Ft Drum Runway Lighting Repair - Final RTA Plans (1-54).pdf

PDF 14 MB Posted

Attached to
Construction of Wheeler Sack Army Airfield (WSAAF) Lighting Upgrade Fort Drum, NY
Solicitation number
W912DS25RA003
Issued by

About this file

This is a comprehensive set of contract documents for the Runway 03-21 Airfield Lighting Repair Project at Wheeler-Sack Army Airfield, Fort Drum, New York. The project, solicited by the US Army Corps of Engineers New York District, involves extensive infrastructure improvements including full-depth pavement removal and replacement for runway and taxiway surfaces, installation of new electrical ductbanks and airfield lighting systems, and construction of a new 3,200 square foot Airfield Lighting Vault (AFLV).

The project is divided into two primary phases spanning approximately 30 months, with major work including removing and reconstructing concrete and asphalt pavements on Runway 03-21 and associated taxiways, installing new electrical infrastructure and conduit systems, replacing runway edge lights, threshold lights, and guidance signs, and constructing a new lighting vault. The contract includes precise specifications for pavement removal, base course preparation, electrical systems installation, and site restoration, with specific requirements for handling potential polyfluoroalkyl substances (PFAS) in excavated soils. The project is critical for maintaining operational capabilities of the Wheeler-Sack Army Airfield, with careful phasing to minimize disruption to airfield operations.

View the file

Other files

File Type Posted
Amendment 13 - W912DS25RA003.pdf PDF
Ft_Drum_Pre-Award_Re-Phasing_Specifications.pdf PDF
Amendment 12 - W912DS25RA003.pdf PDF
FortDrum_SWPPP_Rephasing_Stamped_R1-20 Apr 26.pdf PDF
FortDrum-WSAAF-Request_for_Disturbance_Letter.pdf PDF
Ft Drum Pre-Award Re-Phasing Drawings_041726.pdf PDF
Amendment 11 W912DS25RA003.pdf PDF
Amendment 10 - W912DS25RA003.pdf PDF
Amendment 9 W912DS25RA003.pdf PDF
Basis of Award W912DS25RA003 18Dec2025.pdf PDF
GC101 - Phasing and Schedule Market Research.pdf PDF
Phasing and Schedule Market Research.pdf PDF
Amendment 8 - W912DS25RA003.pdf PDF
Electric and Water Utilities on the Concrete Batch Plant Site.pdf PDF
Amendment 7 - W912DS25RA003.pdf PDF
Amendment 6 - W912DS25RA003.pdf PDF
32 12 15.13.pdf PDF
Basis of Award W912DS25RA003 12Nov2025.pdf PDF
Amendment 5 - W912DS25RA003.pdf PDF
Amendment 2 W912DS25RA003.pdf PDF
Amendment 4 W912DS25RA003.pdf PDF
Basis of Award W912DS25RA003 22Oct2025.pdf PDF
Amendment 3 - W912DS25RA003.pdf PDF
Ft_Drum_SWPPP_FINAL_04252025_UPD07OCT25.pdf PDF
Sign-in Sheet.pdf PDF
Amendment 0003 Specs - Ft Drum Runway Lighting Repair (WSAAF).pdf PDF
Ft Drum Runway Lighting Repair - Final RTA Plans (218-326).pdf PDF
Ft Drum Runway Lighting Repair - Final RTA Plans (55-108).pdf PDF
Ft_Drum_RTA_Specifications_Reprint.pdf PDF
Ft Drum Runway Lighting Repair - Final RTA Plans (109-217).pdf PDF
Ft Drum Runway Lighting Repair - Final RTA Plans (327-433).pdf PDF
Amendment 2 - W912DS25RA003.pdf PDF
Bidder Walkthrough Visitor Pass Instructions R1.pdf PDF
Ft Drum Runway Lighting Repair - Final RTA Plans 25 APR 2025(109-217)_UPD23SEP25.pdf PDF
Ft Drum Runway Lighting Repair - Final RTA Plans 25 APR 2025(1-54)_UPD23SEP25.pdf PDF
WSAAF Lighting Upgrade JA - Monaco Fire Alarm_signed-_Redacted.pdf PDF
Solicitation Amendment W912DS25RA0030001 SF 30.pdf PDF
Ft Drum Runway Lighting Repair - Final RTA Plans 25 APR 2025(218-326)_UPD23SEP25.pdf PDF
WSAAF Lighting Upgrade JA - Trane Tracer Ensemble_Redacted.pdf PDF
Ft_Drum_RTA_Specifications_Reprint_UPD23SEP25.pdf PDF
Ft Drum Runway Lighting Repair - Final RTA Plans 25 APR 2025(327-433)_UPD23SEP25.pdf PDF
Ft Drum Runway Lighting Repair - Final RTA Plans 25 APR 2025(55-108)_UPD23SEP25.pdf PDF
Ft Drum Map (WSAAF Bidder Walkthrough).pdf PDF
Solicitation - W912DS25RA003.pdf PDF
Basis of Award - W912DS25RA003.pdf PDF
Bidder Walkthrough Plan.pdf PDF
IMDR-ES_Form_2_APPLICATION_FOR_SPONSORSHIPv7.pdf PDF
Bidder Walkthrough Visitor Pass Instructions.pdf PDF
Ft_Drum Runway Lighting Repair RTA Specs 25 Apr 25.pdf PDF
Show all 49

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CUI

ATTENTION

Use this space to indicate categories, limited dissemination controls, special instructions, points of contact, etc., if needed.

ATTENTION

All individuals handling this information are required to protect it from unauthorized disclosure.

Handling, storage, reproduction, and disposition of the attached document(s) must be in accordance with 32 CFR Part 2002 and applicable agency policy.

Access to and dissemination of Controlled Unclassified Information shall be allowed as necessary and permissible to any individual(s), organization(s), or grouping(s) of users, provided such access or dissemination is consistent with or in furtherance of a Lawful Government Purpose and in a manner consistent with applicable law, regulations, and Government-wide policies.

Standard Form 901 (11-18) Prescribed by GSA/ISOO | 32 CFR 2002

CUI

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

SU

BM

IT

TE

D B

Y:

C H

EC

KE

D B

Y:

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

IS

SU

E D

AT

E:

SI

ZE

M

AR

K

D

ES

C R

IP

TI

O N

D

AT

E

SHEET ID

CUI

CUI

C :\T

EM

P\

PW

_W

O R

K\

ES

T-

LS

\D M

S5

\D

1G

I0

.D W

G

:4 3:

A

M

/2 3/

M O

R R

IS

T3

N

EW

Y O

R K

D

IS

TR

IC

T N

EW

Y

O R

K, N

Y

-25 A

PR

. 2

AN

SI

D

W H

EE

LE

R -S

AC

K

AR

M

Y

AI

R

FI

EL

D

, F O

R T

D R

U M

, N Y

R U

N W

AY

3-

A

IR

FI

EL

D L

IG

H

TI

N

G R

EP

AI

R P

R O

JE

C

T W

2-

D S-

-D

W

2D S2

3F

R

TA

S U

BM

IS

SI

O

N

US Army Corps of Engineers

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

H .B

AR

N

H

AR

T

T.

M

O R

R

IS

C .T

W

IG

G

E.

JA

R G

ER

C

O

VE

R S

H

EE

T

GI001

SOLICITATION NO.:

CONTRACT NO.:

ISSUE DATE:

Fort Drum, NY Runway 03-21 Airfield Lighting Repair

RTA SUBMISSION

04/25/2025

US Army Corps of Engineers

NEW YORK DISTRICT

CONTROLLED BY: USAG FORT DRUM DPW

CONTROLLED BY: AMIM-DRP-G

CUI CATEGORIES: CTI-SP, PHYS

DISTRIBUTION STATEMENT: N OFORN

POINT OF CONTACT: FRED STONE 315-772-4939

LOCATION MAP VICINITY MAP

PROJECT AREA

ALL INDIVIDUALS HANDLING THIS

INFORMATION ARE REQUIRED TO PROTECT IT

FROM UNAUTHORIZED DISCLOSURE.

HANDLING, STORAGE, REPRODUCTION AND

DISPOSITION OF THE ATTACHED DOCUMENT(S)

MUST BE IN ACCORDANCE WITH 32 CFR PART

2002 AND APPLICABLE AGENCY POLICY.

ACCESS TO AND DISSEMINATION OF

CONTROLLED UNCLASSIFIED INFORMATION

SHALL BE ALLOWED AS NECESSARY AND

PERMISSIBLE TO ANY INDIVIDUAL(S),

ORGANIZATION(S) OR GROUPING(S) OF USERS,

PROVIDED SUCH ACCESS OR DISSEMINATION

IS CONSISTENT WITH OR IN FURTHERANCE OF

A LAWFUL GOVERNMENT PURPOSE AND IN A

MANNER CONSISTENT WITH APPLICABLE LAW,

REGULATIONS AND GOVERNMENT-WIDE

POLICIES.

ARCHITECTURAL TELECOMMUNICATIONS CIVIL - AIRFIELD/SITE

CIVIL - ENVIRONMENTALFIRE PROTECTIONPLUMBING

STRUCTURAL ELECTRICAL - AIRFIELD/SITE

ELECTRICAL - AFLV

MECHANICAL

4/24/25

4/23/2025

4/23/2025

CONTROLLED BY: USAG FORT DRUM DPW

CONTROLLED BY: AMIM-DRP-G

CUI CATEGORIES: CRIT

DISTRIBUTION STATEMENT: None

POINT OF CONTACT: RYAN CHURCHILL 315-608-1119

ALL INDIVIDUALS HANDLING THIS INFORMATION ARE

REQUIRED TO PROTECT IT FROM UNAUTHORIZED

DISCLOSURE. HANDLING, STORAGE, REPRODUCTION

AND DISPOSITION OF THE ATTACHED DOCUMENT(S)

MUST BE IN ACCORDANCE WITH 32 CFR PART 2002

AND APPLICABLE AGENCY POLICY. ACCESS TO AND

DISSEMINATION OF CONTROLLED UNCLASSIFIED

INFORMATION SHALL BE ALLOWED AS NECESSARY

AND PERMISSIBLE TO ANY INDIVIDUAL(S),

ORGANIZATION(S) OR GROUPING(S) OF USERS,

PROVIDED SUCH ACCESS OR DISSEMINATION IS

CONSISTENT WITH OR IN FURTHERANCE OF A

LAWFUL GOVERNMENT PURPOSE AND IN A MANNER

CONSISTENT WITH APPLICABLE LAW, REGULATIONS

AND GOVERNMENT-WIDE POLICIES.

