About this file
From the source
Instruction to Offerors Attachments 1-11
Other files
| File |
Type |
Posted |
| W912GB-17-R-0020_0013.pdf |
PDF |
|
| W912GB-17-R-00020_0012.pdf |
PDF |
|
| ATTACHMENT_4_Price_schedule_Revised_29_Aug_2017.xlsx |
XLSX spreadsheet |
|
| Conformed_Section_00_10_00_Solicitation_CLIN_Schedule.pdf |
PDF |
|
| A.07.23_Atch_1_Experience_Overview_Sheet_Revised_08_August_17.docx |
DOCX document |
|
| Attachment_15_URBANISM_CERTIFICATIE_01011401[1].pdf |
PDF |
|
| W912GB-17-R-0020-00011.pdf |
PDF |
|
| Attachment H3 FSC 001-FSC X002.pdf |
PDF |
|
| Attachment H5 170809.MI GE 001 Scope Modification.pdf |
PDF |
|
| Attachment_14_SOW_Track_Changes.pdf |
PDF |
|
| Attachment H6 170814.MI RB 001 RB X001 RB X002 Modification_Annex 1.pdf |
PDF |
|
| Attachment H2 FSC 001-FSC X001.pdf |
PDF |
|
| Attachment H1 FSC 001-FSC 001.pdf |
PDF |
|
| Attachment H4 170809.MI GC 001 Scope Modification.pdf |
PDF |
|
| ATTACHMENT_4_Price_schedule.xlsx |
XLSX spreadsheet |
|
| Conform_Copy_W912GB-17-R-0020.pdf |
PDF |
|
| W912GB-17-R-0020-0010_(Post-Closing).pdf |
PDF |
|
| DRAWING_C0003-CIVIL_DETAIL.pdf |
PDF |
|
| W912GB-17-R-0020_0009.pdf |
PDF |
|
| SF1442_Section_00_10_00_Solicitation_Contract_Line_Item_Number_Schedule_Conformed.pdf |
PDF |
|
| W912GB-17-R-0020_0008.pdf |
PDF |
|
| 01_SOW_Revised_19_July_2017.pdf |
PDF |
|
| Amendment_07.pdf |
PDF |
|
| Attachment_4_ERI_Revised_Price_Schedule_23_June_17_REVISED_1_JULY_2017.xlsx |
XLSX spreadsheet |
|
| SOW_5July2017.pdf |
PDF |
|
| AW_78-24-27.pdf |
PDF |
|
| W912GB-17-R-0020-0006.pdf |
PDF |
|
| Contingency_Design_Program.PDF |
PDF |
|
| MK_MI_SOW-A_DA.docx |
DOCX document |
|
| MK_FSC_SOW-A_DA.docx |
DOCX document |
|
| CX007-CX200.pdf |
PDF |
|
| W912GB-17-R-002005.pdf |
PDF |
|
| A.07.23_Atch_1_Experience_Overview_Sheet_Revised_23_June_17.docx |
DOCX document |
|
| RETENTION_POND_LOCATION__DRAWINGS_REVISED_23_June_17.pdf |
PDF |
|
| A.07.23_Atch_5_Resume_Revised_23Jun17.docx |
DOCX document |
|
| A.07.23_Attachment_4_ERI_Revised_Price_Schedule_23_June_17.xlsx |
XLSX spreadsheet |
|
| W912GB-17-R-0020-0004_FBO.pdf |
PDF |
|
| A.07.23_Attachment_4_ERI_Revised_Price_Schedule_13_June_17.xlsx |
XLSX spreadsheet |
|
| Att._12_Pre_Proposal_Conference_W912GB-17-R-0020_MK_Romania_-_6_June.ppt |
PPT presentation |
|
| Att._13_Pre_Proposal_Sign_In_Roster.pdf |
PDF |
|
| W912GB-17-R-0020-0003.pdf |
PDF |
|
| PPSV_Agenda__Logistic_Plan_with_Project_Site_Plan.pdf |
PDF |
|
| W912GB-17-R-0020_Amendment_02.pdf |
PDF |
|
| A.07.23_Attachment_4_ERI_Revised_Price_Schedule_24_MAY_17.xlsx |
XLSX spreadsheet |
|
| A.07.24_W912GB-17-R-0020_Amendment_01_23_May_2017.pdf |
PDF |
|
| SOW_Attachment_E1-E3_Design_Drawings_35_.zip |
ZIP file |
|
| A.01.13_USACE_Specifications_09_May_17.pdf |
PDF |
|
| A.07.23_W912GB-17-R-0020_Solicitation_9_May_17.pdf |
PDF |
|
| SOW_Attachments_A-G.zip |
ZIP file |
|
| A.02.02 Atch_5_DRAFT PRE-SOL_FUEL STORAGE CAPACITY.pdf |
PDF |
|
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it.
Updated .