Att._12_Pre_Proposal_Conference_W912GB-17-R-0020_MK_Romania_-_6_June.ppt
PPT presentation 5 MB Posted
- Solicitation number
- W912GB-17-R-0020
About this file
Attachment 12 "Pre-Proposal Conference Slides." Issued with Solicitation W912GB-17-R-0020 Amendment 03 on 09 June 2017.
View the file
Other files
Show 40 more
Latest 50 of 57 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
“The views, opinions and findings contained in this report are those of the authors(s) and should not be construed as an official Department of the Army position, policy or decision, unless so designated by other official documentation.”
Prepared by Jefferey Ball For Pre-Proposal Conference 6 June 2017
U.S. ARMY CORPS OF ENGINEERS EUROPE DISTRICT
PRE-PROPOSAL CONFERENCE
SOLICITATION W912GB-17-R-0020
VARIOUS BASE IMPROVEMENTS MIHAIL KOGĂLNICEANU
AIR BASE ROMANIA
File Name
AGENDA
Solicitation Brief – Contract Specialist Mr. Jefferey Ball
Project Brief – Program Manager Mr. Bryan McClure
Legal Brief – Legal Counsel Ms. Megan Tooman
DISCLAIMER
Information Provided During Pre-Proposal Conference
Any remarks or explanations provided during this pre-proposal conference are for general information and will not change the terms and conditions of the solicitation
Any changes resulting from the conference or responses to questions will be done in writing by the issuance of amendments
Contracting Officer Authority
Only a warranted Contracting Officer (either a Procuring Contracting Officer (PCO), or an Administrative Contracting Officer (ACO), acting within their delegated limits, has the authority to issue modifications or otherwise change the terms and conditions of a contract. If an individual other than the Contracting Officer attempts to make changes to the terms and conditions of a contract you shall not proceed with the change and shall immediately notify the contracting officer
CONTRACTING KEY PERSONNEL
Procuring Contracting Officer (PCO) - Mr. Jeffrey Holt
Has the authority to change the terms and conditions of the solicitation / contract
Contract Specialists – Mr. Jefferey Ball / Secondary Mr. Dean DeFord
Main Point of Contacts (POC) during the solicitation phase
All correspondence requiring Government responses during the solicitation shall be sent to the Contract Specialist and Secondary Contract Specialist
Contact Information:
Mr. Jefferey Ball: Email: Jefferey.A.Ball@usace.army.mil Telephone: +49 611 9744 2619
Mr. Dean DeFord: Email: Dean.P.DeFord@usace.army.mil Telephone: +49 611 9744 2113
U.S. PROCUREMENT LAWS AND REGULATIONS
Regulations and Agency Supplements
Federal Acquisition Regulation (FAR) – http://farsite.hill.af.mil/vffara.htm
Defense Federal Acquisition Regulation Supplement (DFARS) - http://farsite.hill.af.mil/vfdfara.htm
Army Federal Acquisition Regulation Supplement (AFARS) - http://farsite.hill.af.mil/vfafara.htm
U.S. Army Corps of Engineers Acquisition Instructions (UAI) - http://www.usace.army.mil/BusinessWithUs/Contracting/Resources.aspx
FEDERAL BUSINESS OPPORTUNITIES
Announcement of Opportunities:
The synopsis, solicitation and all subsequent amendments are posted through the Federal Business Opportunities (FedBizOpps)
It is the offeror’s sole responsibility to obtain the solicitation and any subsequent amendments through the FedBizOpps
FedBizOpps Website: http://www.fbo.gov
User guides are located under the “Getting Started” tab
File Name
SYSTEM FOR AWARD MANAGEMENT (SAM)
Mandatory Registration in SAM
The Federal Government mandates that a contractor be registered in the SAM database prior to the award of a Federal contract.
Federal Acquisition Regulation (FAR) clause 52.204-7 states that in order to do business with the Government, the contractor must be registered in the SAM database.
Firms interested in doing business with the Federal Government should visit the SAM website, which consolidates federal procurement systems such as Central Contractor Registration (CCR) and Online Representations and Certifications Application (ORCA).
The Joint Venture (JV) must be registered prior to award with a unique Duns and Bradstreet Number and CAGE Code. You can not use one of the JV partner’s registration.
System for Award Management (SAM) Website: https://www.sam.gov/ File Name
DATA UNIVERSAL NUMBERING SYSTEM (DUNS) NUMBER
Obtain DUNS Number by contacting Duns and Bradstreet
Duns and Bradstreet Website: http://www.dnb.com
File Name
CONTRACTOR AND GOVERNMENT ENTITY (CAGE) CODE
The CAGE code is a required piece of data for registering in the System for Award Management (SAM).
Vendors located in the United States that do not have a CAGE code will be assigned one when registering in the System for Award Management (SAM) database.