INDEX

DESIGN SHEET NO. DESCRIPTION

1 GI001 COVER SHEET

2 GI002 DRAWING INDEX

3 GI003 DRAWING INDEX

4 GI004 DRAWING INDEX

5 GI005 NOTES, ABBREVIATIONS, AND LEGEND

6 GI006 GENERAL CONSTRUCTION NOTES

7 GI101 CONTRACTOR STAGING AND ACCESS PLAN

8 GI102 SURVEY CONTROL PLAN

9 GI103 HEIGHT RESTRICTION PLAN

10 GC001 WORK RESTRICTION NOTES AND LEGEND

11 GC100 OVERALL PHASING PLAN

12 GC101 OVERALL PHASE 1 PLAN

13 GC102 CONSTRUCTION SAFETY AND PHASING PLAN

- PHASE 1

14 GC103 CONSTRUCTION SAFETY AND PHASING PLAN

- PHASE 1

15 GC104 CONSTRUCTION SAFETY AND PHASING PLAN

- PHASE 1

16 GC105 CONSTRUCTION SAFETY AND PHASING PLAN

- PHASE 1

17 GC106 CONSTRUCTION SAFETY AND PHASING PLAN

- PHASE 1

18 GC107 CONSTRUCTION SAFETY AND PHASING PLAN

- PHASE 1

19 GC108 CONSTRUCTION SAFETY AND PHASING PLAN

- PHASE 1

20 GC109 OVERALL PHASE 2 PLAN

21 GC110 CONSTRUCTION SAFETY AND PHASING PLAN

- PHASE 2

22 GC111 CONSTRUCTION SAFETY AND PHASING PLAN

- PHASE 2

23 GC112 CONSTRUCTION SAFETY AND PHASING PLAN

- PHASE 2

24 GC113 CONSTRUCTION SAFETY AND PHASING PLAN

- PHASE 2

25 GC114 CONSTRUCTION SAFETY AND PHASING PLAN

- PHASE 2

26 GC115 CONSTRUCTION SAFETY AND PHASING PLAN

- PHASE 2

27 GC116 CONSTRUCTION SAFETY AND PHASING PLAN

- PHASE 2

28 GC117 CONSTRUCTION SAFETY AND PHASING PLAN

- PHASE 2

29 GC118 PHASE 2 AIRFIELD LIGHTING CUTOVER PLAN

30 GC501 CONSTRUCTION CONTROL DETAILS

31 GC502 AIRFIELD LIGHTING PHASING DETAILS

32 FL001 LIFE SAFETY CODE SUMMARY

33 FL002 LIFE SAFETY SITE PLAN

34 FL101 FIRST FLOOR - LIFE SAFETY PLAN

35 C-001 AIRFIELD CIVIL KEYPLAN

36 C-301 TYPICAL REMOVAL SECTIONS

INDEX

DESIGN SHEET NO. DESCRIPTION

37 C-302 TYPICAL REMOVAL SECTIONS

38 C-303 TYPICAL SECTION GENERAL NOTES

39 C-304 TYPICAL SECTIONS

40 C-305 TYPICAL SECTIONS

41 C-306 TYPICAL SECTIONS

42 C-307 TYPICAL SECTIONS

43 C-308 TYPICAL SECTIONS

44 C-309 TYPICAL SECTIONS

45 C-310 TYPICAL SECTIONS

46 CD001 CIVIL DEMOLITION NOTES

47 CD101 CIVIL DEMOLITION PLAN

48 CD102 CIVIL DEMOLITION PLAN

49 CD103 CIVIL DEMOLITION PLAN

50 CD104 CIVIL DEMOLITION PLAN

51 CD105 CIVIL DEMOLITION PLAN

52 CD106 CIVIL DEMOLITION PLAN

53 CD107 CIVIL DEMOLITION PLAN

54 CD108 CIVIL DEMOLITION PLAN

55 CD109 CIVIL DEMOLITION PLAN

56 CD110 CIVIL DEMOLITION PLAN

57 CD111 CIVIL DEMOLITION PLAN

58 CD112 CIVIL DEMOLITION PLAN

59 CD113 CIVIL DEMOLITION PLAN

60 CD114 CIVIL DEMOLITION PLAN

61 CD115 CIVIL DEMOLITION PLAN

62 CD501 CIVIL DEMOLITION DETAILS

63 CE001 SOIL EROSION AND SEDIMENT CONTROL

KEYPLAN

64 CE101 SOIL EROSION AND SEDIMENT CONTROL

PLAN

65 CE102 SOIL EROSION AND SEDIMENT CONTROL

PLAN

66 CE103 SOIL EROSION AND SEDIMENT CONTROL

PLAN

67 CE104 SOIL EROSION AND SEDIMENT CONTROL

PLAN

68 CE105 SOIL EROSION AND SEDIMENT CONTROL

PLAN

69 CE106 SOIL EROSION AND SEDIMENT CONTROL

PLAN

70 CE107 SOIL EROSION AND SEDIMENT CONTROL

PLAN

71 CE108 SOIL EROSION AND SEDIMENT CONTROL

PLAN

72 CE109 SOIL EROSION AND SEDIMENT CONTROL

PLAN

INDEX

DESIGN SHEET NO. DESCRIPTION

73 CE110 SOIL EROSION AND SEDIMENT CONTROL

PLAN

74 CE111 SOIL EROSION AND SEDIMENT CONTROL

PLAN

75 CE112 SOIL EROSION AND SEDIMENT CONTROL

PLAN

76 CE113 SOIL EROSION AND SEDIMENT CONTROL

PLAN

77 CE114 SOIL EROSION AND SEDIMENT CONTROL

PLAN

78 CE115 SOIL EROSION AND SEDIMENT CONTROL

PLAN

79 CE116 SOIL EROSION AND SEDIMENT CONTROL

PLAN

80 CE117 SOIL EROSION AND SEDIMENT CONTROL

PLAN

81 CE118 SOIL EROSION AND SEDIMENT CONTROL

PLAN

82 CE121 AIRFIELD LIGHTING VAULT AREA SOIL

EROSION AND SEDIMENT CONTROL PLAN

83 CE501 SOIL EROSION AND SEDIMENT CONTROL

DETAILS

84 CS101 GEOMETRY PLAN

85 CS102 GEOMETRY PLAN

86 CS103 GEOMETRY PLAN

87 CS104 GEOMETRY PLAN

88 CS105 GEOMETRY PLAN

89 CS106 GEOMETRY PLAN

90 CS107 GEOMETRY PLAN

91 CS108 GEOMETRY PLAN

92 CS109 GEOMETRY PLAN

93 CS110 GEOMETRY PLAN

94 CS111 GEOMETRY PLAN

95 CS112 GEOMETRY PLAN

96 CS113 GEOMETRY PLAN

97 CS114 GEOMETRY PLAN

98 CS115 GEOMETRY PLAN

99 CS121 AIRFIELD LIGHTING VAULT SITE PLAN

100 CS122 AIRFIELD LIGHTING VAULT SITE PLAN

101 CS501 CIVIL SITE DETAILS

102 CG101 GRADING PLAN

103 CG102 GRADING PLAN

104 CG103 GRADING PLAN

105 CG104 GRADING PLAN

106 CG105 GRADING PLAN

107 CG106 GRADING PLAN

108 CG107 GRADING PLAN

INDEX

DESIGN SHEET NO. DESCRIPTION

109 CG108 GRADING PLAN

110 CG109 GRADING PLAN

111 CG110 GRADING PLAN

112 CG111 GRADING PLAN

113 CG112 GRADING PLAN

114 CG113 GRADING PLAN

115 CG114 GRADING PLAN

116 CG115 GRADING PLAN

117 CG116 GRADING PLAN

118 CG121 AIRFIELD LIGHTING VAULT SITE GRADING

PLAN

119 CG201 RUNWAY 03-21 PCC RECONSTRUCTION

PROFILE

120 CG202 LIGHTING VAULT ACCESS DRIVEWAY

PROFILE

121 CG301 RUNWAY 03-21 PCC RECONSTRUCTION

CROSS SECTIONS

122 CG302 RUNWAY 03-21 PCC RECONSTRUCTION

CROSS SECTIONS

123 CG303 RUNWAY 03-21 PCC RECONSTRUCTION

CROSS SECTIONS

124 CG304 RUNWAY 03-21 PCC RECONSTRUCTION

CROSS SECTIONS

125 CG305 RUNWAY 03-21 PCC RECONSTRUCTION

CROSS SECTIONS

126 CG306 RUNWAY 03-21 PCC RECONSTRUCTION

CROSS SECTIONS

127 CG307 RUNWAY 03-21 PCC RECONSTRUCTION

CROSS SECTIONS

128 CG308 RUNWAY 03-21 PCC RECONSTRUCTION

CROSS SECTIONS

129 CG309 RUNWAY 03-21 PCC RECONSTRUCTION

CROSS SECTIONS

130 CG310 RUNWAY 03-21 PCC RECONSTRUCTION

CROSS SECTIONS

131 CP101 PAVING AND JOINT ELEVATION PLAN

132 CP102 PAVING AND JOINT ELEVATION PLAN

133 CP103 PAVING AND JOINT ELEVATION PLAN

134 CP104 PAVING AND JOINT ELEVATION PLAN

135 CP105 PAVING AND JOINT ELEVATION PLAN

136 CP106 PAVING AND JOINT ELEVATION PLAN

137 CP107 PAVING AND JOINT ELEVATION PLAN

138 CP108 PAVING AND JOINT ELEVATION PLAN

139 CP109 PAVING AND JOINT ELEVATION PLAN

140 CP110 PAVING AND JOINT ELEVATION PLAN

141 CP111 PAVING AND JOINT ELEVATION PLAN

142 CP112 PAVING AND JOINT ELEVATION PLAN

143 CP113 PAVING AND JOINT ELEVATION PLAN

144 CP114 PAVING AND JOINT ELEVATION PLAN

INDEX

DESIGN SHEET NO. DESCRIPTION

145 CP115 PAVING AND JOINT ELEVATION PLAN

146 CP116 PAVING AND JOINT ELEVATION PLAN

147 CP117 PAVING AND JOINT ELEVATION PLAN

148 CP118 PAVING AND JOINT ELEVATION PLAN

149 CP119 PAVING AND JOINT ELEVATION PLAN

150 CP120 PAVING AND JOINT ELEVATION PLAN

151 CP121 PAVING AND JOINT ELEVATION PLAN

152 CP122 PAVING AND JOINT ELEVATION PLAN

153 CP123 PAVING AND JOINT ELEVATION PLAN

154 CP124 PAVING AND JOINT ELEVATION PLAN

155 CP125 PAVING AND JOINT ELEVATION PLAN

156 CP126 PAVING AND JOINT ELEVATION PLAN

157 CP127 PAVING AND JOINT ELEVATION PLAN

158 CP128 PAVING AND JOINT ELEVATION PLAN

159 CP129 PAVING AND JOINT ELEVATION PLAN

160 CP130 PAVING AND JOINT ELEVATION PLAN

161 CP131 PAVING AND JOINT ELEVATION PLAN

162 CP132 PAVING AND JOINT ELEVATION PLAN

163 CP133 PAVING AND JOINT ELEVATION PLAN

164 CP134 PAVING AND JOINT ELEVATION PLAN

165 CP135 PAVING AND JOINT ELEVATION PLAN

166 CP136 PAVING AND JOINT ELEVATION PLAN

167 CP137 PAVING AND JOINT ELEVATION PLAN

168 CP138 AIRFIELD LIGHTING VAULT PAVING PLAN

169 CP501 PAVING DETAILS

170 CP502 PAVING DETAILS

171 CP503 PAVING DETAILS

172 CT101 MARKING PLAN

173 CT102 MARKING PLAN

174 CT103 MARKING PLAN

175 CT104 MARKING PLAN

176 CT105 MARKING PLAN

177 CT106 MARKING PLAN

178 CT107 MARKING PLAN

179 CT108 MARKING PLAN

180 CT109 MARKING PLAN

H .B

AR

N

H

AR

T

T.

M

O R

R

IS

C .T

W

IG

G

E.

JA

R G

ER

D

R

AW

IN

G

IN

D

EX

GI002

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

SU

BM

IT

TE

D B

Y:

C H

EC

KE

D B

Y:

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

IS

SU

E D

AT

E:

SI

ZE

M

AR

K

D

ES

C R

IP

TI

O N

D

AT

E

SHEET ID

CUI

CUI

C :\T

EM

P\

PW

_W

O R

K\

ES

T-

LS

\D M

S5

\D

1G

I0

-G I0

.D

W G

3:

:4

PM

/2 7/

M O

R R

IS

T3

N

EW

Y O

R K

D

IS

TR

IC

T N

EW

Y

O R

K, N

Y

-28 F

EB

. 2

AN

SI

D

W H

EE

LE

R -S

AC

K

AR

M

Y

AI

R

FI

EL

D

, F O

R T

D R

U M

, N Y

R U

N W

AY

3-

A

IR

FI

EL

D L

IG

H

TI

N

G R

EP

AI

R P

R O

JE

C

T W

2-

D S-

-D

W

2D S2

3F

R

TA

S U

BM

IS

SI

O

N

US Army Corps of Engineers

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

4/

/2

4/

/2

A

PR

. 2

181 CT110 MARKING PLAN

182 CT111 MARKING PLAN

183 CT112 MARKING PLAN

184 CT113 MARKING PLAN

185 CT114 MARKING PLAN

186 CT115 MARKING PLAN

187 CT501 CIVIL MARKING DETAILS

188 CT502 CIVIL MARKING DETAILS

189 CU201 UTILITY PROFILES

190 CU501 WATER DISTRIBUTION STANDARD DETAILS

191 CU502 WATER DISTRIBUTION STANDARD DETAILS

192 CU503 WATER DISTRIBUTION STANDARD DETAILS

193 CX101 GROOVING PLAN

194 CX102 GROOVING PLAN

195 CX501 CIVIL GROOVING DETAILS

196 S-001 STRUCTURAL GENERAL NOTES

197 S-002 STRUCTURAL GENERAL NOTES AND DESIGN

CRITERIA

198 S-101 FOUNDATION PLAN

199 S-102 ROOF FRAMING PLAN

200 S-201 STRUCTURAL BUILDING ELEVATIONS

201 S-202 STRUCTURAL BUILDING ELEVATIONS

202 S-301 SECTIONS

203 S-501 TYPICAL DETAILS

204 S-502 TYPPICAL DETAILS

205 A-001 ABBREVIATIONS

206 A-002 GENERAL SYMBOLS AND NOTES

207 AS101 ARCHITECTURAL SITE PLAN

208 A-101 FIRST FLOOR PLAN

209 A-105 ROOF PLAN

210 A-201 EXTERIOR ELEVATIONS

211 A-301 BUILDING SECTIONS

212 A-310 WALL SECTIONS AND DETAILS

213 A-500 BUILDING ENVELOPE DETAILS

214 A-501 CANOPY DETAILS

215 A-601 PARTITION TYPES

216 A-603 DOOR SCHEDULE AND DETAILS

INDEX

DESIGN SHEET NO. DESCRIPTION

217 A-604 DOOR DETAILS

218 I-101 FIRST FLOOR PLAN - FINISHES

219 I-111 FIRST FLOOR PLAN - SIGNAGE

220 FA001 FIRE ALARM GENERAL NOTES

221 FA101 FIRST FLOOR PLAN - FIRE ALARM

222 M-001 HVAC GENERAL NOTES

223 M-002 HVAC GENERAL NOTES

224 M-101 FLOOR PLAN - DUCTWORK

225 M-301 BUILDING SECTIONS

226 M-351 FUEL OIL FLOW DIAGRAM

227 M-501 HVAC DETAILS

228 M-502 HVAC DETAILS

229 M-601 HVAC EQUIPMENT SCHEDULE

230 M-602 HVAC EQUIPMENT SCHEDULE

231 M-603 HVAC EQUIPMENT SCHEDULE

232 M-604 VENTILATION SCHEDULE

233 M-701 HVAC CONTROLS

234 M-702 HVAC CONTROLS

235 M-703 HVAC CONTROLS

236 M-704 HVAC CONTROLS

237 M-705 HVAC CONTROLS

238 M-706 HVAC CONTROLS

239 M-707 HVAC CONTROLS

240 MP101 FLOOR PLAN - PIPING

241 MS100 MECHANICAL SITE PLAN

242 E-001 ELECTRICAL GENERAL NOTES AND

ABBREVIATIONS

243 E-002 ELECTRICAL DEMOLITION, AIRFIELD

ELECTRICAL AND ELECTRICAL SITE LEGEND

244 E-003 ELECTRICAL SYMBOLS

245 E-004 ELECTRICAL SYMBOLS

246 E-005 AIRFIELD ELECTRICAL KEYPLAN

247 EL101 AIRFIELD LIGHTING VAULT FIRST FLOOR

LIGHTING PLAN

248 EL102 AIRFIELD LIGHTING VAULT ROOF LIGHTING

PLAN

249 EP101 AIRFIELD LIGHTING VAULT ELECTRICAL

LAYOUT PLAN

250 EP102 AIRFIELD LIGHTING VAULT POWER PLAN

251 EP103 AIRFIELD LIGHTING VAULT ABOVE GRADE

CONDUIT PLAN

252 EP104 AIRFIELD LIGHTING VAULT BELOW GRADE

CONDUIT PLAN

INDEX

DESIGN SHEET NO. DESCRIPTION

253 EG101 AIRFIELD LIGHTING VAULT GROUNDING PLAN

254 EG102 AIRFIELD LIGHTING VAULT LIGHTNING

PROTECTION PLAN

255 EP201 ELECTRICAL VAULT POWER DISTRIBUTION

ROOM ELEVATIONS

256 EP202 ELECTRICAL VAULT EXTERIOR ELEVATIONS

257 E-501 ELECTRICAL DETAILS

258 E-502 ELECTRICAL DETAILS

259 E-503 ELECTRICAL DETAILS

260 EP601 AIRFIELD LIGHTING VAULT PARTIAL SINGLE

LINE DIAGRAM

261 EL701 ELECTRICAL LIGHTING SCHEDULES

262 EP701 ELECTRICAL MISCELLANEOUS SCHEDULES

263 EP702 ELECTRICAL PANEL SCHEDULES

264 EP703 ELECTRICAL PANEL SCHEDULES

265 EP704 ELECTRICAL PANEL SCHEDULES

266 ED101 AIRFIELD ELECTRICAL DEMOLITION PLAN

267 ED102 AIRFIELD ELECTRICAL DEMOLITION PLAN

268 ED103 AIRFIELD ELECTRICAL DEMOLITION PLAN

269 ED104 AIRFIELD ELECTRICAL DEMOLITION PLAN

270 ED105 AIRFIELD ELECTRICAL DEMOLITION PLAN

271 ED106 AIRFIELD ELECTRICAL DEMOLITION PLAN

272 ED107 AIRFIELD ELECTRICAL DEMOLITION PLAN

273 ED108 AIRFIELD ELECTRICAL DEMOLITION PLAN

274 ED109 AIRFIELD ELECTRICAL DEMOLITION PLAN

275 ED110 AIRFIELD ELECTRICAL DEMOLITION PLAN

276 ED111 AIRFIELD ELECTRICAL DEMOLITION PLAN

277 ED112 AIRFIELD ELECTRICAL DEMOLITION PLAN

278 ED113 AIRFIELD ELECTRICAL DEMOLITION PLAN

279 ED114 AIRFIELD ELECTRICAL DEMOLITION PLAN

280 ED115 AIRFIELD ELECTRICAL DEMOLITION PLAN

281 ED116 AIRFIELD ELECTRICAL DEMOLITION PLAN

282 ED117 AIRFIELD ELECTRICAL DEMOLITION PLAN

283 ED118 AIRFIELD ELECTRICAL DEMOLITION PLAN

284 ED119 AIRFIELD ELECTRICAL DEMOLITION PLAN

285 ED120 AIRFIELD ELECTRICAL DEMOLITION PLAN

286 ED121 AIRFIELD ELECTRICAL DEMOLITION PLAN

287 ED122 AIRFIELD ELECTRICAL DEMOLITION PLAN

288 ED123 AIRFIELD ELECTRICAL DEMOLITION PLAN

INDEX

DESIGN SHEET NO. DESCRIPTION

289 ED124 AIRFIELD ELECTRICAL DEMOLITION PLAN

290 ED125 AIRFIELD ELECTRICAL DEMOLITION PLAN

291 ED501 EXISTING AIRFIELD LIGHTING VAULT

292 ED502 EXISTING RUNWAY 03 ALSF-1 WIRING

DIAGRAM DETAILS

293 ED503 EXISTING RUNWAY 21 ALSF-1 WIRING

DIAGRAM DETAILS

294 ED601 EXISTING CONSTANT CURRENT REGULATOR

AND CABLE ID SCHEDULE

295 EA101 AIRFIELD ELECTRICAL LIGHTING AND

SIGNAGE PLAN

296 EA102 AIRFIELD ELECTRICAL LIGHTING AND

SIGNAGE PLAN

297 EA103 AIRFIELD ELECTRICAL LIGHTING AND

SIGNAGE PLAN

298 EA104 AIRFIELD ELECTRICAL LIGHTING AND

SIGNAGE PLAN

299 EA105 AIRFIELD ELECTRICAL LIGHTING AND

SIGNAGE PLAN

300 EA106 AIRFIELD ELECTRICAL LIGHTING AND

SIGNAGE PLAN

301 EA107 AIRFIELD ELECTRICAL LIGHTING AND

SIGNAGE PLAN

302 EA108 AIRFIELD ELECTRICAL LIGHTING AND

SIGNAGE PLAN

303 EA109 AIRFIELD ELECTRICAL LIGHTING AND

SIGNAGE PLAN

304 EA110 AIRFIELD ELECTRICAL LIGHTING AND

SIGNAGE PLAN

305 EA111 AIRFIELD ELECTRICAL LIGHTING AND

SIGNAGE PLAN

306 EA112 AIRFIELD ELECTRICAL LIGHTING AND

SIGNAGE PLAN

307 EA113 AIRFIELD ELECTRICAL LIGHTING AND

SIGNAGE PLAN

308 EA114 AIRFIELD ELECTRICAL LIGHTING AND

SIGNAGE PLAN

309 EA115 AIRFIELD ELECTRICAL LIGHTING AND

SIGNAGE PLAN

310 EA116 AIRFIELD ELECTRICAL LIGHTING AND

SIGNAGE PLAN

311 EA117 AIRFIELD ELECTRICAL LIGHTING AND

SIGNAGE PLAN

312 EA118 AIRFIELD ELECTRICAL LIGHTING AND

SIGNAGE PLAN

313 EA119 AIRFIELD ELECTRICAL LIGHTING AND

SIGNAGE PLAN

314 EA120 AIRFIELD ELECTRICAL LIGHTING AND

SIGNAGE PLAN

315 EA121 AIRFIELD ELECTRICAL LIGHTING AND

SIGNAGE PLAN

316 EA201 RUNWAY 21 PAPI PLAN AND PROFILE

317 EA202 RUNWAY 03 PAPI PLAN AND PROFILE

318 EA203 LIGHTING VAULT AIRFIELD ELECTRICAL

DISTRIBUTION ENLARGED PLAN

319 EA204 RUNWAY 15 MALSR DISTRIBUTION

ENCLOSURE ENLARGED PLAN

320 EA501 MISCELLANEOUS AIRFIELD ELECTRICAL

DETAILS

321 EA502 MISCELLANEOUS AIRFIELD ELECTRICAL

DETAILS

322 EA503 CONDUIT AND DUCTBANK DETAILS

323 EA504 CONDUIT AND DUCTBANK DETAILS

324 EA505 CONDUIT AND DUCTBANK DETAILS

INDEX

DESIGN SHEET NO. DESCRIPTION

325 EA506 DIRECTIONAL DRILLING AND BORE SPACERS

DETAILS

326 EA507 JUNCTION CAN PLAZA DETAILS

327 EA510 BASE CAN IN FULL STRENGTH ASPHALT

PAVEMENT

328 EA511 BASE CAN IN FULL STRENGTH PCC

PAVEMENT

329 EA512 BASE CAN IN ASPHALT SHOULDER

PAVEMENT

330 EA513 LIGHT FIXTURE AND BASECAN

MISCELLANEOUS DETAILS

331 EA520 THRESHOLD CIRCUITING CONFIGURATION

DETAIL

332 EA521 THRESHOLD LIGHT FIXTURE BAR DETAILS

333 EA522 03 RUNWAY END LIGHT FIXTURE BAR

DETAILS

334 EA523 03 RUNWAY END LIGHT FIXTURE BAR

DETAILS

335 EA524

RUNWAY 03 DISPLACED THRESHOLD, END

LIGHT, AND RUNWAY 21 THRESHOLD

FIXTURE BAR DETAILS

336 EA530 RUNWAY 03 ALSF-1 CONFIGURATION

DETAILS

337 EA531 ALSF-1 LIGHT BAR DETAILS

338 EA532 ALSF-1 LIGHT BAR DETAILS

339 EA533 ALSF-1 LIGHT BAR DETAILS

340 EA534 ALSF-1 LIGHT BAR DETAILS

341 EA535 RUNWAY 03 SEQUENCE FLASHING LIGHT

AND FOUNDATION DETAILS

342 EA536 RUNWAY 03 ALSF-1 WIRING DIAGRAM

DETAILS

343 EA537 RUNWAY 21 ALSF-1 WIRING DIAGRAM

DETAILS

344 EA540 GUIDANCE SIGN DETAILS

345 EA541 GUIDANCE SIGN DETAILS

346 EA542 WIND CONE DETAILS

347 EA543 PAPI DETAILS

348 EA544 PAPI DETAILS

349 EA550 TYPICAL CCR SWITCHGEAR PLAN AND

ELEVATION

350 EA601 CONSTANT CURRENT REGULATOR

SCHEDULE

351 EA602 AIRFIELD CIRCUIT AND CABLE SCHEUDLE

352 EA603 AIRFIELD LIGHTING FIXTURE LOCATION

SCHEDULE

353 EA604 AIRFIELD STRUCTURE SCHEDULE

354 EA605 GUIDANCE SIGN SCHEDULE

355 EA606 CCR SWITCHGEAR 1 DETAILS

356 EA607 CCR SWITCHGEAR 2 DETAILS

357 EA608 CCR SWITCHGEAR 3 DETAILS

358 EA609 CCR SWITCHGEAR 4 DETAILS

359 EA701 AIRFIELD CIRCUITING 5KV HOMERUN PLANS

360 EA702 AIRFIELD CIRCUITING 5KV HOMERUN PLANS

H .B

AR

N

H

AR

T

T.

M

O R

R

IS

C .T

W

IG

G

E.

JA

R G

ER

D

R

AW

IN

G

IN

D

EX

GI003

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

SU

BM

IT

TE

D B

Y:

C H

EC

KE

D B

Y:

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

IS

SU

E D

AT

E:

SI

ZE

M

AR

K

D

ES

C R

IP

TI

O N

D

AT

E

SHEET ID

CUI

CUI

C :\T

EM

P\

PW

_W

O R

K\

ES

T-

LS

\D M

S5

\D

1G

I0

-G I0

.D

W G

3:

:1

PM

/2 7/

M O

R R

IS

T3

N

EW

Y O

R K

D

IS

TR

IC

T N

EW

Y

O R

K, N

Y

-28 F

EB

. 2

AN

SI

D

W H

EE

LE

R -S

AC

K

AR

M

Y

AI

R

FI

EL

D

, F O

R T

D R

U M

, N Y

R U

N W

AY

3-

A

IR

FI

EL

D L

IG

H

TI

N

G R

EP

AI

R P

R O

JE

C

T W

2-

D S-

-D

W

2D S2

3F

R

TA

S U

BM

IS

SI

O

N

US Army Corps of Engineers

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

4/

/2

IS

SU

E D

AT

E:

A

PR

. 2

361 EA703 AIRFIELD CIRCUITING 5KV HOMERUN PLANS

362 EA704 AIRFIELD CIRCUITING 5KV HOMERUN PLANS

363 EA705 AIRFIELD CIRCUITING 5KV HOMERUN PLANS

364 EA706 AIRFIELD CIRCUITING 5KV HOMERUN PLANS

365 EA707 AIRFIELD CIRCUITING 5KV HOMERUN PLANS

366 EA708 AIRFIELD CIRCUITING 5KV HOMERUN PLANS

367 EA709 AIRFIELD CIRCUITING 5KV HOMERUN PLANS

368 EA710 AIRFIELD CIRCUITING 5KV HOMERUN PLANS

369 EA711 AIRFIELD CIRCUITING 5KV HOMERUN PLANS

370 EA712 AIRFIELD CIRCUITING 5KV HOMERUN PLANS

371 EA713 AIRFIELD CIRCUITING 5KV HOMERUN PLANS

372 EA714 AIRFIELD CIRCUITING 5KV HOMERUN PLANS

373 EA715 AIRFIELD CIRCUITING 5KV HOMERUN PLANS

374 EA716 AIRFIELD CIRCUITING 5KV HOMERUN PLANS

375 EA717 AIRFIELD CIRCUITING 5KV HOMERUN PLANS

376 EA718 AIRFIELD CIRCUITING 5KV HOMERUN PLANS

377 EA719 AIRFIELD CIRCUITING 5KV HOMERUN PLANS

378 EA720 AIRFIELD CIRCUITING 5KV HOMERUN PLANS

379 EA721 AIRFIELD CIRCUITING 5KV HOMERUN PLANS

380 EA722 AIRFIELD CIRCUITING 5KV HOMERUN PLANS

381 EA723 AIRFIELD CIRCUITING 5KV HOMERUN PLANS

382 EA724 AIRFIELD CIRCUITING MALSR 2.4KV AND

CONTROL

383 EA801 ALCMS ARCHITECTURE DIAGRAM

384 EA802 ALCMS SCHEDULE AND WIRING DIAGRAM

385 EA803 ALCMS ATCT WIRING DIAGRAM

386 EA804 ALCMS BEACON CONTROL DETAILS

387 EA805 ATCT RISER DIAGRAM

388 EA806 VAULT MISCELLANEOUS DETAILS

389 EA901 JUNCTION CAN PLAZA LAYOUT DIAGRAMS

390 EA902 JUNCTION CAN PLAZA LAYOUT DIAGRAMS

391 EA903 JUNCTION CAN PLAZA LAYOUT DIAGRAMS

392 EA904 JUNCTION CAN PLAZA LAYOUT DIAGRAMS

393 EA905 JUNCTION CAN PLAZA LAYOUT DIAGRAMS

394 EA906 JUNCTION CAN PLAZA LAYOUT DIAGRAMS

395 EA907 JUNCTION CAN PLAZA LAYOUT DIAGRAMS

396 EA908 JUNCTION CAN PLAZA LAYOUT DIAGRAMS

INDEX

DESIGN SHEET NO. DESCRIPTION

397 EA909 JUNCTION CAN PLAZA LAYOUT DIAGRAMS

398 EA910 JUNCTION CAN PLAZA LAYOUT DIAGRAMS

399 EA911 AIRFIELD LIGHTING HANDHOLE LAYOUT

DIAGRAMS

400 ES101

AIRFIELD LIGHTING VAULT EXTERIOR

ELECTRICAL AND TELECOMMUNICATIONS

DISTRIBUTION PLAN

401 ES102

AIRFIELD LIGHTING VAULT EXTERIOR

ELECTRICAL AND TELECOMMUNICATIONS

DISTRIBUTION PLAN

402 ES103

AIRFIELD LIGHTING VAULT EXTERIOR

ELECTRICAL AND TELECOMMUNICATIONS

DISTRIBUTION PLAN

403 ES104

AIRFIELD LIGHTING VAULT EXTERIOR

ELECTRICAL AND TELECOMMUNICATIONS

DISTRIBUTION PLAN

404 ES105

AIRFIELD LIGHTING VAULT EXTERIOR

ELECTRICAL AND TELECOMMUNICATIONS

DISTRIBUTION PLAN

405 ES501 ELECTRICAL AND TELECOMMUNICATIONS

MANHOLE DETAILS

406 ES502 ELECTRICAL HANDHOLE DETAIL

407 ES503 TELECOMMUNICATIONS HANDHOLE DETAIL

408 ES504 PAD-MOUNTED TRANSFORMER AND SWITCH

DETAILS

409 ES505 ELECTRICAL SITE DUCTBANK DETAILS

410 ES506 MOUNTAIN RAMP ELECTRICAL DETAILS

411 ES507 MOUNTAIN RAMP ELECTRICAL DETAILS

412 ES508 FIBER TERMINATION DETAILS

413 ES509 FIBER TERMINATION WIRING DIAGRAM

414 ES601 ELECTRICAL SITE PARTIAL SINGLE LINE

DIAGRAM

415 ES602 ELECTRICAL SITE CIRCUIT AND CABLE

SCHEDULE

416 ES603

ELECTRICAL SITE MANHOLES, POWER

HANDHOLES, AND COMMUNICATION

HANDHOLES

417 ES604

MOUNTAIN RAMP APRON LIGHTING PARTIAL

SINGLE LINE DIAGRAM AND PANEL

SCHEDULE

418 ES605 MOUNTAIN RAMP HIGH MAST LIGHTING

CONTROL WIRING DIAGRAM

419 ES701 UTILITY STRUCTURE FOLDOUT DIAGRAMS

420 ES702 UTILITY STRUCTURE FOLDOUT DIAGRAMS

421 ES703 UTILITY STRUCTURE FOLDOUT DIAGRAMS

422 ES704 UTILITY STRUCTURE FOLDOUT DIAGRAMS

423 ES705 UTILITY STRUCTURE FOLDOUT DIAGRAMS

424 ES706 UTILITY STRUCTURE FOLDOUT DIAGRAMS

425 ES707 UTILITY STRUCTURE FOLDOUT DIAGRAMS

426 ES708 UTILITY STRUCTURE FOLDOUT DIAGRAMS

427 T-001 TELECOM LEGEND

428 T-101 TELECOMMUNICATIONS FIRST FLOOR PLAN

429 T-102 TELECOMMUNICATIONS TOWER PLAN

430 T-501 TELECOM DETAILS

431 T-601 TELECOM RISER DIAGRAMS

432 T-602 TELECOM OSP SINGLE LINE DIAGRAM

H .B

AR

N

H

AR

T

T.

M

O R

R

IS

C .T

W

IG

G

E.

JA

R G

ER

D

R

AW

IN

G

IN

D

EX

GI004

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

SU

BM

IT

TE

D B

Y:

C H

EC

KE

D B

Y:

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

IS

SU

E D

AT

E:

SI

ZE

M

AR

K

D

ES

C R

IP

TI

O N

D

AT

E

SHEET ID

CUI

CUI

C :\T

EM

P\

PW

_W

O R

K\

ES

T-

LS

\D M

S5

\D

1G

I0

-G I0

.D

W G

3:

:3

PM

/2 7/

M O

R R

IS

T3

N

EW

Y O

R K

D

IS

TR

IC

T N

EW

Y

O R

K, N

Y

-28 F

EB

. 2

AN

SI

D

W H

EE

LE

R -S

AC

K

AR

M

Y

AI

R

FI

EL

D

, F O

R T

D R

U M

, N Y

R U

N W

AY

3-

A

IR

FI

EL

D L

IG

H

TI

N

G R

EP

AI

R P

R O

JE

C

T W

2-

D S-

-D

W

2D S2

3F

R

TA

S U

BM

IS

SI

O

N

US Army Corps of Engineers

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

4/

/2

IS

SU

E D

AT

E:

A

PR

. 2

H .B

AR

N

H

AR

T

T.

M

O R

R

IS

C .T

W

IG

G

E.

JA

R G

ER

N

O

TE

S, A

BB

R

EV

IA

TI

O

N S, A N

D L

EG

EN

D

GI005

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

SU

BM

IT

TE

D B

Y:

C H

EC

KE

D B

Y:

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

IS

SU

E D

AT

E:

SI

ZE

M

AR

K

D

ES

C R

IP

TI

O N

D

AT

E

SHEET ID

CUI

CUI

C :\T

EM

P\

PW

_W

O R

K\

ES

T-

LS

\D M

S5

\D

1G

I0

.D W

G 3:

:2

PM

/2

5/

H

B0

N

EW

Y O

R K

D

IS

TR

IC

T N

EW

Y

O R

K, N

Y

-28 F

EB

. 2

AN

SI

D

W H

EE

LE

R -S

AC

K

AR

M

Y

AI

R

FI

EL

D

, F O

R T

D R

U M

, N Y

R U

N W

AY

3-

A

IR

FI

EL

D L

IG

H

TI

N

G R

EP

AI

R P

R O

JE

C

T W

2-

D S-

-D

W

2D S2

3F

R

TA

S U

BM

IS

SI

O

N

US Army Corps of Engineers

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

6W4" 6 WAY DUCT WITH 4" DIAMETER CONDUIT

@ AT

AC ASPHALT CONCRETE

ACP ACCESS CONTROL POINT

APP ACCIDENT PREVENTION PLAN

ACM ASBESTOS CONTAINING MATERIALS

AFLV AIRFIELD LIGHTING VAULT

ALCMS AIRPORT LIGHTING CONTROL AND MONITORING

SYSTEM

ALS APPROACH LIGHTING SYSTEM

ALSF APPROACH LIGHTING SYSTEM WITH SEQUENCED

FLASHING LIGHTS

ARFF AIRCRAFT RESCUE AND FIREFIGHTING

A.S.T.M. AMERICAN SOCIETY FOR TESTING AND MATERIALS

ATCT AIR TRAFFIC CONTROL TOWER

ATS AUTOMATIC TRANSFER SWITCH

B.G.S BELOW GRADED SURFACE

BLDG. BUILDING

B.M. BENCHMARK

BMP BEST MANAGEMENT PRACTICES

C&D CONSTRUCTION AND DEMOLITION DEBRIS

CCR CONSTANT CURRENT REGULATOR

CE CONCRETE ENCASED

C/L, ℄ CENTERLINE

CLIN CONTRACT LINE ITEM NUMBER

CLR. CLEAR

CLSM CONTROLLED LOW-STRENGTH MATERIAL

COL. COLUMN

CONC. CONCRETE

CONT. CONTINUOUS

CONST. CONSTRUCTION

COORD. COORDINATE

COR CONTRACTING OFFICER'S REPRESENTATIVE

CSC CONTRACTOR SECURITY COORDINATOR

CU COPPER

CTL CONTROL

DEB DIRECT EARTH BURIED

DEPT DEPARTMENT

DIA, Ø DIAMETER

DPW DIRECTORATE OF PUBLIC WORKS

E EAST / EASTING

EA. EACH

EL, ELEV ELEVATION

ENGR ENGINEER

EQ. EQUAL

EXIST. EXISTING

EXT. EXTERIOR

FOD FOREIGN OBJECT DEBRIS

FT FEET/FORT

G GRADE

GA. GAGE / GAUGE

GALV. GALVANIZED

GCABC GRADED CRUSHED AGGREGATE BASE COURSE

GND. GROUND

GOVT. GOVERNMENT

HS&E HEALTH, SAFETY AND ENVIRONMENTAL

HH HANDHOLE

HMA HOT MIX ASPHALT

HORIZ. HORIZONTAL

HT. HEIGHT

I.D. INSIDE DIAMETER

ILS INSTRUMENT LANDING SYSTEM

INFO. INFORMATION

INV INVERT

JCP JUNCTION CAN PLAZA

JMF JOB MIX FORMULA

K RATE OF GRADE CHANGE

KGTB WHEELER-SACK ARMY AIRFIELD (AIRPORT CODE)

KO CONTRACTING OFFICER

kV KILOVOLT kVA KILOVOLT-AMPERE kW KILOWATT

L LENGTH

LED LIGHT-EMITTING DIODE

LOC LOCALIZER

LT LIGHT / LEFT

M&R MAINTENANCE AND REHABILITATION

MAX MAXIMUM

MAT. MATERIAL

MFR. MANUFACTURER

MH MANHOLE

MIN MINIMUM

MISC. MISCELLANEOUS

MPT MAINTENANCE AND PROTECTION OF TRAFFIC

N NORTH / NORTHING

NAVD88 NORTH AMERICAN VERTICAL DATUM 1988

NO, # NUMBER

NOI NOTICE OF INTENT

NPDES NATIONAL POLLUTANT DISCHARGE ELIMINATION

SYSTEM

NTP NOTICE TO PROCEED

NTS NOT TO SCALE

NY NEW YORK

NYSDEC NEW YORK STATE DEPARTMENT OF ENVIRONMENTAL

CONSERVATION

NYSDOT NEW YORK STATE DEPARTMENT OF TRANSPORTATION

O.C. ON CENTER

O.D. OUTSIDE DIAMETER

OSHA OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION

PACS PRIMARY AIRPORT CONTROL STATION

PACM POTENTIAL ASBESTOS CONTAINING MATERIALS

PAPI PRECISION APPROACH PATH INDICATOR

PAR PRECISION APPROACH RADAR

PC POINT OF CURVATURE

PCC PORTLAND CEMENT CONCRETE

P.C.F. POUNDS PER CUBIC FOOT

PDM PROGRAM DEPOT MAINTENANCE

PFAS POLYFLUOROALKYL SUBSTANCES

PM PROJECT MANAGER

PPE PERSONAL PROTECTIVE EQUIPMENT

P.S.F. POUNDS PER SQUARE FOOT

P.S.I. POUNDS PER SQUARE INCH

PT POINT OF TANGENCY

PVC POINT OF VERTICAL CURVATURE

PVI POINT OF VERTICAL INTERSECTION

PVT POINT OF VERTICAL TANGENCY

PWR POWER

QTY. QUANTITY

R RADIUS

RP RADIUS POINT

RDM RUNWAY DISTANCE MARKER

REINF. REINFORCED

REQ'D REQUIRED

RMC RIGID METAL CONDUIT

RGS RIGID GALVANIZED STEEL

RT RIGHT

R/W,RWY RUNWAY

S SLOPE

SACS SECONDARY AIRPORT CONTROL STATION

SCH SCHEDULE

SQ. SQUARE

SPEC. SPECIFICATION

SSHO SITE SAFETY AND HEALTH OFFICER

ST STREET

STA STATION

STD STANDARD

SWPPP STORM WATER POLLUTION PREVENTION PLAN

Te THICKENED EDGE THICKNESS

THRU THROUGH

(TYP) TYPICAL

T/W TAXIWAY

UFC UNIFIED FACILITIES CRITERIA

UFGS UNIFIED FACILITIES GUIDE SPECIFICATIONS

USACE UNITED STATES ARMY CORPS OF ENGINEERS

V VOLT

VCC VISITOR CONTROL CENTER

VERT. VERTICAL

VFR VISUAL FLIGHT RULES

VTP VEHICLE TRACKING PADS

WSAAF WHEELER-SACK ARMY AIRFIELD

WZTC WORK ZONE TRAFFIC CONTROL

HAZARDOUS MATERIALS:

1. LEAD BASED PAINTS ARE NOT EXPECTED WITHIN THE PROJECT AREA. DO NOT INCLUDE ANY LEAD BASED PAINT TESTING OR REMOVAL IN THE BID.

2. ACM ARE NOT EXPECTED TO BE LOCATED AROUND THE EXISTING UTILITY LINES. BASE BIDS ON UTILITY LINES REMAINING IN PLACE WITHOUT ABATEMENT WORK BEING

REQUIRED.

3. IMMEDIATELY NOTIFY THE COR IF ANY SUSPECTED ASBESTOS CONTAINING MATERIAL IS ENCOUNTERED DURING THE COURSE OF CONSTRUCTION. TESTING, ABATEMENT, REMOVAL AND DISPOSAL OF PACM AND ACM ARE BEYOND THE SCOPE OF THE CONTRACT AND WILL BE CONSIDERED A DIFFERING SITE CONDITION, IN ACCORDANCE WITH

APPLICABLE FAR AND DFAR CLAUSES.

SCOPE OF WORK SUMMARY:

THE WORK OF THIS CONTRACT CAN GENERALLY BE SUMMARIZED AS FOLLOWS:

1. CIVIL: FULL-DEPTH REMOVAL AND REPLACEMENT OF RUNWAY SHOULDERS INCLUDING SUBGRADE AND BASE COURSE. FULL-DEPTH REMOVAL AND REPLACEMENT OF PORTLAND CEMENT CONCRETE INCLUDING SUBGRADE, SUBBASE, BASE COURSE AND GEOTEXTILE FABRIC ON RUNWAY 03-21 AS INDICATED ON DRAWINGS. REMOVAL AND REPLACEMENT OF RUNWAY 03-21 PAVEMENT MARKINGS AND AFFECTED TAXIWAYS PAVEMENT MARKINGS AS INDICATED ON THE DRAWINGS. REPAIR SHELTER AND SITE INFRASTRUCTURE FOR THE RUNWAY 03-21 INSTRUMENT LANDING SYSTEM. CONSTRUCT ASPHALT VEHICLE ROAD AND PARKING LOT FOR NEW AIRFIELD LIGHTING VAULT.

INSTALLATION OF NEW 8-INCH WATER MAIN LINE AND 2-INCH SERVICE LINE CONNECTED TO THE AFLV. CONSTRUCTION OF EQUIPMENT PADS, SIDEWALKS AND ADDITIONAL CONCRETE PAVEMENT ADJACENT TO THE NEW AFLV. ADDITIONAL WORK ITEMS TO INCLUDE EARTHWORK, MISCELLANEOUS DEMOLITION AND RESTORATION, SITE GRADING AND STABILIZATION, INSTALLATION OF AGGREGATE BASE COURSE, STORM WATER MANAGEMENT, SITE UTILITIES AND MISCELLANEOUS ITEMS REQUIRED TO COMPLETE

WORK.

2. ELECTRICAL: REMOVAL AND REPLACEMENT OF ALL RUNWAY EDGE, THRESHOLD AND END LIGHTS INCLUDING CONDUIT, CABLE, BASE CANS AND HANDHOLES ON RUNWAY 03-21. REMOVE AND REPLACE RUNWAY 03-21 PRECISION APPROACH PATH INDICATORS AND WIND CONES. REMOVE AND REPLACE THE APPROACH LIGHTING SYSTEM WITH SEQUENCED FLASHING LIGHTS FIXTURES WITHIN THE RUNWAY 03 DISPLACED THRESHOLD INCLUDING CONDUIT, CABLE, BASE CANS AND HANDHOLES AS INDICATED.

