A.07.23_Atch_5_Resume_Revised_23Jun17.docx

DOCX document 13 KB Posted

Attached to
Various Base Improvements Mihail Kogalniceanu Air Base, Romania
Solicitation number
W912GB-17-R-0020
Issued by

About this file

Revised Attachment 5 Resume Dated 23 June 2017. Issued 23 June 2017

View the file

Other files

File Type Posted
W912GB-17-R-0020_0013.pdf PDF
W912GB-17-R-00020_0012.pdf PDF
ATTACHMENT_4_Price_schedule_Revised_29_Aug_2017.xlsx XLSX spreadsheet
Conformed_Section_00_10_00_Solicitation_CLIN_Schedule.pdf PDF
A.07.23_Atch_1_Experience_Overview_Sheet_Revised_08_August_17.docx DOCX document
Attachment_15_URBANISM_CERTIFICATIE_01011401[1].pdf PDF
W912GB-17-R-0020-00011.pdf PDF
Attachment H3 FSC 001-FSC X002.pdf PDF
Attachment H5 170809.MI GE 001 Scope Modification.pdf PDF
Attachment_14_SOW_Track_Changes.pdf PDF
Attachment H6 170814.MI RB 001 RB X001 RB X002 Modification_Annex 1.pdf PDF
Attachment H2 FSC 001-FSC X001.pdf PDF
Attachment H1 FSC 001-FSC 001.pdf PDF
Attachment H4 170809.MI GC 001 Scope Modification.pdf PDF
ATTACHMENT_4_Price_schedule.xlsx XLSX spreadsheet
Conform_Copy_W912GB-17-R-0020.pdf PDF
W912GB-17-R-0020-0010_(Post-Closing).pdf PDF
DRAWING_C0003-CIVIL_DETAIL.pdf PDF
W912GB-17-R-0020_0009.pdf PDF
SF1442_Section_00_10_00_Solicitation_Contract_Line_Item_Number_Schedule_Conformed.pdf PDF
W912GB-17-R-0020_0008.pdf PDF
01_SOW_Revised_19_July_2017.pdf PDF
Amendment_07.pdf PDF
Attachment_4_ERI_Revised_Price_Schedule_23_June_17_REVISED_1_JULY_2017.xlsx XLSX spreadsheet
SOW_5July2017.pdf PDF
AW_78-24-27.pdf PDF
W912GB-17-R-0020-0006.pdf PDF
Contingency_Design_Program.PDF PDF
MK_MI_SOW-A_DA.docx DOCX document
MK_FSC_SOW-A_DA.docx DOCX document
CX007-CX200.pdf PDF
W912GB-17-R-002005.pdf PDF
A.07.23_Atch_1_Experience_Overview_Sheet_Revised_23_June_17.docx DOCX document
RETENTION_POND_LOCATION__DRAWINGS_REVISED_23_June_17.pdf PDF
A.07.23_Attachment_4_ERI_Revised_Price_Schedule_23_June_17.xlsx XLSX spreadsheet
W912GB-17-R-0020-0004_FBO.pdf PDF
A.07.23_Attachment_4_ERI_Revised_Price_Schedule_13_June_17.xlsx XLSX spreadsheet
Att._12_Pre_Proposal_Conference_W912GB-17-R-0020_MK_Romania_-_6_June.ppt PPT presentation
Att._13_Pre_Proposal_Sign_In_Roster.pdf PDF
W912GB-17-R-0020-0003.pdf PDF
PPSV_Agenda__Logistic_Plan_with_Project_Site_Plan.pdf PDF
W912GB-17-R-0020_Amendment_02.pdf PDF
A.07.23_Attachment_4_ERI_Revised_Price_Schedule_24_MAY_17.xlsx XLSX spreadsheet
A.07.24_W912GB-17-R-0020_Amendment_01_23_May_2017.pdf PDF
SOW_Attachment_E1-E3_Design_Drawings_35_.zip ZIP file
A.01.13_USACE_Specifications_09_May_17.pdf PDF
A.07.23_W912GB-17-R-0020_Solicitation_9_May_17.pdf PDF
Instruction_to_Offerors_Attachments_1-11.zip ZIP file
SOW_Attachments_A-G.zip ZIP file
A.02.02 Atch_5_DRAFT PRE-SOL_FUEL STORAGE CAPACITY.pdf PDF
Show 40 more

Latest 50 of 57 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT 4

RESUME FORM

Solicitation W912GB-17-R-0020 (Attach additional pages as necessary)

PRIME CONTRACTOR SPECIFICALLY IDENTIFIED KEY PERSONNEL: Check applicable box

[ ] Project Manager (PM)[ ] Construction Site Superintendent (SS)
[ ] Contractor Quality Control Manage (CQCM)[ ] Site Health and Safety Officer (SSHO)
[ ] Quality Control (QC) Civil Engineer[ ] QC Mechanical Engineer
[ ] QC Mechanical Technician[ ] QC Electrical Engineer

[ ] QC Concrete, Pavement and Soils (Material Technician)

Name of Individual: _________________________________________________________

Employed by: ________________________________________________________________

Number of years with firm: _________________________________________________

Number of years as practicing professional in your current field: ___________

Clearance Level (e.g. Secret, Top Secret, etc): ________________________________________

Education: (degree(s)/year/specialization): _____________________________________________________________________________

Registration/Number/State/Year: _____________________________________________________________________________

Experience: (most recent to earliest) (attach additional pages as required)

Project: __________________________Company: __________________________________ Dates: From _______________ to ___________________ Type of Construction or Design: _____________________________________________________________________________ Duties & Responsibilities:

Project: __________________________Company: __________________________________ Dates: From _______________ to ___________________ Type of Construction or Design: _____________________________________________________________________________ Duties & Responsibilities:

Project: __________________________Company __________________________________ Dates: From _______________ to ___________________ Type of Construction or Design: _____________________________________________________________________________ Duties & Responsibilities:

Project: __________________________Company __________________________________

Type of Construction or Design: _____________________________________________________________________________ Duties & Responsibilities:

Experience with other Key Personnel identified for this project:

Period of time as an employee of the US Prime Contractor or US Joint Venture Partner:

File details come from the government source that posted it. Updated .