CAGE Website: http://www.dlis.dla.mil/CAGE/cage_welcome.aspx
File Name
DESIGN – BUILD (DB) FIRM FIXED PRICE (FFP) CONTRACT
Full and open competed one-step turn-key FFP stand alone contract
Delivery Dates:
Cargo Apron Base and Option 780 calendar days from the issuance of the NTP Fuel Storage Capacity Base and Option 1090 calendar days from the issuance of the NTP Multimodal Improvements Base and Option 810 calendar days from the issuance of the NTP (with exception of SCLINs 3001EA and 3001EB they have a delivery date of 1050 calendar days from the issuance of the NTP)
Place of Performance - Mihail Kogălniceanu Air Base, Romania
Magnitude of Construction: $25,000,000.00 - $100,000,000.00
Best Value – Tradeoff
One-Step Turn-Key (Design – Build waiver authorizing one step procedures obtained)
One offeror will be awarded the contract
CONTRACT LINE ITEM (CLIN) NUMBERING
Three Base Item CLINs (All Base Item CLINs/SCLINs will be awarded at time of award)
Informational CLIN 1001 – Cargo Apron MK Air Base, Romania
Priced Sub-Contract Line Item Numbers (SCLINs) 1001AA – 1001FA
Informational CLIN 2001 – Fuel Storage Capacity MK Air Base, Romania
Priced Sub-Contract Line Item Numbers (SCLINs) 2001AA – 1001DB
Informational CLIN 3001 – Multimodal Improvements MK Air Base, Romania
Priced Sub-Contract Line Item Numbers (SCLINs) 3001AA – 3001MA
CONTRACT LINE ITEM (CLIN) NUMBERING CONTINUED
Two Option CLINs (Government has the right to award Option CLINs/SCLINs within 120 Calendar Days after issuance of NTP. Delivery Date for each line item is identified in the description.
Informational CLIN 1002 – Cargo Apron MK Air Base, Romania
Priced Sub-Contract Line Item Numbers (SCLINs) 1002AA – 1002BA
Informational CLIN 3002 – Multimodal Improvements MK Air Base, Romania
Priced Sub-Contract Line Item Numbers (SCLINs) 3002AA – 3002EA
BANK LETTER OF ASSURANCE (BLA) / BANK LETTER OF GUARANTEE (BLG)
Original BLA submitted with offeror’s proposal (a sample letter is provided as attachment with the solicitation) BLA must be 30% of the offeror’s total proposed amount, which includes base and option items
The Government will return the original BLA received from the unsuccessful offerors
Original BLG will be submitted by the successful offeror within seven (7) calendar days of notice of award
Sample BLG is also included in the solicitation (Offeror must work with their bank to use the same language provided in the sample letter provided in the solicitation) BLG must be 30% of the successful offeror’s total proposal, which includes base and option items
The BLG submitted by the successful offeror will be reviewed by the Procuring Contracting Officer and Legal Counsel. If the same language is not used in the submitted BLG from the successful offeror it may be rejected and sent back to the successful offeror for revision.
Secure your BLG language from the bank early
PROPOSAL SUBMISSION REQUIREMENTS
See solicitation section 00 21 00 “Instructions” under “Solicitation requirements an outline explaining the required proposal format is provided
Review section 00 21 00 of the solicitation carefully. Failure to submit all required documentation may result in rejection of the submitted proposal.
Submit Technical and Price proposals in separate volumes
Volume I Technical - four non-price technical factors
Factor One (1) – Experience Factor Two (2) – Past Performance Factor Three (3) – Management Approach Factor Four (4) – Design Capability File Name
PROPOSAL SUBMISSION REQUIREMENTS - CONTINUED
Volume I Continued – Other required documents to be submitted
Letter(s) of Commitment for Key Subcontractors Joint Venture Agreement The name, address, telephone and fax numbers, e-mail addresses of the Points of Contact with the authority to legally bind the contractor.
Name, address, DUNS, CAGE, and Tax Identification Number (TIN) of the contractor submitting the proposal
Volume II – Price
Factor Five (5) – Price
PROPOSAL SUBMISSION REQUIREMENTS - CONTINUED
Volume II Price Continued - Other required documents to be submitted
Offer Standard Form 1442 Amendments Standard Form 30 Solicitation Section 00 45 00 Representations and Certifications (System for Award Management (SAM)) Price Schedule (See Solicitation Attachment 4 “Price Schedule” Excel) Bank Letter of Assurance
The offeror’s proposal shall be submitted via AMRDEC SAFE Application. The AMRDEC SAFE Application is used to send large files to individuals that would normally be too large to send via email. Anyone has access to SAFE.
The AMRDEC SAFE Application can be accessed via https://safe.amrdec.army.mil/safe
PROPOSAL DUE DATE
Proposals are due on or before
30 June 2017 15:00 hours Central European Summer Time (CEST)
If there is a change in the proposal due date, you will be notified by an amendment to the solicitation which you must acknowledge.
LATE PROPOSALS
Late proposals are handled in accordance with FAR 15.208
Any proposal, modification, or revision, that is received at the designated Government office after the exact time specified for receipt of proposals is “late” and will not be considered unless it is received before award is made, the contracting officer determines that accepting the late proposal would not unduly delay the acquisition; and —
If it was transmitted through an electronic commerce method authorized by the solicitation, it was received at the initial point of entry to the Government infrastructure not later than 5:00 p.m. one working day prior to the date specified for receipt of proposals; or
There is acceptable evidence to establish that it was received at the Government installation designated for receipt of proposals and was under the Government’s control prior to the time set for receipt of proposals; or
It was the only proposal received.
File Name
BEST VALUE - TRADEOFF DETERMINATION
Award will be made to the offeror whose total evaluated price and technical proposal provides the best value to the Government
The Government reserves the right to accept other than the lowest price offer and to reject any and all offers
Best Value Tradeoff Process Reference – FAR Part 15.101-1: http://farsite.hill.af.mil/vffara.htm
File Name
BEST PROPOSAL
Offerors are advised to provide their BEST PROPOSAL in their first submission
The Government reserves the right to award without discussions
File Name
DISCUSSIONS
The Government reserves the right to conduct discussions, if in the best interest of the Government
The primary purpose of these exchanges is to maximize the Government’s ability to get the best value, based on the requirements and evaluation factors stated in the solicitation
File Name
BASIS FOR AWARD
Subject to the provisions contained herein, award will be made to one (1) Offeror who is deemed responsible in accordance with the Federal Acquisition Regulation (FAR), conforms to the solicitation requirements, and whose proposal, judged by an overall assessment of the evaluation criteria and other considerations specified in this solicitation, represents the Best Value to the Government. This source selection approach, called Best-Value Tradeoff, includes an evaluation of all factors: Experience, Past Performance, Management Approach, Design Capability and Price.