REMOVAL AND REPLACEMENT OF AIRFIELD GUIDANCE SIGNS, MANDATORY PILOT INSTRUCTION SIGNS AND DISTANCE REMAINING MARKING SIGNS AS INDICATED ON THE DRAWINGS. REMOVAL AND REPLACEMENT OF TAXIWAY EDGE LIGHTS INCLUDING CONDUIT AND CABLE AS INDICATED. INSTALL AIRFIELD LIGHTING HOME RUN DUCT BANK WITH A JUNCTION CAN PLAZA SYSTEM AND INSTALL NEW AIRFIELD LIGHTING CABLE WITHIN THE PROJECT FOOTPRINT. REMOVAL AND REPLACEMENT OF MOUNTAIN RAMP HIGH-MAST LIGHT POWER AND COMMUNICATIONS JUNCTION BOXES, SECONDARY CABLING FROM EXISTING TRANSFORMERS AND NEW FIBER OPTIC CONTROL COMMUNICATIONS CONNECTION. PROVIDE MEDIUM-VOLTAGE DISTRIBUTION AND INFRASTRUCTURE FOR NEW AIRFIELD LIGHTING VAULT. PROVIDE SWITCHBOARDS, PANELBOARDS, EMERGENCY GENERATOR AND ANCILLARY EQUIPMENT WITHIN NEW VAULT TO SUPPORT CONSTANT CURRENT SWITCHGEAR STYLE REGULATORS AND AIRFIELD LIGHTING CONTROL AND MONITORING SYSTEM WITH NODE LOCATIONS AS INDICATED.

3. AIRFIELD LIGHTING VAULT: NEW CONSTRUCTION OF A 3,200 SQUARE FOOT AIRFIELD LIGHTING VAULT BUILDING (AFLV). STRUCTURAL, MECHANICAL, PLUMBING, ELECTRICAL, LIGHTING, COMMUNICATIONS, FIRE DETECTION / MASS NOTIFICATION, DIRECT DIGITAL CONTROLS AND RELATED BUILDING MANAGEMENT SYSTEMS AS INDICATED ON THE

CONTRACT DOCUMENTS.

ABBREVIATIONS:

EXISTING UTILITY LEGEND:

E EXISTING ELECTRICAL HANDHOLE / JUNCTION BOX TO REMAIN

EXISTING COMMUNICATIONS MANHOLE TO REMAIN

EXISTING RUNWAY / TAXIWAY LIGHT FIXTURE AND BASE CAN TO REMAIN

EXISTING ELETRICAL CONDUIT / DUCTBANK TO REMAIN

EXISTING COMMUNICATIONS CONDUIT / DUCTBANK TO REMAIN

EXISTING GAS LINE

EXISTING WATERMAIN LINE

C

COMM

G

W

EXISTING SANITARY SEWER LINESAN

EXISTING AIRFIELD SIGN

EXISTING STORM WATER LINESD

EXISTING UTILITY FEATURE

POLYFLUOROALKYL SUBSTANCES (PFAS):

1. SOILS CONTAINING POLYFLUOROALKYL SUBSTANCES (PFAS) ARE EXPECTED TO BE ENCOUNTERED WHEN PERFORMING CONSTRUCTION, EXCAVATION OR MAINTENANCE

ACTIVITIES WITHIN THE POTENTIAL AREAS OF CONCERN INDICATED ON THE DRAWINGS. THE POTENTIAL AREAS OF CONCERN FOR ENCOUNTERING SOILS CONTAINING PFAS SUBSTANCES INDICATED ON THE DRAWINGS WERE BASED ON THE MOST RECENT STUDY PERFORMED AT WSAAF AND ARE APPROXIMATE. THE EXACT LIMITS OF THE POTENTIAL AREAS OF CONCERN ON THE AIRFIELD MAY VARY. COORDINATE WASTE COLLECTION AND DISPOSAL IN ADVANCE WITH THE FORT DRUM DPW ENVIRONMENTAL

OFFICE.

2. USE THE EXCAVATED MATERIAL LOCATED WITHIN THE POTENTIAL AREAS OF CONCERN AS BACKFILL NEAR THE ORIGINAL SOURCE OF THE MATERIAL. EXCAVATED MATERIAL REMAINING AFTER BACKFILLING EXCAVATIONS WILL BE DEFINED AS "EXCESS" MATERIAL. STOCKPILE EXCESS MATERIAL IN ACCORDANCE WITH PFAS NOTE 6. THE EXCESS EXCAVATED MATERIAL MUST BE TESTED PRIOR TO HANDLING THE MATERIAL IN ACCORDANCE WITH PFAS NOTE 3. THE GOVERNMENT WILL COMPLETE ALL REQUIRED PFAS SAMPLING, TESTING AND ANALYSIS FOR THE EXCESS EXCAVATED SOIL WITHIN THE POTENTIAL AREAS OF CONCERN TO DETERMINE IF THE EXCESS EXCAVATED SOIL EXCEEDS THE NYSDEC PART 360 CLASSIFICATION FOR "UNRESTRICTED USE". FT DRUM ENVIRONMENTAL WILL NOT COMPLETE SAMPLING AND ANALYSIS DAILY. PROVIDE FT DRUM ENVIRONMENTAL A MINIMUM 1 WEEK ADVANCE NOTICE TO COMPLETE THE SOIL SAMPLING AND LABORATORY ANALYSIS. INCLUDE A MINIMUM OF 21-CALENDAR DAYS IN THE PROJECT SCHEDULE TO COMPLETE LABORATORY TESTS FOR EACH SAMPLE. NO ADDITIONAL TIME WILL BE CONSIDERED BY THE GOVERNMENT FOR THE TIME REQUIRED

TO COMPLETE THE SOIL SAMPLING AND TESTING OF THE EXCESS EXCAVATED SOIL.

3. CONTAMINATED SOIL FOR THIS PROJECT IS DEFINED AS SOIL THAT IS DETERMINED THROUGH LABORATORY TESTING TO EXCEED THE NYSDEC PART 360 CLASSIFICATION FOR "UNRESTRICTED USE". MANAGE EXCESS CONTAMINATED SOIL NOT USED AS BACKFILL IN THE FOLLOWING ORDER:

3.1. SPREAD CONTAMINATED MATERIAL NEAR THE SOURCE OF THE MATERIAL AT LOCATIONS DETERMINED BY FORT DRUM ENVIRONMENTAL, FORT DRUM ENGINEERING, AND THE WSAAF MANAGER. SPREAD EXCESS SOIL TO MATCH EXISTING GRADES AND TO PRODUCE A CONSISTENT GRADE. FEATHER THE EDGES TO BLEND INTO THE EXISTING GRADES TO THE SATISFACTION OF THE CONTRACTING OFFICER. RESTORE AREAS IN ACCORDANCE WITH UFGS SPECIFICATION SECTION 32 92 19 SEEDING AT NO ADDITIONAL COST TO THE GOVERNMENT. PRIOR TO PROCEEDING WITH SPREADING THE EXCESS CONTAMINATED SOIL NEAR THE SOURCE OF THE MATERIAL, THE CONTRACTOR MUST GAIN APPROVAL FROM THE CONTRACTING OFFICER AND DEMONSTRATE TO THE GOVERNMENT THAT NO ADDITIONAL BACKFILL MATERIAL WILL BE

REQUIRED NEAR THE SOURCE OF THE MATERIAL AS PART OF THIS PROJECT.

3.2. EXCESS CONTAMINATED SOIL, NOT USED AS BACKFILL OR UNABLE TO SPREAD ON WSAAF NEAR THE SOURCE OF THE MATERIAL, MUST BE DISPOSED OF OFF GOVERNMENT PROPERTY AT A LICENSED FACILITY IN ACCORDANCE WITH ALL APPLICABLE FEDERAL, STATE AND LOCAL CRITERIA AT NO ADDITIONAL COST TO THE GOVERNMENT. PROVIDE WEIGHT TICKETS FROM THE APPROVED LICENSED FACILITY FOR ALL CONTAMINATED MATERIAL DISPOSED OF OFF GOVERNMENT PROPERTY.

INCLUDE WEIGHT TICKETS AS PART OF THE MONTHLY SOLID WASTE REPORT. SUBMIT THE MONTHLY SOLID WASTE REPORT TO THE GOVERNMENT FOR APPROVAL AS PART OF THE MONTHLY INVOICE SUBMITTAL. PRIOR TO DISPOSING OF THE CONTAMINATED MATERIAL OFF THE INSTALLATION AT THE CONTRACTOR'S EXPENSE, THE CONTRACTOR MUST DEMONSTRATE TO THE GOVERNMENT THAT NO ADDITIONAL CONTAMINATED MATERIAL CAN BE SPREAD ON SITE NEAR THE SOURCE OF THE

MATERIAL.

4. UNRESTRICTED USE SOIL FOR THIS PROJECT IS DEFINED AS SOIL THAT IS DETERMINED THROUGH LABORATORY TESTING TO MEET THE NYSDEC PART 360 CLASSIFICATION FOR "UNRESTRICTED USE". MANAGE EXCESS UNRESTRICTED USE SOIL NOT USED AS BACKFILL IN THE FOLLOWING ORDER:

4.1. SPREAD EXCESS UNRESTRICTED USE SOIL WITHIN THE PROJECT LIMITS TO THE SATISFACTION OF THE CONTRACTING OFFICER. SPREAD EXCESS SOIL TO MATCH EXISTING GRADES AND FEATHER THE EDGES TO BLEND INTO THE EXISTING GRADES. RESTORE AREAS IN ACCORDANCE WITH SPECIFICATION UFGS SECTION 32 92 19 SEEDING AT NO ADDITIONAL COST TO THE GOVERNMENT. PRIOR TO PROCEEDING WITH SPREADING THE EXCESS UNRESTRICTED USE SOIL WITHIN THE PROJECT LIMITS, THE CONTRACTOR MUST GAIN APPROVAL FROM THE CONTRACTING OFFICER AND DEMONSTRATE TO THE GOVERNMENT THAT NO ADDITIONAL BACKFILL MATERIAL WILL

BE REQUIRED FOR THE PROJECT.

4.2. EXCESS UNRESTRICTED USE SOIL, NOT USED AS BACKFILL OR UNABLE TO SPREAD ON WSAAF WITHIN THE PROJECT LIMITS, MUST BE DISPOSED OF OFF GOVERNMENT PROPERTY BY THE CONTRACTOR AT NO ADDITIONAL COST TO THE GOVERNMENT. PROVIDE VOLUME OF UNRESTRICTED USE SOIL DISPOSED OF OFF GOVERNMENT PROPERTY AS PART OF THE MONTHLY SOLID WASTE REPORT. SUBMIT THE MONTHLY SOLID WASTE REPORT TO THE GOVERNMENT FOR APPROVAL AS PART OF THE MONTHLY INVOICE SUBMITTAL. PRIOR TO DISPOSING THE LEAN SOIL OFF THE INSTALLATION AT THE CONTRACTOR'S EXPENSE, THE CONTRACTOR MUST DEMONSTRATE TO THE GOVERNMENT THAT NO ADDITIONAL UNRESTRICTED USE SOIL CAN BE SPREAD ON SITE WITHIN THE PROJECT LIMITS.

5. FOR BIDDING PURPOSES, ASSUME ALL SOIL LOCATED WITHIN THE POTENTIAL AREAS OF CONCERN INDICATED ON THE DRAWINGS IS CONTAMINATED AND DOES NOT MEET THE NYSDEC PART 360 REGULATIONS FOR "UNRESTRICTED USE". FOR BIDDING PURPOSES, ASSUME ALL SOIL LOCATED OUTSIDE THE POTENTIAL AREAS OF CONCERN INDICATED ON THE DRAWINGS IS UNRESTRICTED USE SOIL MEETING THE NYSDEC PART 360 REGULATIONS FOR "UNRESTRICTED USE".

6. TEMPORARILY STOCKPILE ALL EXCESS EXCAVATED MATERIAL WITHIN THE POTENTIAL AREA OF CONCERN IN ONE LOCATION NEAR THE ORIGINAL SOURCE OF THE MATERIAL.

THE HEIGHT OF THE STOCKPILE MUST NOT PENETRATE ABOVE THE OBSTRUCTION ELEVATIONS INDICATED ON THE DRAWINGS. ONLY ONE STOCKPILE IS AUTHORIZED IN EACH DESIGNATED CONSTRUCTION FREE ZONE. PROTECT STOCKPILES FROM POTENTIAL CONTAMINATE MIGRATION IN ACCORDANCE WITH ALL APPLICABLE FEDERAL, STATE

AND LOCAL RULES AND REGULATIONS.

7. A TRAINED ENVIRONMENTAL MANAGER PER SPECIFICATION SECTION 01 57 19 MUST BE ON SITE AT ALL TIMES DURING CONSTRUCTION ACTIVITIES NEAR OR WITHIN THE POTENTIAL AREAS OF CONCERN. ADHERE TO ALL APPLICABLE FEDERAL, STATE AND LOCAL RULES AND REGULATIONS WHILE PERFORMING WORK WITHIN OR NEAR THE POTENTIAL AREAS OF CONCERN TO INCLUDE WETTING OF EXCAVATION AREAS PRIOR TO AND THROUGHOUT EXCAVATION ACTIVITIES AND USE OF THE APPROPRIATE PPE.

8. TOPSOIL AND HYDROSEED AREAS WHERE CONTAMINATED SOIL WAS SPREAD WITHIN 24-HOURS OF PLACEMENT TO PREVENT WIND-BORNE MIGRATION. SURVEY THE AREA WHERE THE SOIL WAS SPREAD TO INCLUDE THE DISTURBED LIMITS AND AT A 50-FOOT GRID. PROVIDE THE SURVEY DATA TO THE GOVERNMENT FOR REVIEW AND APPROVAL.

NO ADDITIONAL COST OR SCHEDULE EXTENSIONS WILL BE CONSIDERED BY THE GOVERNMENT FOR REGRADING REQUIRED BY THE CONTRACTOR TO CORRECT ISSUES OBSERVED WITH FEATHERING THE MATERIAL TO MATCH THE EXISTING GRADES AND DRAINAGE PATTERNS.

4/

/2

IS

SU

E D

AT

E:

A

PR

. 2

AR

N

H

AR

T

T.

M

O R

R

IS

C .T

W

IG

G

E.

JA

R G

ER

G

EN

ER

AL

C

O N

ST

R

U C

TI

O

N N

O

TE

S

GI006

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

SU

BM

IT

TE

D B

Y:

C H

EC

KE

D B

Y:

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

IS

SU

E D

AT

E:

SI

ZE

M

AR

K

D

ES

C R

IP

TI

O N

D

AT

E

SHEET ID

CUI

CUI

C :\T

EM

P\

PW

_W

O R

K\

ES

T-

LS

\D M

S5

\D

1G

I0

.D W

G 3:

:3

PM

/2

5/

H

B0

N

EW

Y O

R K

D

IS

TR

IC

T N

EW

Y

O R

K, N

Y

-28 F

EB

. 2

AN

SI

D

W H

EE

LE

R -S

AC

K

AR

M

Y

AI

R

FI

EL

D

, F O

R T

D R

U M

, N Y

R U

N W

AY

3-

A

IR

FI

EL

D L

IG

H

TI

N

G R

EP

AI

R P

R O

JE

C

T W

2-

D S-

-D

W

2D S2

3F

R

TA

S U

BM

IS

SI

O

N

US Army Corps of Engineers

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

1. CONSTRUCTION ACCESS SHALL BE AS SHOWN IN THESE DRAWINGS UNLESS OTHERWISE APPROVED BY THE CONTRACTING OFFICER.

2. ALL CONTRACTOR DELIVERIES AND CONTRACTOR PERSONNEL MUST ENTER THE INSTALLATION THROUGH THE GASOLINE ALLEY ACP. ALL DELIVERIES MUST BE MADE DURING NORMAL WORKING HOURS.

ALL CONSTRUCTION TRAFFIC MUST LEAVE WSAAF THROUGH THE WSAAF ACP. AT NO TIMES WILL CONSTRUCTION TRAFFIC BE AUTHORIZED TO LEAVE WSAAF THROUGH THE GASOLINE ALLEY ACP.

CONTRACTOR ACCESS TO THE AIRFIELD WILL BE THROUGH THE AIRFIELD GATE INDICATED ON THE DRAWINGS. THE CONTRACTOR MUST PROVIDE AN ACP GUARD, AT THE CONTRACTOR'S EXPENSE, AT ALL TIMES WHILE WORKING ON THE AIRFIELD. OBTAIN BADGES FOR ALL CONTRACTOR PERSONNEL THROUGH THE VISITOR CONTROL CENTER. CONTRACTOR TO COORDINATE WITH INSTALLATION THROUGH COR FOR REQUIRED AIRFIELD DRIVER TRAINING. THE CONTRACTOR'S ACP GUARD MUST ONLY PERMIT THE PRIME CONTRACTOR AND ITS SUBCONTRACTOR CONSTRUCTION VEHICLES ACCESS TO THE AIRFIELD. PRIVATELY OWNED VEHICLES OF THE PRIME CONTRACTOR AND ITS SUBCONTRACTOR EMPLOYEES ARE NOT CONSTRUCTION VEHICLES AND ARE NOT ALLOWED ON THE AIRFIELD. THE CONTRACTOR MAY REQUEST USAGE OF THE WSAAF ACP FOR NON-AIRFIELD CONCRETE AND ASPHALT DELIVERY TRUCKS ONLY, UNLESS APPROVED OTHERWISE BY FORT DRUM AND THE COR. SUBMIT REQUESTS A MINIMUM OF 14 CALENDAR DAYS PRIOR TO ANY PLANNED NON-AIRFIELD CONCRETE OR ASPHALT DELIVERIES. REQUEST ACCESS TO USE THE WSAAF ACP THROUGH THE COR. APPROVAL WILL BE BASED ON THE NUMBER OF GOVERNMENT PERSONNEL AVAILABLE, MILITARY OPERATIONS OR OTHER SITUATIONS AND IS NOT GUARANTEED.

3. MAXIMUM SPEED OF ALL CONTRACTOR VEHICLES MUST BE 25 MPH WHEN TRAVELING ON WSAAF PROPERTY UNLESS FOLLOWING OTHERWISE POSTED SPEED LIMITS. MAXIMUM SPEED LIMIT ON THE

INSTALLATION IS 10 MPH WHEN PASSING SOLDIERS/PEDESTRIANS.

4. THIS PROJECT IS ON WSAAF PROPERTY. FOLLOW ALL WSAAF SECURITY AND SAFETY REQUIREMENTS IN ACCORDANCE WITH CONTRACT REQUIREMENTS AT ALL TIMES.

5. ALL CONTRACTOR AUTHORIZED VEHICLES AND CONSTRUCTION EQUIPMENT MUST DISPLAY A YELLOW FLASHING BEACON OR A 3'-0" x 3'-0" INTERNATIONAL ORANGE AND WHITE CHECKERED FLAG (12-INCH SQUARES) DISPLAYED IN FULL VIEW ABOVE THE VEHICLES IN ACCORDANCE WITH FAA AC 150/5210-5 CURRENT EDITION. A YELLOW FLASHING BEACON MUST BE USED DURING NIGHT OPERATIONS (FLAG NOT ACCEPTABLE). VEHICLES WHICH ARE NOT MARKED OR LIGHTED MUST BE ESCORTED BY A VEHICLE THAT IS EQUIPPED WITH THE APPROPRIATE MARKING AND LIGHTING DEVICES. ONLY VEHICLES MARKED

WITH THE CONTRACTOR'S COMPANY NAME WILL BE ALLOWED IN THE PROJECT AREAS.

6. USE OF UNAUTHORIZED HAUL ROUTES WILL NOT BE ACCEPTABLE. HAUL TRUCKS MUST BE COVERED AT ALL TIMES. IMMEDIATELY CLEAN AND REMOVE ANY FOREIGN OBJECTS, SPILLAGE, DEBRIS, OR DUST AS A RESULT OF HAULING OPERATIONS AT THE EXPENSE OF THE CONTRACTOR AND TO THE SATISFACTION OF THE COR. IMMEDIATELY CLEAN AND REMOVE THE MATERIAL. HAULING ACROSS ACTIVE

TAXIWAYS OR RUNWAYS IS STRICTLY PROHIBITED WITHOUT PRIOR APPROVAL FROM THE COR.

7. PREPARE AN ENVIRONMENTAL PREVENTION PLAN (EPP) IN ACCORDANCE WITH SPECIFICATION SECTION 01 35 26 AND IN ACCORDANCE WITH ALL APPLICABLE FEDERAL, STATE AND LOCAL RULES AND REGULATIONS PRIOR TO BEGINNING CONSTRUCTION ACTIVITIES. THE CONTRACTOR MUST HAVE AN APPROVED EPP PRIOR TO STARTING CONSTRUCTION.

8. KEEP ALL AIRFIELD PAVEMENT FREE OF DEBRIS AND SEDIMENT DEPOSITED AS A RESULT OF HAULING OR OTHER CONSTRUCTION ACTIVITY AT ALL TIMES. PROVIDE A MINIMUM OF ONE MOTORIZED VACUUM STREET SWEEPER ON SITE AT ALL TIMES TO CONTINUOUSLY CLEAN THE SURFACE OF ALL ACTIVE APRONS AND PAVED VEHICLE SERVICE ROADS OF ANY FOREIGN OBJECT DEBRIS THAT MAY RESULT FROM HAULING ACTIVITIES OR ANY OTHER CONSTRUCTION ACTIVITIES. NO AMOUNT OF FOD WILL BE TOLERATED OR ALLOWED ON ANY ACTIVE AIRFIELD PAVEMENTS.

9. THE APPROXIMATE LIMIT OF THE CONTRACTOR'S PARKING AND STAGING AREA FOR MATERIAL STOCKPILING, LABS, AND OFFICE TRAILERS IS SHOWN ON THE DRAWINGS. THE EXACT LOCATION AND LIMITS OF THE CONTRACTOR'S PARKING AND STAGING AREA MUST BE ESTABLISHED BY THE CONTRACTOR WITH THE APPROVAL OF THE COR.

10. THE REQUIRED UTILITIES FOR THE CONTRACTOR'S STAGING AREA MUST BE ARRANGED FOR BY THE CONTRACTOR DIRECTLY WITH THE APPROPRIATE UTILITY AGENCY, CONTRACTING OFFICER AND FORT DRUM. IT IS THE CONTRACTOR'S RESPONSIBILITY TO DETERMINE THE AVAILABILITY OF UTILITIES AND TO ENCLOSE, SECURE, AND SET UP THEIR OPERATIONAL AREA. IMMEDIATELY PRIOR TO MOBILIZATION, CONFIRM WITH FORT DRUM ON THE AVAILABILITY FOR THE BASE TO PROVIDE TEMPORARY WATER. FORT DRUM WILL PROVIDE TEMPORARY ELECTRICAL AND NATURAL GAS SERVICE AT NO COST TO THE CONTRACTOR. THE CONTRACTOR IS RESPONSIBLE FOR ALL COSTS ASSOCIATED WITH THE INSTALLATION, REMOVAL AND SITE RESTORATION FOR TEMPORARY UTILITY SERVICE FROM THE POINTS OF CONNECTION TO THE CONTRACTOR PRIMARY STAGING AREA. COORDINATE THE POINTS OF CONNECTIONS TO FORT DRUM UTILITIES WITH FORT DRUM ENGINEERING. ALL OTHER TEMPORARY UTILITY SERVICE REQUIRED AT THE STAGING AREA WILL BE AT THE CONTRACTOR'S EXPENSE AND MUST BE COORDINATED DIRECTLY WITH THE UTILITY SERVICE OWNER. THE CONTRACTOR IS RESPONSIBLE FOR ALL COSTS ASSOCIATED WITH PROVIDING PORTABLE SANITARY FACILITIES AT THE STAGING AREA. PRIOR TO INSTALLING TEMPORARY UTILITIES, INSTALL UTILITY GRADE METERS FOR ALL UTILITY SERVICES PROVIDED BY FORT DRUM AND AS REQUIRED BY THE UTILITY SERVICE OWNER OR UTILITY SERVICE PROVIDER. PROVIDE METER READINGS AS PART OF THE MONTHLY INVOICE SUBMITTAL TO THE COR AND FORT DRUM ENERGY MANAGER FOR FORT DRUM OWNED UTILITY SERVICES. PROVIDE A MINIMUM 48 HOURS NOTICE TO THE GOVERNMENT TO INSPECT ALL TEMPORARY UTILITY CONNECTIONS PRIOR TO

ACTIVATING UTILITIES FOR USE.

11. INSPECT THE CONSTRUCTION HAUL ROUTES ON EXISTING PAVEMENT WITH PHOTOGRAPH DOCUMENTATION BEFORE AND AFTER CONSTRUCTION WITH THE COR. REPAIR ANY DAMAGE TO THE HAUL ROUTE PAVEMENTS OR ACCESS ROADS AT THE CONTRACTOR'S EXPENSE. ROADWAYS MUST BE MAINTAINED THROUGHOUT THE PROJECT DURATION TO ALLOW SAFE USE BY FORT DRUM. PROVIDE A HAUL ROAD RELEASE SIGNED BY FORT DRUM DPW, THE CONTRACTOR AND USACE UPON COMPLETION OF THE PROJECT AND AFTER THE HAUL ROUTES HAVE BEEN RESTORED TO ORIGINAL OR BETTER CONDITION.

12. SUBMIT A WORK PLAN A MINIMUM OF 30-CALENDAR DAYS PRIOR TO BEGINNING CONSTRUCTION ACTIVITIES ON THE PROJECT. AT A MINIMUM, THE WORK PLAN MUST INCLUDE A SCHEDULE OF ACTIVITIES, METHODS OF EXCAVATING, PROPOSED EXCAVATION EQUIPMENT, TEMPORARY STORAGE METHODS, PROPOSED TEMPORARY STORAGE LOCATION ON SITE, CONTRACTOR SPECIFIC MEASURES WHEN WORKING IN THE AREAS INCLUDED IN THE WORK PLAN, PROPOSED DISPOSAL LOCATIONS FOR CONTAMINATED SOIL AND PROPOSED DISPOSAL LOCATIONS FOR UNRESTRICTED USE SOIL.

13. DO NOT ALLOW EQUIPMENT OR OTHER VEHICLES TO PARK ON ACTIVE TAXIWAYS, TOWWAYS, OR WITHIN THE CLEARANCE BOUNDARY LIMITS INDICATED ON THE PHASING SERIES SHEETS AT ANY TIME. ALL ACTIVE RUNWAYS, TAXIWAYS, AND APRONS MUST REMAIN CLEAR FOR AIRCRAFT AND EMERGENCY VEHICLES.

14. THE CONTRACTOR IS RESPONSIBLE FOR ANY IMPROVEMENTS NECESSARY TO UPGRADE EXISTING ABANDONED ROADS OR TO CREATE ADDITIONAL ROADS FOR USE AS HAUL ROUTES AS NECESSARY FOR THIS PROJECT. REMOVE TEMPORARY ROADS AT THE CONCLUSION OF THE PROJECT AND RETURN AREAS TO PREVIOUS CONDITION UNLESS OTHERWISE DIRECTED BY THE CONTRACTING OFFICER.

15. EXISTING UNDERGROUND UTILITIES AND STRUCTURES ARE SHOWN AT APPROXIMATE LOCATIONS AND DEPTHS. THERE MAY BE OTHER EXISTING UTILITIES OR STRUCTURES LOCATED WITHIN THE PROJECT AREA WHICH ARE NOT PRESENTLY KNOWN. PRIOR TO CONSTRUCTION, CONTACT UNDERGROUND UTILITIES CALL CENTER OF NEW YORK FOR EXACT LOCATIONS OF UNDERGROUND UTILITIES (1-800-962-7962) AND FORT DRUM DPW TO OBTAIN DIG PERMITS AND UTILITY CLEARANCES. USE GROUND PENETRATING RADAR ACROSS ALL PAVEMENT SURFACES IDENTIFIED FOR REMOVAL PRIOR TO BEGINNING DEMOLITION. VERIFY THE LOCATION OF ALL EXISTING UTILITIES PRIOR TO ANY DEMOLITION TO ENSURE THAT ONLY THE UTILITIES AND FEATURES MARKED FOR DEMOLITION ARE REMOVED, AND ALL OTHER UTILITIES AND FEATURES ARE NOT DISTURBED. ANY UTILITIES TO REMAIN, WHICH ARE DISTURBED BY THE CONTRACTOR, MUST BE REPAIRED BY THE CONTRACTOR AT NO ADDITIONAL COST TO THE GOVERNMENT. CONTRACTOR MAY NOT BEGIN ANY EXCAVATION UNTIL ALL NAVAID, AIRFIELD LIGHTING, ELECTRICAL, COMMUNICATION CABLES AND ALL OTHER UNDERGROUND UTILITIES LOCATED IN

THE CONSTRUCTION AREA HAVE BEEN IDENTIFIED BY THE CONTRACTOR.

16. IMMEDIATELY REPAIR ANY DAMAGE TO UTILITIES, AT THE CONTRACTOR'S EXPENSE, AS DIRECTED BY THE COR, IN THE EVENT OF CONTRACTOR INFLICTED DAMAGE TO EXISTING UTILITIES AND CABLES THAT ARE MARKED IN THE FIELD AND SHOWN TO REMAIN. IMMEDIATELY NOTIFY THE WSAAF PROJECT MANAGER AND AIRFIELD MANAGEMENT POINT OF CONTACT WHENEVER UTILITIES ARE DAMAGED BY THE CONTRACTOR. INSPECT UTILITIES AND NOTIFY THE CONTRACTING OFFICER OF ANY PRIOR DAMAGE BEFORE STARTING WORK IN THE PROJECT AREA.

17. CONTROL DUST FROM THEIR OPERATIONS TO A LEVEL ACCEPTABLE TO THE COR AND IN ACCORDANCE WITH ALL APPLICABLE PERMITS AT ALL TIMES. PROVIDE VACUUM SWEEPER TRUCKS, WATER TRUCKS, AND OTHER EQUIPMENT NECESSARY TO CONTROL DUST AND DEBRIS AT ALL TIMES. POSITION ALL EQUIPMENT REQUIRED TO CONTROL THE DUST WITHIN THE LIMITS OF CONSTRUCTION AND IN GOOD WORKING CONDITION. ALL METHODS FOR CONTROLLING DUST AND DEBRIS IS SUBJECT TO THE APPROVAL OF THE COR. DUST AND DEBRIS CONTROL MUST BE STRICTLY MONITORED DUE TO ITS IMPACT ON AIRCRAFT SAFETY. FAILURE TO PROPERLY CONTROL DUST AND DEBRIS OR TO IMMEDIATELY RESPOND TO ANY REQUEST TO DO SO WILL RESULT IN CONSTRUCTION ACTIVITIES BEING STOPPED BY THE THE GOVERNMENT UNTIL DUST AND DEBRIS CAN BE PROPERLY CONTROLLED. CONSTRUCTION SCHEDULE EXTENSIONS WILL NOT BE GRANTED FOR LOST TIME ASSOCIATED WITH DUST AND DEBRIS

WORK STOPPAGES.

18. HOLD WEEKLY MEETINGS WITH THE WSAAF PROJECT MANAGER AND OTHER INTERESTED PARTIES TO COORDINATE CLOSURES, WORK AREAS, CONTRACTOR ACCESS, AND CONSTRUCTION SCHEDULES.

PROVIDE A MINIMUM TWO WEEK SCHEDULE OF PROPOSED CONSTRUCTION ACTIVITIES PRIOR TO EACH WEEKLY MEETING. ADDITIONAL MEETINGS MAY BE HELD AS NECESSARY.

19. THE GOVERNMENT RESERVES THE RIGHT TO CONTRACT, AND PERFORM, OTHER WORK ON, OR NEAR, THE WORK COVERED BY THIS CONTRACT. WHEN SEPARATE CONTRACTS ARE WITHIN THE WORK LIMITS OF ANY ONE PROJECT, EACH CONTRACTOR MUST CONDUCT THEIR WORK SO AS NOT TO INTERFERE OR HINDER THE PROGRESS OF ANY OTHER CONTRACTORS WORKING IN THE SAME AREA.

20. CONFORM TO ALL LOCAL, REGIONAL, STATE AND FEDERAL REGULATIONS REGARDING THE PROTECTION OF THE ENVIRONMENT THROUGHOUT THE DURATION OF THE PROJECT. ACQUIRE, AT THE CONTRACTOR'S EXPENSE, ANY AND ALL PERMITS ASSOCIATED WITH THE CONSTRUCTION ACTIVITIES TO BE ACCOMPLISHED BY THE CONTRACTOR. CONSTRUCTION SCHEDULE EXTENSIONS WILL NOT BE

GRANTED FOR THE TIME REQUIRED TO COMPLETE THE APPLICABLE PERMITS.

21. PRIOR TO BEGINNING ANY WORK, VERIFY VERTICAL AND HORIZONTAL CONTROL FROM THE INFORMATION GIVEN ON THE SURVEY CONTROL PLAN. INFORM THE ENGINEER OF ANY DISCREPANCIES NOTED IN THE DESIGN SURVEY INFORMATION. IN THE EVENT OF A CONFLICT BETWEEN THE ORIGINAL DESIGN SURVEY AND THE CONTRACTOR SITE VERIFICATION SURVEY, THE ENGINEER MUST EVALUATE THE NEW INFORMATION AND PROVIDE DESIGN REVISIONS BEFORE THE CONTRACTOR CAN COMMENCE WITH THE WORK.

22. THE CONTRACTOR MUST BE AVAILABLE AS REQUIRED BY THE COR, WSAAF PROJECT MANAGER, OR WSAAF AIRFIELD OPERATIONS MANAGER, DURING THE PROJECT TO MAINTAIN PHASING SAFETY DEVICES OR CORRECT DUST AND DEBRIS ISSUES, AS DESIRED BY THE WSAAF PROJECT MANAGER OR AIRFIELD MANAGEMENT.

23. RETAIN A LICENSED LAND SURVEYOR FOR ALL PAVEMENT, UTILITY AND FIELD STAKEOUT AT THE CONTRACTOR'S EXPENSE. SURVEY ALL EXISTING UNDERGROUND UTILITIES ENCOUNTERED THROUGHOUT THE PROJECT. PROVIDE SURVEY INFORMATION, TO INCLUDE LOCATION, DEPTH, AND UTILITY INFORMATION TO THE WSAAF PROJECT MANAGER AND AS PART OF THE CLOSEOUT DOCUMENTS.

24. PROVIDE AS-BUILT RECORD DRAWINGS IN ACCORDANCE WITH CONTRACT REQUIREMENTS .THE PRIME CONTRACTOR MUST RETAIN THE SERVICES OF A LICENSED LAND SURVEYOR TO COMPLETE THE AS-BUILT RECORD SURVEY AND RETAIN A LICENSED PROFESSIONAL ENGINEER AND ARCHITECT, AS APPLICABLE, TO PREPARE THE AS-BUILT RECORD DRAWINGS. AS-BUILT RECORD DRAWINGS MUST BEAR THE SEAL AND SIGNATURE OF THE LICENSED PROFESSIONAL FOR THE APPLICABLE ENGINEERING AND ARCHITECTURAL DISCIPLINES.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .