Various Base Improvements Mihail Kogalniceanu Air Base, Romania
Solicitation number
W912GB-17-R-0020
Issued by

About this file

Conformed Version of SF 1442 Section 00 10 00 Solicitation Contract Line Item Number Schedule

View the file

Other files

File Type Posted
W912GB-17-R-0020_0013.pdf PDF
W912GB-17-R-00020_0012.pdf PDF
ATTACHMENT_4_Price_schedule_Revised_29_Aug_2017.xlsx XLSX spreadsheet
Conformed_Section_00_10_00_Solicitation_CLIN_Schedule.pdf PDF
A.07.23_Atch_1_Experience_Overview_Sheet_Revised_08_August_17.docx DOCX document
Attachment_15_URBANISM_CERTIFICATIE_01011401[1].pdf PDF
W912GB-17-R-0020-00011.pdf PDF
Attachment H3 FSC 001-FSC X002.pdf PDF
Attachment H5 170809.MI GE 001 Scope Modification.pdf PDF
Attachment_14_SOW_Track_Changes.pdf PDF
Attachment H6 170814.MI RB 001 RB X001 RB X002 Modification_Annex 1.pdf PDF
Attachment H2 FSC 001-FSC X001.pdf PDF
Attachment H1 FSC 001-FSC 001.pdf PDF
Attachment H4 170809.MI GC 001 Scope Modification.pdf PDF
ATTACHMENT_4_Price_schedule.xlsx XLSX spreadsheet
Conform_Copy_W912GB-17-R-0020.pdf PDF
W912GB-17-R-0020-0010_(Post-Closing).pdf PDF
DRAWING_C0003-CIVIL_DETAIL.pdf PDF
W912GB-17-R-0020_0009.pdf PDF
W912GB-17-R-0020_0008.pdf PDF
01_SOW_Revised_19_July_2017.pdf PDF
Amendment_07.pdf PDF
Attachment_4_ERI_Revised_Price_Schedule_23_June_17_REVISED_1_JULY_2017.xlsx XLSX spreadsheet
SOW_5July2017.pdf PDF
AW_78-24-27.pdf PDF
W912GB-17-R-0020-0006.pdf PDF
Contingency_Design_Program.PDF PDF
MK_MI_SOW-A_DA.docx DOCX document
MK_FSC_SOW-A_DA.docx DOCX document
CX007-CX200.pdf PDF
W912GB-17-R-002005.pdf PDF
A.07.23_Atch_1_Experience_Overview_Sheet_Revised_23_June_17.docx DOCX document
RETENTION_POND_LOCATION__DRAWINGS_REVISED_23_June_17.pdf PDF
A.07.23_Atch_5_Resume_Revised_23Jun17.docx DOCX document
A.07.23_Attachment_4_ERI_Revised_Price_Schedule_23_June_17.xlsx XLSX spreadsheet
W912GB-17-R-0020-0004_FBO.pdf PDF
A.07.23_Attachment_4_ERI_Revised_Price_Schedule_13_June_17.xlsx XLSX spreadsheet
Att._12_Pre_Proposal_Conference_W912GB-17-R-0020_MK_Romania_-_6_June.ppt PPT presentation
Att._13_Pre_Proposal_Sign_In_Roster.pdf PDF
W912GB-17-R-0020-0003.pdf PDF
PPSV_Agenda__Logistic_Plan_with_Project_Site_Plan.pdf PDF
W912GB-17-R-0020_Amendment_02.pdf PDF
A.07.23_Attachment_4_ERI_Revised_Price_Schedule_24_MAY_17.xlsx XLSX spreadsheet
A.07.24_W912GB-17-R-0020_Amendment_01_23_May_2017.pdf PDF
SOW_Attachment_E1-E3_Design_Drawings_35_.zip ZIP file
A.01.13_USACE_Specifications_09_May_17.pdf PDF
A.07.23_W912GB-17-R-0020_Solicitation_9_May_17.pdf PDF
Instruction_to_Offerors_Attachments_1-11.zip ZIP file
SOW_Attachments_A-G.zip ZIP file
A.02.02 Atch_5_DRAFT PRE-SOL_FUEL STORAGE CAPACITY.pdf PDF
Show 40 more

Latest 50 of 57 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W912GB-17-R-0020

Section 00 10 00 - SOLICITATION, CONTRACT LINE ITEM NUMBER (CLIN) SCHEDULE

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Base Items Cargo Apron

FFP

Cargo Apron (CA) MK Air Base, Romania Base Line Items

Base Line Items: The following base line items include providing all labor, materials, equipment, and services necessary to complete the design and construction of the work identified in the attached Plans, Specifications, Scope of Work (SOW), Solicitation / Request for Proposal, and Base Contract. It also includes preparation of all documents, submittals, and schedules; inspections; and compliance with all technical, quality control, administrative, regulatory, permitting and safety requirements. All work shall be performed in accordance with these documents.