NOTE: Experience contains a pass/fail elements. The Offerors must submit at least three (3) projects that (the offeror) performed as the prime contractor. In case of a Joint Venture (JV) proposal, the work must have been performed by at least one of the JV partners. Offerors who do not meet that minimum requirement are not eligible for award. The Offeror must have directly performed at least two (2) of the five (5) projects submitted for experience as Design Build.
BASIS FOR AWARD CONTINUED
The relative weight of the evaluation factors is as follows Experience is significantly more important than Past Performance, Past Performance is significantly more important than Management Approach, Management Approach is significantly more important then Design Capability and when the four non-price factors are combined, they are approximately equal to Price.
The Government reserves the right to award to other than the lowest proposed price. The greater the equality of technical proposals, the more important price shall become in selecting the Best Value to the Government. Unreasonably high or low proposed prices may be grounds for eliminating a proposal from the competition based upon an assessment that the Offeror does not understand the requirement or the Offeror has made an unreasonable proposal. The awarded contract will incorporate the successful Offeror's proposal to the extent it offers betterments and does not conflict with the Request for Proposal.
CONTRACT AWARD
One (1) contract will be awarded
Responsible in Accordance with FAR 9.104. Contractor Qualification: contractor determined to be responsible
Conforms to Solicitation Requirements
Proposal Represents Best Value to Government. We can award to other to the lowest overall evaluated price
File Name
DEBRIEFING
Pre-Award Debriefing – Federal Acquisition Regulation (FAR) – 15.505
Post-Award Debriefing – Federal Acquisition Regulation (FAR) – 15.506
FAR Website: http://farsite.hill.af.mil/vffara.htm
File Name
PROPOSAL FORMAT
Basic Proposal Submission Requirements
Typed and submitted in grammatically correct English Organized, concise, and shall be clearly identified and tabbed. Each factor shall be described in a separate tabbed section.
Management Approach section shall be tabbed and sectioned as follows:
| i. Organization Structure and Staffing |
| ii. Specifically Identified Personnel |
| iii. Project Execution and Management |
| iv. Quality Control and Processes |
| v. Schedule |
File Name
File Name
PROPOSAL FORMAT CONTINUED
Volume I – Four Technical Factors
Cover Page Include - The name, address, telephone and fax numbers, e-mail addresses of the Points of Contact with the authority to legally bind the contractor. DUNS, CAGE, and Tax Identification Number (TIN) of the contractor submitting the proposal. Followed by a table of contents.
| Tab 1 Factor One (1) – Experience |
| Tab 2 Factor Two (2) – Past Performance |
| Tab 3 Factor Three (3) – Management Approach |
| i. Organization Structure and Staffing |
| ii. Project Execution and Management |
| iii. Specifically Identified Personnel |
| iv. Quality Control and Processes |
| v. Schedule |
| Tab 4 Factor Four (4) – Design Capability |
| Tab 5 - Letter(s) of Commitment for Key Subcontractors |
| Tab 6 - Joint Venture Agreement |
PROPOSAL FORMAT CONTINUED
Volume II – One Price Factor
Cover Page - The name, address, telephone and fax numbers, e-mail addresses of the Points of Contact with the authority to legally bind the contractor DUNS, CAGE, Tax Identification Number (TIN) of the contractor submitting the proposal. Followed by a table of contents.
| Tab 1 - Offer Standard Form 1442 |
| Tab 2 - Amendments Standard Form 30 |
| Tab 3 - Solicitation Section 00 45 00 Representations and Certifications |
| Tab 4 - Price Schedule (See Solicitation Section 00 10 00 “Solicitation, CLIN, Schedule”) |
| Tab 5 - Bank Letter of Assurance |
Note: Failing to submit or complete attachments properly, may result in rejection of the offer without further evaluation. Therefore, Offerors are urged to follow instructions and submit questions to Contracting if the instructions are not understood.
JOINT VENTURES / SUBCONTRACTORS
Ensure that any Joint Ventures (JV) comply with the requirements and submit a JV agreement addressing all requirements stated in section 00 21 00. "***The authorized member noted in the Joint Venture Agreement shall sign the SF 1442 and the Bank Letter of Assurance or Bid Bond. Make sure to include as part of Volume I. ***".
If an Offeror wishes to be credited with the experience of a Key Subcontractor or supplier (i.e., a firm that is not the prime contractor or part of the JV) a letter of commitment signed by the Key Subcontractor and the prime contractor shall be submitted. The commitment letter shall be submitted even if the firm is in some way related to a JV Partner (for example, the Key Subcontractor is a subsidiary of a JV Partner, or a subsidiary of a firm to which the JV partner is also a subsidiary). If a letter of commitment is not submitted, the experience will not be considered. Include this information as part of Volume I.
FACTOR 1 EXPERIENCE - SUBMISSION REQUIREMENTS
For Factor 1 – Experience, Offerors shall submit two attachments, Attachment 1, Experience Overview Sheet and Attachment 2 Experience Information Sheet, detailing previous work experience projects meeting the requirements of this solicitation.
