety requirements. All work shall be performed in accordance with these documents.Award of Options: The Government reserves the right to award any options within 120 calendar days following issuance of Notice to Proceed (NTP) for the base work. If an option is exercised, it must be completed within the number of calendar days stated in the optional line item being exercised.Period of Performance: A single Notice to Proceed will be issued for all awarded work. All work shall be completed within the number of calendar days indicated in each line item from the date of the Notice to Proceed. Included in the total Period of Performance is a period of up to 120 calendar days during which the host nation Ministry of Defense will review the 100% design submittals and provide review comments to the US government. Only upon completion of the host nation Ministry of Defense (MOD) review, will the designs be approved for construction.Liquidated Damages: Liquidated damages shall be assessed in the amount of €3.166,00 per calendar day of delay beyond the required completion date of the contract.

CLIN Deleted

SUBCLIN 1002AA

The CLIN description has changed from Add Blast/Exhaust Deflect Construction to SCLIN Deleted - Do Not Price.

The CLIN extended description has changed from:

Additional Blast/Exhaust Deflector(s) (Construction) -All work, materials, and labor required to construct additional Blast/Exhaust Deflector(s) Refer to plan(s) CX002-CX006Should the Government exercise this optional line item all work shall be completed within 780 calendar days from the date of the issuance of the Notice to Proceed for the base items.

The option status has changed from Option to No Status.

SUBCLIN 1002BA

The CLIN description has changed from Enlarge FixedWing Park Apron Constructio to SCLIN Deleted - Do Not Price.

The CLIN extended description has changed from:

Enlarge Fixed Wing Parking Apron (Construction): -All work, materials, and labor required to construct Fixed Wing Parking Apron Refer to plan(s) CX002-CX006Should the Government exercise this optional line item all work shall be completed within 780 calendar days from the date of the issuance of the Notice to Proceed for the base items.

The option status has changed from Option to No Status.

SUBCLIN 1002BB

The CLIN description has changed from Demolition of Existing Structures to SCLIN Deleted - Do Not Price.

All work, materials, and labor required to remove any existing structures as outlined in the scope of work.

SECTION 00 21 00 - INSTRUCTIONS

The following have been modified:

INSTRUCTIONS TO OFFERORS

F. PROPOSAL SUBMISSION (00 21 00)

1. INTRODUCTION: The Offeror’s proposal shall be submitted via AMRDEC. The solicitation shall provide AMRDEC instructions and receipt date for proposal submittal. Offerors are cautioned that “parroting” of the Technical requirements or the SOW with a statement of intent to perform does not reflect an understanding of the requirement or capability to perform. Offerors are responsible for including sufficient details to permit a complete and accurate evaluation of each proposal.

Proprietary information shall be clearly marked.

2. PROPOSAL SUBMISSION REQUIREMENTS

The Government will not make assumptions concerning intent, capabilities, or experiences. Clear identification of proposal details shall be the sole responsibility of the Offeror. The proposal shall meet the following basic requirements:

a. The proposal shall be typed and submitted in grammatically correct English.

b. The proposal shall be organized, concise, and shall be clearly identified and tabbed. Each factor shall be described in a separate tabbed section.

c. The Management Approach section shall be sectioned as follows:

i. Organization Structure and Staffing;

ii. Project Execution and Management;

iii. Specifically Identified Personnel;

iv. Quality Control and Processes; and

v. Schedule

d. The proposal shall be identified by the solicitation number, volume number, and name, address, and telephone number of the prime Offeror on the cover.

e. The proposal shall contain a table of contents and include the volume and page number at the bottom left side of each page.

f. Offerors shall verify that the information of all submitted forms is current, correct, and complete including name(s) of the point(s) of contact (POCs), email address(es), and telephone number(s), for the three (3) technical factors.

g. Offerors shall submit a signed Offer, Standard Form (SF) 1442 for this solicitation, including verification of all amendments received.

h. Proposals shall completely and adequately address the requirements of this solicitation. Offerors are reminded that elaborate corporate marketing information, formatting, special reproduction techniques, etc., are not necessary.

i. Contractors are cautioned against submitting conditional proposals.

j. Failing to submit attachments or failing to complete the proposal properly may result in rejection of the offer without further evaluation. Therefore, Offerors are urged to follow instructions and speak with the Contracting Officer if instructions are not understood.