Period of Performance: A single Notice to Proceed will be issued for all awarded work. All work shall be completed within the number of calendar days indicated in each line item from the date of the Notice to Proceed. Included in the total Period of Performance is a period of up to 120 calendar days during which the host nation Ministry of Defense will review the 100% design submittals and provide review comments to the US government. Only upon completion of the host nation Ministry of Defense (MOD) review, will the designs be approved for construction.

Liquidated Damages: Liquidated damages shall be assessed in the amount of €3.166,00 per calendar day of delay beyond the required completion date of the contract.

NET AMT

1001AA 1 Job A/E-provided Service

FFP

A/E-provided Service: All work and labor required to provide a Geotechnical Survey for the project site.

All work on this base line item shall be completed within 780 calendar days from the date of the Notice to Proceed.

FOB: Destination

1001BA 1 Job A/E-provided Service

FFP

A/E-provided Service: All work and labor required to provide a Topographical Survey for the project site.

All work on this base line item shall be completed within 780 calendar days from

1001CA 1 Job Fixed Wing Parking Apron (Design)

FFP

Fixed Wing Parking Apron, Fixed Wing Taxiway, and Blast/Exhaust Deflector (Design): All work and labor required to design Fixed Wing Parking Apron, Fixed Wing Taxiway and Blast/Exhaust Deflector.

All work on this base line item shall be completed within 780 calendar days from

1001CB 1 Job Fixed Wing Parking Apron (Construction)

FFP

Fixed Wing Parking Apron (Construction): All work, materials, and labor required to construct Fixed Wing Parking Apron containing: Hardscape, Drainage, Base Courses, Shoulders, Marking, Grounding / Mooring, and Lighting. Including supporting facilities: Electric Service, Storm Drainage, and Site Improvement Refer to plan(s) C002-C006

All work on this base line item shall be completed within 780 calendar days from

1001CC 1 Job Fixed Wing Taxiway (Construction)

FFP

Fixed Wing Taxiway (Construction): All work, materials, and labor required to construct Fixed Wing Taxiway including supporting facilities: Hardscape, Drainage, Base Courses, Shoulders, Marking, and Lighting. Including supporting facilities: Electric Service, Storm Drainage, Site Improvement.

All work on this base line item shall be completed within 780 calendar days from

1001CD 1 Job Blast/Exhaust Deflector (Construction)

FFP

Blast/Exhaust Deflector (Construction): All work, materials, and labor required to construct Blast/Exhaust Deflector. Refer to plan(s) C002-C006

All work on this base line item shall be completed within 780 calendar days from

1001DA 1 Job Airfield Lighting Vault (Design)

FFP

Airfield Lighting Vault (ALV) (Design): All work and labor required to design Airfield Lighting Vault (ALV).

All work on this base line item shall be completed within 780 calendar days from

1001DB 1 Job Airfield Lighting Vault (Construction)

FFP

Airfield Lighting Vault (ALV) (Construction): All work, materials, and labor required to construct Airfield Lighting Vault (ALV), including: Electric Service.

All work on this base line item shall be completed within 780 calendar days from

1001EA 1 Job Additional Blast/Exhaust Deflect Design

FFP

Additional Blast/Exhaust Deflector(s) (Design) -All work, materials, and labor required to design additional Blast/Exhaust Deflector(s) Refer to plan(s) CX002-

CX006

All work on this base line item shall be completed within 780 calendar days from

1001FA 1 Job Enlarge Fixed Wing Parking Apron Design

FFP

Enlarge Fixed Wing Parking Apron (Design): -All work, materials, and labor required to design Fixed Wing Parking Apron Refer to plan(s) CX002-CX006

All work on this base line item shall be completed within 780 calendar days from

Option Items Cargo Apron

FFP

Cargo Apron (CA) MK Air Base, Romania Optional Line Items

Optional Line Items: The following optional line items include providing all labor, materials, equipment, and services necessary to complete the design and construction of the work identified in the attached Plans, Specifications, Scope of Work (SOW), Solicitation / Request for Proposal, and Base Contract. It also includes preparation of all documents, submittals, and schedules; inspections; and compliance with all technical, quality control, administrative, regulatory, permitting and safety requirements. All work shall be performed in accordance with these documents.