Information for completing Attachment 1 and Attachment 2:
Offerors shall complete an Experience Overview Sheet (Attachment 1) with a total listing not-to-exceed
| five (5) projects that best represent the Offeror’s work experience required on this solicitation and |
| in accordance with the Evaluation Criteria. |
Offerors shall provide an Experience Information Sheet (Attachment 2) for each project listed on Attachment 1 Experience Overview Sheet in accordance with the Evaluation Criteria.
Offeror’s must submit at least three (3) projects that were performed by the Offeror as the Prime contractor. In case of a JV, the work must have been performed by at least one of the JV partners.
The Offeror must have directly performed at least two (2) of the five (5) projects submitted for experience as Design Build.
File Name
FACTOR 1 EXPERIENCE - SUBMISSION REQUIREMENTS CONTINUED
Note: If a Key Subcontractor’s experience is submitted for evaluation purposes, clearly address the
Offeror’s experience in working with those Key Subcontractors. If a JV, clearly address the experience of each of the JV Partners and the relationship of the JV partners on any ongoing or previous projects. The proposal shall receive a higher rating if the proposal contains evidence of the JV entity or the Prime and Key subcontractor working successfully together on relevant previous projects. Ensure the information provided is in accordance with the Evaluation Criteria.
File Name
Attachment 1 – Experience Overview Sheet
File Name
Attachment 2 – Experience Information Sheet
File Name
FACTOR 2 PAST PERFORMANCE - SUBMISSION REQUIREMENTS
The Past Performance Questionnaire (PPQ) (Attachment 3), included in the solicitation is provided
| for the Offeror or its team members to submit to the client for each project the Offeror includes in its |
| proposal for Factor 1, Experience. Ensure correct phone numbers and email addresses are providedfor the client point of contact. Completed PPQs should be submitted with your proposal. If the Offeror is unable to obtain a completed PPQ from a client for a project(s) before the proposal closing date, the Offeror should complete and submit with the proposal the first page of the PPQ (Attachment 3), which will provide contract and client information for the respective project(s). Offerors should follow-up with clients/references to ensure timely submittal of questionnaires. If the client requests, questionnaires may be submitted directly to the Government’s point of contact, Jefferey Ball via email at Jefferey.A.Ball@usace.army.mil and cenau.proposal@usace.army.mil prior to proposal closing date. Offerors shall not incorporate by reference into their proposal PPQs previously submitted for other RFPs. However, this does not preclude the Government from utilizing previously submitted PPQ information in the past performance evaluation. |
File Name
FACTOR 2 PAST PERFORMANCE - SUBMISSION REQUIREMENTS CONTINUED
Offerors may provide a completed Department of Defense, DD2626 form or a Contractor
Performance Assessment Report (CPAR), in lieu of Attachment 3. CPARS evaluations and DD2626s shall be signed by all designated authorities for consideration of evaluation.
Offerors may also include performance recognition documents received within the last six (6) years, such as awards, award fee determinations, customer letters of commendation, commercial and foreign government evaluations and any other forms of performance recognition.
In addition to the above, the Government may review any other sources of information for evaluating
| past performance. Other sources may include, but are not limited to, past performance information |
| retrieved through the Past Performance Information Retrieval System (PPIRS), including Contractor |
| Performance Assessment Reporting System (CPARS), using all CAGE/DUNS numbers of team |
| members (partnership, JV, teaming arrangement, or parent company/subsidiary/affiliate) identified in the Offeror's proposal, inquiries of owner representative(s), Federal Awardee Performance and |
| Integrity Information System (FAPIIS), Electronic Subcontract Reporting System (eSRS), and any |
| other known sources not provided by the Offeror. |
File Name
While the Government may elect to consider data from other sources, the burden of providing detailed, current, accurate and complete past performance information rests with the Offeror and the Government is under no obligation to check other sources.
File Name
Attachment 3 – Past Performance Questionnaire (Section A)
Attachment 3 – Past Performance Questionnaire (Section B)
File Name
Attachment 3 – Past Performance Questionnaire (Section B)
File Name
FACTOR 2 PAST PERFORMANCE – VOLUME I
Fill in and include Attachment 3 for each project submitted under the Past Performance Tab
Provide additional information, problems solved, letters of appreciations, final evaluations
File Name
FACTOR 3 MANAGEMENT APPROACH- SUBMISSION REQUIREMENTS
NOTE: Maximum allowable page limit for Factor 3 Management Approach is 50 pages. Any additional pages over 50 will not be evaluated by the Government. The Organization Chart, Resumes, and Letters of Commitment shall not count towards the 50 Page Maximum for this Factor. There are no individually rated sub factors; Factor 3 will receive 1 consolidated rating. For this factor the Offeror must submit a Management Plan for successful execution of this project. The narrative shall clearly demonstrate that the Offeror understands the technical scope of this project. The narrative shall describe, in detail, how the project team will accomplish the project; and how the prime contractor will manage the various subcontractors, material acquisition and requirements for compliance with the RFP. The areas of emphasis relating to this factor are; Organization Structure and Staffing; Specifically Identified Personnel; Project Execution and Management; and Quality Control and Processes; and Schedule (these are NOT individually rated sub factors). The Management Plan shall be clear, concise and tailored to this specific project and demonstrate understanding of the requirements. The plan should not include restatement of our specification requirements. At a minimum, the plan must include the following:
File Name
FACTOR 3 MANAGEMENT APPROACH - SUBMISSION REQUIREMENTS CONTINUED
1. Organization Structure and Staffing: The Offeror must clearly describe its organization structure and provide an Organization Chart. The description must identify all offices involved in this project from the Offeror’s Headquarters through to the Offeror’s site office, and how they are related. All Joint Venture partners and major Subcontractors shall be addressed in this description. The description shall identify whether functions/positions will be filled by prime or by subcontractors.
