This is a comprehensive set of contract documents for the Runway 03-21 Airfield Lighting Repair Project at Wheeler-Sack Army Airfield, Fort Drum, New York. The project, solicited by the US Army Corps of Engineers New York District, involves extensive infrastructure improvements including full-depth pavement removal and replacement for runway and taxiway surfaces, installation of new electrical ductbanks and airfield lighting systems, and construction of a new 3,200 square foot Airfield Lighting Vault (AFLV).
The project is divided into two primary phases spanning approximately 30 months, with major work including removing and reconstructing concrete and asphalt pavements on Runway 03-21 and associated taxiways, installing new electrical infrastructure and conduit systems, replacing runway edge lights, threshold lights, and guidance signs, and constructing a new lighting vault. The contract includes precise specifications for pavement removal, base course preparation, electrical systems installation, and site restoration, with specific requirements for handling potential polyfluoroalkyl substances (PFAS) in excavated soils. The project is critical for maintaining operational capabilities of the Wheeler-Sack Army Airfield, with careful phasing to minimize disruption to airfield operations.
View the file
Other files
Show all 49
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CUI
ATTENTION
Use this space to indicate categories, limited dissemination controls, special instructions, points of contact, etc., if needed.
ATTENTION
All individuals handling this information are required to protect it from unauthorized disclosure.
Handling, storage, reproduction, and disposition of the attached document(s) must be in accordance with 32 CFR Part 2002 and applicable agency policy.
Access to and dissemination of Controlled Unclassified Information shall be allowed as necessary and permissible to any individual(s), organization(s), or grouping(s) of users, provided such access or dissemination is consistent with or in furtherance of a Lawful Government Purpose and in a manner consistent with applicable law, regulations, and Government-wide policies.
Standard Form 901 (11-18) Prescribed by GSA/ISOO | 32 CFR 2002
CUI
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
IS
SU
E D
AT
E:
SI
ZE
M
AR
K
D
ES
C R
IP
TI
O N
D
AT
E
SHEET ID
CUI
CUI
C :\T
EM
P\
PW
_W
O R
K\
ES
T-
LS
\D M
S5
\D
1G
I0
.D W
G
:4 3:
A
M
/2 3/
M O
R R
IS
T3
N
EW
Y O
R K
D
IS
TR
IC
T N
EW
Y
O R
K, N
Y
-25 A
PR
. 2
AN
SI
D
W H
EE
LE
R -S
AC
K
AR
M
Y
AI
R
FI
EL
D
, F O
R T
D R
U M
, N Y
R U
N W
AY
3-
A
IR
FI
EL
D L
IG
H
TI
N
G R
EP
AI
R P
R O
JE
C
T W
2-
D S-
-D
W
2D S2
3F
R
TA
S U
BM
IS
SI
O
N
US Army Corps of Engineers
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
H .B
AR
N
H
AR
T
T.
M
O R
R
IS
C .T
W
IG
G
E.
JA
R G
ER
C
O
VE
R S
H
EE
T
GI001
SOLICITATION NO.:
CONTRACT NO.:
ISSUE DATE:
Fort Drum, NY Runway 03-21 Airfield Lighting Repair
RTA SUBMISSION
04/25/2025
US Army Corps of Engineers
NEW YORK DISTRICT
CONTROLLED BY: USAG FORT DRUM DPW
CONTROLLED BY: AMIM-DRP-G
CUI CATEGORIES: CTI-SP, PHYS
DISTRIBUTION STATEMENT: N OFORN
POINT OF CONTACT: FRED STONE 315-772-4939
LOCATION MAP VICINITY MAP
PROJECT AREA
ALL INDIVIDUALS HANDLING THIS
INFORMATION ARE REQUIRED TO PROTECT IT
FROM UNAUTHORIZED DISCLOSURE.
HANDLING, STORAGE, REPRODUCTION AND
DISPOSITION OF THE ATTACHED DOCUMENT(S)
MUST BE IN ACCORDANCE WITH 32 CFR PART
2002 AND APPLICABLE AGENCY POLICY.
ACCESS TO AND DISSEMINATION OF
CONTROLLED UNCLASSIFIED INFORMATION
SHALL BE ALLOWED AS NECESSARY AND
PERMISSIBLE TO ANY INDIVIDUAL(S),
ORGANIZATION(S) OR GROUPING(S) OF USERS,
PROVIDED SUCH ACCESS OR DISSEMINATION
IS CONSISTENT WITH OR IN FURTHERANCE OF
A LAWFUL GOVERNMENT PURPOSE AND IN A
MANNER CONSISTENT WITH APPLICABLE LAW,
REGULATIONS AND GOVERNMENT-WIDE
POLICIES.
ARCHITECTURAL TELECOMMUNICATIONS CIVIL - AIRFIELD/SITE
CIVIL - ENVIRONMENTALFIRE PROTECTIONPLUMBING
STRUCTURAL ELECTRICAL - AIRFIELD/SITE
ELECTRICAL - AFLV
MECHANICAL
4/24/25
4/23/2025
4/23/2025
CONTROLLED BY: USAG FORT DRUM DPW
CONTROLLED BY: AMIM-DRP-G
CUI CATEGORIES: CRIT
DISTRIBUTION STATEMENT: None
POINT OF CONTACT: RYAN CHURCHILL 315-608-1119
ALL INDIVIDUALS HANDLING THIS INFORMATION ARE
REQUIRED TO PROTECT IT FROM UNAUTHORIZED
DISCLOSURE. HANDLING, STORAGE, REPRODUCTION
AND DISPOSITION OF THE ATTACHED DOCUMENT(S)
MUST BE IN ACCORDANCE WITH 32 CFR PART 2002
AND APPLICABLE AGENCY POLICY. ACCESS TO AND
DISSEMINATION OF CONTROLLED UNCLASSIFIED
INFORMATION SHALL BE ALLOWED AS NECESSARY
AND PERMISSIBLE TO ANY INDIVIDUAL(S),
ORGANIZATION(S) OR GROUPING(S) OF USERS,
PROVIDED SUCH ACCESS OR DISSEMINATION IS
CONSISTENT WITH OR IN FURTHERANCE OF A
LAWFUL GOVERNMENT PURPOSE AND IN A MANNER
CONSISTENT WITH APPLICABLE LAW, REGULATIONS
AND GOVERNMENT-WIDE POLICIES.
INDEX
DESIGN SHEET NO. DESCRIPTION
1 GI001 COVER SHEET
2 GI002 DRAWING INDEX
3 GI003 DRAWING INDEX
4 GI004 DRAWING INDEX
5 GI005 NOTES, ABBREVIATIONS, AND LEGEND
6 GI006 GENERAL CONSTRUCTION NOTES
7 GI101 CONTRACTOR STAGING AND ACCESS PLAN
8 GI102 SURVEY CONTROL PLAN
9 GI103 HEIGHT RESTRICTION PLAN
10 GC001 WORK RESTRICTION NOTES AND LEGEND
11 GC100 OVERALL PHASING PLAN
12 GC101 OVERALL PHASE 1 PLAN
13 GC102 CONSTRUCTION SAFETY AND PHASING PLAN
- PHASE 1
14 GC103 CONSTRUCTION SAFETY AND PHASING PLAN
- PHASE 1
15 GC104 CONSTRUCTION SAFETY AND PHASING PLAN
- PHASE 1
16 GC105 CONSTRUCTION SAFETY AND PHASING PLAN
- PHASE 1
17 GC106 CONSTRUCTION SAFETY AND PHASING PLAN
- PHASE 1
18 GC107 CONSTRUCTION SAFETY AND PHASING PLAN
- PHASE 1
19 GC108 CONSTRUCTION SAFETY AND PHASING PLAN
- PHASE 1
20 GC109 OVERALL PHASE 2 PLAN
21 GC110 CONSTRUCTION SAFETY AND PHASING PLAN
- PHASE 2
22 GC111 CONSTRUCTION SAFETY AND PHASING PLAN
- PHASE 2
23 GC112 CONSTRUCTION SAFETY AND PHASING PLAN
- PHASE 2
24 GC113 CONSTRUCTION SAFETY AND PHASING PLAN
- PHASE 2
25 GC114 CONSTRUCTION SAFETY AND PHASING PLAN
- PHASE 2
26 GC115 CONSTRUCTION SAFETY AND PHASING PLAN
- PHASE 2
27 GC116 CONSTRUCTION SAFETY AND PHASING PLAN
- PHASE 2
28 GC117 CONSTRUCTION SAFETY AND PHASING PLAN
- PHASE 2
29 GC118 PHASE 2 AIRFIELD LIGHTING CUTOVER PLAN
30 GC501 CONSTRUCTION CONTROL DETAILS
31 GC502 AIRFIELD LIGHTING PHASING DETAILS
32 FL001 LIFE SAFETY CODE SUMMARY
33 FL002 LIFE SAFETY SITE PLAN
34 FL101 FIRST FLOOR - LIFE SAFETY PLAN
35 C-001 AIRFIELD CIVIL KEYPLAN
36 C-301 TYPICAL REMOVAL SECTIONS
INDEX
DESIGN SHEET NO. DESCRIPTION
37 C-302 TYPICAL REMOVAL SECTIONS
38 C-303 TYPICAL SECTION GENERAL NOTES
39 C-304 TYPICAL SECTIONS
40 C-305 TYPICAL SECTIONS
41 C-306 TYPICAL SECTIONS
42 C-307 TYPICAL SECTIONS
43 C-308 TYPICAL SECTIONS
44 C-309 TYPICAL SECTIONS
45 C-310 TYPICAL SECTIONS
46 CD001 CIVIL DEMOLITION NOTES
47 CD101 CIVIL DEMOLITION PLAN
48 CD102 CIVIL DEMOLITION PLAN
49 CD103 CIVIL DEMOLITION PLAN
50 CD104 CIVIL DEMOLITION PLAN
51 CD105 CIVIL DEMOLITION PLAN
52 CD106 CIVIL DEMOLITION PLAN
53 CD107 CIVIL DEMOLITION PLAN
54 CD108 CIVIL DEMOLITION PLAN
55 CD109 CIVIL DEMOLITION PLAN
56 CD110 CIVIL DEMOLITION PLAN
57 CD111 CIVIL DEMOLITION PLAN
58 CD112 CIVIL DEMOLITION PLAN
59 CD113 CIVIL DEMOLITION PLAN
60 CD114 CIVIL DEMOLITION PLAN
61 CD115 CIVIL DEMOLITION PLAN
62 CD501 CIVIL DEMOLITION DETAILS
63 CE001 SOIL EROSION AND SEDIMENT CONTROL
KEYPLAN
64 CE101 SOIL EROSION AND SEDIMENT CONTROL
PLAN
65 CE102 SOIL EROSION AND SEDIMENT CONTROL
PLAN
66 CE103 SOIL EROSION AND SEDIMENT CONTROL
PLAN
67 CE104 SOIL EROSION AND SEDIMENT CONTROL
PLAN
68 CE105 SOIL EROSION AND SEDIMENT CONTROL
PLAN
69 CE106 SOIL EROSION AND SEDIMENT CONTROL
PLAN
70 CE107 SOIL EROSION AND SEDIMENT CONTROL
PLAN
71 CE108 SOIL EROSION AND SEDIMENT CONTROL
PLAN
72 CE109 SOIL EROSION AND SEDIMENT CONTROL
PLAN
INDEX
DESIGN SHEET NO. DESCRIPTION
73 CE110 SOIL EROSION AND SEDIMENT CONTROL
PLAN
74 CE111 SOIL EROSION AND SEDIMENT CONTROL
PLAN
75 CE112 SOIL EROSION AND SEDIMENT CONTROL
PLAN
76 CE113 SOIL EROSION AND SEDIMENT CONTROL
PLAN
77 CE114 SOIL EROSION AND SEDIMENT CONTROL
PLAN
78 CE115 SOIL EROSION AND SEDIMENT CONTROL
PLAN
79 CE116 SOIL EROSION AND SEDIMENT CONTROL
PLAN
80 CE117 SOIL EROSION AND SEDIMENT CONTROL
PLAN
81 CE118 SOIL EROSION AND SEDIMENT CONTROL
PLAN
82 CE121 AIRFIELD LIGHTING VAULT AREA SOIL
EROSION AND SEDIMENT CONTROL PLAN
83 CE501 SOIL EROSION AND SEDIMENT CONTROL
DETAILS
84 CS101 GEOMETRY PLAN
85 CS102 GEOMETRY PLAN
86 CS103 GEOMETRY PLAN
87 CS104 GEOMETRY PLAN
88 CS105 GEOMETRY PLAN
89 CS106 GEOMETRY PLAN
90 CS107 GEOMETRY PLAN
91 CS108 GEOMETRY PLAN
92 CS109 GEOMETRY PLAN
93 CS110 GEOMETRY PLAN
94 CS111 GEOMETRY PLAN
95 CS112 GEOMETRY PLAN
96 CS113 GEOMETRY PLAN
97 CS114 GEOMETRY PLAN
98 CS115 GEOMETRY PLAN
99 CS121 AIRFIELD LIGHTING VAULT SITE PLAN
100 CS122 AIRFIELD LIGHTING VAULT SITE PLAN
101 CS501 CIVIL SITE DETAILS
102 CG101 GRADING PLAN
103 CG102 GRADING PLAN
104 CG103 GRADING PLAN
105 CG104 GRADING PLAN
106 CG105 GRADING PLAN
107 CG106 GRADING PLAN
108 CG107 GRADING PLAN
INDEX
DESIGN SHEET NO. DESCRIPTION
109 CG108 GRADING PLAN
110 CG109 GRADING PLAN
111 CG110 GRADING PLAN
112 CG111 GRADING PLAN
113 CG112 GRADING PLAN
114 CG113 GRADING PLAN
115 CG114 GRADING PLAN
116 CG115 GRADING PLAN
117 CG116 GRADING PLAN
118 CG121 AIRFIELD LIGHTING VAULT SITE GRADING
PLAN
119 CG201 RUNWAY 03-21 PCC RECONSTRUCTION
PROFILE
120 CG202 LIGHTING VAULT ACCESS DRIVEWAY
PROFILE
121 CG301 RUNWAY 03-21 PCC RECONSTRUCTION
CROSS SECTIONS
122 CG302 RUNWAY 03-21 PCC RECONSTRUCTION
CROSS SECTIONS
123 CG303 RUNWAY 03-21 PCC RECONSTRUCTION
CROSS SECTIONS
124 CG304 RUNWAY 03-21 PCC RECONSTRUCTION
CROSS SECTIONS
125 CG305 RUNWAY 03-21 PCC RECONSTRUCTION
CROSS SECTIONS
126 CG306 RUNWAY 03-21 PCC RECONSTRUCTION
CROSS SECTIONS
127 CG307 RUNWAY 03-21 PCC RECONSTRUCTION
CROSS SECTIONS
128 CG308 RUNWAY 03-21 PCC RECONSTRUCTION
CROSS SECTIONS
129 CG309 RUNWAY 03-21 PCC RECONSTRUCTION
CROSS SECTIONS
130 CG310 RUNWAY 03-21 PCC RECONSTRUCTION
CROSS SECTIONS
131 CP101 PAVING AND JOINT ELEVATION PLAN
132 CP102 PAVING AND JOINT ELEVATION PLAN
133 CP103 PAVING AND JOINT ELEVATION PLAN
134 CP104 PAVING AND JOINT ELEVATION PLAN
135 CP105 PAVING AND JOINT ELEVATION PLAN
136 CP106 PAVING AND JOINT ELEVATION PLAN
137 CP107 PAVING AND JOINT ELEVATION PLAN
138 CP108 PAVING AND JOINT ELEVATION PLAN
139 CP109 PAVING AND JOINT ELEVATION PLAN
140 CP110 PAVING AND JOINT ELEVATION PLAN
141 CP111 PAVING AND JOINT ELEVATION PLAN
142 CP112 PAVING AND JOINT ELEVATION PLAN
143 CP113 PAVING AND JOINT ELEVATION PLAN
144 CP114 PAVING AND JOINT ELEVATION PLAN
INDEX
DESIGN SHEET NO. DESCRIPTION
145 CP115 PAVING AND JOINT ELEVATION PLAN
146 CP116 PAVING AND JOINT ELEVATION PLAN
147 CP117 PAVING AND JOINT ELEVATION PLAN
148 CP118 PAVING AND JOINT ELEVATION PLAN
149 CP119 PAVING AND JOINT ELEVATION PLAN
150 CP120 PAVING AND JOINT ELEVATION PLAN
151 CP121 PAVING AND JOINT ELEVATION PLAN
152 CP122 PAVING AND JOINT ELEVATION PLAN
153 CP123 PAVING AND JOINT ELEVATION PLAN
154 CP124 PAVING AND JOINT ELEVATION PLAN
155 CP125 PAVING AND JOINT ELEVATION PLAN
156 CP126 PAVING AND JOINT ELEVATION PLAN
157 CP127 PAVING AND JOINT ELEVATION PLAN
158 CP128 PAVING AND JOINT ELEVATION PLAN
159 CP129 PAVING AND JOINT ELEVATION PLAN
160 CP130 PAVING AND JOINT ELEVATION PLAN
161 CP131 PAVING AND JOINT ELEVATION PLAN
162 CP132 PAVING AND JOINT ELEVATION PLAN
163 CP133 PAVING AND JOINT ELEVATION PLAN
164 CP134 PAVING AND JOINT ELEVATION PLAN
165 CP135 PAVING AND JOINT ELEVATION PLAN
166 CP136 PAVING AND JOINT ELEVATION PLAN
167 CP137 PAVING AND JOINT ELEVATION PLAN
168 CP138 AIRFIELD LIGHTING VAULT PAVING PLAN
169 CP501 PAVING DETAILS
170 CP502 PAVING DETAILS
171 CP503 PAVING DETAILS
172 CT101 MARKING PLAN
173 CT102 MARKING PLAN
174 CT103 MARKING PLAN
175 CT104 MARKING PLAN
176 CT105 MARKING PLAN
177 CT106 MARKING PLAN
178 CT107 MARKING PLAN
179 CT108 MARKING PLAN
180 CT109 MARKING PLAN
H .B
AR
N
H
AR
T
T.
M
O R
R
IS
C .T
W
IG
G
E.
JA
R G
ER
D
R
AW
IN
G
IN
D
EX
GI002
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
IS
SU
E D
AT
E:
SI
ZE
M
AR
K
D
ES
C R
IP
TI
O N
D
AT
E
SHEET ID
CUI
CUI
C :\T
EM
P\
PW
_W
O R
K\
ES
T-
LS
\D M
S5
\D
1G
I0
-G I0
.D
W G
3:
:4
PM
/2 7/
M O
R R
IS
T3
N
EW
Y O
R K
D
IS
TR
IC
T N
EW
Y
O R
K, N
Y
-28 F
EB
. 2
AN
SI
D
W H
EE
LE
R -S
AC
K
AR
M
Y
AI
R
FI
EL
D
, F O
R T
D R
U M
, N Y
R U
N W
AY
3-
A
IR
FI
EL
D L
IG
H
TI
N
G R
EP
AI
R P
R O
JE
C
T W
2-
D S-
-D
W
2D S2
3F
R
TA
S U
BM
IS
SI
O
N
US Army Corps of Engineers
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
4/
/2
4/
/2
A
PR
. 2
181 CT110 MARKING PLAN
182 CT111 MARKING PLAN
183 CT112 MARKING PLAN
184 CT113 MARKING PLAN
185 CT114 MARKING PLAN
186 CT115 MARKING PLAN
187 CT501 CIVIL MARKING DETAILS
188 CT502 CIVIL MARKING DETAILS
189 CU201 UTILITY PROFILES
190 CU501 WATER DISTRIBUTION STANDARD DETAILS
191 CU502 WATER DISTRIBUTION STANDARD DETAILS
192 CU503 WATER DISTRIBUTION STANDARD DETAILS
193 CX101 GROOVING PLAN
194 CX102 GROOVING PLAN
195 CX501 CIVIL GROOVING DETAILS
196 S-001 STRUCTURAL GENERAL NOTES
197 S-002 STRUCTURAL GENERAL NOTES AND DESIGN
CRITERIA
198 S-101 FOUNDATION PLAN
199 S-102 ROOF FRAMING PLAN
200 S-201 STRUCTURAL BUILDING ELEVATIONS
201 S-202 STRUCTURAL BUILDING ELEVATIONS
202 S-301 SECTIONS
203 S-501 TYPICAL DETAILS
204 S-502 TYPPICAL DETAILS
205 A-001 ABBREVIATIONS
206 A-002 GENERAL SYMBOLS AND NOTES
207 AS101 ARCHITECTURAL SITE PLAN
208 A-101 FIRST FLOOR PLAN
209 A-105 ROOF PLAN
210 A-201 EXTERIOR ELEVATIONS
211 A-301 BUILDING SECTIONS
212 A-310 WALL SECTIONS AND DETAILS
213 A-500 BUILDING ENVELOPE DETAILS
214 A-501 CANOPY DETAILS
215 A-601 PARTITION TYPES
216 A-603 DOOR SCHEDULE AND DETAILS
INDEX
DESIGN SHEET NO. DESCRIPTION
217 A-604 DOOR DETAILS
218 I-101 FIRST FLOOR PLAN - FINISHES
219 I-111 FIRST FLOOR PLAN - SIGNAGE
220 FA001 FIRE ALARM GENERAL NOTES
221 FA101 FIRST FLOOR PLAN - FIRE ALARM
222 M-001 HVAC GENERAL NOTES
223 M-002 HVAC GENERAL NOTES
224 M-101 FLOOR PLAN - DUCTWORK
225 M-301 BUILDING SECTIONS
226 M-351 FUEL OIL FLOW DIAGRAM
227 M-501 HVAC DETAILS
228 M-502 HVAC DETAILS
229 M-601 HVAC EQUIPMENT SCHEDULE
230 M-602 HVAC EQUIPMENT SCHEDULE
231 M-603 HVAC EQUIPMENT SCHEDULE
232 M-604 VENTILATION SCHEDULE
233 M-701 HVAC CONTROLS
234 M-702 HVAC CONTROLS
235 M-703 HVAC CONTROLS
236 M-704 HVAC CONTROLS
237 M-705 HVAC CONTROLS
238 M-706 HVAC CONTROLS
239 M-707 HVAC CONTROLS
240 MP101 FLOOR PLAN - PIPING
241 MS100 MECHANICAL SITE PLAN
242 E-001 ELECTRICAL GENERAL NOTES AND
ABBREVIATIONS
243 E-002 ELECTRICAL DEMOLITION, AIRFIELD
ELECTRICAL AND ELECTRICAL SITE LEGEND
244 E-003 ELECTRICAL SYMBOLS
245 E-004 ELECTRICAL SYMBOLS
246 E-005 AIRFIELD ELECTRICAL KEYPLAN
247 EL101 AIRFIELD LIGHTING VAULT FIRST FLOOR
LIGHTING PLAN
248 EL102 AIRFIELD LIGHTING VAULT ROOF LIGHTING
PLAN
249 EP101 AIRFIELD LIGHTING VAULT ELECTRICAL
LAYOUT PLAN
250 EP102 AIRFIELD LIGHTING VAULT POWER PLAN
251 EP103 AIRFIELD LIGHTING VAULT ABOVE GRADE
CONDUIT PLAN
252 EP104 AIRFIELD LIGHTING VAULT BELOW GRADE
CONDUIT PLAN
INDEX
DESIGN SHEET NO. DESCRIPTION
253 EG101 AIRFIELD LIGHTING VAULT GROUNDING PLAN
254 EG102 AIRFIELD LIGHTING VAULT LIGHTNING
PROTECTION PLAN
255 EP201 ELECTRICAL VAULT POWER DISTRIBUTION
ROOM ELEVATIONS
256 EP202 ELECTRICAL VAULT EXTERIOR ELEVATIONS
257 E-501 ELECTRICAL DETAILS
258 E-502 ELECTRICAL DETAILS
259 E-503 ELECTRICAL DETAILS
260 EP601 AIRFIELD LIGHTING VAULT PARTIAL SINGLE
LINE DIAGRAM
261 EL701 ELECTRICAL LIGHTING SCHEDULES
262 EP701 ELECTRICAL MISCELLANEOUS SCHEDULES
263 EP702 ELECTRICAL PANEL SCHEDULES
264 EP703 ELECTRICAL PANEL SCHEDULES
265 EP704 ELECTRICAL PANEL SCHEDULES
266 ED101 AIRFIELD ELECTRICAL DEMOLITION PLAN
267 ED102 AIRFIELD ELECTRICAL DEMOLITION PLAN
268 ED103 AIRFIELD ELECTRICAL DEMOLITION PLAN
269 ED104 AIRFIELD ELECTRICAL DEMOLITION PLAN
270 ED105 AIRFIELD ELECTRICAL DEMOLITION PLAN
271 ED106 AIRFIELD ELECTRICAL DEMOLITION PLAN
272 ED107 AIRFIELD ELECTRICAL DEMOLITION PLAN
273 ED108 AIRFIELD ELECTRICAL DEMOLITION PLAN
274 ED109 AIRFIELD ELECTRICAL DEMOLITION PLAN
275 ED110 AIRFIELD ELECTRICAL DEMOLITION PLAN
276 ED111 AIRFIELD ELECTRICAL DEMOLITION PLAN
277 ED112 AIRFIELD ELECTRICAL DEMOLITION PLAN
278 ED113 AIRFIELD ELECTRICAL DEMOLITION PLAN
279 ED114 AIRFIELD ELECTRICAL DEMOLITION PLAN
280 ED115 AIRFIELD ELECTRICAL DEMOLITION PLAN
281 ED116 AIRFIELD ELECTRICAL DEMOLITION PLAN
282 ED117 AIRFIELD ELECTRICAL DEMOLITION PLAN
283 ED118 AIRFIELD ELECTRICAL DEMOLITION PLAN
284 ED119 AIRFIELD ELECTRICAL DEMOLITION PLAN
285 ED120 AIRFIELD ELECTRICAL DEMOLITION PLAN
286 ED121 AIRFIELD ELECTRICAL DEMOLITION PLAN
287 ED122 AIRFIELD ELECTRICAL DEMOLITION PLAN
288 ED123 AIRFIELD ELECTRICAL DEMOLITION PLAN
INDEX
DESIGN SHEET NO. DESCRIPTION
289 ED124 AIRFIELD ELECTRICAL DEMOLITION PLAN
290 ED125 AIRFIELD ELECTRICAL DEMOLITION PLAN
291 ED501 EXISTING AIRFIELD LIGHTING VAULT
292 ED502 EXISTING RUNWAY 03 ALSF-1 WIRING
DIAGRAM DETAILS
293 ED503 EXISTING RUNWAY 21 ALSF-1 WIRING
DIAGRAM DETAILS
294 ED601 EXISTING CONSTANT CURRENT REGULATOR
AND CABLE ID SCHEDULE
295 EA101 AIRFIELD ELECTRICAL LIGHTING AND
SIGNAGE PLAN
296 EA102 AIRFIELD ELECTRICAL LIGHTING AND
SIGNAGE PLAN
297 EA103 AIRFIELD ELECTRICAL LIGHTING AND
SIGNAGE PLAN
298 EA104 AIRFIELD ELECTRICAL LIGHTING AND
SIGNAGE PLAN
299 EA105 AIRFIELD ELECTRICAL LIGHTING AND
SIGNAGE PLAN
300 EA106 AIRFIELD ELECTRICAL LIGHTING AND
SIGNAGE PLAN
301 EA107 AIRFIELD ELECTRICAL LIGHTING AND
SIGNAGE PLAN
302 EA108 AIRFIELD ELECTRICAL LIGHTING AND
SIGNAGE PLAN
303 EA109 AIRFIELD ELECTRICAL LIGHTING AND
SIGNAGE PLAN
304 EA110 AIRFIELD ELECTRICAL LIGHTING AND
SIGNAGE PLAN
305 EA111 AIRFIELD ELECTRICAL LIGHTING AND
SIGNAGE PLAN
306 EA112 AIRFIELD ELECTRICAL LIGHTING AND
SIGNAGE PLAN
307 EA113 AIRFIELD ELECTRICAL LIGHTING AND
SIGNAGE PLAN
308 EA114 AIRFIELD ELECTRICAL LIGHTING AND
SIGNAGE PLAN
309 EA115 AIRFIELD ELECTRICAL LIGHTING AND
SIGNAGE PLAN
310 EA116 AIRFIELD ELECTRICAL LIGHTING AND
SIGNAGE PLAN
311 EA117 AIRFIELD ELECTRICAL LIGHTING AND
SIGNAGE PLAN
312 EA118 AIRFIELD ELECTRICAL LIGHTING AND
SIGNAGE PLAN
313 EA119 AIRFIELD ELECTRICAL LIGHTING AND
SIGNAGE PLAN
314 EA120 AIRFIELD ELECTRICAL LIGHTING AND
SIGNAGE PLAN
315 EA121 AIRFIELD ELECTRICAL LIGHTING AND
SIGNAGE PLAN
316 EA201 RUNWAY 21 PAPI PLAN AND PROFILE
317 EA202 RUNWAY 03 PAPI PLAN AND PROFILE
318 EA203 LIGHTING VAULT AIRFIELD ELECTRICAL
DISTRIBUTION ENLARGED PLAN
319 EA204 RUNWAY 15 MALSR DISTRIBUTION
ENCLOSURE ENLARGED PLAN
320 EA501 MISCELLANEOUS AIRFIELD ELECTRICAL
DETAILS
321 EA502 MISCELLANEOUS AIRFIELD ELECTRICAL
DETAILS
322 EA503 CONDUIT AND DUCTBANK DETAILS
323 EA504 CONDUIT AND DUCTBANK DETAILS
324 EA505 CONDUIT AND DUCTBANK DETAILS
INDEX
DESIGN SHEET NO. DESCRIPTION
325 EA506 DIRECTIONAL DRILLING AND BORE SPACERS
DETAILS
326 EA507 JUNCTION CAN PLAZA DETAILS
327 EA510 BASE CAN IN FULL STRENGTH ASPHALT
PAVEMENT
328 EA511 BASE CAN IN FULL STRENGTH PCC
PAVEMENT
329 EA512 BASE CAN IN ASPHALT SHOULDER
PAVEMENT
330 EA513 LIGHT FIXTURE AND BASECAN
MISCELLANEOUS DETAILS
331 EA520 THRESHOLD CIRCUITING CONFIGURATION
DETAIL
332 EA521 THRESHOLD LIGHT FIXTURE BAR DETAILS
333 EA522 03 RUNWAY END LIGHT FIXTURE BAR
DETAILS
334 EA523 03 RUNWAY END LIGHT FIXTURE BAR
DETAILS
335 EA524
RUNWAY 03 DISPLACED THRESHOLD, END
LIGHT, AND RUNWAY 21 THRESHOLD
FIXTURE BAR DETAILS
336 EA530 RUNWAY 03 ALSF-1 CONFIGURATION
DETAILS
337 EA531 ALSF-1 LIGHT BAR DETAILS
338 EA532 ALSF-1 LIGHT BAR DETAILS
339 EA533 ALSF-1 LIGHT BAR DETAILS
340 EA534 ALSF-1 LIGHT BAR DETAILS
341 EA535 RUNWAY 03 SEQUENCE FLASHING LIGHT
AND FOUNDATION DETAILS
342 EA536 RUNWAY 03 ALSF-1 WIRING DIAGRAM
DETAILS
343 EA537 RUNWAY 21 ALSF-1 WIRING DIAGRAM
DETAILS
344 EA540 GUIDANCE SIGN DETAILS
345 EA541 GUIDANCE SIGN DETAILS
346 EA542 WIND CONE DETAILS
347 EA543 PAPI DETAILS
348 EA544 PAPI DETAILS
349 EA550 TYPICAL CCR SWITCHGEAR PLAN AND
ELEVATION
350 EA601 CONSTANT CURRENT REGULATOR
SCHEDULE
351 EA602 AIRFIELD CIRCUIT AND CABLE SCHEUDLE
352 EA603 AIRFIELD LIGHTING FIXTURE LOCATION
SCHEDULE
353 EA604 AIRFIELD STRUCTURE SCHEDULE
354 EA605 GUIDANCE SIGN SCHEDULE
355 EA606 CCR SWITCHGEAR 1 DETAILS
356 EA607 CCR SWITCHGEAR 2 DETAILS
357 EA608 CCR SWITCHGEAR 3 DETAILS
358 EA609 CCR SWITCHGEAR 4 DETAILS
359 EA701 AIRFIELD CIRCUITING 5KV HOMERUN PLANS
360 EA702 AIRFIELD CIRCUITING 5KV HOMERUN PLANS
H .B
AR
N
H
AR
T
T.
M
O R
R
IS
C .T
W
IG
G
E.
JA
R G
ER
D
R
AW
IN
G
IN
D
EX
GI003
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
IS
SU
E D
AT
E:
SI
ZE
M
AR
K
D
ES
C R
IP
TI
O N
D
AT
E
SHEET ID
CUI
CUI
C :\T
EM
P\
PW
_W
O R
K\
ES
T-
LS
\D M
S5
\D
1G
I0
-G I0
.D
W G
3:
:1
PM
/2 7/
M O
R R
IS
T3
N
EW
Y O
R K
D
IS
TR
IC
T N
EW
Y
O R
K, N
Y
-28 F
EB
. 2
AN
SI
D
W H
EE
LE
R -S
AC
K
AR
M
Y
AI
R
FI
EL
D
, F O
R T
D R
U M
, N Y
R U
N W
AY
3-
A
IR
FI
EL
D L
IG
H
TI
N
G R
EP
AI
R P
R O
JE
C
T W
2-
D S-
-D
W
2D S2
3F
R
TA
S U
BM
IS
SI
O
N
US Army Corps of Engineers
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
4/
/2
IS
SU
E D
AT
E:
A
PR
. 2
361 EA703 AIRFIELD CIRCUITING 5KV HOMERUN PLANS
362 EA704 AIRFIELD CIRCUITING 5KV HOMERUN PLANS
363 EA705 AIRFIELD CIRCUITING 5KV HOMERUN PLANS
364 EA706 AIRFIELD CIRCUITING 5KV HOMERUN PLANS
365 EA707 AIRFIELD CIRCUITING 5KV HOMERUN PLANS
366 EA708 AIRFIELD CIRCUITING 5KV HOMERUN PLANS
367 EA709 AIRFIELD CIRCUITING 5KV HOMERUN PLANS
368 EA710 AIRFIELD CIRCUITING 5KV HOMERUN PLANS
369 EA711 AIRFIELD CIRCUITING 5KV HOMERUN PLANS
370 EA712 AIRFIELD CIRCUITING 5KV HOMERUN PLANS
371 EA713 AIRFIELD CIRCUITING 5KV HOMERUN PLANS
372 EA714 AIRFIELD CIRCUITING 5KV HOMERUN PLANS
373 EA715 AIRFIELD CIRCUITING 5KV HOMERUN PLANS
374 EA716 AIRFIELD CIRCUITING 5KV HOMERUN PLANS
375 EA717 AIRFIELD CIRCUITING 5KV HOMERUN PLANS
376 EA718 AIRFIELD CIRCUITING 5KV HOMERUN PLANS
377 EA719 AIRFIELD CIRCUITING 5KV HOMERUN PLANS
378 EA720 AIRFIELD CIRCUITING 5KV HOMERUN PLANS
379 EA721 AIRFIELD CIRCUITING 5KV HOMERUN PLANS
380 EA722 AIRFIELD CIRCUITING 5KV HOMERUN PLANS
381 EA723 AIRFIELD CIRCUITING 5KV HOMERUN PLANS
382 EA724 AIRFIELD CIRCUITING MALSR 2.4KV AND
CONTROL
383 EA801 ALCMS ARCHITECTURE DIAGRAM
384 EA802 ALCMS SCHEDULE AND WIRING DIAGRAM
385 EA803 ALCMS ATCT WIRING DIAGRAM
386 EA804 ALCMS BEACON CONTROL DETAILS
387 EA805 ATCT RISER DIAGRAM
388 EA806 VAULT MISCELLANEOUS DETAILS
389 EA901 JUNCTION CAN PLAZA LAYOUT DIAGRAMS
390 EA902 JUNCTION CAN PLAZA LAYOUT DIAGRAMS
391 EA903 JUNCTION CAN PLAZA LAYOUT DIAGRAMS
392 EA904 JUNCTION CAN PLAZA LAYOUT DIAGRAMS
393 EA905 JUNCTION CAN PLAZA LAYOUT DIAGRAMS
394 EA906 JUNCTION CAN PLAZA LAYOUT DIAGRAMS
395 EA907 JUNCTION CAN PLAZA LAYOUT DIAGRAMS
396 EA908 JUNCTION CAN PLAZA LAYOUT DIAGRAMS
INDEX
DESIGN SHEET NO. DESCRIPTION
397 EA909 JUNCTION CAN PLAZA LAYOUT DIAGRAMS
398 EA910 JUNCTION CAN PLAZA LAYOUT DIAGRAMS
399 EA911 AIRFIELD LIGHTING HANDHOLE LAYOUT
DIAGRAMS
400 ES101
AIRFIELD LIGHTING VAULT EXTERIOR
ELECTRICAL AND TELECOMMUNICATIONS
DISTRIBUTION PLAN
401 ES102
AIRFIELD LIGHTING VAULT EXTERIOR
ELECTRICAL AND TELECOMMUNICATIONS
DISTRIBUTION PLAN
402 ES103
AIRFIELD LIGHTING VAULT EXTERIOR
ELECTRICAL AND TELECOMMUNICATIONS
DISTRIBUTION PLAN
403 ES104
AIRFIELD LIGHTING VAULT EXTERIOR
ELECTRICAL AND TELECOMMUNICATIONS
DISTRIBUTION PLAN
404 ES105
AIRFIELD LIGHTING VAULT EXTERIOR
ELECTRICAL AND TELECOMMUNICATIONS
DISTRIBUTION PLAN
405 ES501 ELECTRICAL AND TELECOMMUNICATIONS
MANHOLE DETAILS
406 ES502 ELECTRICAL HANDHOLE DETAIL
407 ES503 TELECOMMUNICATIONS HANDHOLE DETAIL
408 ES504 PAD-MOUNTED TRANSFORMER AND SWITCH
DETAILS
409 ES505 ELECTRICAL SITE DUCTBANK DETAILS
410 ES506 MOUNTAIN RAMP ELECTRICAL DETAILS
411 ES507 MOUNTAIN RAMP ELECTRICAL DETAILS
412 ES508 FIBER TERMINATION DETAILS
413 ES509 FIBER TERMINATION WIRING DIAGRAM
414 ES601 ELECTRICAL SITE PARTIAL SINGLE LINE
DIAGRAM
415 ES602 ELECTRICAL SITE CIRCUIT AND CABLE
SCHEDULE
416 ES603
ELECTRICAL SITE MANHOLES, POWER
HANDHOLES, AND COMMUNICATION
HANDHOLES
417 ES604
MOUNTAIN RAMP APRON LIGHTING PARTIAL
SINGLE LINE DIAGRAM AND PANEL
SCHEDULE
418 ES605 MOUNTAIN RAMP HIGH MAST LIGHTING
CONTROL WIRING DIAGRAM
419 ES701 UTILITY STRUCTURE FOLDOUT DIAGRAMS
420 ES702 UTILITY STRUCTURE FOLDOUT DIAGRAMS
421 ES703 UTILITY STRUCTURE FOLDOUT DIAGRAMS
422 ES704 UTILITY STRUCTURE FOLDOUT DIAGRAMS
423 ES705 UTILITY STRUCTURE FOLDOUT DIAGRAMS
424 ES706 UTILITY STRUCTURE FOLDOUT DIAGRAMS
425 ES707 UTILITY STRUCTURE FOLDOUT DIAGRAMS
426 ES708 UTILITY STRUCTURE FOLDOUT DIAGRAMS
427 T-001 TELECOM LEGEND
428 T-101 TELECOMMUNICATIONS FIRST FLOOR PLAN
429 T-102 TELECOMMUNICATIONS TOWER PLAN
430 T-501 TELECOM DETAILS
431 T-601 TELECOM RISER DIAGRAMS
432 T-602 TELECOM OSP SINGLE LINE DIAGRAM
H .B
AR
N
H
AR
T
T.
M
O R
R
IS
C .T
W
IG
G
E.
JA
R G
ER
D
R
AW
IN
G
IN
D
EX
GI004
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
IS
SU
E D
AT
E:
SI
ZE
M
AR
K
D
ES
C R
IP
TI
O N
D
AT
E
SHEET ID
CUI
CUI
C :\T
EM
P\
PW
_W
O R
K\
ES
T-
LS
\D M
S5
\D
1G
I0
-G I0
.D
W G
3:
:3
PM
/2 7/
M O
R R
IS
T3
N
EW
Y O
R K
D
IS
TR
IC
T N
EW
Y
O R
K, N
Y
-28 F
EB
. 2
AN
SI
D
W H
EE
LE
R -S
AC
K
AR
M
Y
AI
R
FI
EL
D
, F O
R T
D R
U M
, N Y
R U
N W
AY
3-
A
IR
FI
EL
D L
IG
H
TI
N
G R
EP
AI
R P
R O
JE
C
T W
2-
D S-
-D
W
2D S2
3F
R
TA
S U
BM
IS
SI
O
N
US Army Corps of Engineers
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
4/
/2
IS
SU
E D
AT
E:
A
PR
. 2
H .B
AR
N
H
AR
T
T.
M
O R
R
IS
C .T
W
IG
G
E.
JA
R G
ER
N
O
TE
S, A
BB
R
EV
IA
TI
O
N S, A N
D L
EG
EN
D
GI005
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
IS
SU
E D
AT
E:
SI
ZE
M
AR
K
D
ES
C R
IP
TI
O N
D
AT
E
SHEET ID
CUI
CUI
C :\T
EM
P\
PW
_W
O R
K\
ES
T-
LS
\D M
S5
\D
1G
I0
.D W
G 3:
:2
PM
/2
5/
H
B0
N
EW
Y O
R K
D
IS
TR
IC
T N
EW
Y
O R
K, N
Y
-28 F
EB
. 2
AN
SI
D
W H
EE
LE
R -S
AC
K
AR
M
Y
AI
R
FI
EL
D
, F O
R T
D R
U M
, N Y
R U
N W
AY
3-
A
IR
FI
EL
D L
IG
H
TI
N
G R
EP
AI
R P
R O
JE
C
T W
2-
D S-
-D
W
2D S2
3F
R
TA
S U
BM
IS
SI
O
N
US Army Corps of Engineers
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
6W4" 6 WAY DUCT WITH 4" DIAMETER CONDUIT
@ AT
AC ASPHALT CONCRETE
ACP ACCESS CONTROL POINT
APP ACCIDENT PREVENTION PLAN
ACM ASBESTOS CONTAINING MATERIALS
AFLV AIRFIELD LIGHTING VAULT
ALCMS AIRPORT LIGHTING CONTROL AND MONITORING
SYSTEM
ALS APPROACH LIGHTING SYSTEM
ALSF APPROACH LIGHTING SYSTEM WITH SEQUENCED
FLASHING LIGHTS
ARFF AIRCRAFT RESCUE AND FIREFIGHTING
A.S.T.M. AMERICAN SOCIETY FOR TESTING AND MATERIALS
ATCT AIR TRAFFIC CONTROL TOWER
ATS AUTOMATIC TRANSFER SWITCH
B.G.S BELOW GRADED SURFACE
BLDG. BUILDING
B.M. BENCHMARK
BMP BEST MANAGEMENT PRACTICES
C&D CONSTRUCTION AND DEMOLITION DEBRIS
CCR CONSTANT CURRENT REGULATOR
CE CONCRETE ENCASED
C/L, ℄ CENTERLINE
CLIN CONTRACT LINE ITEM NUMBER
CLR. CLEAR
CLSM CONTROLLED LOW-STRENGTH MATERIAL
COL. COLUMN
CONC. CONCRETE
CONT. CONTINUOUS
CONST. CONSTRUCTION
COORD. COORDINATE
COR CONTRACTING OFFICER'S REPRESENTATIVE
CSC CONTRACTOR SECURITY COORDINATOR
CU COPPER
CTL CONTROL
DEB DIRECT EARTH BURIED
DEPT DEPARTMENT
DIA, Ø DIAMETER
DPW DIRECTORATE OF PUBLIC WORKS
E EAST / EASTING
EA. EACH
EL, ELEV ELEVATION
ENGR ENGINEER
EQ. EQUAL
EXIST. EXISTING
EXT. EXTERIOR
FOD FOREIGN OBJECT DEBRIS
FT FEET/FORT
G GRADE
GA. GAGE / GAUGE
GALV. GALVANIZED
GCABC GRADED CRUSHED AGGREGATE BASE COURSE
GND. GROUND
GOVT. GOVERNMENT
HS&E HEALTH, SAFETY AND ENVIRONMENTAL
HH HANDHOLE
HMA HOT MIX ASPHALT
HORIZ. HORIZONTAL
HT. HEIGHT
I.D. INSIDE DIAMETER
ILS INSTRUMENT LANDING SYSTEM
INFO. INFORMATION
INV INVERT
JCP JUNCTION CAN PLAZA
JMF JOB MIX FORMULA
K RATE OF GRADE CHANGE
KGTB WHEELER-SACK ARMY AIRFIELD (AIRPORT CODE)
KO CONTRACTING OFFICER
kV KILOVOLT kVA KILOVOLT-AMPERE kW KILOWATT
L LENGTH
LED LIGHT-EMITTING DIODE
LOC LOCALIZER
LT LIGHT / LEFT
M&R MAINTENANCE AND REHABILITATION
MAX MAXIMUM
MAT. MATERIAL
MFR. MANUFACTURER
MH MANHOLE
MIN MINIMUM
MISC. MISCELLANEOUS
MPT MAINTENANCE AND PROTECTION OF TRAFFIC
N NORTH / NORTHING
NAVD88 NORTH AMERICAN VERTICAL DATUM 1988
NO, # NUMBER
NOI NOTICE OF INTENT
NPDES NATIONAL POLLUTANT DISCHARGE ELIMINATION
SYSTEM
NTP NOTICE TO PROCEED
NTS NOT TO SCALE
NY NEW YORK
NYSDEC NEW YORK STATE DEPARTMENT OF ENVIRONMENTAL
CONSERVATION
NYSDOT NEW YORK STATE DEPARTMENT OF TRANSPORTATION
O.C. ON CENTER
O.D. OUTSIDE DIAMETER
OSHA OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION
PACS PRIMARY AIRPORT CONTROL STATION
PACM POTENTIAL ASBESTOS CONTAINING MATERIALS
PAPI PRECISION APPROACH PATH INDICATOR
PAR PRECISION APPROACH RADAR
PC POINT OF CURVATURE
PCC PORTLAND CEMENT CONCRETE
P.C.F. POUNDS PER CUBIC FOOT
PDM PROGRAM DEPOT MAINTENANCE
PFAS POLYFLUOROALKYL SUBSTANCES
PM PROJECT MANAGER
PPE PERSONAL PROTECTIVE EQUIPMENT
P.S.F. POUNDS PER SQUARE FOOT
P.S.I. POUNDS PER SQUARE INCH
PT POINT OF TANGENCY
PVC POINT OF VERTICAL CURVATURE
PVI POINT OF VERTICAL INTERSECTION
PVT POINT OF VERTICAL TANGENCY
PWR POWER
QTY. QUANTITY
R RADIUS
RP RADIUS POINT
RDM RUNWAY DISTANCE MARKER
REINF. REINFORCED
REQ'D REQUIRED
RMC RIGID METAL CONDUIT
RGS RIGID GALVANIZED STEEL
RT RIGHT
R/W,RWY RUNWAY
S SLOPE
SACS SECONDARY AIRPORT CONTROL STATION
SCH SCHEDULE
SQ. SQUARE
SPEC. SPECIFICATION
SSHO SITE SAFETY AND HEALTH OFFICER
ST STREET
STA STATION
STD STANDARD
SWPPP STORM WATER POLLUTION PREVENTION PLAN
Te THICKENED EDGE THICKNESS
THRU THROUGH
(TYP) TYPICAL
T/W TAXIWAY
UFC UNIFIED FACILITIES CRITERIA
UFGS UNIFIED FACILITIES GUIDE SPECIFICATIONS
USACE UNITED STATES ARMY CORPS OF ENGINEERS
V VOLT
VCC VISITOR CONTROL CENTER
VERT. VERTICAL
VFR VISUAL FLIGHT RULES
VTP VEHICLE TRACKING PADS
WSAAF WHEELER-SACK ARMY AIRFIELD
WZTC WORK ZONE TRAFFIC CONTROL
HAZARDOUS MATERIALS:
1. LEAD BASED PAINTS ARE NOT EXPECTED WITHIN THE PROJECT AREA. DO NOT INCLUDE ANY LEAD BASED PAINT TESTING OR REMOVAL IN THE BID.
2. ACM ARE NOT EXPECTED TO BE LOCATED AROUND THE EXISTING UTILITY LINES. BASE BIDS ON UTILITY LINES REMAINING IN PLACE WITHOUT ABATEMENT WORK BEING
REQUIRED.
3. IMMEDIATELY NOTIFY THE COR IF ANY SUSPECTED ASBESTOS CONTAINING MATERIAL IS ENCOUNTERED DURING THE COURSE OF CONSTRUCTION. TESTING, ABATEMENT, REMOVAL AND DISPOSAL OF PACM AND ACM ARE BEYOND THE SCOPE OF THE CONTRACT AND WILL BE CONSIDERED A DIFFERING SITE CONDITION, IN ACCORDANCE WITH
APPLICABLE FAR AND DFAR CLAUSES.
SCOPE OF WORK SUMMARY:
THE WORK OF THIS CONTRACT CAN GENERALLY BE SUMMARIZED AS FOLLOWS:
1. CIVIL: FULL-DEPTH REMOVAL AND REPLACEMENT OF RUNWAY SHOULDERS INCLUDING SUBGRADE AND BASE COURSE. FULL-DEPTH REMOVAL AND REPLACEMENT OF PORTLAND CEMENT CONCRETE INCLUDING SUBGRADE, SUBBASE, BASE COURSE AND GEOTEXTILE FABRIC ON RUNWAY 03-21 AS INDICATED ON DRAWINGS. REMOVAL AND REPLACEMENT OF RUNWAY 03-21 PAVEMENT MARKINGS AND AFFECTED TAXIWAYS PAVEMENT MARKINGS AS INDICATED ON THE DRAWINGS. REPAIR SHELTER AND SITE INFRASTRUCTURE FOR THE RUNWAY 03-21 INSTRUMENT LANDING SYSTEM. CONSTRUCT ASPHALT VEHICLE ROAD AND PARKING LOT FOR NEW AIRFIELD LIGHTING VAULT.
INSTALLATION OF NEW 8-INCH WATER MAIN LINE AND 2-INCH SERVICE LINE CONNECTED TO THE AFLV. CONSTRUCTION OF EQUIPMENT PADS, SIDEWALKS AND ADDITIONAL CONCRETE PAVEMENT ADJACENT TO THE NEW AFLV. ADDITIONAL WORK ITEMS TO INCLUDE EARTHWORK, MISCELLANEOUS DEMOLITION AND RESTORATION, SITE GRADING AND STABILIZATION, INSTALLATION OF AGGREGATE BASE COURSE, STORM WATER MANAGEMENT, SITE UTILITIES AND MISCELLANEOUS ITEMS REQUIRED TO COMPLETE
WORK.
2. ELECTRICAL: REMOVAL AND REPLACEMENT OF ALL RUNWAY EDGE, THRESHOLD AND END LIGHTS INCLUDING CONDUIT, CABLE, BASE CANS AND HANDHOLES ON RUNWAY 03-21. REMOVE AND REPLACE RUNWAY 03-21 PRECISION APPROACH PATH INDICATORS AND WIND CONES. REMOVE AND REPLACE THE APPROACH LIGHTING SYSTEM WITH SEQUENCED FLASHING LIGHTS FIXTURES WITHIN THE RUNWAY 03 DISPLACED THRESHOLD INCLUDING CONDUIT, CABLE, BASE CANS AND HANDHOLES AS INDICATED.
REMOVAL AND REPLACEMENT OF AIRFIELD GUIDANCE SIGNS, MANDATORY PILOT INSTRUCTION SIGNS AND DISTANCE REMAINING MARKING SIGNS AS INDICATED ON THE DRAWINGS. REMOVAL AND REPLACEMENT OF TAXIWAY EDGE LIGHTS INCLUDING CONDUIT AND CABLE AS INDICATED. INSTALL AIRFIELD LIGHTING HOME RUN DUCT BANK WITH A JUNCTION CAN PLAZA SYSTEM AND INSTALL NEW AIRFIELD LIGHTING CABLE WITHIN THE PROJECT FOOTPRINT. REMOVAL AND REPLACEMENT OF MOUNTAIN RAMP HIGH-MAST LIGHT POWER AND COMMUNICATIONS JUNCTION BOXES, SECONDARY CABLING FROM EXISTING TRANSFORMERS AND NEW FIBER OPTIC CONTROL COMMUNICATIONS CONNECTION. PROVIDE MEDIUM-VOLTAGE DISTRIBUTION AND INFRASTRUCTURE FOR NEW AIRFIELD LIGHTING VAULT. PROVIDE SWITCHBOARDS, PANELBOARDS, EMERGENCY GENERATOR AND ANCILLARY EQUIPMENT WITHIN NEW VAULT TO SUPPORT CONSTANT CURRENT SWITCHGEAR STYLE REGULATORS AND AIRFIELD LIGHTING CONTROL AND MONITORING SYSTEM WITH NODE LOCATIONS AS INDICATED.
3. AIRFIELD LIGHTING VAULT: NEW CONSTRUCTION OF A 3,200 SQUARE FOOT AIRFIELD LIGHTING VAULT BUILDING (AFLV). STRUCTURAL, MECHANICAL, PLUMBING, ELECTRICAL, LIGHTING, COMMUNICATIONS, FIRE DETECTION / MASS NOTIFICATION, DIRECT DIGITAL CONTROLS AND RELATED BUILDING MANAGEMENT SYSTEMS AS INDICATED ON THE
CONTRACT DOCUMENTS.
ABBREVIATIONS:
EXISTING UTILITY LEGEND:
E EXISTING ELECTRICAL HANDHOLE / JUNCTION BOX TO REMAIN
EXISTING COMMUNICATIONS MANHOLE TO REMAIN
EXISTING RUNWAY / TAXIWAY LIGHT FIXTURE AND BASE CAN TO REMAIN
EXISTING ELETRICAL CONDUIT / DUCTBANK TO REMAIN
EXISTING COMMUNICATIONS CONDUIT / DUCTBANK TO REMAIN
EXISTING GAS LINE
EXISTING WATERMAIN LINE
C
COMM
G
W
EXISTING SANITARY SEWER LINESAN
EXISTING AIRFIELD SIGN
EXISTING STORM WATER LINESD
EXISTING UTILITY FEATURE
POLYFLUOROALKYL SUBSTANCES (PFAS):
1. SOILS CONTAINING POLYFLUOROALKYL SUBSTANCES (PFAS) ARE EXPECTED TO BE ENCOUNTERED WHEN PERFORMING CONSTRUCTION, EXCAVATION OR MAINTENANCE
ACTIVITIES WITHIN THE POTENTIAL AREAS OF CONCERN INDICATED ON THE DRAWINGS. THE POTENTIAL AREAS OF CONCERN FOR ENCOUNTERING SOILS CONTAINING PFAS SUBSTANCES INDICATED ON THE DRAWINGS WERE BASED ON THE MOST RECENT STUDY PERFORMED AT WSAAF AND ARE APPROXIMATE. THE EXACT LIMITS OF THE POTENTIAL AREAS OF CONCERN ON THE AIRFIELD MAY VARY. COORDINATE WASTE COLLECTION AND DISPOSAL IN ADVANCE WITH THE FORT DRUM DPW ENVIRONMENTAL
OFFICE.
2. USE THE EXCAVATED MATERIAL LOCATED WITHIN THE POTENTIAL AREAS OF CONCERN AS BACKFILL NEAR THE ORIGINAL SOURCE OF THE MATERIAL. EXCAVATED MATERIAL REMAINING AFTER BACKFILLING EXCAVATIONS WILL BE DEFINED AS "EXCESS" MATERIAL. STOCKPILE EXCESS MATERIAL IN ACCORDANCE WITH PFAS NOTE 6. THE EXCESS EXCAVATED MATERIAL MUST BE TESTED PRIOR TO HANDLING THE MATERIAL IN ACCORDANCE WITH PFAS NOTE 3. THE GOVERNMENT WILL COMPLETE ALL REQUIRED PFAS SAMPLING, TESTING AND ANALYSIS FOR THE EXCESS EXCAVATED SOIL WITHIN THE POTENTIAL AREAS OF CONCERN TO DETERMINE IF THE EXCESS EXCAVATED SOIL EXCEEDS THE NYSDEC PART 360 CLASSIFICATION FOR "UNRESTRICTED USE". FT DRUM ENVIRONMENTAL WILL NOT COMPLETE SAMPLING AND ANALYSIS DAILY. PROVIDE FT DRUM ENVIRONMENTAL A MINIMUM 1 WEEK ADVANCE NOTICE TO COMPLETE THE SOIL SAMPLING AND LABORATORY ANALYSIS. INCLUDE A MINIMUM OF 21-CALENDAR DAYS IN THE PROJECT SCHEDULE TO COMPLETE LABORATORY TESTS FOR EACH SAMPLE. NO ADDITIONAL TIME WILL BE CONSIDERED BY THE GOVERNMENT FOR THE TIME REQUIRED
TO COMPLETE THE SOIL SAMPLING AND TESTING OF THE EXCESS EXCAVATED SOIL.
3. CONTAMINATED SOIL FOR THIS PROJECT IS DEFINED AS SOIL THAT IS DETERMINED THROUGH LABORATORY TESTING TO EXCEED THE NYSDEC PART 360 CLASSIFICATION FOR "UNRESTRICTED USE". MANAGE EXCESS CONTAMINATED SOIL NOT USED AS BACKFILL IN THE FOLLOWING ORDER:
3.1. SPREAD CONTAMINATED MATERIAL NEAR THE SOURCE OF THE MATERIAL AT LOCATIONS DETERMINED BY FORT DRUM ENVIRONMENTAL, FORT DRUM ENGINEERING, AND THE WSAAF MANAGER. SPREAD EXCESS SOIL TO MATCH EXISTING GRADES AND TO PRODUCE A CONSISTENT GRADE. FEATHER THE EDGES TO BLEND INTO THE EXISTING GRADES TO THE SATISFACTION OF THE CONTRACTING OFFICER. RESTORE AREAS IN ACCORDANCE WITH UFGS SPECIFICATION SECTION 32 92 19 SEEDING AT NO ADDITIONAL COST TO THE GOVERNMENT. PRIOR TO PROCEEDING WITH SPREADING THE EXCESS CONTAMINATED SOIL NEAR THE SOURCE OF THE MATERIAL, THE CONTRACTOR MUST GAIN APPROVAL FROM THE CONTRACTING OFFICER AND DEMONSTRATE TO THE GOVERNMENT THAT NO ADDITIONAL BACKFILL MATERIAL WILL BE
REQUIRED NEAR THE SOURCE OF THE MATERIAL AS PART OF THIS PROJECT.
3.2. EXCESS CONTAMINATED SOIL, NOT USED AS BACKFILL OR UNABLE TO SPREAD ON WSAAF NEAR THE SOURCE OF THE MATERIAL, MUST BE DISPOSED OF OFF GOVERNMENT PROPERTY AT A LICENSED FACILITY IN ACCORDANCE WITH ALL APPLICABLE FEDERAL, STATE AND LOCAL CRITERIA AT NO ADDITIONAL COST TO THE GOVERNMENT. PROVIDE WEIGHT TICKETS FROM THE APPROVED LICENSED FACILITY FOR ALL CONTAMINATED MATERIAL DISPOSED OF OFF GOVERNMENT PROPERTY.
INCLUDE WEIGHT TICKETS AS PART OF THE MONTHLY SOLID WASTE REPORT. SUBMIT THE MONTHLY SOLID WASTE REPORT TO THE GOVERNMENT FOR APPROVAL AS PART OF THE MONTHLY INVOICE SUBMITTAL. PRIOR TO DISPOSING OF THE CONTAMINATED MATERIAL OFF THE INSTALLATION AT THE CONTRACTOR'S EXPENSE, THE CONTRACTOR MUST DEMONSTRATE TO THE GOVERNMENT THAT NO ADDITIONAL CONTAMINATED MATERIAL CAN BE SPREAD ON SITE NEAR THE SOURCE OF THE
MATERIAL.
4. UNRESTRICTED USE SOIL FOR THIS PROJECT IS DEFINED AS SOIL THAT IS DETERMINED THROUGH LABORATORY TESTING TO MEET THE NYSDEC PART 360 CLASSIFICATION FOR "UNRESTRICTED USE". MANAGE EXCESS UNRESTRICTED USE SOIL NOT USED AS BACKFILL IN THE FOLLOWING ORDER:
4.1. SPREAD EXCESS UNRESTRICTED USE SOIL WITHIN THE PROJECT LIMITS TO THE SATISFACTION OF THE CONTRACTING OFFICER. SPREAD EXCESS SOIL TO MATCH EXISTING GRADES AND FEATHER THE EDGES TO BLEND INTO THE EXISTING GRADES. RESTORE AREAS IN ACCORDANCE WITH SPECIFICATION UFGS SECTION 32 92 19 SEEDING AT NO ADDITIONAL COST TO THE GOVERNMENT. PRIOR TO PROCEEDING WITH SPREADING THE EXCESS UNRESTRICTED USE SOIL WITHIN THE PROJECT LIMITS, THE CONTRACTOR MUST GAIN APPROVAL FROM THE CONTRACTING OFFICER AND DEMONSTRATE TO THE GOVERNMENT THAT NO ADDITIONAL BACKFILL MATERIAL WILL
BE REQUIRED FOR THE PROJECT.
4.2. EXCESS UNRESTRICTED USE SOIL, NOT USED AS BACKFILL OR UNABLE TO SPREAD ON WSAAF WITHIN THE PROJECT LIMITS, MUST BE DISPOSED OF OFF GOVERNMENT PROPERTY BY THE CONTRACTOR AT NO ADDITIONAL COST TO THE GOVERNMENT. PROVIDE VOLUME OF UNRESTRICTED USE SOIL DISPOSED OF OFF GOVERNMENT PROPERTY AS PART OF THE MONTHLY SOLID WASTE REPORT. SUBMIT THE MONTHLY SOLID WASTE REPORT TO THE GOVERNMENT FOR APPROVAL AS PART OF THE MONTHLY INVOICE SUBMITTAL. PRIOR TO DISPOSING THE LEAN SOIL OFF THE INSTALLATION AT THE CONTRACTOR'S EXPENSE, THE CONTRACTOR MUST DEMONSTRATE TO THE GOVERNMENT THAT NO ADDITIONAL UNRESTRICTED USE SOIL CAN BE SPREAD ON SITE WITHIN THE PROJECT LIMITS.
5. FOR BIDDING PURPOSES, ASSUME ALL SOIL LOCATED WITHIN THE POTENTIAL AREAS OF CONCERN INDICATED ON THE DRAWINGS IS CONTAMINATED AND DOES NOT MEET THE NYSDEC PART 360 REGULATIONS FOR "UNRESTRICTED USE". FOR BIDDING PURPOSES, ASSUME ALL SOIL LOCATED OUTSIDE THE POTENTIAL AREAS OF CONCERN INDICATED ON THE DRAWINGS IS UNRESTRICTED USE SOIL MEETING THE NYSDEC PART 360 REGULATIONS FOR "UNRESTRICTED USE".
6. TEMPORARILY STOCKPILE ALL EXCESS EXCAVATED MATERIAL WITHIN THE POTENTIAL AREA OF CONCERN IN ONE LOCATION NEAR THE ORIGINAL SOURCE OF THE MATERIAL.
THE HEIGHT OF THE STOCKPILE MUST NOT PENETRATE ABOVE THE OBSTRUCTION ELEVATIONS INDICATED ON THE DRAWINGS. ONLY ONE STOCKPILE IS AUTHORIZED IN EACH DESIGNATED CONSTRUCTION FREE ZONE. PROTECT STOCKPILES FROM POTENTIAL CONTAMINATE MIGRATION IN ACCORDANCE WITH ALL APPLICABLE FEDERAL, STATE
AND LOCAL RULES AND REGULATIONS.
7. A TRAINED ENVIRONMENTAL MANAGER PER SPECIFICATION SECTION 01 57 19 MUST BE ON SITE AT ALL TIMES DURING CONSTRUCTION ACTIVITIES NEAR OR WITHIN THE POTENTIAL AREAS OF CONCERN. ADHERE TO ALL APPLICABLE FEDERAL, STATE AND LOCAL RULES AND REGULATIONS WHILE PERFORMING WORK WITHIN OR NEAR THE POTENTIAL AREAS OF CONCERN TO INCLUDE WETTING OF EXCAVATION AREAS PRIOR TO AND THROUGHOUT EXCAVATION ACTIVITIES AND USE OF THE APPROPRIATE PPE.
8. TOPSOIL AND HYDROSEED AREAS WHERE CONTAMINATED SOIL WAS SPREAD WITHIN 24-HOURS OF PLACEMENT TO PREVENT WIND-BORNE MIGRATION. SURVEY THE AREA WHERE THE SOIL WAS SPREAD TO INCLUDE THE DISTURBED LIMITS AND AT A 50-FOOT GRID. PROVIDE THE SURVEY DATA TO THE GOVERNMENT FOR REVIEW AND APPROVAL.
NO ADDITIONAL COST OR SCHEDULE EXTENSIONS WILL BE CONSIDERED BY THE GOVERNMENT FOR REGRADING REQUIRED BY THE CONTRACTOR TO CORRECT ISSUES OBSERVED WITH FEATHERING THE MATERIAL TO MATCH THE EXISTING GRADES AND DRAINAGE PATTERNS.
4/
/2
IS
SU
E D
AT
E:
A
PR
. 2
AR
N
H
AR
T
T.
M
O R
R
IS
C .T
W
IG
G
E.
JA
R G
ER
G
EN
ER
AL
C
O N
ST
R
U C
TI
O
N N
O
TE
S
GI006
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
IS
SU
E D
AT
E:
SI
ZE
M
AR
K
D
ES
C R
IP
TI
O N
D
AT
E
SHEET ID
CUI
CUI
C :\T
EM
P\
PW
_W
O R
K\
ES
T-
LS
\D M
S5
\D
1G
I0
.D W
G 3:
:3
PM
/2
5/
H
B0
N
EW
Y O
R K
D
IS
TR
IC
T N
EW
Y
O R
K, N
Y
-28 F
EB
. 2
AN
SI
D
W H
EE
LE
R -S
AC
K
AR
M
Y
AI
R
FI
EL
D
, F O
R T
D R
U M
, N Y
R U
N W
AY
3-
A
IR
FI
EL
D L
IG
H
TI
N
G R
EP
AI
R P
R O
JE
C
T W
2-
D S-
-D
W
2D S2
3F
R
TA
S U
BM
IS
SI
O
N
US Army Corps of Engineers
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
1. CONSTRUCTION ACCESS SHALL BE AS SHOWN IN THESE DRAWINGS UNLESS OTHERWISE APPROVED BY THE CONTRACTING OFFICER.
2. ALL CONTRACTOR DELIVERIES AND CONTRACTOR PERSONNEL MUST ENTER THE INSTALLATION THROUGH THE GASOLINE ALLEY ACP. ALL DELIVERIES MUST BE MADE DURING NORMAL WORKING HOURS.
ALL CONSTRUCTION TRAFFIC MUST LEAVE WSAAF THROUGH THE WSAAF ACP. AT NO TIMES WILL CONSTRUCTION TRAFFIC BE AUTHORIZED TO LEAVE WSAAF THROUGH THE GASOLINE ALLEY ACP.
CONTRACTOR ACCESS TO THE AIRFIELD WILL BE THROUGH THE AIRFIELD GATE INDICATED ON THE DRAWINGS. THE CONTRACTOR MUST PROVIDE AN ACP GUARD, AT THE CONTRACTOR'S EXPENSE, AT ALL TIMES WHILE WORKING ON THE AIRFIELD. OBTAIN BADGES FOR ALL CONTRACTOR PERSONNEL THROUGH THE VISITOR CONTROL CENTER. CONTRACTOR TO COORDINATE WITH INSTALLATION THROUGH COR FOR REQUIRED AIRFIELD DRIVER TRAINING. THE CONTRACTOR'S ACP GUARD MUST ONLY PERMIT THE PRIME CONTRACTOR AND ITS SUBCONTRACTOR CONSTRUCTION VEHICLES ACCESS TO THE AIRFIELD. PRIVATELY OWNED VEHICLES OF THE PRIME CONTRACTOR AND ITS SUBCONTRACTOR EMPLOYEES ARE NOT CONSTRUCTION VEHICLES AND ARE NOT ALLOWED ON THE AIRFIELD. THE CONTRACTOR MAY REQUEST USAGE OF THE WSAAF ACP FOR NON-AIRFIELD CONCRETE AND ASPHALT DELIVERY TRUCKS ONLY, UNLESS APPROVED OTHERWISE BY FORT DRUM AND THE COR. SUBMIT REQUESTS A MINIMUM OF 14 CALENDAR DAYS PRIOR TO ANY PLANNED NON-AIRFIELD CONCRETE OR ASPHALT DELIVERIES. REQUEST ACCESS TO USE THE WSAAF ACP THROUGH THE COR. APPROVAL WILL BE BASED ON THE NUMBER OF GOVERNMENT PERSONNEL AVAILABLE, MILITARY OPERATIONS OR OTHER SITUATIONS AND IS NOT GUARANTEED.
3. MAXIMUM SPEED OF ALL CONTRACTOR VEHICLES MUST BE 25 MPH WHEN TRAVELING ON WSAAF PROPERTY UNLESS FOLLOWING OTHERWISE POSTED SPEED LIMITS. MAXIMUM SPEED LIMIT ON THE
INSTALLATION IS 10 MPH WHEN PASSING SOLDIERS/PEDESTRIANS.
4. THIS PROJECT IS ON WSAAF PROPERTY. FOLLOW ALL WSAAF SECURITY AND SAFETY REQUIREMENTS IN ACCORDANCE WITH CONTRACT REQUIREMENTS AT ALL TIMES.
5. ALL CONTRACTOR AUTHORIZED VEHICLES AND CONSTRUCTION EQUIPMENT MUST DISPLAY A YELLOW FLASHING BEACON OR A 3'-0" x 3'-0" INTERNATIONAL ORANGE AND WHITE CHECKERED FLAG (12-INCH SQUARES) DISPLAYED IN FULL VIEW ABOVE THE VEHICLES IN ACCORDANCE WITH FAA AC 150/5210-5 CURRENT EDITION. A YELLOW FLASHING BEACON MUST BE USED DURING NIGHT OPERATIONS (FLAG NOT ACCEPTABLE). VEHICLES WHICH ARE NOT MARKED OR LIGHTED MUST BE ESCORTED BY A VEHICLE THAT IS EQUIPPED WITH THE APPROPRIATE MARKING AND LIGHTING DEVICES. ONLY VEHICLES MARKED
WITH THE CONTRACTOR'S COMPANY NAME WILL BE ALLOWED IN THE PROJECT AREAS.
6. USE OF UNAUTHORIZED HAUL ROUTES WILL NOT BE ACCEPTABLE. HAUL TRUCKS MUST BE COVERED AT ALL TIMES. IMMEDIATELY CLEAN AND REMOVE ANY FOREIGN OBJECTS, SPILLAGE, DEBRIS, OR DUST AS A RESULT OF HAULING OPERATIONS AT THE EXPENSE OF THE CONTRACTOR AND TO THE SATISFACTION OF THE COR. IMMEDIATELY CLEAN AND REMOVE THE MATERIAL. HAULING ACROSS ACTIVE
TAXIWAYS OR RUNWAYS IS STRICTLY PROHIBITED WITHOUT PRIOR APPROVAL FROM THE COR.
7. PREPARE AN ENVIRONMENTAL PREVENTION PLAN (EPP) IN ACCORDANCE WITH SPECIFICATION SECTION 01 35 26 AND IN ACCORDANCE WITH ALL APPLICABLE FEDERAL, STATE AND LOCAL RULES AND REGULATIONS PRIOR TO BEGINNING CONSTRUCTION ACTIVITIES. THE CONTRACTOR MUST HAVE AN APPROVED EPP PRIOR TO STARTING CONSTRUCTION.
8. KEEP ALL AIRFIELD PAVEMENT FREE OF DEBRIS AND SEDIMENT DEPOSITED AS A RESULT OF HAULING OR OTHER CONSTRUCTION ACTIVITY AT ALL TIMES. PROVIDE A MINIMUM OF ONE MOTORIZED VACUUM STREET SWEEPER ON SITE AT ALL TIMES TO CONTINUOUSLY CLEAN THE SURFACE OF ALL ACTIVE APRONS AND PAVED VEHICLE SERVICE ROADS OF ANY FOREIGN OBJECT DEBRIS THAT MAY RESULT FROM HAULING ACTIVITIES OR ANY OTHER CONSTRUCTION ACTIVITIES. NO AMOUNT OF FOD WILL BE TOLERATED OR ALLOWED ON ANY ACTIVE AIRFIELD PAVEMENTS.
9. THE APPROXIMATE LIMIT OF THE CONTRACTOR'S PARKING AND STAGING AREA FOR MATERIAL STOCKPILING, LABS, AND OFFICE TRAILERS IS SHOWN ON THE DRAWINGS. THE EXACT LOCATION AND LIMITS OF THE CONTRACTOR'S PARKING AND STAGING AREA MUST BE ESTABLISHED BY THE CONTRACTOR WITH THE APPROVAL OF THE COR.
10. THE REQUIRED UTILITIES FOR THE CONTRACTOR'S STAGING AREA MUST BE ARRANGED FOR BY THE CONTRACTOR DIRECTLY WITH THE APPROPRIATE UTILITY AGENCY, CONTRACTING OFFICER AND FORT DRUM. IT IS THE CONTRACTOR'S RESPONSIBILITY TO DETERMINE THE AVAILABILITY OF UTILITIES AND TO ENCLOSE, SECURE, AND SET UP THEIR OPERATIONAL AREA. IMMEDIATELY PRIOR TO MOBILIZATION, CONFIRM WITH FORT DRUM ON THE AVAILABILITY FOR THE BASE TO PROVIDE TEMPORARY WATER. FORT DRUM WILL PROVIDE TEMPORARY ELECTRICAL AND NATURAL GAS SERVICE AT NO COST TO THE CONTRACTOR. THE CONTRACTOR IS RESPONSIBLE FOR ALL COSTS ASSOCIATED WITH THE INSTALLATION, REMOVAL AND SITE RESTORATION FOR TEMPORARY UTILITY SERVICE FROM THE POINTS OF CONNECTION TO THE CONTRACTOR PRIMARY STAGING AREA. COORDINATE THE POINTS OF CONNECTIONS TO FORT DRUM UTILITIES WITH FORT DRUM ENGINEERING. ALL OTHER TEMPORARY UTILITY SERVICE REQUIRED AT THE STAGING AREA WILL BE AT THE CONTRACTOR'S EXPENSE AND MUST BE COORDINATED DIRECTLY WITH THE UTILITY SERVICE OWNER. THE CONTRACTOR IS RESPONSIBLE FOR ALL COSTS ASSOCIATED WITH PROVIDING PORTABLE SANITARY FACILITIES AT THE STAGING AREA. PRIOR TO INSTALLING TEMPORARY UTILITIES, INSTALL UTILITY GRADE METERS FOR ALL UTILITY SERVICES PROVIDED BY FORT DRUM AND AS REQUIRED BY THE UTILITY SERVICE OWNER OR UTILITY SERVICE PROVIDER. PROVIDE METER READINGS AS PART OF THE MONTHLY INVOICE SUBMITTAL TO THE COR AND FORT DRUM ENERGY MANAGER FOR FORT DRUM OWNED UTILITY SERVICES. PROVIDE A MINIMUM 48 HOURS NOTICE TO THE GOVERNMENT TO INSPECT ALL TEMPORARY UTILITY CONNECTIONS PRIOR TO
ACTIVATING UTILITIES FOR USE.
11. INSPECT THE CONSTRUCTION HAUL ROUTES ON EXISTING PAVEMENT WITH PHOTOGRAPH DOCUMENTATION BEFORE AND AFTER CONSTRUCTION WITH THE COR. REPAIR ANY DAMAGE TO THE HAUL ROUTE PAVEMENTS OR ACCESS ROADS AT THE CONTRACTOR'S EXPENSE. ROADWAYS MUST BE MAINTAINED THROUGHOUT THE PROJECT DURATION TO ALLOW SAFE USE BY FORT DRUM. PROVIDE A HAUL ROAD RELEASE SIGNED BY FORT DRUM DPW, THE CONTRACTOR AND USACE UPON COMPLETION OF THE PROJECT AND AFTER THE HAUL ROUTES HAVE BEEN RESTORED TO ORIGINAL OR BETTER CONDITION.
12. SUBMIT A WORK PLAN A MINIMUM OF 30-CALENDAR DAYS PRIOR TO BEGINNING CONSTRUCTION ACTIVITIES ON THE PROJECT. AT A MINIMUM, THE WORK PLAN MUST INCLUDE A SCHEDULE OF ACTIVITIES, METHODS OF EXCAVATING, PROPOSED EXCAVATION EQUIPMENT, TEMPORARY STORAGE METHODS, PROPOSED TEMPORARY STORAGE LOCATION ON SITE, CONTRACTOR SPECIFIC MEASURES WHEN WORKING IN THE AREAS INCLUDED IN THE WORK PLAN, PROPOSED DISPOSAL LOCATIONS FOR CONTAMINATED SOIL AND PROPOSED DISPOSAL LOCATIONS FOR UNRESTRICTED USE SOIL.
13. DO NOT ALLOW EQUIPMENT OR OTHER VEHICLES TO PARK ON ACTIVE TAXIWAYS, TOWWAYS, OR WITHIN THE CLEARANCE BOUNDARY LIMITS INDICATED ON THE PHASING SERIES SHEETS AT ANY TIME. ALL ACTIVE RUNWAYS, TAXIWAYS, AND APRONS MUST REMAIN CLEAR FOR AIRCRAFT AND EMERGENCY VEHICLES.
14. THE CONTRACTOR IS RESPONSIBLE FOR ANY IMPROVEMENTS NECESSARY TO UPGRADE EXISTING ABANDONED ROADS OR TO CREATE ADDITIONAL ROADS FOR USE AS HAUL ROUTES AS NECESSARY FOR THIS PROJECT. REMOVE TEMPORARY ROADS AT THE CONCLUSION OF THE PROJECT AND RETURN AREAS TO PREVIOUS CONDITION UNLESS OTHERWISE DIRECTED BY THE CONTRACTING OFFICER.
15. EXISTING UNDERGROUND UTILITIES AND STRUCTURES ARE SHOWN AT APPROXIMATE LOCATIONS AND DEPTHS. THERE MAY BE OTHER EXISTING UTILITIES OR STRUCTURES LOCATED WITHIN THE PROJECT AREA WHICH ARE NOT PRESENTLY KNOWN. PRIOR TO CONSTRUCTION, CONTACT UNDERGROUND UTILITIES CALL CENTER OF NEW YORK FOR EXACT LOCATIONS OF UNDERGROUND UTILITIES (1-800-962-7962) AND FORT DRUM DPW TO OBTAIN DIG PERMITS AND UTILITY CLEARANCES. USE GROUND PENETRATING RADAR ACROSS ALL PAVEMENT SURFACES IDENTIFIED FOR REMOVAL PRIOR TO BEGINNING DEMOLITION. VERIFY THE LOCATION OF ALL EXISTING UTILITIES PRIOR TO ANY DEMOLITION TO ENSURE THAT ONLY THE UTILITIES AND FEATURES MARKED FOR DEMOLITION ARE REMOVED, AND ALL OTHER UTILITIES AND FEATURES ARE NOT DISTURBED. ANY UTILITIES TO REMAIN, WHICH ARE DISTURBED BY THE CONTRACTOR, MUST BE REPAIRED BY THE CONTRACTOR AT NO ADDITIONAL COST TO THE GOVERNMENT. CONTRACTOR MAY NOT BEGIN ANY EXCAVATION UNTIL ALL NAVAID, AIRFIELD LIGHTING, ELECTRICAL, COMMUNICATION CABLES AND ALL OTHER UNDERGROUND UTILITIES LOCATED IN
THE CONSTRUCTION AREA HAVE BEEN IDENTIFIED BY THE CONTRACTOR.
16. IMMEDIATELY REPAIR ANY DAMAGE TO UTILITIES, AT THE CONTRACTOR'S EXPENSE, AS DIRECTED BY THE COR, IN THE EVENT OF CONTRACTOR INFLICTED DAMAGE TO EXISTING UTILITIES AND CABLES THAT ARE MARKED IN THE FIELD AND SHOWN TO REMAIN. IMMEDIATELY NOTIFY THE WSAAF PROJECT MANAGER AND AIRFIELD MANAGEMENT POINT OF CONTACT WHENEVER UTILITIES ARE DAMAGED BY THE CONTRACTOR. INSPECT UTILITIES AND NOTIFY THE CONTRACTING OFFICER OF ANY PRIOR DAMAGE BEFORE STARTING WORK IN THE PROJECT AREA.
17. CONTROL DUST FROM THEIR OPERATIONS TO A LEVEL ACCEPTABLE TO THE COR AND IN ACCORDANCE WITH ALL APPLICABLE PERMITS AT ALL TIMES. PROVIDE VACUUM SWEEPER TRUCKS, WATER TRUCKS, AND OTHER EQUIPMENT NECESSARY TO CONTROL DUST AND DEBRIS AT ALL TIMES. POSITION ALL EQUIPMENT REQUIRED TO CONTROL THE DUST WITHIN THE LIMITS OF CONSTRUCTION AND IN GOOD WORKING CONDITION. ALL METHODS FOR CONTROLLING DUST AND DEBRIS IS SUBJECT TO THE APPROVAL OF THE COR. DUST AND DEBRIS CONTROL MUST BE STRICTLY MONITORED DUE TO ITS IMPACT ON AIRCRAFT SAFETY. FAILURE TO PROPERLY CONTROL DUST AND DEBRIS OR TO IMMEDIATELY RESPOND TO ANY REQUEST TO DO SO WILL RESULT IN CONSTRUCTION ACTIVITIES BEING STOPPED BY THE THE GOVERNMENT UNTIL DUST AND DEBRIS CAN BE PROPERLY CONTROLLED. CONSTRUCTION SCHEDULE EXTENSIONS WILL NOT BE GRANTED FOR LOST TIME ASSOCIATED WITH DUST AND DEBRIS
WORK STOPPAGES.
18. HOLD WEEKLY MEETINGS WITH THE WSAAF PROJECT MANAGER AND OTHER INTERESTED PARTIES TO COORDINATE CLOSURES, WORK AREAS, CONTRACTOR ACCESS, AND CONSTRUCTION SCHEDULES.
PROVIDE A MINIMUM TWO WEEK SCHEDULE OF PROPOSED CONSTRUCTION ACTIVITIES PRIOR TO EACH WEEKLY MEETING. ADDITIONAL MEETINGS MAY BE HELD AS NECESSARY.
19. THE GOVERNMENT RESERVES THE RIGHT TO CONTRACT, AND PERFORM, OTHER WORK ON, OR NEAR, THE WORK COVERED BY THIS CONTRACT. WHEN SEPARATE CONTRACTS ARE WITHIN THE WORK LIMITS OF ANY ONE PROJECT, EACH CONTRACTOR MUST CONDUCT THEIR WORK SO AS NOT TO INTERFERE OR HINDER THE PROGRESS OF ANY OTHER CONTRACTORS WORKING IN THE SAME AREA.
20. CONFORM TO ALL LOCAL, REGIONAL, STATE AND FEDERAL REGULATIONS REGARDING THE PROTECTION OF THE ENVIRONMENT THROUGHOUT THE DURATION OF THE PROJECT. ACQUIRE, AT THE CONTRACTOR'S EXPENSE, ANY AND ALL PERMITS ASSOCIATED WITH THE CONSTRUCTION ACTIVITIES TO BE ACCOMPLISHED BY THE CONTRACTOR. CONSTRUCTION SCHEDULE EXTENSIONS WILL NOT BE
GRANTED FOR THE TIME REQUIRED TO COMPLETE THE APPLICABLE PERMITS.
21. PRIOR TO BEGINNING ANY WORK, VERIFY VERTICAL AND HORIZONTAL CONTROL FROM THE INFORMATION GIVEN ON THE SURVEY CONTROL PLAN. INFORM THE ENGINEER OF ANY DISCREPANCIES NOTED IN THE DESIGN SURVEY INFORMATION. IN THE EVENT OF A CONFLICT BETWEEN THE ORIGINAL DESIGN SURVEY AND THE CONTRACTOR SITE VERIFICATION SURVEY, THE ENGINEER MUST EVALUATE THE NEW INFORMATION AND PROVIDE DESIGN REVISIONS BEFORE THE CONTRACTOR CAN COMMENCE WITH THE WORK.
22. THE CONTRACTOR MUST BE AVAILABLE AS REQUIRED BY THE COR, WSAAF PROJECT MANAGER, OR WSAAF AIRFIELD OPERATIONS MANAGER, DURING THE PROJECT TO MAINTAIN PHASING SAFETY DEVICES OR CORRECT DUST AND DEBRIS ISSUES, AS DESIRED BY THE WSAAF PROJECT MANAGER OR AIRFIELD MANAGEMENT.
23. RETAIN A LICENSED LAND SURVEYOR FOR ALL PAVEMENT, UTILITY AND FIELD STAKEOUT AT THE CONTRACTOR'S EXPENSE. SURVEY ALL EXISTING UNDERGROUND UTILITIES ENCOUNTERED THROUGHOUT THE PROJECT. PROVIDE SURVEY INFORMATION, TO INCLUDE LOCATION, DEPTH, AND UTILITY INFORMATION TO THE WSAAF PROJECT MANAGER AND AS PART OF THE CLOSEOUT DOCUMENTS.
24. PROVIDE AS-BUILT RECORD DRAWINGS IN ACCORDANCE WITH CONTRACT REQUIREMENTS .THE PRIME CONTRACTOR MUST RETAIN THE SERVICES OF A LICENSED LAND SURVEYOR TO COMPLETE THE AS-BUILT RECORD SURVEY AND RETAIN A LICENSED PROFESSIONAL ENGINEER AND ARCHITECT, AS APPLICABLE, TO PREPARE THE AS-BUILT RECORD DRAWINGS. AS-BUILT RECORD DRAWINGS MUST BEAR THE SEAL AND SIGNATURE OF THE LICENSED PROFESSIONAL FOR THE APPLICABLE ENGINEERING AND ARCHITECTURAL DISCIPLINES.