Additional Proposal Submission Requirements: Proposals shall meet the additional following basic requirements:

k. Volume I: Offerors shall verify that the information for all forms submitted for the four (4) technical factors is current, correct, and complete including name(s) of the point(s) of contact (POCs), email address(es), and telephone number(s), for the one technical factor.

l. Volume II: The Pricing Schedule shall be completed in full.

m. Volume II: Offerors shall submit a signed Offer, Standard Form (SF) 1442 for this solicitation, including verification of all amendments received.

Proposal Expenses and Pre-Contract Costs: The request for proposal (RFP) solicitation does not commit the Government to pay any costs incurred in the preparation and submission of a proposal or for any other costs incurred by any firm submitting a proposal in response to this solicitation.

3. JOINT VENTURE PROPOSAL

If submitting a proposal as a JV, the experience and past performance of each of the JV Partners can be submitted for the JV Entity. The experience for each JV Partner should be clearly described.

The proposal will receive a higher rating if the proposal contains evidence of the JV Entity working successfully together previously on relevant projects.

An Offeror that is part of a JV must submit a legally binding JV Agreement. The Government will not evaluate the capability of any Offerors that are not included in the JV agreement. JVs must include a copy of the legal joint venture agreement signed by an authorized officer from each of the firms comprising the JV with the chief executive of each entity identified and must be translated into English, if the original agreement is in a language other than English.

If submitting a proposal as a joint venture, the experience and past performance of each of the joint venture partners can be submitted for the joint venture entity. The experience for each joint venture partner will be considered the experience of the joint venture entity. JVs shall submit the following additional documentation regarding their business entities:

a. A copy of their joint venture agreement in English.

b. A detailed statement outlining the following in terms of percentages, where appropriate.

1) The relationship of the joint venture parties in terms of business ownership, capital contribution, and profit distribution or loss sharing. The joint venture agreement must show that joint venture members are jointly and severally liable for any obligations under the contract.

2) The management approach of the joint venture in terms of who will conduct, direct, supervise and control the project and have custody and control of the assets of the joint venture and perform the duties necessary to complete the work.

3) The structure of the joint venture and decision-ranking responsibilities of the joint venture parties in terms of who will control the manner and method of performance of the work.

4) The bonding responsibilities of the joint venture parties.

5) Identification of the key personnel having authority to legally bind the joint venture to subcontracts and state who will provide or contract for the labor and materials for the joint venture.

6) Identification of party maintaining the joint venture bank accounts for the payment of all expenses and the deposits of all receipts, keep the books and records, and pay applicable taxes for the joint venture.

7) Identification of party furnishing the facilities, such as office supplies and telephone service.

8) Identification of party having overall control of the joint venture. Other sections of the proposal shall identify, where appropriate, whether key personnel are employees of the individual joint venture parties and identify the party, or hired as employees of the joint venture. Include this information as a part of Phase I.

9) A complete and legally binding document with all the information required under this section titled “Joint Ventures” shall be included. The JV agreement submitted to the Government shall be the only valid JV agreement for purposes of performance under this contract or any responsibilities of the JV under the contract. Any changes to the JV agreement must be submitted to the Contracting Officer and is subject to approval by the Government prior to execution of the change.

4. KEY SUBCONTRACTORS

If an Offeror wishes to be credited with the experience of a Key Subcontractor a letter of commitment signed by the Key Subcontractor AND the prime contractor shall be submitted. The commitment letter shall be submitted even if the firm is in some way related to the prime contractor (for example, the Key Subcontractor is a subsidiary of the prime contractor, or a subsidiary of a firm to which the the prime contractor is also a subsidiary). If a letter of commitment is not submitted, the experience will not be considered. Include this information as part of Volume I (See Appendix I, Sample Letter of Commitment).

5. PROPOSAL FORMAT

a. Proposals shall be submitted in the following format:

Volume I-

Factor One (1) – Experience, Factor Two (2) – Past Performance Factor Three (3) – Management Approach; This shall include the following (If applicable): Letter(s) of Commitment, Joint Venture Agreement Factor Four (4) – Design Capability

Volume II – Price/Administrative Proposal

Factor Five (5) – Price Submit BLA with Price Schedule; This volume shall include the information as detailed in “PROPOSAL FORMAT FOR VOLUME II,” below.

b. Proposals Submittal Process:

Proposals shall be submitted utilizing the AMRDEC SAFE Application. The AMRDEC SAFE Application is used to send large files to individuals that would normally be too large to send via email. Anyone has access to SAFE, and the application is available for use by anyone. There are no user accounts for SAFE, and authentication is handled via email.

1.) The AMRDEC SAFE application can be accessed via https://safe.amrdec.army.mil/safe.

2.) From the SAFE homepage, select the option to Proceed as Guest:

o Proceed as Guest - Select this option if you do not have a CAC.

3.) After selecting the option, the page will be redirected to the package upload form. Fill in all the required input fields:

o Your Name - Your name;

o Your Email address - Your email address;

o Confirm Your Email Address - Re-enter your email address;

o Description of File(s) - Enter W912GB17R0020-COMPANY NAME:

o File(s) - Click the "Browse" button to select your file(s). You may add up to 25 files per package, provided that the total file size does not exceed 2GB;

File names shall be titled:

1. W912GB17R0020 – Company Name- Volume I

2. W912GB17R0020 – Company Name – Volume II

4.) Deletion Date - Select the Maximum date for the package to be deleted from SAFE. The maximum (which is also the default) is two weeks (14 days) from today;

5.) Provide an email address for access: For example, enter: Jefferey.A.Ball@usace.army.mil and cenau.proposal@usace.army.mil

6.) Grant access to these individuals (Note: This is the list of people you have granted access to the package). To remove a recipient, highlight their name and click the "Remove" button.

7.) Caveats - Default is "None";

8.) Encrypt email message when possible - Attempt to encrypt the package's notification email to each recipient;

9.) Notify me when files are downloaded - You (the sender) will receive a notification via email when a recipient downloads the package;

10.) Require CAC for pickup - Require the recipient to be logged in with a valid US DoD-issued

CAC to download the file(s). Recipients without a CAC will not be able to download the package.

11.) Clicking the "Submit" button will upload the files and submit the package. Guest users will need to check their email to verify their email address before the recipients will be notified. No additional action is required by CAC users.

12.) After the package has been uploaded (and verified, if proceeding as a guest), each recipient will receive a link to the package download page as well as a password. These passwords are unique for each recipient (not the package), and will be disabled once SAFE detects that the user successfully downloaded each file within the package. Forwarding recipient and sender notification emails to anyone except the AMRDEC WEB Team is strictly forbidden.

Proposal submission shall be submitted via AMRDEC by the date and time indicated on the SF 1442, or as amended. No facsimiles or regular e-mail submissions of proposals, with the exception of Attachment Three (3), Past Performance Questionnaires, are permitted.

c. Proposal Receipt Confirmation Points of Contact:

E-mail: Jefferey.A.Ball@usace.army.mil Telephone: +49(0)611-9744-2619

E-mail: kristina.morrow@usace.army.mil Telephone: +49(0)611-9744-2630

6. PROPOSAL SUBMISSION REQUIREMENTS

When the word ‘Offeror’ is encountered throughout this Section, it is intended to mean a company seeking to do business with the Government that submits a proposal in response to this solicitation. When the word “Government” is encountered throughout this Section, it is intended to mean U.S. Army Corps of Engineers.

FACTOR 1: EXPERIENCE

Submission Requirements

Offerors shall submit two (2) attachments, Attachment 1, Experience Overview Sheet and Attachment 2, Experience Information Sheet detailing previous work experience projects meeting the requirements of this solicitation.

a. Information for completing Attachment 1 and Attachment 2:

1) Offerors shall complete an Experience Overview Sheet (Attachment 1) with a total listing not-to-exceed five (5) projects that best represent the Offeror’s work experience required on this solicitation and in accordance with the Evaluation Criteria..

2) Offerors shall provide an Experience Information Sheet (Attachment 2) for each project listed on Attachment 1, Experience Overview Sheet in accordance with the Evaluation Criteria.

3) Offerors must submit at least three (3) two (2) projects that were performed by the Offeror as the Prime contractor. In case of a Joint Venture, the work must have been performed by at least one of the JV partners.

Note: If a Key Subcontractor’s experience is submitted for evaluation purposes, clearly address the Offeror’s experience in working with those Key Subcontractors. If a JV, clearly address the experience of each of the JV Partners and the relationship of the JV partners on any ongoing or previous projects. The proposal shall receive a higher rating if the proposal contains evidence of the JV entity or the Prime and Key subcontractor working successfully together on relevant previous projects. Ensure the information provided is in accordance with the Evaluation Criteria..

FACTOR 2: PAST PERFORMANCE

Submission Requirements:

The Past Performance Questionnaire (PPQ) (Attachment 3), included in the solicitation is provided for the Offeror or its team members to submit to the client for each project the Offeror includes in its proposal for Factor 1, Experience. Ensure correct phone numbers and email addresses are provided for the client point of contact. Completed PPQs should be submitted with your proposal. If the Offeror is unable to obtain a completed PPQ from a client for a project(s) before the proposal closing date, the Offeror should complete and submit with the proposal the first page of the PPQ (Attachment 3), which will provide contract and client information for the respective project(s). Offerors should follow-up with clients/references to ensure timely submittal of questionnaires. If the client requests, questionnaires may be submitted directly to the Government’s point of contact, Jefferey Ball via email at Jefferey.A.Ball@usace.army.mil and cenau.proposal@usace.army.mil prior to proposal closing date. Offerors shall not incorporate by reference into their proposal PPQs previously submitted for other RFPs. However, this does not preclude the Government from utilizing previously submitted PPQ information in the past performance evaluation.

Offerors may provide a completed Department of Defense, DD2626 form or a Contractor Performance Assessment Report (CPAR), in lieu of Attachment 3. CPARS evaluations and DD2626s shall be signed by all designated authorities for consideration of evaluation.

Offerors may also include performance recognition documents received within the last six (6) years, such as awards, award fee determinations, customer letters of commendation, commercial and foreign government evaluations and any other forms of performance recognition.

In addition to the above, the Government may review any other sources of information for evaluating past performance. Other sources may include, but are not limited to, past performance information retrieved through the Past Performance Information Retrieval System (PPIRS), including Contractor Performance Assessment Reporting System (CPARS), using all CAGE/DUNS numbers of team members (partnership, JV, teaming arrangement, or parent company/subsidiary/affiliate) identified in the Offeror's proposal, inquiries of owner representative(s), Federal Awardee Performance and

Integrity Information System (FAPIIS), Electronic Subcontract Reporting System (eSRS), and any other known sources not provided by the Offeror.

While the Government may elect to consider data from other sources, the burden of providing detailed, current, accurate and complete past performance information rests with the Offeror and the government is under no obligation to check other sources.

FACTOR 3: MANAGEMENT APPROACH

NOTE:Maximum allowable page limit for Factor 3 Management Approach is 50 pages. Any additional pages over 50 will not be evaluated by the Government. The Organization Chart, Resumes, and Letters of Commitment shall not count towards the 50 Page Maximum for this Factor. There are no individually rated subfactors; Factor 3 will receive 1 consolidated rating.For this factor the Offeror must submit a Management Plan for successful execution of this project. The narrative shall clearly demonstrate that the Offeror understands the technical scope of this project.

The narrative shall describe, in detail, how the project team will accomplish the project; and how the prime contractor will manage the various subcontractors, material acquisition and requirements for compliance with the RFP. The areas of emphasis relating to this factor are; Organization Structure and Staffing; Specifically Identified Personnel; Project Execution and Management; and Quality Control and Processes; and Schedule (these are NOT individually rated subfactors). The Management Plan shall be clear, concise and tailored to this specific project and demonstrate understanding of the requirements. The plan should not include restatement of our specification requirements. At a minimum, the plan must include the following:

1. Organization Structure and Staffing: The Offeror must clearly describe its organization structure and provide an Organization Chart. The description must identify all offices involved in this project from the Offeror’s Headquarters through to the Offeror’s site office, and how they are related. All Joint Venture partners and major Subcontractors shall be addressed in this description. The description shall identify whether functions/positions will be filled by prime or by subcontractors.

Specifically Identified Personnel Submission Requirements: The Offeror is required to provide a Resume Form for the four (4) identified Specifically Identified Personnel, provided as Attachment 4, “Resume Form,” to document the experience of each of their Specifically Identified Personnel.

Provide resume forms for the following Specifically Identified Personnel (SIP) for both primary and alternate. :

i. Project Manager

ii. Construction Superintendent

iii. Construction Quality Control Systems Manager

iv. Scheduler

All Specifically Identified Personnel must be identified by title, organization, and physical location, and their major responsibilities and authorities must be stated.

Minimum experience for the Specifically Identified Personnel shall include experience with at least 1 similar project in the role for which they are proposed and

1) the Quality Control Manager and Project Manager each must have 5 years construction experience on construction similar in scope and complexity to that required in this solicitation, and

2) the Construction Superintendent must have 10 years experience in work of a nature similar to that required by this solicitation.

3) The Scheduler must have 2 years construction scheduling experience on construction project in similar scope and complexity and at least one project comparable in size to this solicitation. Resume Forms must clearly demonstrate the person proposed meets the minimum requirements.

Please note that Specifically Identified Personnel may not be changed during execution of the project without the approval of a USACE Contracting Officer. No substitutions shall be made except unless authorized in writing by a USACE Contracting Officer.

The proposal shall clearly explain the proposed staffing and how the Specifically Identified Personnel will communicate between each other and with the US Government.

2. Project Execution and Management: The Offeror shall describe its plan for execution of the project. This includes the following elements at a minimum:

a. Project start up and mobilization – identify the activities that will take place immediately after contract award, to include mobilization, material shop drawing, submittals (to include submittal register), procurement of key subcontracts, etc.

b. Staffing of the field office – explain who will be located at the field office, the proposed location of the office, and the planned timeframe to establish the office. Identify the personnel who will be located on-site during the construction. There shall be at least 1 person, fluent in the English language, available at the field office at all times (24 hours/day, 7 days/week).

c. Plan to supply materials and special equipment – explain where significant building materials will be obtained (country of origin).

d. Plan to obtain, retain, coordinate, and manage subcontractors – the Offeror must identify the significant aspects of the work which are to be self-performed and those that will be subcontracted. The plan must demonstrate the offeror ability to obtain labor both skilled and unskilled in sufficient quantities and commitment to providing additional labor and other resources as necessary. The Offeror must identify all key subcontractors by name and must provide a signed letter of commitment. The Offeror must identify the nature and overall percent of work that will be performed by the Prime Contractor and all key sub-contractors). Offerors are reminded of the requirements of 52.236-1, Performance of Work by the Contractor.

Please note that Key Subcontractors may not be changed during execution of the project without the approval of a USACE Contracting Officer. No substitutions shall be made unless a USACE Contracting Officer determines in the exercise of his/her sole discretion that the proposed substitution is in the best interest of the Government. All approvals shall be in writing from the USACE Contracting Officer and may not be delegated to an Administrative Contracting Officer.

e. Plan for obtaining utilities to include water, sewer, and power to facilitate all onsite construction activities thru contract completion. Plan should include a discussion of requirement necessary for commissioning.

f. Plan for completing work in Romania with emphasis on offeror’s understanding and ability to meet visa and work permitting requirements/process. The plan must demonstrate an understanding of host nation visa and work permit requirements and explain in detail how the offeror intends to fulfill these requirements. Plan must include a discussion on how offeror will mitigate any delays in meeting host nation requirements and subsequent delays in contract performance.

g. Plan for obtaining access to the site (registration of workers) and controlling access to the site during construction.

3. Quality Control and Processes: The Offeror shall describe its Quality Control plan and processes for the project.

The following minimum areas should be addressed in the plan:

a. Construction Quality Control

b. Safety Plan

c. Shop drawing and Request for Information (RFI) process

d. Risk identification and management program

e. Clear assignments of responsibility/authority of key staff members

4. Schedule: The Offeror shall provide a proposed summary schedule.

1. The Offeror shall provide their plan to successfully execute the work within the time allowed. The plan shall include the scheduling team in addition to the specific schedulers identified in the Management Plan. The schedule shall be consistent with the Management Plan (Factor 3) described above and with the proposed manning of the projects. The schedule shall include all of the major portions of work and describe any phasing required for this project. The schedule shall address the submittals, reviews and approval periods. The schedule shall address long lead-time items and shall take into consideration all major portions of work. For the purposes of this section only, the Offeror shall use the dates of 15 September 2017 for award and 15 October 2017 for NTP and should prepare the schedule assuming that all base line items and options will be awarded on that date.

Offerors shall give attention to the following features and incorporate the following minimum activities shown below, while also considering the “Constraints” listed below:

a. Prime and Sub-Contractor Work

b. Shop Drawing preparation

c. Site infrastructure activities

d. Show the overall construction phase for the site work, and for utilities.

e. Show turnover of the Multimodal Improvement, Fuel Storage Capacity, and Cargo Apron facilities. Identify any proposed phased turnovers. The time to complete the facility and turnover to the Government must consider the requirement for the Offeror’s Construction Quality Control (CQC), completion inspection and the subsequent joint Contractor-Government turnover inspection. Ensure completion date for each Multimodal Improvement, Fuel Storage Capacity, and Cargo Apron Facility meets the contract required delivery date.

f. Show as-built submissions.

Constraints: The Offeror must demonstrate the capability and flexibility to plan and schedule the complete project to meet the required contract completion period stated on the schedule. Clearly identify any constraints on the schedules presented (e.g., labor or material availability, permits, weather, etc.). Indicate the anticipated overall critical path on the schedule.

The schedule must be specifically-tailored to the project contemplated by the solicitation.

FACTOR 4: DESIGN CAPABILITY

For Factor Four (4) – Design Capability, the Offeror shall submit their plan for obtaining Designer(s) of Record appropriate for the anticipated work under this contract including airfield taxiway and/or aircraft parking apron new construction; Cconstruction of a rail spur with railhead and supporting infrastructure; Installation of fuel storage and delivery systems and supporting infrastructure; New Construction of facilities (buildings) etc. At a minimum the plan shall include the following:

1. Criteria for selection of the Designer(s) of Record

2. Letter of Commitment from proposed DOR(s), if not using in-house DOR

3. The Plan shall demonstrate a thorough knowledge of engineering and design in Romania to include coordination with host nation authorities. Additionally, Offerors must demonstrate an understanding of certification and registration requirements for companies in Romania and the ability to meet the requirements. The prime contractor and the proposed DOR must demonstrate the ability to communicate in the host nation’s acknowledged national language(s) and English.

FACTOR 5: PRICE

This volume shall consist of all information required to support proposed prices. Certified cost and pricing data are not currently required; however, the Government reserves the right to request such data prior to award. The information submitted in this volume shall comply with FAR 15 and the requirements set forth below. There are no page limitations for this volume.

1. Offerors shall submit completed Attachment 4: Price Schedule containing prices and must propose on all CLINs, to include option CLINs, if applicable.

2. Completed Blocks 14 through 20 of the Offer, Standard Form (SF) 1442, duly executed with an original signature by an authorized official to bind the company. If submitting as a joint venture, an authorized official from each of the firms comprising the joint venture shall sign the SF 1442.

3. Representations and Certifications fully completed.

4. The name, addresses, telephone number(s), facsimile number(s), and e-mail address (es) of the point(s) of contact with the authority to legally bind the Offeror.

5. The name, address, DUNS, CAGE, and Tax Identification Number (TIN) of the Offeror submitting the proposal.

6. Executed Bid Bond or Bank Letter of Assurance (to be submitted hard copy, notarized original via delivery service to the address below); and a copy of the agent’s authority to sign bonds/BLA for the surety company shall accompany the bid bond/BLA. The Executed Bid Bond or BLA shall also be provided as a copy along with the electronic proposal. The hardcopy must be delivered no later than 5 calendar days after the proposal due date.

U.S. Army Corps of Engineers, Europe District W912GB-17-R-0020 Attn: Jefferey Ball Konrad Adenauer Ring 39 65187 Wiesbaden

Or

Department of the Army CMR 410 Box 7 Attn: Contracting – Jefferey Ball

APO, AE 09049

Note: Offerors must be registered in System for Award Management (SAM) system prior to receiving an award. If submitting as a joint venture, the joint venture entity must be registered in SAM prior to receiving an award.

b. Failure to submit Section 00 10 00 and/or failure to complete all Line Items on Section 00 10 00, may result in the Offeror’s proposal package being rejected by the Government after initial evaluation without further consideration.

In addition to the Bank Letter of Assurance/Bid Bond and Performance and Payment Bonds/Bank Letter of Guaranty as outlined in the solicitation, Offerors may be required to provide additional information at a later date if needed to verify financial responsibility to perform the contract, such as a Financial Responsibility Form, Balance Sheet / Profit and Loss Statement, etc.

This contract is firm-fixed-price, payable entirely in Euros. No additional sums will be payable due to any escalation in the cost of materials, equipment or labor. The Contractor’s failure to properly estimate or accurately predict the cost and/or difficulty in achieving the results required by this contract is not reimbursable. The contract price will not be adjusted on account of fluctuations in the currency exchange rates. Changes in the contract price and/or time to complete will be made only due to changes made by the Government in the work to be performed/due to delays caused by the Government as determined and approved in accordance with Federal Acquisition Regulation (FAR) clauses. Advance payments are not authorized and the contractor will be paid only for work as the work is accomplished in defined intervals as the work proceeds, in accordance with FAR clause 52.232-5 Payments under Fixed-Price Construction Contracts.

SECTION 00 22 00 - SUPPLEMENTARY INSTRUCTIONS

The following have been modified:

INSTRUCTIONS TO OFFERORS

SECTION II

SOLICITATION PROVISIONS

A. PROPOSAL SUBMISSION REQUIREMENTS, EVALUATION CRITERIA AND BASIS FOR

AWARD (Section 00 22 00)

The requirements for the preparation and submission of proposals and the requirements for the evaluation of proposals in response to this solicitation are contained in the Request for Proposal. This acquisition will be procured in accordance with 10 U.S. Code § 2862 - Turn-key selection procedures. Subject to the provisions contained herein, the award will be made to one (1) Offeror in accordance with who is deemed responsible in accordance with the Federal Acquisition Regulation (FAR), whose proposal conforms to the solicitation requirements, represents the Best Value to the Government as judged by an overall assessment of the evaluation criteria and other considerations specified in this solicitation,. This source selection approach, called Best-Value Tradeoff, includes an evaluation of five (5) factors: Experience, Past Performance, Management Approach, Design Capability and Price.

Experience contains pass/fail elements. The Offerors must submit at least three (3) projects that they (the offeror) performed as the prime contractor. In case of a Joint Venture (JV) proposal, the work must have been performed by at least one of the JV partners. The Offeror must have directly performed at least two (2) of the five (5) projects submitted for experience as Design Build. Offerors who do not meet these minimum requirements are not eligible for award.

Once a proposal is rated “Pass” for this aspect, the relative weight of the evaluation factors is as follows: Experience is significantly more important than Past Performance, Past Performance is significantly more important than Management Approach, and Management Approach is significantly more important than Design Capability. When the four (4) non-price factors are combined, they are approximately equal to Price.

The Government reserves the right to award to other than the lowest proposed price. The greater the equality of technical proposals, the more important price shall become in selecting the Best Value to the Government.

Unreasonably high proposed prices may be grounds for eliminating a proposal from the competitive range. The awarded contract will incorporate the successful offerors proposal to the extent it does not conflict with the solicitation requirements.

B. FACTORS TO BE EVALUATED

The following evaluation factors will be used to evaluate each proposal: Award will be made to the Offerors whose proposals are the best value to the Government based upon an integrated assessment of the evaluation factors. IAW FAR 15.304, the following factors will be considered in evaluating the proposals:

Factor 1 – Experience Factor 2 – Past Performance Factor 3 – Management Approach Factor 4 – Design Capabilty Factor 5 - Price

C. EVALUATION APPROACH

The overarching evaluation approach for all factors is as follows:

Adequacy of Response. The proposal will be evaluated to determine whether the Offeror’s methods and approach have been adequately and completely considered, defined, and satisfied the requirements specified in the solicitation. The proposal will be evaluated to determine the extent to which each requirement has been addressed in the proposal in accordance with the proposal submission section of the solicitation.

Feasibility of Approach. The proposal will be evaluated to determine the extent to which the proposed approach is workable and the end results achievable. The proposal will be evaluated to determine the extent to which the Offeror is expected to be able to successfully complete the proposed tasks and technical requirements within the required schedule.

D. DISCUSSIONS

1. GENERAL INFORMATION: The Government does not intend to hold discussions. However, in accordance with FAR 15.306(d), discussion sessions with each Offeror may be held. Should discussions take place, all Offerors in the competitive range will be allowed to submit Final Proposal Revisions.

2. DISCUSSION SCHEDULING: If discussions are conducted, the Contracting Officer may conduct discussions orally, in writing, etc. The method for discussions will be at the discretion of the Contracting Officer. The Contracting Officer will provide additional instructions with the notification.

E. CRITERIA FOR EVALUATION FACTORS

FACTOR 1: EXPERIENCE

1. The Government will evaluate the depth and the relevancy of the experience as submitted in the offeror’s proposal in accordance with the following criteria:

a. Projects submitted should demonstrate work experience performed within Romania or the European Union

(EU).

b. Experience managing multiple projects performed simultaneously with phased deliverables scheduled within a contiguous…