2. Specifically Identified Personnel Submission Requirements: The Offeror is required to provide a Resume Form for the four (4) identified Specifically Identified Personnel, provided as Attachment 5, “Resume Form,” to document the experience of each of their Specifically Identified Personnel.
Provide resume forms for the following Specifically Identified Personnel (SIP) for both primary and alternate:
| i. Project Manager |
| ii. Construction Superintendent |
| iii. Construction Quality Control Systems Manager |
| iv. Scheduler |
File Name
FACTOR 3 MANAGEMENT APPROACH - SUBMISSION REQUIREMENTS CONTINUED
All Specifically Identified Personnel must be identified by title, organization, and physical location, and their major responsibilities and authorities must be stated.
Minimum experience for the Specifically Identified Personnel shall include experience with at least 1 similar project in the role for which they are proposed and
| 1) the Quality Control Manager and Project Manager each must have 5 years construction | |
| experience on construction similar in scope and complexity to that required in this | solicitation, and |
| 2) the Construction Superintendent must have 10 years experience in work of a nature |
| similar to that required by this solicitation. |
| 3) The Scheduler must have 2 years construction scheduling experience on construction |
| project in similar scope and complexity and at least one project comparable in size to this |
| solicitation. Resume Forms must clearly demonstrate the person proposed |
| meets the minimum requirements. |
File Name
FACTOR 3 MANAGEMENT APPROACH – SUBMISSION REQUIREMENTS CONTINUED
Please note that Specifically Identified Personnel may not be changed during execution of the project without the approval of a USACE Contracting Officer. No substitutions shall be made except unless authorized in writing by a USACE Contracting Officer.
The proposal shall clearly explain the proposed staffing and how the Specifically Identified Personnel will communicate between each other and with the US Government.
3. Project Execution and Management: The Offeror shall describe its plan for execution of the project. This includes the following elements at a minimum:
| a. Project start up and mobilization – identify the activities that will take place immediately after |
| contract award, to include mobilization, material shop drawing, submittals (to include submittal |
| register), procurement of key subcontracts, etc. |
| b. Staffing of the field office – explain who will be located at the field office, the proposed location |
| of the office, and the planned timeframe to establish the office. Identify the personnel who will |
| be located on-site during the construction. There shall be at least 1 person, fluent in the English |
| language, available at the field office at all times (24 hours/day, 7 days/week). |
File Name
c. Plan to supply materials and special equipment – explain where significant building materials will be obtained (country of origin).
d. Plan to obtain, retain, coordinate, and manage subcontractors – the Offeror must identify the
| significant aspects of the work which are to be self-performed and those that will be | |
| subcontracted. The plan must demonstrate the offeror ability to obtain labor both skilled and | |
| unskilled in sufficient quantities and commitment to providing additional labor and other | |
| resources as necessary. The Offeror must identify all key subcontractors by name and must | |
| provide a signed letter of commitment. The Offeror must identify the nature and overall percent of | |
| work that | will be performed by the Prime Contractor and all key sub-contractors). Offerors are |
| reminded of the requirements of 52.236-1, Performance of Work by the Contractor. |
Please note that Key Subcontractors may not be changed during execution of the project without the approval of a USACE Contracting Officer. No substitutions shall be made unless a USACE Contracting Officer determines in the exercise of his/her sole discretion that the proposed substitution is in the best interest of the Government. All approvals shall be in writing from the USACE Contracting Officer and may not be delegated to an Administrative Contracting Officer.
File Name
| e. Plan for obtaining utilities to include water, sewer, and power to facilitate all onsite construction | |
| activities thru contract completion. Plan should include a discussion of requirement necessary for | |
| commissioning. |
| f. Plan for completing work in Romania with emphasis on offeror’s understanding and ability to |
| meet visa and work permitting requirements/process. The plan must demonstrate an |
| understanding of host nation visa and work permit requirements and explain in detail how the |
| offeror intends to fulfill these requirements. Plan must include a discussion on how offeror will |
| mitigate any delays in meeting host nation requirements and subsequent delays in contract |
| performance. |
| g. Plan for obtaining access to the site (registration of workers) and controlling access to the site |
| during construction. |
4. Quality Control and Processes: The Offeror shall describe its Quality Control plan and processes for the project. The following minimum areas should be addressed in the plan:
a. Construction Quality Control
b. Safety Plan
c. Shop drawing and Request for Information (RFI) process
d. Risk identification and management program
e. Clear assignments of responsibility/authority of key staff members
5. Schedule: The Offeror shall provide a proposed summary schedule.
The Offeror shall provide their plan to successfully execute the work within the time allowed. The plan shall include the scheduling team in addition to the specific schedulers identified in the Management Plan. The schedule shall be consistent with the Management Plan (Factor 3) described above and with the proposed manning of the projects. The schedule shall include all of the major portions of work and describe any phasing required for this project. The schedule shall address the submittals, reviews and approval periods. The schedule shall address long lead-time items and shall take into consideration all major portions of work. For the purposes of this section only, the Offeror shall use the dates of 15 September 2017 for award and 15 October 2017 for NTP and should prepare the schedule assuming that all base line items and options will be awarded on that date.
Offerors shall give attention to the following features and incorporate the following minimum activities shown below, while also considering the “Constraints” listed below:
a. Prime and Sub-Contractor Work
b. Shop Drawing preparation
c. Site infrastructure activities
d. Show the overall construction phase for the site work, and for utilities.
e. Show turnover of the Multimodal Improvement, Fuel Storage Capacity, and Cargo Apron
| facilities. Identify any proposed phased turnovers. The time to complete the facility and turnover |
| to the Government must consider the requirement for the Offeror’s Construction Quality Control |
| (CQC), completion inspection and the subsequent joint Contractor-Government turnover |
| inspection. Ensure completion date for each Multimodal Improvement, Fuel Storage Capacity, |
| and Cargo Apron Facility meets the contract required delivery date. |
f. Show as-built submissions.
Constraints: The Offeror must demonstrate the capability and flexibility to plan and schedule the complete project to meet the required contract completion period stated on the schedule. Clearly identify any constraints on the schedules presented (e.g., labor or material availability, permits, weather, etc.). Indicate the anticipated overall critical path on the schedule.
The schedule must be specifically-tailored to the project contemplated by the solicitation.
FACTOR 4 DESIGN CAPABILITY - SUBMISSION REQUIREMENTS
For Factor Four (4) – Design Capability, the Offeror shall submit their plan for obtaining Designer(s) of Record appropriate for the anticipated work under this contract including airfield taxiway and/or aircraft parking apron new construction; Construction of a rail spur with railhead and supporting infrastructure; Installation of fuel storage and delivery systems and supporting infrastructure; New Construction of facilities (buildings) etc. At a minimum the plan shall include the following:
| 1. Criteria for selection of the Designer(s) of Record |
| 2. Letter of Commitment from proposed DOR(s), if not using in-house DOR |
| 3. The Plan shall demonstrate a thorough knowledge of engineering and design in Romania to |
| include coordination with host nation authorities. Additionally, Offerors must demonstrate an |
| understanding of certification and registration requirements for companies in Romania and |
| the ability to meet the requirements. The prime contractor and the proposed DOR must |
| demonstrate the ability to communicate in the host nation’s acknowledged national |
| language(s) and English. |
File Name
FACTOR 5 PRICE - VOLUME II – SUBMISSION REQUIREMENTS
This volume shall consist of all information required to support proposed prices. Certified cost and pricing data are not currently required; however, the Government reserves the right to request such data prior to award. The information submitted in this volume shall comply with FAR 15 and the requirements set forth below. There are no page limitations for this volume. Proposed prices shall be in Euros
| 1. Offerors shall submit completed Attachment 4: Price Schedule containing prices and must |
| propose on all CLINs, to include option CLINs, if applicable. |
| 2. Completed Blocks 14 through 20 of the Offer, Standard Form (SF) 1442, duly executed with an |
| original signature by an authorized official to bind the company. If submitting as a joint venture, |
| an authorized official from each of the firms comprising the joint venture shall sign the SF 1442. |
3. Representations and Certifications fully completed.
| 4. The name, addresses, telephone number(s), facsimile number(s), and e-mail address(es) of the |
| point(s) of contact with the authority to legally bind the Offeror. |
| 5. The name, address, DUNS, CAGE, and Tax Identification Number (TIN) of the Offeror |
| submitting the proposal. |
File Name
6. Executed Bid Bond or Bank Letter of Assurance (to be submitted hard copy, notarized original via delivery service to the address below); and a copy of the agent’s authority to sign bonds/BLA for the surety company shall accompany the bid bond/BLA. The Executed Bid Bond and BLA shall also be provided as a copy along with the electronic proposal. The hardcopy must be delivered prior to the proposal due date.
| U.S. Army Corps of Engineers, Europe District |
| W912GB-17-R-0020 Attn: Jefferey Ball |
| Konrad Adenauer Ring 39 |
| 65187 Wiesbaden |
Or
| Department of the Army |
| CMR 410 Box 7 |
| Attn: Contracting – Jefferey Ball |
| APO, AE 09049 |
File Name
Note: Offerors must be registered in System for Award Management (SAM) system prior to receiving an award. If submitting as a joint venture, the joint venture entity must be registered in SAM prior to receiving an award.
Failure to submit Section 00 10 00 and/or failure to complete all Line Items on Section 00 10 00, may result in the Offeror’s proposal package being rejected by the Government after initial evaluation without further consideration.
In addition to the Bank Letter of Assurance/Bid Bond and Performance and Payment Bonds/Bank Letter of Guaranty as outlined in the solicitation, Offerors may be required to provide additional information at a later date if needed to verify financial responsibility to perform the contract, such as a Financial Responsibility Form, Balance Sheet / Profit and Loss Statement, etc.
File Name
This contract is firm-fixed-price, payable entirely in Euros. No additional sums will be payable due to any escalation in the cost of materials, equipment or labor. The Contractor’s failure to properly estimate or accurately predict the cost and/or difficulty in achieving the results required by this contract is not reimbursable. The contract price will not be adjusted on account of fluctuations in the currency exchange rates. Changes in the contract price and/or time to complete will be made only due to changes made by the Government in the work to be performed/due to delays caused by the Government as determined and approved in accordance with Federal Acquisition Regulation (FAR) clauses. Advance payments are not authorized and the contractor will be paid only for work as the work is accomplished in defined intervals as the work proceeds, in accordance with FAR clause 52.232-5 Payments under Fixed-Price Construction Contracts.
File Name
EVALUATION CRITERIA
Bryan McClure
Program Management File Name
FACTOR 1 EXPERIENCE - EVALUATION CRITERIA
1. The Government will evaluate the depth and the relevancy of the experience as submitted in the offeror’s proposal in accordance with the following criteria:
a. All Projects submitted should demonstrate work experience performed within Romania or the European Union (EU).
b. Experience managing multiple projects performed simultaneously with phased deliverables scheduled within a contiguous site.
c. Projects with minimum cost of €5,000,000 and a maximum cost of €40,000,000. Offerors may submit higher valued projects if there is a scope of work with a measurable performance period and measureable monetary value within a larger project that is relevant to this procurement, including a clear breakdown of all project costs, especially the portion being submitted for consideration. Offerors shall clearly describe this project and how it related to the overall contract.
d. Projects considered relevant shall be completed within the last six (6) years from the date of the solicitation or at least 50% complete by the date of this solicitation. If a project is not yet complete, the Offeror shall list the scheduled completion date as well as the project’s current completed percentage.
File Name
FACTOR 1 EXPERIENCE - EVALUATION CRITERIA CONTINUED
2. Projects submitted for consideration, which meet the above parameters, shall include experience in the following areas:
a. Airfield runway, airfield taxiway and/or aircraft parking apron new construction
b. Construction of a rail spur with railhead and supporting infrastructure
c. Installation of above ground aviation fuel storage and delivery systems minimum capacity 500,000 gallons and supporting infrastructure (Fuel delivery and collection)
d. New Construction of facilities (buildings) of size ranging between 1000 SM and 2000 SM (replace with size range for ready building), including major building systems such as electrical, mechanical, structural, storm drainage, sanitary sewer, and other supporting facilities. Facilities constructed within an active airfield shall be considered more relevant than other facilities.
File Name
3. The Offeror must have directly performed at least three (3) of the five (5) projects submitted for experience as the Prime Contractor. In case of a JV, the work must have been performed by at least one of the JV partners. Offerors who do not meet this requirement are not eligible for award.
4. The Offeror must have directly performed at least two (2) of the five (5) projects submitted for experience as Design Build. The Offeror must describe the nature of the Design-Build element of the project. For example: The project was awarded as a 35% design package, and the Offeror demonstrates that they were responsible for completing the 100% design of the project as well as the construction. Offerors who do not meet this requirement are not eligible for award.
The following characteristics will impact relevancy (in no order of importance):
| Offerors demonstrating experience with multiple projects in multiple trades are considered more relevant. |
| Offerors demonstrating experience with USACE and/or DoD are considered more relevant. |
| Project examples that demonstrate experience by the Offeror working with proposed Key Subcontractors are considered more relevant than projects performed by Key Subcontractors in which the Offeror did not participate. In the case of experience through JV partnerships, experience in which the JV partners worked together is considered more relevant than experience in which only one of the JV partners performed without the other JV partners. |
| Projects outside the cost range will be considered less relevant. Smaller projects bundled into a larger |
| project in order to meet the cost element are not considered relevant. |
| Projects older than six (6) years may be considered but will be considered less relevant. |
| Projects demonstrating experience in Romania are considered more relevant. |
| Projects demonstrating experience in EU are considered more relevant. |
| Projects completed outside of Romania or the EU may be considered less relevant. |
File Name
Remember to follow solicitation instructions exactly
Check that all criteria is met, or as much as possible
Check that Attachment 1 and 2 (for each project) are filled out completely and accurately
File Name
FACTOR 2 PAST PERFORMANCE - EVALUATION CRITERIA
The Government will evaluate the Offeror’s past performance to determine how relevant project work is, as described in Factor 1 Experience, for recent projects. The Government will evaluate the Offeror’s performance to determine a confidence assessment of the Offeror’s performance. With respect to relevancy, more relevant past performance will typically be a stronger predictor of future performance and have more influence on the past performance confidence assessment than past performance of lesser relevance.
Past Performance will be evaluated for projects completed in the last six (6) years from the date of this solicitation or currently ongoing (at least 50% complete in accordance with the previous guidance provided in this plan).
The Offeror's past performance will be evaluated based on performance on projects submitted under Factor 1 Experience, to include the past performance of any Subcontractors or JV partners whose projects the Offeror may have submitted. Proposals will be evaluated based on the information provided and any other Past Performance information obtained by the Government. Past performance will be evaluated in accordance with the following criteria:
FACTOR 2 PAST PERFORMANCE - EVALUATION CRITERIA CONTINUED
| a. Quality: The degree to which the Offeror has complied with the contract requirements; met | |
| quality standards; was timely in regard to problem resolution without extensive customer guidance; | and the shown effectiveness of his prior quality control program. |
| b. Schedule/Timeliness of Performance: Whether the Offeror met contract completion dates |
| including significant milestones and where schedules were exceeded, whether the Offeror identified |
| valid justifications for the delays or if liquidated damages were assessed due to late delivery by the |
| Offeror. |
| c. Customer Satisfaction: The degree to which end-users were satisfied with the project; whether | ||
| the Offeror was reasonable and cooperative in regard to resolving disagreements; whether the | Offeror was responsive and businesslike with concern for the customer, and whether the Offeror | achieved customer satisfaction. |
File Name
d. Management Personnel/Labor: Whether the Offeror used effective business practices for on- site management for subcontractors, suppliers, materials, and labor force. Whether and the extent to which the Offeror displayed an ability to hire and retain a qualified workforce; controlled government/ owner property when applicable; provided a workforce with the required expertise; successfully managed projects and easily assimilated and incorporated changes in requirements and priorities in response to the owner; and provided an effective overall management and control of projects and programs.
