This is Standard Form 30, Amendment 10 to a solicitation for airfield runway and lighting construction at Fort Drum, New York. The amendment extends the proposal due date from February 4, 2026 to April 17, 2026 at 2:00 PM EST. The contracting activity is the U.S. Army Corps of Engineers (W2SD Endist, New York; KO Contracting Division), with solicitation number W912DS25RA003 dated September 16, 2025. The project number is PANNAD-25-P-0000 004048.

The amendment addresses industry feedback regarding project phasing and scheduling. Key construction milestones include Phase 1 work (airfield lighting vault and runway reconstruction) with a minimum 19-month duration for completion by October 31, 2027, Phase 2 runway concrete paving (8-9 months minimum), and lighting system cutover (1 month minimum). The amendment includes updated Davis-Bacon Act wage rates effective January 30, 2026, covering heavy and highway construction in Jefferson, Lewis, and St. Lawrence Counties, New York, with prevailing wage classifications for electricians, ironworkers, laborers, equipment operators, and other trades. The government notes a critical scheduling conflict between the 240-day proposal acceptance period (SF1442 Block 13d) and the assumed April 1, 2026 Notice to Proceed date, reducing the actual acceptance window to 33 calendar days. Long-lead electrical equipment procurement and concrete mix design processes must begin early 2026 to meet construction season requirements. Proposals must be submitted electronically to the Contract Specialist and Contracting Officer identified in the solicitation. The amendment clarifies access requirements for Fort Drum, including DoD identification credentials and security protocols for contractor employees.

View the file

Other files

File Type Posted
Amendment 13 - W912DS25RA003.pdf PDF
Amendment 12 - W912DS25RA003.pdf PDF
Ft_Drum_Pre-Award_Re-Phasing_Specifications.pdf PDF
Ft Drum Pre-Award Re-Phasing Drawings_041726.pdf PDF
FortDrum_SWPPP_Rephasing_Stamped_R1-20 Apr 26.pdf PDF
FortDrum-WSAAF-Request_for_Disturbance_Letter.pdf PDF
Amendment 11 W912DS25RA003.pdf PDF
Phasing and Schedule Market Research.pdf PDF
Amendment 9 W912DS25RA003.pdf PDF
GC101 - Phasing and Schedule Market Research.pdf PDF
Basis of Award W912DS25RA003 18Dec2025.pdf PDF
Amendment 8 - W912DS25RA003.pdf PDF
Amendment 7 - W912DS25RA003.pdf PDF
Electric and Water Utilities on the Concrete Batch Plant Site.pdf PDF
Basis of Award W912DS25RA003 12Nov2025.pdf PDF
Amendment 6 - W912DS25RA003.pdf PDF
32 12 15.13.pdf PDF
Amendment 5 - W912DS25RA003.pdf PDF
Amendment 2 W912DS25RA003.pdf PDF
Basis of Award W912DS25RA003 22Oct2025.pdf PDF
Amendment 4 W912DS25RA003.pdf PDF
Amendment 0003 Specs - Ft Drum Runway Lighting Repair (WSAAF).pdf PDF
Ft_Drum_SWPPP_FINAL_04252025_UPD07OCT25.pdf PDF
Amendment 3 - W912DS25RA003.pdf PDF
Sign-in Sheet.pdf PDF
Ft Drum Runway Lighting Repair - Final RTA Plans (109-217).pdf PDF
Amendment 2 - W912DS25RA003.pdf PDF
Ft Drum Runway Lighting Repair - Final RTA Plans (55-108).pdf PDF
Ft Drum Runway Lighting Repair - Final RTA Plans (218-326).pdf PDF
Ft Drum Runway Lighting Repair - Final RTA Plans (327-433).pdf PDF
Ft Drum Runway Lighting Repair - Final RTA Plans (1-54).pdf PDF
Ft_Drum_RTA_Specifications_Reprint.pdf PDF
Ft Drum Runway Lighting Repair - Final RTA Plans 25 APR 2025(218-326)_UPD23SEP25.pdf PDF
WSAAF Lighting Upgrade JA - Monaco Fire Alarm_signed-_Redacted.pdf PDF
Bidder Walkthrough Visitor Pass Instructions R1.pdf PDF
Ft Drum Runway Lighting Repair - Final RTA Plans 25 APR 2025(55-108)_UPD23SEP25.pdf PDF
Ft Drum Runway Lighting Repair - Final RTA Plans 25 APR 2025(327-433)_UPD23SEP25.pdf PDF
Ft_Drum_RTA_Specifications_Reprint_UPD23SEP25.pdf PDF
Solicitation Amendment W912DS25RA0030001 SF 30.pdf PDF
Ft Drum Runway Lighting Repair - Final RTA Plans 25 APR 2025(1-54)_UPD23SEP25.pdf PDF
Ft Drum Runway Lighting Repair - Final RTA Plans 25 APR 2025(109-217)_UPD23SEP25.pdf PDF
WSAAF Lighting Upgrade JA - Trane Tracer Ensemble_Redacted.pdf PDF
Bidder Walkthrough Visitor Pass Instructions.pdf PDF
Ft Drum Map (WSAAF Bidder Walkthrough).pdf PDF
Ft_Drum Runway Lighting Repair RTA Specs 25 Apr 25.pdf PDF
Basis of Award - W912DS25RA003.pdf PDF
Bidder Walkthrough Plan.pdf PDF
Solicitation - W912DS25RA003.pdf PDF
IMDR-ES_Form_2_APPLICATION_FOR_SPONSORSHIPv7.pdf PDF
Show all 49

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER.

If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

16C. DATE SIGNED

Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

Section 00 00 00 - Procurement and Contracting Requirements

The following changes have been made:

INFORMATION FROM TO

Response Due Date 04 Feb 2026 17 Apr 2026

Miscellaneous text in this section has been modified to:

Amendment 10

The following feedback was received in response to Amendment 9's request for industry feedback regarding project phasing.