Award of Options: The Government reserves the right to award any options within 120 calendar days following issuance of Notice to Proceed (NTP) for the base work. If an option is exercised, it must be completed within the number of calendar days stated in the optional line item being exercised.

Period of Performance: A single Notice to Proceed will be issued for all awarded work. All work shall be completed within the number of calendar days indicated in each line item from the date of the Notice to Proceed. Included in the total Period of Performance is a period of up to 120 calendar days during which the host nation Ministry of Defense will review the 100% design submittals and provide review comments to the US government. Only upon completion of the host nation Ministry of Defense (MOD) review, will the designs be approved for construction.

Liquidated Damages: Liquidated damages shall be assessed in the amount of

1002AA 1 Job OPTION Add Blast/Exhaust Deflect Construction

FFP

Additional Blast/Exhaust Deflector(s) (Construction) -All work, materials, and labor required to construct additional Blast/Exhaust Deflector(s) Refer to plan(s)

CX002-CX006

Should the Government exercise this optional line item all work shall be completed within 780 calendar days from the date of the issuance of the Notice to Proceed for the base items.

1002BA 1 Job OPTION Enlarge FixedWing Park Apron Constructio

FFP

Enlarge Fixed Wing Parking Apron (Construction): -All work, materials, and labor required to construct Fixed Wing Parking Apron Refer to plan(s) CX002-CX006

Should the Government exercise this optional line item all work shall be completed within 780 calendar days from the date of the issuance of the Notice to Proceed for the base items.

1002BB

Demolition of Existing Structures

FFP

All work, materials, and labor required to remove any existing structures as outlined in the scope of work.

Base Items Fuel Storage Capacity

FFP

Fuel Storage Capacity (FSC) MK Air Base Romania Base Line Items

Base Line Items: The following base line items include providing all labor, materials, equipment, and services necessary to complete the design and construction of the work identified in the attached Plans, Specifications, Scope of Work (SOW), Solicitation / Request for Proposal, and Base Contract. It also includes preparation of all documents, submittals, and schedules; inspections; and compliance with all technical, quality control, administrative, regulatory, permitting and safety requirements. All work shall be performed in accordance with these documents.

Period of Performance: A single Notice to Proceed will be issued for all awarded work. All work shall be completed within the number of calendar days indicated in each line item from the date of the Notice to Proceed. Included in the total Period of Performance is a period of up to 120 calendar days during which the host nation Ministry of Defense will review the 100% design submittals and provide review comments to the US government. Only upon completion of the host nation Ministry of Defense (MOD) review, will the designs be approved for construction.

Liquidated Damages: Liquidated damages shall be assessed in the amount of

2001AA 1 Job A/E-provided Service

FFP

A/E-provided Service: All work and labor required to provide a Geotechnical Survey for the project site.

All work on this base line item shall be completed within 1090 calendar days from the date of the issuance of the Notice to Proceed.

2001BA 1 Job A/E-provided Service

FFP

A/E-provided Service: All work and labor required to provide a Topographical Survey for the project site.

All work on this base line item shall be completed within 1090 calendar days from

2001CA 1 Job Aircraft Fuel Storage Facility Design

FFP

Aircraft Fuel Storage Facility, Aircraft Fuel Truck Loading Facility, and Fuel Truck Parking Area (Design): All work and labor required to design Aircraft Fuel Storage Facility, Aircraft Fuel Truck Loading Facility, and Fuel Truck Parking Area.

All work on this base line item shall be completed within 1090 calendar days from

2001CB 1 Job Aircraft Fuel Storage Fac (Construction)

FFP

Aircraft Fuel Storage Facility (Construction): All work, materials, and labor required to construct Aircraft Fuel Storage Facility containing: Aircraft Fuel Storage Tank, Fuel Containment System, 2 Tanks 1.892M Liters / 499,985 Gallon each), and Alt. Fuel Delivery Connection. Including supporting facilities: Electric Service, Water, Sewer, Paving, Walks, Curbs and Gutters, Storm Drainage Site Improvement, Information Systems.