| e. Cost/Financial Management: Whether the Offeror met the contract requirements by completing | ||
| the project at the agreed to price and where not, the extent to which the Offeror was responsible for | ||
| cost increases; whether the Offeror provided alternative methods that benefited the client; whether | the Offeror submitted invoices timely with sufficient documentation to substantiate requested | payment and avoided significant unexplained variances from the original price. |
File Name
| f. Safety/Security: The Offeror’s prior record for maintaining an environment of safety, adherence |
| to a safety plan, and compliance with safety requirements, including following safety regulations, |
| housekeeping, and correcting noted deficiencies, as well as the Offeror’s prior compliance with all |
| security requirements and personnel security requirements when applicable. |
1. The Government reserves the right to verify statements the Offeror makes regarding its past performance to determine whether they are substantiated.
2. The Government will consider past performance information in evaluating overall risk associated with a particular Offeror. When evaluating these criteria, the following will be taken into consideration for evaluation purposes:
| a. The relevance of the past performance; |
| b. how recently the project submitted was performed; |
| c. trends in the Offeror’s performance; |
| d. evaluations, letters of appreciation, and commendations from customers; and |
| e. positive and/or negative comments that impact evaluation of Offeror’s past performance. |
File Name
3. Unavailability of Past Performance Information: IAW FAR 15.305(a)(2)(iv), in the case of an Offeror without a record of relevant past performance or for whom information on past performance is not available; the Offeror may not be evaluated favorably or unfavorably on past performance.
File Name
FACTOR 3 MANAGEMENT APPROACH – EVALUATION CRITERIA
The Offeror’s Management Plan (including the Organization Structure and Staffing; Specifically Identified
Personnel; Project Execution and Management; Quality Control and Processes; and Schedule) will be evaluated for feasibility, completeness, reasonableness, risk, and logic. In evaluating the Offeror’s proposal regarding the Management Plan, the Government will evaluate whether the plan includes all the elements described in this solicitation, and that the plan is reasonable and logical in relation to this project. The management plan which includes the organizational structure and staffing, project execution and management, specifically identified personnel and quality control processes will be rated as one factor. The Government will consider whether the management plan:
Organizational Structure and Staffing:
| 1. Clearly delineates lines of authority on the organizational chart (graph) organized in a precise | and logical manner including the relationship between the headquarters’ office and the site office, | including all involved with the management of the contract including subcontractors and joint | venture partners. |
| 2. The graph and the narrative description clearly display the planned organization structure. |
| 3. Comprehensive descriptions of duties, roles, major responsibilities, and authorities for specifically | ||
| identified personnel including roles of authorities for subcontractors and joint ventures presented as | a logical approach to perform the work throughout the contract, including which roles and personnel | are identified to communicate with the Government. |
Specifically Identified Personnel
4. The Offeror’s Specifically Identified Personnel will be evaluated based on the information provided on Attachment 5, “Resume Form.” The minimum qualifications for the Specifically Identified Personnel are listed below, and if the Specifically Identified Personnel Resume Form submitted does not demonstrate these qualifications then the Specifically Identified Personnel will not be considered to meet the minimum requirements for this Factor, and will receive an unacceptable rating in this Factor.
a. Specifically Identified Personnel shall meet the individual requirements below:
| i. The Contractor Quality Control Systems Manager and Project Manager |
| each must have5 years construction experience on construction similar in |
| complexity and scope to that required in this solicitation; |
| ii. The Construction Superintendent must have 10 years experience in work of a nature |
| similar to that required by this solicitation. Resume Forms must demonstrate this |
| experience. |
| iii. The Scheduler must have 2 years construction scheduling experience on construction |
| project in similar scope and complexity and at least one project comparable in size to this |
| solicitation. Resume Forms must clearly demonstrate the person proposed meets the |
| minimum requirements. |
Project Execution and Management:
5. The Offeror’s Project Execution and Management will be evaluated for feasibility, completeness, reasonableness, risk, and logic. The Government will evaluate the degree to which the plan describes a viable strategy to execute the project to achieve the desired quality as described in the solicitation. A precise explanation illustrating an understanding of the contract requirements by describing management for performance of the contract including start-up / mobilization, summary to supply labor and resources (prime and subcontract), summary to acquire materials, plan to obtain, retain, coordinate and manage subcontractors, summary for obtaining utilities to support to include water, sewer, and power, summary for compliance with host nation requirements, summary for compliance with security requirements , and additional and/or unique management advantages provided to the Government. The Government will also consider the risk associated with the Offeror’s plan and the degree to which the plan describes a viable strategy to execute the project.
Quality Control and Processes:
6. The Offeror’s Quality Control and Process will be evaluated to determine whether the offeror’s methods
| and approach have comprehensively considered, defined, and satisfied the requirements specified in the | |
| solicitation. The proposal will be evaluated to determine the extent to which each requirement of the | |
| solicitation has been addressed and the quality of the approach addressed in the proposal in accordance | |
| with the proposal submission section of the solicitation. | |
| Schedule: |
7. The Offeror’s schedule will be evaluated for feasibility, completeness, logic, reasonableness, and risk associated with the proposed schedule as compared to the solicitation requirements. In assessing reasonableness, the Government will take into account how well the proposed summary schedule supports the contract duration as compared with the solicitation requirements. Furthermore, the Offeror’ schedule must specifically demonstrate the Offeror’s ability to satisfy the milestones specified in the Statement of Work and specification sections.
This is the start of the file's text. The full file is on GovTribe.