1) Minimum and suggested duration to complete Phase 1 work inclusive of site restoration.

a) Our minimum and suggested duration for completion of Phase 1 work activities is 19 months, similar to the Gov's outlined duration in the amended GC001 Phasing Description Table. This duration is primarily driven by the amount of time necessary to submit all required preconstruction submittals, and procurement / installation / commissioning of the major airfield lighting equipment and cutovers.

2) Minimum and suggested duration to complete Phase 2 work inclusive of site restoration.

a) Our minimum and suggested duration to complete Phase 2 is 19 months total (overall window inclusive of preconstruction activities such as: PCC paving & HMA mix design development & approval, mobilization / demobilization of the on-site batch plant for production of the PCC paving mix, and Phase 2 physical work activities including site restoration).

Our minimum duration to complete Phase 2 physical work activities including site restoration at Runway 03-21, requiring closure of the Runway, is 8 months (minimum window of March 1 to October 31). Our suggested duration to complete Phase 2 physical work activities at Runway 03-21 is 9 months (suggested window of March 1 to November 30 work period).

3) Minimum and suggested duration to switch the lighting system over to the new Air Field Lighting Vault, conductors, and controls.

a) Our minimum and suggested duration for the lighting system cutover to the new Airfield Lighting Vault is 1 month.

4) Any other items or suggestions related to phasing and the Runway 03-21 shut down that would improve efficiency and/or reduce cost.

W912DS25RA0030010

a) Any changes that will extend the schedule past the 2027 construction season will impact project cost due to annual labor rate escalations, material cost increases

b) As was the subject of Amendment 007, Bidder Inquiry #1; the SF1442 (Block 13d) currently has a stated proposal acceptance period of 240 calendar days. Based on the current solicitation response date of 4 February 2026 the SF1442 stated acceptance review period of 240 calendar days conflicts with the construction schedule on GC001, with an assumed NTP date of 1 April 2026. With a 4 February 2026 solicitation response date and a 1 April 2026 assumed NTP, according to our schedule projection, the proposal acceptance period is reduced to 33 calendar days in order to maintain the 1 April 2026 NTP date.

The Government needs to resolve this conflict so there is certainty as to the planned NTP date for the following reasons:

Long lead electrical equipment (some with over 365 days lead time) needs to be ordered as early in 2026 as possible to allow lighting cutover and reopening of Runway 03-21 to occur in

To permit the 03-21 runway concrete and follow-on work to be completed in 2027 the concrete mix design process must be started as early in 2026 as possible to avoid any potential delays to the start of the 03-21 concrete paving in 2027. A later award date increases risk of not completing the physical construction and reopening of Runway 03-21 by the required contract completion date per Section 00 70 00 Schedule A and incurring deployment/redeployment costs, contingency costs that must be considered in pricing this project.

A later award date will adversely impact the cost of work due to increased need to work overtime hours to accomplish the Phase 1 work by the stipulated 31 October 2027 completion per the GC001 drawing.

A later award date will shorten the 2026 construction season, potentially shift some Phase 1 work into 2027 and potentially 2028 (assuming the GC001 stipulated date is changed), further increasing the cost of Phase 1 work and potential work crew resource constraints for the 2027 season.

A later award date increases the risk of not completing physical construction by 31 October 2027 making it necessary to further compress the schedule through additional overtime labor to meet the 31 October 2027 construction completion (GC001)

c) We would like to seek clarification of the intended use of Runways 08-26 and 15-33 during Phase 2. The issued GC101 Phasing and Schedule Market Research Sketch as part of AM 09 indicated that the 'Haul route via 15-33 will not be available during Phase work'. RFP Drawing GC109 (Overall Phase 2 MPT Plant) depicted Lighted Runway Closure Markers at both ends of RWY 08-26 and 15-33. If the runways are to be closed, what affects the availability of these runways to be used as haul routes? This would have a minor cost impact.

Other Input:

1) The current proposal due date is 4 February 2026, to allow sufficient time to make proposal and pricing adjustments any changes to the current Solicitation requirements need to be issued no later than 14 January 2026.

2) It is requested that the Government consider establishing a DX priority rating to this project to assist in expediting the long lead electrical equipment needed to meet the schedule requirements. DOC2 ratings do not carry the same priority weight as the DX rating.

Section 00 21 16 - Instructions to Proposers

Miscellaneous text in this section has been modified to:

INSTRUCTIONS TO PROPOSERS

CPARS

The Federal Acquisition Regulation (FAR) requires that Past Performance Information (PPI) be collected on DoD contracts. The Contractor Performance Assessment Reporting System (CPARS) is a web-enabled application that supports the completion, distribution, and retrieval of all contract performance evaluations.

Contractor Representatives are responsible for reviewing and commenting on evaluations submitted on the Contractor Performance Assessment Reporting System (CPARS) website at https://www.cpars.gov/

AT/OPSEC

1. AT Level I Training.

This provision/contract text is for contractor employees with an area of performance within an Army-controlled installation, facility, or area. All contractor employees, including subcontractor employees, requiring access to Army installations, facilities, or controlled access areas shall complete AT Level I awareness training within 30 calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever applies. The contractor shall submit certificates of completion for each affected contractor employee and subcontractor employee to the COR (or to the contracting officer, if a COR is not assigned) within 30 calendar days after completion of training by all employees and subcontractor personnel.

AT Level I awareness training is available at https://jkodirect.jten.mil

2. Access and general protection/security policy and procedures. This standard language is for contractor employees with an area of performance within Army controlled installation, facility, or area.

2.1 Installation Access and Identification of Contractor's Employees: Entry to the installation requires the following: current vehicle registration, proof of insurance, valid driver's license for the vehicle driver, and picture identification for other personnel. Contractors/Subcontractors and their employees requiring access to the installation will be required to comply with the installation access control policy/procedures. The Government will not be responsible for damages due to delay/stoppages caused by failure to comply.

Contractors shall be restricted to physically sign in at the Visitor Control Center (VCC), located just prior to the Paul Cerjan Gate, for entry unless they have a DoD issued ID card, a local temporary pass, or a local access badge (LAB). The contractor shall also provide all information required for background checks to meet installation access requirements to be accomplished by Director of Emergency Services or Physical Security Office. Contractor workforce must comply with all personal identity verification requirements as

W912DS25RA0030010

https://www.cpars.gov/ https://jkodirect.jten.mil/ directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes.