All work on this base line item shall be completed within 1090 calendar days from

2001CC 1 Job Aircraft Fuel Truck LoadFac Construction

FFP

Aircraft Fuel Truck Loading Facility (Construction): All work, materials, and labor required to construct Aircraft Fuel Truck Loading Facility containing: Distribution Piping, Pipe Bollards including supporting facilities: Electric Service, Water, Sewer, Paving, Walks, Curbs and Gutters, Storm Drainage, Site Improvement, Information Systems.

All work on this base line item shall be completed within 1090 calendar days from

2001CD 1 Job Fuel Truck Parking Area (Construction)

FFP

Fuel Truck Parking Area (Construction) All work, materials, and labor required to construct Fuel Truck Parking Area including supporting facilities: Water, Sewer Paving, Walks, Curbs and Gutters, Storm Drainage, and Site Improvement.

All work on this base line item shall be completed within 1090 calendar days from

2001DA 1 Job Fueling/POL, Support Building (Design)

FFP

Fueling/POL, Support Building (Design): All work and labor required to design Fueling/POL, Support Building.

All work on this base line item shall be completed within 1090 calendar days from

2001DB 1 Job Fueling/POL,Support Bldg (Construction)

FFP

Fueling/POL,Support Building (Construction): All work, materials, and labor required to construct Fueling / POL, Support Building including supporting facilities: Vapor Barrier, Electric Service, Water, Sewer, Storm Drainage, and Information Systems.

All work on this base line item shall be completed within 1090 calendar days from

OPTION Demolition of Existing Structures

FFP

(Construction) - All work, materials, and labor required to remove any existing structures as outlined in the scope of work.

Base Items Mutimodal Improvements

FFP

Multimodal Improvements (MI) MK Air Base, Romania Base Line Items

Base Line Items: The following base line items include providing all labor, materials, equipment, and services necessary to complete the design and construction of the work identified in the attached Plans, Specifications, Scope of Work (SOW), Solicitation / Request for Proposal, and Base Contract. It also includes preparation of all documents, submittals, and schedules; inspections; and compliance with all technical, quality control, administrative, regulatory, permitting and safety requirements. All work shall be performed in accordance with these documents.

Period of Performance: A single Notice to Proceed will be issued for all awarded work. All work shall be completed within the number of calendar days indicated in each line item from the date of the Notice to Proceed. Included in the total Period of Performance is a period of up to 120 calendar days during which the host nation Ministry of Defense will review the 100% design submittals and provide review comments to the US government. Only upon completion of the host nation Ministry of Defense (MOD) review, will the designs be approved for construction.

Liquidated Damages: Liquidated damages shall be assessed in the amount of

3001AA 1 Job A/E-provided Service

FFP

A/E-provided Service: All work and labor required to provide a Geotechnical Survey for the project site.

All work on this base line item shall be completed within 810 calendar days from

3001BA 1 Job A/E-provided Service

FFP

A/E-provided Service: All work and labor required to provide a Topographical Survey for the project site.

All work on this base line item shall be completed within 810 calendar days from

3001CA 1 Job Site Roads Utilities Transformer Design

FFP

Site Roads, Utilities and Transformer Station (Design): All work and labor required to design Site Roads, utilities and and transformer station and connection to existing Substation on the TFOS

All work on this base line item shall be completed within 810 calendar days from

3001CB 1 Job Site Roads Streets Walkways Construction

FFP

Site Roads, Streets and Walkways (Construction): All work, materials, and labor required to construct Site Roads including: Paving, Walks, Curbs, and Gutter, and Site Improvement.

All work on this base line item shall be completed within 810 calendar days from

3001CC 1 Job Site Utilities (Construction)

FFP

Site Utilities (Construction): All work, materials, and labor required to construct Site Utilities including: Electric Service, Water, Sewer, Storm Drainage, and Information Systems.

All work on this base line item shall be completed within 810 calendar days from

3001CD 1 Job Transformer Station Connect Construction

FFP

Transformer Station and Connection to existing Substation on the TFOS (Construction): All work, materials, and labor required to construct Transformer Station including: Electric Service.

All work on this base line item shall be completed within 810 calendar days from

3001DA 1 Job Rail load /off-load facility Design

FFP

Rail load /off-load facility (Railhead), Vehicle Wash Facility and Entrance Gate, (Design): All work and labor required to design Railhead and Vehicle Wash Facility.

All work on this base line item shall be completed within 810 calendar days from

3001DB 1 Job Rail load /off-load fac Construction

FFP

Rail load /off-load facility Railhead (Construction): All work, materials, and labor required to construct Railhead containing: RR Tracks w/Ties and Ballast, Railhead Apron/Service Lane, Concrete Hardstand, Loading/Unloading Dock/Ramp, At- Grade Rail Crossing, and Rail Switch.

Including supporting facilities: Electric Service, Water, Sewer, Storm Drainage, Site Improvement, and Information Systems.

All work on this base line item shall be completed within 810 calendar days from

3001DC 1 Job Entrance Gate (Construction)

FFP

Entrance Gate (Construction) All work, materials, and labor required to construct Entrance Gate including supporting facilities: Electric Service, Site Improvement, and Information Systems.

All work on this base line item shall be completed within 810 calendar days from

3001DD 1 Job Vehicle Wash Facility (Construction)

FFP

Vehicle Wash Facility (Construction) All work, materials, and labor required to construct Vehicle Wash Facility containing of: Vehicle Wash Facility, Wash Support Building, Wash Support Bldg. Vapor Barrier, Wash Facility Apron, Gravity Oil/Grease Sep., and Water and Grit Separator

Including supporting facilities: Electric Service, Water, Sewer, and Storm Drainage.

All work on this base line item shall be completed within 810 calendar days from

3001EA 1 Job Ready Building (Design)

FFP

Ready Building (Design): All work and labor required to design one building (referred to as the Ready Building) containing all functions of:

-Ready Building-A/DACG with Overhead Protection -Shipping and Receiving and Cargo Operations Building -Overhead Protection, Pallet Area -Staging Marshalling Area and an exterior:

-Open Storage Area, Installation and Generator Station

All work on this base line item shall be completed within 1050 calendar days from

3001EB 1 Job Ready Building (Construction)

FFP

Ready Building (Construction): All work, materials, and labor required to construct one building containing all functions of:

-Ready Building-A/DACG with Overhead Protection -Shipping and Receiving and Cargo Operations Building -Overhead Protection, Pallet Area including supporting facilities: Electric Service, Water, Sewer, Paving, Walks, Curbs, and Gutter, Storm Drainage, Site Improvement, Information Systems.

All work on this base line item shall be completed within 1050 calendar days from

3001EC 1 Job Open Storage Area Install (Construction)

FFP

Open Storage Area, Installation (Construction): All work, materials, and labor required to construct Open Storage Area, Installation, including supporting facilities: Storm Drainage.

All work on this base line item shall be completed within 810 calendar days from

3001ED 1 Job Staging Marshalling Area (Construction)

FFP

Staging Marshalling Area (Construction): All work, materials, and labor required to construct a staging marshalling area

All work on this base line item shall be completed within 810 calendar days from

3001FA 1 Job A/E-provided Service

FFP

A/E-provided Service: All work and labor required to provide LEED Services for the Ready Building (Enhanced Commissioning)

All work on this base line item shall be completed within 1050 calendar days from

3001GA 1 Job Fencing Sys. Staging Marshalling Design

FFP

Fencing System for the Staging Marshalling Area (Design) All work and labor required to design Fencing System for the Staging Marshalling Area at the Railhead

All work on this base line item shall be completed within 810 calendar days from

3001HA 1 Job Alternative water Connection (Design)

FFP

Alternative water Connection (Design): All work and labor required to design Alternative Water Connection to the PFOS.

All work on this base line item shall be completed within 810 calendar days from

3001JA 1 Job Backup Generator (Design)

FFP

Backup Generator (Design): All work and labor required to design Backup Generator for Rail Head, Fueling Area and Cargo Apron.

All work on this base line item shall be completed within 810 calendar days from

3001KA 1 Job Alt Electrical Utility Connection Design

FFP

Alternative Electrical Utility Connection (Design): All work and labor required to design alternative electrical utility connection of Transformer Station to existing Electrical Sub Station on PFOS in lieu of the requirement to connect to transformer in base bid.

All work on this base line item shall be completed within 810 calendar days from

3001LA 1 Job Enlargement of service lane Design

FFP

Enlargement of service lane, movement platform and railway (Design): All work and labor required to design enlargement of service lane, movement platform and railway

All work on this base line item shall be completed within 810 calendar days from

3001MA 1 Job A/E provided Service (LEED Services)

FFP

A/E provided Service (LEED Services): All work and labor required to provide LEED Services for the Ready Building (v4 Base Services in Design and Construction Phases incl. Pre Assessment, Energy Modeling, Fundamental Commissioning, Fees, etc.)

All work on this base line item shall be completed within 810 calendar days from

Option Items Multimodal Improvements

FFP

Multimodal Improvements (MI) MK Air Base, Romania Optional Line Items

Optional Line Items: The following optional line items include providing all labor, materials, equipment, and services necessary to complete the design and construction of the work identified in the attached Plans, Specifications, Scope of Work (SOW), Solicitation / Request for Proposal, and Base Contract. It also includes preparation of all documents, submittals, and schedules; inspections; and compliance with all technical, quality control, administrative, regulatory, permitting and safety requirements. All work shall be performed in accordance with these documents.

Award of Options: The Government reserves the right to award any options within 120 calendar days following issuance of Notice to Proceed (NTP) for the base work. If an option is exercised, it must be completed within the number of calendar days stated in the optional line item being exercised.

Period of Performance: A single Notice to Proceed will be issued for all awarded work. All work shall be completed within the number of calendar days indicated in each line item from the date of the Notice to Proceed. Included in the total Period of Performance is a period of up to 120 calendar days during which the host nation Ministry of Defense will review the 100% design submittals and provide review comments to the US government. Only upon completion of the host nation Ministry of Defense (MOD) review, will the designs be approved for construction.

Liquidated Damages: Liquidated damages shall be assessed in the amount of

3002AA 1 Job OPTION Fence Sys Staging Marshalli Construction

FFP

Fencing System for the Staging Marshalling Area at the Railhead (Construction):

All work, materials, and labor required to construct Fencing System at the Railhead.

The Government reserves the right to exercise this option within 120 calendar days of issuance of the Notice to Proceed for the base items work. Should the Government exercise this optional line item all work shall be completed within 810 calendar days from the date of the issuance of the Notice to Proceed for the base items.

3002BA 1 Job OPTION Alt water Connection (Construction)

FFP

Alternative Water Connection (Construction) All work, materials, and labor required to construct Alternative Water Connection to the PFOS. Refer to plan

GE001.

The Government reserves the right to exercise this option within 120 calendar days of issuance of the Notice to Proceed for the base items work. Should the Government exercise this optional line item all work shall be completed within 810 calendar days from the date of the issuance of the Notice to Proceed for the base

3002CA 1 Job OPTION Backup Generator (Construction)

FFP

Backup Generator (Construction) All work, materials, and labor required to provide Backup Generator Station for Rail Head, Fueling Area and Cargo Apron.

The Government reserves the right to exercise this option within 120 calendar days of issuance of the Notice to Proceed for the base items work. Should the Government exercise this optional line item all work shall be completed within 810 calendar days from the date of the issuance of the Notice to Proceed for the base

3002DA 1 Job OPTION Alt Elec Utility Connect Construction

FFP

Alternative Electrical Utility Connection (Construction): All work, materials, and labor required to construct alternative electrical utility connection of Transformer Station to existing Electrical Sub Station on PFOS in lieu of the requirement to connect to transformer in base bid. Refer to plan GE001.

The Government reserves the right to exercise this option within 120 calendar days of issuance of the Notice to Proceed for the base items work. Should the Government exercise this optional line item all work shall be completed within 810 calendar days from the date of the issuance of the Notice to Proceed for the base

3002EA 1 Job OPTION Enlargement service lane Construction

FFP

Enlargement of service lane, movement platform and railway (Construction): All work and labor required to construction enlargement of service lane, movement platform and railway

The Government reserves the right to exercise this option within 120 calendar days of issuance of the Notice to Proceed for the base items work. Should the Government exercise this optional line item all work shall be completed within 810 calendar days from the date of the issuance of the Notice to Proceed for the base

3002EB

OPTION Demolition of Existing Structures

FFP

(Construction) - All work, materials, and labor required to remove any existing structures as outlined in the scope of work.

3002EC

OPTION Relocate two (2) Above Ground Fuel Lines

FFP

All work, materials, and labor required to relocate two (2) above ground existing, active fuel lines as outlined in the scope of work.