2.2 The Contractor shall provide a list of names and dates of birth of all employees that will be working on this contract to include subcontractors. CORs/Contract Technical Representatives are required to complete an IMDR-ES Form 2 (Application for Sponsorship) for all individuals needing access under the contract and submit to usarmy.drum.imcom.mbx.des-acp@army.mil at least 7 days prior to access being needed.

2.3 Each employee who requires access to Fort Drum to perform work under any contract, at any tier, must obtain a DoD identification credential, temporary pass, or a LAB to obtain access to Fort Drum.

2.4 The contractor shall provide information as required by the Fort Drum Chief, Physical Security to enable the government to conduct a National Crime Information Center Interstate Identification Index (NCIC-III) check on all contractor employees who require access to Fort Drum. If the NCIC-III is not adverse, a 30 day temporary access pass will be prepared by the Fort Drum Physical Security Division while the contractor's employee makes an appointment for a Local Access Badge (LAB) to be created if access is needed for longer than 30 days. A LAB will be issued for the duration of the contract or a period of no longer than 365 days at a time. If the NCIC-III is adverse, the employee will be denied access. If access is denied for any reason, the contractor's employee may request a waiver from the installation utilizing the Access Waiver Denial Program. If a Contractor or contractor's employee is denied access for any reason the employee will not be allowed access until a waiver is requested and approved. There is an appeals process through the Directorate of Emergency Services. Final determination to allow entry and the issuance of a DoD credentials rest with the Garrison Commander or his designee, the Director, Emergency Services. 2.5 If an employee no longer needs the DoD identification credential for any reason (e.g. quits his/her job or no longer performs under the contract), the contractor is required to collect the DoD identification credential from the employee and surrender it to the Fort Drum Physical Security Division within four (4) calendar days of such change. If the DoD identification credential cannot be returned within the required time frame for any reason, the contractor shall immediately notify the Physical Security Division verbally, followed up in writing the next work day. Email notification is authorized. An employee's inability to obtain entrance to a Government installation because he/she does not have the required identification badge or visitor's pass shall not excuse timely performance of the requirements of this contract. DoD identification credentials are currently issued at the VCC, Bldg 11008, located just outside the Paul Cerjan Gate. The Government may change the location at which DoD identification credential are issued or returned, with or without advance notice to the contractor.

Any such changes shall not be a basis for adjusting the contract price under any clause of this contract.

2.6 DoD identification credential will not be reproduced or copied by the contractor, its subcontractors, or their employees. If an employee's DoD identification credential is lost, stolen, or reproduced, the contractor shall verbally report the loss, theft, or reproduction to the Fort Drum Physical Security Division on the day such loss, theft, or reproduction is discovered, followed by a written report of the circumstances to the Fort Drum Physical Security Division within two (2) calendar days.

2.7 Each contractor employee shall possess/wear the DoD identification credential while performing work under the contract. The DoD identification credential shall be worn on the upper front of the outer garment unless precluded by OSHA regulation(s). The DoD identification credential will not be used for access to any Government installation except for performance of work under the contract for which is was issued. The contractor, shall upon expiration or termination of the contract, collect all DoD identification credentials and turn them into the COR.

2b. For contractor not eligible for CAC, but requires access to a DoD facility or installation. Contractor and all associated sub-contractors employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (Army Directive 2014-05/AR 190-13), applicable installation, facility and area commander installation /facility access and local security policies and procedures (provided by government representative), or, at OCONUS locations, in accordance with status of forces agreements and other theater regulations.

7. For contracts that require OPSEC Training. All contractor employees, to include subcontractor's employees, requiring access to Army installation, facilities, controlled, access areas, and/or installation computers shall complete OPSEC Level I training within 30 days after contract start date or effective date of incorporation of this requirement into the contract. The Contractor shall provide a certificates of completion for each affected contractor employee and subcontractor employee to the COR, or to the Contracting Officer if a COR is not assigned, with 15 calendar days after completion of training by all employees and subcontractor personnel. OPSEC Level 1 training is available for DOD Civilians/Contractors at https://securityawareness.usalearning.gov/opsec/index.htm.

E VERIFY

The Contractor must pre-screen Candidates using the E-verify Program (http://www.uscis.gov/everify) website to meet the established employment eligibility requirements. The Vendor must ensure that the Candidate has two valid forms of Government issued identification prior to enrollment to ensure the correct information is entered into the E-verify system. An initial list of verified/eligible Candidates must be provided to the COR no later than 3 business days after the initial contract award." *When contracts are with individuals, the individuals will be required to complete a Form I-9, Employment Eligibility Verification, with the designated Government representative. This Form will be provided to the Contracting Officer and shall become part of the official contract file.

INSTRUCTIONS TO OFFERORS

NOTICE REGARDING BID BONDS, PEFORMANCE BONDS, AND PAYMENT BONDS

The Standard Forms (SF24, SF25, and SF25A) for these bonds have been revised and can be found using the search at https://www.gsa.gov/reference/forms# When including your bid/offer, contractors/sureties shall use the revised versions. No other version will be valid and thus may render your bid/offer non-compliant.

ELECTRONIC PROPOSAL SUBMISSION

ELECTRONIC PROPOSALS

(a) Definition. Electronic proposal, as used in this provision, means a proposal, revision or modification of a proposal, or withdrawal of a proposal that is transmitted to and received by the Government via electronic commerce (see FAR Subpart 4.5 -- Electronic Commerce in Contracting).

(b) Offerors may submit electronic proposals as responses to this solicitation. Electronic proposals are subject to the same rules as paper proposals.

(c) The format for electronic proposals in this solicitation is: PDF documents sent via email, ONLY to the Contract Specialist and Contracting Officer, as listed below:

Contract Specialist: Mrs. Jordan Moran - Email Address: Jordan.K.Moran@usace.army.mil Contracting Officer: Mr. Nicholas Emanuel - Email Address: nicholas.p.emanuel@usace.army.mil

(d) If any portion of an electronic proposal received by the Contracting Officer is unreadable to the degree that conformance to the essential requirements of the solicitation cannot be ascertained from the document --

(1) The Contracting Officer immediately shall notify the offeror and permit the offeror to resubmit the proposal;

(2) The method and time for resubmission shall be prescribed by the Contracting Officer after consultation with the offeror; and

(3) The resubmission shall be considered as if it were received at the date and time of the original unreadable submission for the purpose of determining timeliness, provided the offeror complies with the time and format requirements for resubmission prescribed by the Contracting Officer.

W912DS25RA0030010

https://securityawareness.usalearning.gov/opsec/index.htm.

(e) The Government reserves the right to make award solely on the electronic proposal. However, if requested to do so by the Contracting Officer, the apparently successful offeror promptly shall submit the complete original signed proposal.

ELECTRONIC PROPOSAL SUBMISSION

Submit proposals no later than 2:00PM EST on via e-mail to: 17 April 2026

Nicholas.P.Emanuel@usace.army.mil and

Jordan.K.Moran@usace.army.mil

File size is limited to 25MB per email.

The government will not be responsible for submissions delivered to anyone other than those designated to receive proposals. Offerors are responsible for ensuring that proposals are submitted so as to reach the designated recipient. Offerors are responsible for allowing sufficient time for the proposals to be received in accordance with the instructions provided.

OFFEROR INQUIRIES

INQUIRIES

Submission of inquiries will open on 16 September 2025. Please submit technical inquiries and questions relating to this solicitation via email to (Nicholas.P.Emanuel@usace.army.mil) and (Jordan.K.Moran@usace.

. The Government reserves army.mil) Submission of inquires will close 16 October 2025 11:59 AM EST.

the right to decline addressing questions received after this date. If an Offeror believes that the requirement in this solicitation contains an error, omission, or are otherwise unsound; immediately notify the Contract Specialist in writing with supporting rationale. The Government reserves the right to award this contract based on the initial offer, as received, without discussions. A prospective vendor who submits a comment or question will receive an acknowledgement via e-mail, followed by an answer after it has been processed by our technical team. All timely questions and approved answers will be made available through an amendment which will be posted on sam.gov as soon as the comment/question entering period is over and answers are all finalized.

Section 00 72 00 - General Conditions

Miscellaneous text in this section has been modified to:

Wage Rates

Davis-Bacon Act wage decisions NY09 1/30/2026

"General Decision Number: NY20260009 01/30/2026

Superseded General Decision Number: NY20250009

State: New York JN 2/2/2026

Construction Types: Heavy and Highway

Counties: Jefferson, Lewis and St Lawrence Counties in New

York.

HEAVY AND HIGHWAY CONSTRUCTION PROJECTS:

Modification Number Publication Date

0 01/02/2026

1 01/30/2026

BOIL0175-001 01/01/2021

Rates Fringes

BOILERMAKER......................$ 35.23 26.61

BRNY0002-012 06/01/2018

Rates Fringes

CEMENT MASON/CONCRETE FINISHER...$ 37.23 19.51

FOOTNOTE

a. Paid Holidays: Memorial Day, July the 4th, Labor Day, and Thanksgiving Day (provided the employee is employed one day before and one day after the holiday).

CARP0277-007 07/01/2025

Rates Fringes

Carpenters:

HEAVY & HIGHWAY

CONSTRUCTION................$ 39.52 27.16

a. PAID HOLIDAYS: New Year's Day, Memorial Day, Independence

Day, Labor Day, Thanksgiving Day, Christmas Day

ELEC0910-005 04/01/2025

Rates Fringes

ELECTRICIAN......................$ 43.50 5.75%+25.88

ELEC1249-003 05/05/2025

Rates Fringes

ELECTRICIAN (LINE

CONSTRUCTION: LIGHTING AND

TRAFFIC SIGNAL Including any and all Fiber Optic Cable necessary for Traffic Signal

Systems, Traffic Monitoring systems and Road Weather information systems)

Flagman.....................$ 31.72 7%+27.65

Groundman (Truck Driver)....$ 42.29 7%+27.70

Groundman Truck Driver

(tractor trailer unit)......$ 47.57 7%+27.70

Lineman & Technician........$ 52.86 7%+31.90

Mechanic....................$ 42.29 7%+27.70

FOOTNOTE:

a. New Year's Day, Memorial Day, Independence Day, Labor

Day, Thanksgiving Day, Christmas Day, plus President's Day, Good Friday, Decoration Day, Election Day for the President of the United States and Election Day for the Governor of the State of New York, provided the employee works the day before or the day after the holiday.

ELEC1249-004 05/05/2025

Rates Fringes

ELECTRICIAN (Line

Construction)

Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities :

Flagman....................$ 35.34 7%+27.65

Groundman digging machine operator...................$ 55.40 7%+27.90

Groundman truck driver

(tractor trailer unit).....$ 49.25 7%+27.70

Groundman Truck driver.....$ 49.25 7%+27.70

Lineman and Technician.....$ 61.56 7%+31.90

Mechanic...................$ 49.25 7%+27.70

Substation:

Cable Splicer..............$ 63.14 7%+29.40

Flagman....................$ 35.34 7%+27.65

Ground man truck driver....$ 49.25 7%+27.70

Groundman digging machine operator...................$ 55.40 7%+27.90

Groundman truck driver

(tractor trailer unit).....$ 49.25 7%+27.70

Lineman & Technician.......$ 61.56 7%+31.90

Mechanic...................$ 49.25 7%+27.70

Switching structures;

railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable installation

Cable Splicer..............$ 64.59 7%+38.40

Flagman....................$ 35.34 7%+27.65

Groundman Digging Machine

Operator...................$ 55.40 7%+27.90

Groundman Truck Driver

(tractor-trailer unit).....$ 49.25 7%+27.70

Groundman Truck Driver.....$ 49.25 7%+27.70

Lineman & Technician.......$ 61.56 7%+31.90

Mechanic...................$ 49.25 7%+27.70

FOOTNOTE:

a. PAID HOLIDAYS: New Year's Day, Presidents' Day, Memorial

Day, Good Friday, Independence Day, Labor Day, Thanksgiving

Day, Christmas Day, and Election Day for the President of the United States and Election Day for the Governor of New

York State, provided the employee works two days before or two days after the holiday.

ELEC1249-008 01/01/2025

Rates Fringes

ELECTRICIAN (Line

Construction)

TELEPHONE, CATV

FIBEROPTICS CABLE AND

EQUIPMENT

Cable splicer..............$ 40.81 3%+5.77

Groundman..................$ 20.53 3%+5.77

Installer Repairman-

Teledata

Lineman/Technician-

Equipment Operator.........$ 38.73 3%+5.77

Tree Trimmer................$ 31.45 3%+10.48

a. New Year's Day, President's Day, Good Friday, Decoration

Day, Independence Day, Labor Day, Veteran's Day, Thanksgiving Day, Day after Thanksgiving, Christmas Day.

ELEV0062-002 01/01/2025

Rates Fringes

ELEVATOR MECHANIC................$ 58.44 38.435+a+b

FOOTNOTE:

a.Vacation: 6%/under 5 years based on regular hourly rate for all hours worked. 8%/over 5 years based on regular hourly rate for all hours worked.

b. PAID HOLIDAYS: New Year's Day; Memorial Day; Independence

Day; Labor Day; Veterans' Day; Thanksgiving Day; the Friday after Thanksgiving Day; and Christmas Day.

ENGI0158-010 07/01/2017

LEWIS AND ST LAWRENCE COUNTIES

Rates Fringes

Power Equipment Operator

BUILDING

GROUP 1....................$ 36.84 23.80+a

GROUP 2....................$ 34.78 23.80+a

GROUP 3....................$ 30.68 23.80+a

GROUP 4....................$ 38.84 23.80+a

POWER EQUIPMENT OPERATORS CLASSIFICATIONS (BUILDING)

GROUP 1: Air plako, asphalt and blacktop roller, automated concrete spreader (CMI or equivalent), automated fine grade machine (CMI), backhoe, Belt placer, blacktop spreader

(such as barber Greene & Blaw Knox), blacktop plant

(automated), blast or rotary drill (truck or cat mounted), boom truck, cableway, caisson auger, Carry-all Scraper

(self-loading), central mix plant (automated), cherry picker (15 ton capacity), Compressor, pump, generator or welding machine (when used in a battery of not more than

4); crane, crusher (rock), derrick, diesel power unit, dragline, dredge, dual drum paver, elevating grader (self-propelled) or towed, elevator hoist (2 cage), excavator

(all purpose-hydraulically operated), fork lift (loed and lull and other rough terrain type), front end loader (4 c.y. and over), gradall, grader (power), head tower

(Saurman or equal), host ( 2 or 3 drums), hydroblaster

(laser pump), (LCM's) work boat operator, light plants

(compressors and generators), locomotive, maintenance engineer, maintenance welder, mine hoist, mucking machine or mole, overhead crane -fixed permanent, pile driver, quarry master or equivalent, refrigeration equipment (for soil stabilization), sea mule, shovel, side boom, slip form paver, straddle buggy (ross carrier, lumber carrier), tractor drawn belt type loader (Euclid loader), tranching machine (digging capacity of over 4 ft depth), truck crane

(operator), truck of trailer mounted log chipper (self feeder), tug operator (except, rented equipment), tunnel shovel, vibro or sonic hammer controls (when not mounted in proximity to the rig operator

GROUP 2: ""A"" frame truck, blacktop plant (non automatic), All Back Dumps, boring machine, bulldozer, cagehoist, Carry-all scraper, central mix plant (non automated), cherry picker 15 tons and under), Compressor (500 C.F. and over), concrete paver (single drum over 16S), Concrete

Pump, core boring machine, drill rigs (tractor mounted), elevator (as a material hoist), fork lift (all others), front end loader (under 4 c.y.), gunite machine, high pressure boilder 15 lbs & over), hoist (one drum), hydraulic breaking hammer (drop hammer), Kolman plant loader (screening gravel), maintenance grease man, mixer for stabilized base (self propelled Seaman mixer), monorail machine, parapet concrete or pavement grinder, post hole digger (truck or tractor mounted), power sweeper (wayne or similar), pump (4"" and over, pump-crete or sqeeze-crete, road widener (front end of grader or self prop.), roller, self contained hydraulic bench drill, shell winder

(motorized), snorkel (overhead arms), snowblower control man, trenching machine (digging capacity of 4 ft or less), tugger hoist, vibrotamp, well drill, well point system, winch (motor driver),winch cat, winch truck (submersible pumps when used in lieu of well point system

GROUP 3: Compressor (up to 500 C.F.), concrete paver or mixer (under 16S), concrete pavement spreaders and finishers (not automated), conveyor (over 12 ft), electric submersible pump (4"" and over), farm tractor with or without accessories, fine grade machine (not automated), fireman, form tamper, generator (2,500 Watts and over), grout pump, hydraulic pump, mechanical heaters (more than 2 mechanical heaters or any mechanical heater or heaters whose combined output exceeds 640,000 BTU per hour

(manufacturer's rating) plus one contained heating unit

(i.e. sundog, air heat type, new Holland hay dryer type excluded), mulching machine, oiler, power driven welding machine - 300 amp. and over (other than all electric), power heaterman (hay dryer), pump (under 4""), revinus widener (road widener), single light plant, steam cleaner or jenny, tractor with or without towed accessories

GROUP 4: Master mechanic

PREMIUMS:

Hazmat work 2.50

Quad 9 Bulldozer or Multibowl Scraper .50

CRANE PREMIUMS (Add to Group 1 Rate):

All Lattice Boom Cranes (65 ton capacity and over) Group 1

Rate Plus 1.75

All Hydraulic Cranes (100 ton capacity and over) Group 1

Rate Plus 1.75

All Hydraulic Cranes (80 ton capacity to 99 ton capacity)

Group 1 Rate Plus 1.25

All Hydraulic Cranes (65 ton capacity to 79 ton capacity)

Group 1 Rate Plus 1.10

FOOTNOTE:

a. PAID HOLIDAYS: New Year's Day, Memorial Day, Independence

Day, Labor Day, Thanksgiving Day, and Christmas Day provided the employee has worked five consecutive working days before and the working day after the holiday.

* ENGI0158-020 07/01/2025

Rates Fringes

Power equipment operators:

GROUP 1.....................$ 55.85 33.40

GROUP 2.....................$ 54.97 33.40

GROUP 3.....................$ 51.69 33.40

GROUP 4.....................$ 65.51 33.40

GROUP 5.....................$ 60.35 33.40

GROUP 6.....................$ 58.85 33.40

GROUP 7.....................$ 57.20 33.40

POWER EQUIPMENT OPERATORS CLASSIFICATIONS

GROUP 1: Asphalt Curb Machine, Self Propelled, Slipform, Automated Concrete Spreader (CMI Type), Automatic Fine

Grader, Backhoe (Except Tractor Mounted, Rubber Tired), Backhoe Excavator Full Swing (CAT 212 or similar type), Back Filling Machine, Belt Placer (CMI Type), Blacktop

Plant (Automated), Boom truck , Cableway, Caisson Auger, Central Mix Concrete Plant (Automated), Concrete Curb

Machine, Self Propelled, Slipform, Concrete Pump, Crane, Cherry Picker, Derricks (steel erection), Dragline, Overhead Crane (Gantry or Straddle type), Pile Driver, Truck Crane, Directional Drilling Machine, Dredge, Dual

Drum Paver, Excavator (All Purpose Hydraulically Operated)

(Gradall or Similar), Front End Loader ( 4 cu. yd. and

Over), Head Tower (Sauerman or Equal), Hoist (Two or Three

Drum), Holland Loader, Maintenance Engineer, Mine Hoist, Mucking Machine or Mole Pavement Breaker(SP) Wertgen; PB-4 and similar type, Power Grader, Profiler (over 105 H.P.)

Quad 9, Quarry Master (or equivalent), Scraper, Fireman, Fork Lift, Form Tamper, Grout Pump, Gunite Machine, Hammers

(Hydraulic self-propelled), Hydra-Spiker, ride-on, Hydraulic Pump (jacking system), Hydro-Blaster (Water), Mulching Machine, Oiler, Parapet Concrete or Pavement, Shovel, Side Boom, Slip Form Paver, Tractor Drawn, BeltType

Loader, Truck or Trailer Mounted Log , Chipper (Self

Feeder), Tug Operator (Manned Rented Equipment Excluded), Tunnel Shovel

GROUP 2: Asphalt Paver, Backhoe (Tractor Mounted, Rubber

Tired), Bituminous Recycler Machine, Bituminous Spreader and Mixer, Blacktop Plant (NonAutomated), Blast or Rotary

Drill (Truck or Tractor Mounted), Boring Machine, Cage

Hoist, Central Mix Plant (NonAutomated) and All Concrete

Batching Plants, Cherry Picker (5 tons capacity and under), Concrete Paver (Over 16S), Crawler Drill, Self-contained, Crusher, Diesel Power Unit, Drill Rigs, Tractor Mounted, Front End Loader (Under 4 cu. yd.), Greaseman/Lubrication

Engineer, HiPressure Boiler (15 lbs. and over), Hoist (One

Drum), Hydro-Axe, Kolman Plant Loader and Similar Type

Loaders, L.C.M. Work Boat Operator, Locomotive Mixer (for stabilized base selfpropelled), Monorail Machine, Plant

Engineer, Profiler (105 H.P. and under), Grinder, Post Hole

Digger and Post Driver, Power Broom (towed), Power

Heaterman, Power Sweeper, Revinius Widener, Roller (Grade and Fill), Scarifier, ride-on, Shell Winder, Skid steer loader (Bobcat or similar), Span-Saw, ride-on, Steam

Cleaner, Pug Mill, Pump Crete Ready Mix Concrete Plant

Refrigeration Equipment (for soil stabilization)Road

Widener, Roller (all above subgrade), Sea Mule, Self-contained Ride-on Rock Drill, Excluding Air-Track Type

Drill, Skidder, Tractor with Dozer and/or Pusher, Trencher.

Tugger Hoist, Vermeer saw (ride on, any size or type), Winch, Winch Cat

GROUP 3: A Frame Winch Hoist on Truck , Articulated Heavy

Hauler, Aggregate Plant, Asphalt or Concrete Grooving, Machine (ride on), Ballast Regulator, Ride-on Boiler (used in conjunction with production), Bituminous Heater, self-propelled, Boat (powered), Cement and Bin Operator, Compressors, Dust Collectors, Generators, Pumps, Welding

Machines, Light Plants, Heaters (hands-off equipment), Concrete Pavement Spreader and Finisher, Concrete Paver or

Mixer (16S and under), Concrete Saw (self-propelled), Conveyor, Deck Hand, Directional Drill Machine Locator, Drill, (Core), Drill, (Well,) Farm Tractor with accessories, Fine Grade Machine, Tamper, ride-on, Tie

Extractor, ride-on, Tie Handler, ride-on, Tie Inserter, ride-on, Tie Spacer, ride-on, Tire Repair, Track Liner, ride-on, Tractor, Tractor (with towed accessories), Vibratory Compactor, Vibro Tamp, Well Point

GROUP 4: Tower Cranes

GROUP 5: Cranes 50 tons and over

GROUP 6: Cranes 49 tons and below

GROUP 7: Master Mechanic

FOOTNOTE:

a. New Year's Day, Memorial Day, Independence Day, Labor

Day, Thanksgiving Day, Christmas Day provided the employee has worked the working day before and the working day after the holiday.

IRON0060-003 07/01/2025

HEAVY/HIGHWAY CONSTRUCTION

JEFFERSON COUNTY (Townships of Adams, Alexandria, Brownsville, Cape Vincent, Clayton, Ellisburg, Henderson, Housfield, Le Ray, Lorraine, Lyme, Orleans, Pamelia, Rodman, Rutland, Theresa, Watertown and Worth)

Rates Fringes

IRONWORKER

Structural, Ornamental, reinforcing precast concrete erector, machinery mover & rigger, fence erector, stone derrickman, welder, sheeter, sheeter bucker-up..$ 37.16 30.68

IRON0440-005 07/01/2025

HEAVY/HIGHWAY CONSTRUCTION (REMAINDER OF JEFFERSON COUNTY)

LEWIS AND ST. LAWRENCE COUNTIES BUILDING/HEAVY/HIGHWAY

CONSTRUCTION

Rates Fringes

IRONWORKER

STRUCTURAL, ORNAMENTAL,

RODMAN, MACHINERY MOVERS &

RIGGER, FENCE ERECTOR,

REINFORCING, STONE

DERRICKMAN..................$ 35.50 31.39

LABO1822-004 07/01/2023

LEWIS AND ST. LAWRENCE COUNTIES ONLY

JEFFERSON, LEWIS AND ST. LAWRENCE COUNTIES

Rates Fringes

Laborers:

HEAVY & HIGHWAY

GROUP 1....................$ 31.27 27.80+a

GROUP 2....................$ 31.27 27.80+a

GROUP 3....................$ 31.47 27.80+a

GROUP 4....................$ 31.67 27.80+a

GROUP 5....................$ 34.27 27.80+a

FOOTNOTE:

a. New Year's Day, Memorial Day, Independence Day, Labor

Day, Thanksgiving Day, Christmas Day, provided the employee has worked the working day before the holiday and working day after the holiday.

LABORER CLASSIFICATIONS

GROUP 1: Laborers, flaggers, outboard and hand boats.

GROUP 2: Bull float, chain saw, concrete aggregate, bin concrete bootman, gin buggy, hand or machine vibrator, jackhammer, mason tender, mortar mixer, pavement breaker, handlers of all steel mesh, small generators for laborers;

tools, installation of bridge drainage pipe, pipelayers, vibrator type rollers, tamper, drill doctor, tail or screw operator on asphalt paver, water pump operator (1 1/2 inch and single diaphram), nozzle (asphalt, gunnite, seeding and sandblasting), laborers on chain link fence erection, rock splitter and power unit, pusher type concrete saw and all other gas, electric, oil and air tool operators, wrecking laborer.

GROUP 3: All rock or drill machine operators (except quarry master and similar type, acetylene torch operators, asphalt raker, powerderman.

GROUP 4: Blasters, form setters, stone or granite curb setters.

GROUP 5: Hazardous waste removal.

PAIN0004-022 05/01/2024

LEWIS COUNTY (Townships of High Market, Lewis, Leyden, Lyonsdale, Osceola, Turin and West Turin)

Rates Fringes

Painter, Bridge

HEAVY & HIGHWAY

CONSTRUCTION

Bridges....................$ 42.06 30.59

Painter:

BUILDING CONSTRUCTION

Brush & Roll, Drywall

Taping/Finishing...........$ 27.27 26.23

Spray/Sandblasting/Structural

Steel......................$ 27.77 26.23

PAIN0004-026 05/01/2023

JEFFERSON COUNTY; LEWIS COUNTY (Townships of Diana, Croghan, New Bremen, Watson, Greig, Martinsburg, Lwville, Denmark, Harrisburg, Montague and Pinckney); ST. LAWRENCE COUNTY

Rates Fringes

Painters:

Bridge......................$ 42.06 30.59

Brush & Roll, Paperhanging, Wallcoverings.$ 23.25 21.21

Sandblasting................$ 23.75 21.21

Steel Painting..............$ 23.75 21.21

Steel Spray Painting........$ 23.75 21.21

Swing Staging, Window

Jacks, Cup Spray Painting, Steam Cleaning and Hydro

Water Blasting..............$ 23.75 21.21

PAIN0677-001 05/01/2025

Rates Fringes

GLAZIER..........................$ 31.05 31.55

PLUM0073-003 05/01/2019

JEFFERSON, LEWIS (Twps of Diana, Croghan, New Bremen, Watson, Greig, Martinsburg, Lewisville, Denmark, Harrisburg, Montague, Pinkney, Highmarket, Oscellia, and Turin) AND ST. LAWRENCE

COUNTIES

Rates Fringes

Plumber and Steamfitter..........$ 31.43 23.61

PLUM0112-004 05/01/2025

LEWIS COUNTY Townships of Lewis, Leyden, Lyonsdale, West Turin

Rates Fringes

PLUMBER (Including

Steamfiitting)

Northern Zone...............$ 45.93 33.77

ROOF0195-001 07/01/2025

Rates Fringes

ROOFER...........................$ 35.80 25.99

* SFNY0669-001 01/01/2026

Rates Fringes

SPRINKLER FITTER.................$ 47.85 28.94

SHEE0058-004 05/01/2025

LEWIS and ST. LAWRENCE COUNTIES

Rates Fringes

Sheet Metal Worker

Projects over $10 million..$ 46.29 23.31

Incl. HVAC Duct

Projects with sheetmetal work totaling $10 million or less....................$ 36.29 23.31

TEAM0687-001 07/01/2025

Rates Fringes

Truck drivers:

HEAVY & HIGHWAY

GROUP 1....................$ 34.81 27.02

GROUP 2....................$ 35.03 27.02

FOOTNOTE:

a. PAID HOLIDAYS: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, and

Christmas Day

TRUCK DRIVERS CLASSIFICATIONS:

GROUP 1: Pick-ups, panel trucks, flatboy material trucks

(strait jobs), single axle dump trucks, dumpsters, greasers, truck tiremen,, parts chaser, tandems and batch trucks, mechanics, semi trailer, lowboy trucks, asphalt distributor trucks and agitator, mixer trucks and dumpcrete type vehicles, truck mechanic, fuel truck and bus

GROUP 2: Special earth moving quipment (euclid type), or similar off highway equipment, where not self loaded, straddle (ross) carrier, and self contained concrete mobile unit, off highway tandem back dump, twin engine equipment and double hitched equipment where not self loaded

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the

Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.

Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at https://www.dol.gov/agencies/whd/government-contracts.

Note: Executive Order 13658 generally applies to contracts subject to the Davis-Bacon Act that were awarded on or between

January 1, 2015 and January 29, 2022, and that have not been renewed or extended on or after January 30, 2022. Executive

Order 13658 does not apply to contracts subject only to the

Davis-Bacon Related Acts regardless of when they were awarded.

If a contract is subject to Executive Order 13658, the contractor must pay all covered workers at least $13.30 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in 2025. The applicable Executive Order minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under Executive Order 13658 is available at www.dol.gov/whd/govcontracts.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses

(29CFR 5.5 (a) (1) (iii)).

The body of each wage determination lists the classifications and wage rates that have been found to be prevailing for the type(s) of construction and geographic area covered by the wage determination. The classifications are listed in alphabetical order under rate identifiers indicating whether the particular rate is a union rate (current union negotiated rate), a survey rate, a weighted union average rate, a state adopted rate, or a supplemental classification rate.

Union Rate Identifiers

A four-letter identifier beginning with characters other than

""SU"", ""UAVG"", ?SA?, or ?SC? denotes that a union rate was prevailing for that classification in the survey. Example:

PLUM0198-005 07/01/2024. PLUM is an identifier of the union whose collectively bargained rate prevailed in the survey for this classification, which in this example would be Plumbers.

0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. The date, 07/01/2024 in the example, is the effective date of the most current negotiated rate.

Union prevailing wage rates are updated to reflect all changes over time that are reported to WHD in the rates in the collective bargaining agreement (CBA) governing the classification.

Union Average Rate Identifiers

The UAVG identifier indicates that no single rate prevailed for those classifications, but that 100% of the data reported for the classifications reflected union rates. EXAMPLE:

UAVG-OH-0010 01/01/2024. UAVG indicates that the rate is a weighted union average rate. OH indicates the State of Ohio.

The next number, 0010 in the example, is an internal number used in producing the wage determination. The date, 01/01/2024 in the example, indicates the date the wage determination was updated to reflect the most current union average rate.

A UAVG rate will be updated once a year, usually in January, to reflect a weighted average of the current rates in the collective bargaining agreements on which the rate is based.

Survey Rate Identifiers

The ""SU"" identifier indicates that either a single non-union rate prevailed (as defined in 29 CFR 1.2) for this classification in the survey or that the rate was derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As a weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SUFL2022-007

6/27/2024. SU indicates the rate is a single non-union prevailing rate or a weighted average of survey data for that classification. FL indicates the State of Florida. 2022 is the year of the survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. The date, 6/27/2024 in the example, indicates the survey completion date for the classifications and rates under that identifier.

?SU? wage rates typically remain in effect until a new survey is conducted. However, the Wage and Hour Division (WHD) has the discretion to update such rates under 29 CFR 1.6(c)(1).

State Adopted Rate Identifiers

The ""SA"" identifier indicates that the classifications and prevailing wage rates set by a state (or local) government were adopted under 29 C.F.R 1.3(g)-(h). Example: SAME2023-007

01/03/2024. SA reflects that the rates are state adopted. ME refers to the State of Maine. 2023 is the year during which the state completed the survey on which the listed classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination.

The date, 01/03/2024 in the example, reflects the date on which the classifications and rates under the ?SA? identifier took effect under state law in the state from which the rates were adopted.

WAGE DETERMINATION APPEALS PROCESS

1) Has there been an initial decision in the matter? This can be:

a) a survey underlying a wage determination

b) an existing published wage determination

c) an initial WHD letter setting forth a position on a wage determination matter

d) an initial conformance (additional classification and rate) determination

On survey related matters, initial contact, including requests for summaries of surveys, should be directed to the WHD Branch of Wage Surveys. Requests can be submitted via email to davisbaconinfo@dol.gov or by mail to:

Branch of Wage Surveys

Wage and Hour Division

U.S. Department of Labor

200 Constitution Avenue, N.W.

Washington, DC 20210

Regarding any other wage determination matter such as conformance decisions, requests for initial decisions should be directed to the WHD Branch of Construction Wage Determinations.

Requests can be submitted via email to BCWD-Office@dol.gov or by mail to:

Branch of Construction Wage Determinations

Wage and Hour Division

U.S. Department of Labor

200 Constitution Avenue, N.W.

Washington, DC 20210

2) If an initial decision has been issued, then any interested party (those affected by the action) that disagrees with the decision can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7).

Requests for review and reconsideration can be submitted via email to dba.reconsideration@dol.gov or by mail to:

Wage and Hour Administrator

U.S. Department of Labor

200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative

Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board

U.S. Department of Labor

200 Constitution Avenue, N.W.

Washington, DC 20210.

END OF GENERAL DECISION"

IDCode: J
Page: 1
Pages: 33
AmendNo: 0010
EffDate: 03 FEB 2026
ReqNo:
ProjNo: PANNAD-25-P-0000 004048
IssCode: W912DS
AdmCode:
IssuedBy: W2SD ENDIST NEW YORK

KO CONTRACTING DIVISION, 26 FEDERAL PLAZA ROOM 16 300

NEW YORK, NY 10278-0004

UNITED STATES

JORDAN MORAN, EMAIL: JORDAN.K.MORAN@USACE.ARMY.MIL TELEPHONE: 970-790-8121

AdminBy:

SCD: PAS:

ContractorNameAdd:
Code:
FacCode:
SolChg: 1
SolNo: W912DS25RA003
SolDate: 16 SEP 2025
AwardChg: Off
AwardNo:
AwardDate:
Amended: 1
OffrExt: 1
OffrNoEx: Off
NoCopies: 1
ApprData: SEE SECTION G - CONTRACT ADMINISTRATION DATA
ChgeOrd: Off
ChgeOrder:
Modify: Off
SuppAgre: Off
SuppAuth:
ModOthr: Off
OthrSpec:
NoReq: Off
Require: Off
Copies:
Descript: The purpose of this Amendment is to:

1. Extend the proposal due date to 17 April 2026 at 2:00PM EST.

2. Share the industry responses to the Market Research questions in Amendment 9.

3. Update the wage rates.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .