Ft Drum Pre-Award Re-Phasing Drawings_041726.pdf

PDF 31 MB Posted

Attached to
Construction of Wheeler Sack Army Airfield (WSAAF) Lighting Upgrade Fort Drum, NY
Solicitation number
W912DS25RA003
Issued by

About this file

This file is a pre-award re-phasing drawing index and general construction notes for the Wheeler-Sack Army Airfield (WSAAF) Runway 03-21 Airfield Lighting Repair Project at Fort Drum, New York. The drawings document a comprehensive phased construction project with an overall contract duration of 760 days, divided into Phase 1 (preconstruction and initial construction) and Phase 2 (runway reconstruction and lighting cutover, constrained to April 1, 2027 through June 30, 2028). The project encompasses 432 design sheets covering civil, structural, electrical, and telecommunications work, including detailed plans for contractor staging and access, construction safety and phasing, soil erosion and sediment control, civil demolition, grading, paving, airfield lighting vault construction, electrical distribution, ALCMS (Airport Lighting Control and Monitoring System) architecture, and junction can plaza layouts.

Key construction requirements include full-depth removal and replacement of Runway 03-21 pavement with Portland cement concrete including subgrade, subbase, and base course; removal and replacement of runway shoulders; installation of new runway edge, threshold, and end lights with associated conduit and cabling; construction of a 3,200-square-foot airfield lighting vault building with structural, mechanical, plumbing, electrical, lighting, communications, fire detection, and building management systems; installation of electrical ductbank with junction can plaza system and airfield lighting cable; medium-voltage distribution infrastructure; emergency generator and switchgear equipment; and removal of existing contaminated soils in designated PFAS (polyfluoroalkyl substances) areas per the Fort Drum Management Policy. The project requires coordination with active airfield operations, mandatory Project Labor Agreement compliance per Executive Order 14063, continuous maintenance of airfield lighting during all phases, weekly coordination meetings, comprehensive dust and debris control, and a trained environmental manager on-site during work in PFAS-contaminated areas.

View the file

Other files

File Type Posted
Amendment 13 - W912DS25RA003.pdf PDF
Ft_Drum_Pre-Award_Re-Phasing_Specifications.pdf PDF
Amendment 12 - W912DS25RA003.pdf PDF
FortDrum_SWPPP_Rephasing_Stamped_R1-20 Apr 26.pdf PDF
FortDrum-WSAAF-Request_for_Disturbance_Letter.pdf PDF
Amendment 11 W912DS25RA003.pdf PDF
Amendment 10 - W912DS25RA003.pdf PDF
Amendment 9 W912DS25RA003.pdf PDF
Basis of Award W912DS25RA003 18Dec2025.pdf PDF
GC101 - Phasing and Schedule Market Research.pdf PDF
Phasing and Schedule Market Research.pdf PDF
Amendment 8 - W912DS25RA003.pdf PDF
Electric and Water Utilities on the Concrete Batch Plant Site.pdf PDF
Amendment 7 - W912DS25RA003.pdf PDF
Amendment 6 - W912DS25RA003.pdf PDF
32 12 15.13.pdf PDF
Basis of Award W912DS25RA003 12Nov2025.pdf PDF
Amendment 5 - W912DS25RA003.pdf PDF
Amendment 2 W912DS25RA003.pdf PDF
Amendment 4 W912DS25RA003.pdf PDF
Basis of Award W912DS25RA003 22Oct2025.pdf PDF
Amendment 3 - W912DS25RA003.pdf PDF
Ft_Drum_SWPPP_FINAL_04252025_UPD07OCT25.pdf PDF
Sign-in Sheet.pdf PDF
Amendment 0003 Specs - Ft Drum Runway Lighting Repair (WSAAF).pdf PDF
Ft Drum Runway Lighting Repair - Final RTA Plans (218-326).pdf PDF
Ft Drum Runway Lighting Repair - Final RTA Plans (55-108).pdf PDF
Ft_Drum_RTA_Specifications_Reprint.pdf PDF
Ft Drum Runway Lighting Repair - Final RTA Plans (1-54).pdf PDF
Ft Drum Runway Lighting Repair - Final RTA Plans (109-217).pdf PDF
Ft Drum Runway Lighting Repair - Final RTA Plans (327-433).pdf PDF
Amendment 2 - W912DS25RA003.pdf PDF
Bidder Walkthrough Visitor Pass Instructions R1.pdf PDF
Ft Drum Runway Lighting Repair - Final RTA Plans 25 APR 2025(109-217)_UPD23SEP25.pdf PDF
Ft Drum Runway Lighting Repair - Final RTA Plans 25 APR 2025(1-54)_UPD23SEP25.pdf PDF
WSAAF Lighting Upgrade JA - Monaco Fire Alarm_signed-_Redacted.pdf PDF
Solicitation Amendment W912DS25RA0030001 SF 30.pdf PDF
Ft Drum Runway Lighting Repair - Final RTA Plans 25 APR 2025(218-326)_UPD23SEP25.pdf PDF
WSAAF Lighting Upgrade JA - Trane Tracer Ensemble_Redacted.pdf PDF
Ft_Drum_RTA_Specifications_Reprint_UPD23SEP25.pdf PDF
Ft Drum Runway Lighting Repair - Final RTA Plans 25 APR 2025(327-433)_UPD23SEP25.pdf PDF
Ft Drum Runway Lighting Repair - Final RTA Plans 25 APR 2025(55-108)_UPD23SEP25.pdf PDF
Ft Drum Map (WSAAF Bidder Walkthrough).pdf PDF
Solicitation - W912DS25RA003.pdf PDF
Basis of Award - W912DS25RA003.pdf PDF
Bidder Walkthrough Plan.pdf PDF
IMDR-ES_Form_2_APPLICATION_FOR_SPONSORSHIPv7.pdf PDF
Bidder Walkthrough Visitor Pass Instructions.pdf PDF
Ft_Drum Runway Lighting Repair RTA Specs 25 Apr 25.pdf PDF
Show all 49

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

INDEX

DESIGN SHEET NO. DESCRIPTION

1 GI001 COVER SHEET

2 GI002 DRAWING INDEX

3 GI003 DRAWING INDEX

4 GI004 DRAWING INDEX

5 GI005 NOTES, ABBREVIATIONS, AND LEGEND

6 GI006 GENERAL CONSTRUCTION NOTES

7 GI101 CONTRACTOR STAGING AND ACCESS PLAN

8 GI102 SURVEY CONTROL PLAN

9 GI103 HEIGHT RESTRICTION PLAN

GI104 PFAS HANDLING AND DISPOSAL PLAN

10 GC001 WORK RESTRICTION NOTES AND LEGEND

11 GC100 OVERALL PHASING PLAN

12 GC101 OVERALL PHASE 1 PLAN

13 GC102 CONSTRUCTION SAFETY AND PHASING PLAN

- PHASE 1

14 GC103 CONSTRUCTION SAFETY AND PHASING PLAN

- PHASE 1

15 GC104 CONSTRUCTION SAFETY AND PHASING PLAN

- PHASE 1

16 GC105 CONSTRUCTION SAFETY AND PHASING PLAN

- PHASE 1

17 GC106 CONSTRUCTION SAFETY AND PHASING PLAN

- PHASE 1

18 GC107 CONSTRUCTION SAFETY AND PHASING PLAN

- PHASE 1

19 GC108 CONSTRUCTION SAFETY AND PHASING PLAN

- PHASE 1

20 GC109 OVERALL PHASE 2 PLAN

21 GC110 CONSTRUCTION SAFETY AND PHASING PLAN

- PHASE 2

22 GC111 CONSTRUCTION SAFETY AND PHASING PLAN

- PHASE 2

23 GC112 CONSTRUCTION SAFETY AND PHASING PLAN

- PHASE 2

24 GC113 CONSTRUCTION SAFETY AND PHASING PLAN

- PHASE 2

25 GC114 CONSTRUCTION SAFETY AND PHASING PLAN

- PHASE 2

26 GC115 CONSTRUCTION SAFETY AND PHASING PLAN

- PHASE 2

27 GC116 CONSTRUCTION SAFETY AND PHASING PLAN

- PHASE 2

28 GC117 CONSTRUCTION SAFETY AND PHASING PLAN

- PHASE 2

29 GC118 PHASE 2 AIRFIELD LIGHTING CUTOVER PLAN

30 GC501 CONSTRUCTION CONTROL DETAILS

31 GC502 AIRFIELD LIGHTING PHASING DETAILS

32 FL001 LIFE SAFETY CODE SUMMARY

33 FL002 LIFE SAFETY SITE PLAN

34 FL101 FIRST FLOOR - LIFE SAFETY PLAN

35 C-001 AIRFIELD CIVIL KEYPLAN

INDEX

DESIGN SHEET NO. DESCRIPTION

36 C-301 TYPICAL REMOVAL SECTIONS

37 C-302 TYPICAL REMOVAL SECTIONS

38 C-303 TYPICAL SECTION GENERAL NOTES

39 C-304 TYPICAL SECTIONS

40 C-305 TYPICAL SECTIONS

41 C-306 TYPICAL SECTIONS

42 C-307 TYPICAL SECTIONS

43 C-308 TYPICAL SECTIONS

44 C-309 TYPICAL SECTIONS

45 C-310 TYPICAL SECTIONS

46 CD001 CIVIL DEMOLITION NOTES

47 CD101 CIVIL DEMOLITION PLAN

48 CD102 CIVIL DEMOLITION PLAN

49 CD103 CIVIL DEMOLITION PLAN

50 CD104 CIVIL DEMOLITION PLAN

51 CD105 CIVIL DEMOLITION PLAN

52 CD106 CIVIL DEMOLITION PLAN

53 CD107 CIVIL DEMOLITION PLAN

54 CD108 CIVIL DEMOLITION PLAN

55 CD109 CIVIL DEMOLITION PLAN

56 CD110 CIVIL DEMOLITION PLAN

57 CD111 CIVIL DEMOLITION PLAN

58 CD112 CIVIL DEMOLITION PLAN

59 CD113 CIVIL DEMOLITION PLAN

60 CD114 CIVIL DEMOLITION PLAN

61 CD115 CIVIL DEMOLITION PLAN

62 CD501 CIVIL DEMOLITION DETAILS

63 CE001 SOIL EROSION AND SEDIMENT CONTROL

KEYPLAN

64 CE101 SOIL EROSION AND SEDIMENT CONTROL

PLAN

65 CE102 SOIL EROSION AND SEDIMENT CONTROL

PLAN

66 CE103 SOIL EROSION AND SEDIMENT CONTROL

PLAN

67 CE104 SOIL EROSION AND SEDIMENT CONTROL

PLAN

68 CE105 SOIL EROSION AND SEDIMENT CONTROL

PLAN

69 CE106 SOIL EROSION AND SEDIMENT CONTROL

PLAN

70 CE107 SOIL EROSION AND SEDIMENT CONTROL

PLAN

71 CE108 SOIL EROSION AND SEDIMENT CONTROL

PLAN

INDEX

DESIGN SHEET NO. DESCRIPTION

72 CE109 SOIL EROSION AND SEDIMENT CONTROL

PLAN

73 CE110 SOIL EROSION AND SEDIMENT CONTROL

PLAN

74 CE111 SOIL EROSION AND SEDIMENT CONTROL

PLAN

75 CE112 SOIL EROSION AND SEDIMENT CONTROL

PLAN

76 CE113 SOIL EROSION AND SEDIMENT CONTROL

PLAN

77 CE114 SOIL EROSION AND SEDIMENT CONTROL

PLAN

78 CE115 SOIL EROSION AND SEDIMENT CONTROL

PLAN

79 CE116 SOIL EROSION AND SEDIMENT CONTROL

PLAN

80 CE117 SOIL EROSION AND SEDIMENT CONTROL

PLAN

81 CE118 SOIL EROSION AND SEDIMENT CONTROL

PLAN

82 CE121 AIRFIELD LIGHTING VAULT AREA SOIL

EROSION AND SEDIMENT CONTROL PLAN

83 CE501 SOIL EROSION AND SEDIMENT CONTROL

DETAILS

84 CS101 GEOMETRY PLAN

85 CS102 GEOMETRY PLAN

86 CS103 GEOMETRY PLAN

87 CS104 GEOMETRY PLAN

88 CS105 GEOMETRY PLAN

89 CS106 GEOMETRY PLAN

90 CS107 GEOMETRY PLAN

91 CS108 GEOMETRY PLAN

92 CS109 GEOMETRY PLAN

93 CS110 GEOMETRY PLAN

94 CS111 GEOMETRY PLAN

95 CS112 GEOMETRY PLAN

96 CS113 GEOMETRY PLAN

97 CS114 GEOMETRY PLAN

98 CS115 GEOMETRY PLAN

99 CS121 AIRFIELD LIGHTING VAULT SITE PLAN

100 CS122 AIRFIELD LIGHTING VAULT SITE PLAN

101 CS501 CIVIL SITE DETAILS

102 CG101 GRADING PLAN

103 CG102 GRADING PLAN

104 CG103 GRADING PLAN

105 CG104 GRADING PLAN

106 CG105 GRADING PLAN

107 CG106 GRADING PLAN

INDEX

DESIGN SHEET NO. DESCRIPTION

108 CG107 GRADING PLAN

109 CG108 GRADING PLAN

110 CG109 GRADING PLAN

111 CG110 GRADING PLAN

112 CG111 GRADING PLAN

113 CG112 GRADING PLAN

114 CG113 GRADING PLAN

115 CG114 GRADING PLAN

116 CG115 GRADING PLAN

117 CG116 GRADING PLAN

118 CG121 AIRFIELD LIGHTING VAULT SITE GRADING

PLAN

119 CG201 RUNWAY 03-21 PCC RECONSTRUCTION

PROFILE

120 CG202 LIGHTING VAULT ACCESS DRIVEWAY

PROFILE

121 CG301 RUNWAY 03-21 PCC RECONSTRUCTION

CROSS SECTIONS

122 CG302 RUNWAY 03-21 PCC RECONSTRUCTION

CROSS SECTIONS

123 CG303 RUNWAY 03-21 PCC RECONSTRUCTION

CROSS SECTIONS

124 CG304 RUNWAY 03-21 PCC RECONSTRUCTION

CROSS SECTIONS

125 CG305 RUNWAY 03-21 PCC RECONSTRUCTION

CROSS SECTIONS

126 CG306 RUNWAY 03-21 PCC RECONSTRUCTION

CROSS SECTIONS

127 CG307 RUNWAY 03-21 PCC RECONSTRUCTION

CROSS SECTIONS

128 CG308 RUNWAY 03-21 PCC RECONSTRUCTION

CROSS SECTIONS

129 CG309 RUNWAY 03-21 PCC RECONSTRUCTION

CROSS SECTIONS

130 CG310 RUNWAY 03-21 PCC RECONSTRUCTION

CROSS SECTIONS

131 CP101 PAVING AND JOINT ELEVATION PLAN

132 CP102 PAVING AND JOINT ELEVATION PLAN

133 CP103 PAVING AND JOINT ELEVATION PLAN

134 CP104 PAVING AND JOINT ELEVATION PLAN

135 CP105 PAVING AND JOINT ELEVATION PLAN

136 CP106 PAVING AND JOINT ELEVATION PLAN

137 CP107 PAVING AND JOINT ELEVATION PLAN

138 CP108 PAVING AND JOINT ELEVATION PLAN

139 CP109 PAVING AND JOINT ELEVATION PLAN

140 CP110 PAVING AND JOINT ELEVATION PLAN

141 CP111 PAVING AND JOINT ELEVATION PLAN

142 CP112 PAVING AND JOINT ELEVATION PLAN

143 CP113 PAVING AND JOINT ELEVATION PLAN

INDEX

DESIGN SHEET NO. DESCRIPTION

144 CP114 PAVING AND JOINT ELEVATION PLAN

145 CP115 PAVING AND JOINT ELEVATION PLAN

146 CP116 PAVING AND JOINT ELEVATION PLAN

147 CP117 PAVING AND JOINT ELEVATION PLAN

148 CP118 PAVING AND JOINT ELEVATION PLAN

149 CP119 PAVING AND JOINT ELEVATION PLAN

150 CP120 PAVING AND JOINT ELEVATION PLAN

151 CP121 PAVING AND JOINT ELEVATION PLAN

152 CP122 PAVING AND JOINT ELEVATION PLAN

153 CP123 PAVING AND JOINT ELEVATION PLAN

154 CP124 PAVING AND JOINT ELEVATION PLAN

155 CP125 PAVING AND JOINT ELEVATION PLAN

156 CP126 PAVING AND JOINT ELEVATION PLAN

157 CP127 PAVING AND JOINT ELEVATION PLAN

158 CP128 PAVING AND JOINT ELEVATION PLAN

159 CP129 PAVING AND JOINT ELEVATION PLAN

160 CP130 PAVING AND JOINT ELEVATION PLAN

161 CP131 PAVING AND JOINT ELEVATION PLAN

162 CP132 PAVING AND JOINT ELEVATION PLAN

163 CP133 PAVING AND JOINT ELEVATION PLAN

164 CP134 PAVING AND JOINT ELEVATION PLAN

165 CP135 PAVING AND JOINT ELEVATION PLAN

166 CP136 PAVING AND JOINT ELEVATION PLAN

167 CP137 PAVING AND JOINT ELEVATION PLAN

168 CP138 AIRFIELD LIGHTING VAULT PAVING PLAN

169 CP501 PAVING DETAILS

170 CP502 PAVING DETAILS

171 CP503 PAVING DETAILS

172 CT101 MARKING PLAN

173 CT102 MARKING PLAN

174 CT103 MARKING PLAN

175 CT104 MARKING PLAN

176 CT105 MARKING PLAN

177 CT106 MARKING PLAN

178 CT107 MARKING PLAN

179 CT108 MARKING PLAN

H . B

AR

N

H

AR

T

T.

M

O R

R

IS

C . T

W

IG

G

E.

J

AR

G

ER

D

R

AW

IN

G

IN

D

EX

GI002

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

SU

BM

IT

TE

D B

Y:

C H

EC

KE

D B

Y:

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

IS

SU

E D

AT

E:

SI

ZE

M

AR

K

D

ES

C R

IP

TI

O N

D

AT

E

SHEET ID

CUI

CUI

C :\T

EM

P\

PW

_W

O R

K\

ES

T-

LS

\D M

S5

\D

1G

I0

-G I0

.D

W G

1:

:3

PM

/1 7/

M O

R R

IS

T3

N

EW

Y O

R K

D

IS

TR

IC

T N

EW

Y

O R

K, N

Y

-25 A

PR

. 2

AN

SI

D

W H

EE

LE

R -S

AC

K

AR

M

Y

AI

R

FI

EL

D

, F O

R T

D R

U M

, N Y

R U

N W

AY

3-

A

IR

FI

EL

D L

IG

H

TI

N

G R

EP

AI

R P

R O

JE

C

T W

2-

D S-

-D

W

2D S2

3F

R

TA

S U

BM

IS

SI

O

N

US Army Corps of Engineers

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

PR

E-

AW

AR

D

R E-

PH

AS

IN

G

AP

R

INDEX

DESIGN SHEET NO. DESCRIPTION

360 EA702 AIRFIELD CIRCUITING 5KV HOMERUN PLANS

361 EA703 AIRFIELD CIRCUITING 5KV HOMERUN PLANS

362 EA704 AIRFIELD CIRCUITING 5KV HOMERUN PLANS

363 EA705 AIRFIELD CIRCUITING 5KV HOMERUN PLANS

364 EA706 AIRFIELD CIRCUITING 5KV HOMERUN PLANS

365 EA707 AIRFIELD CIRCUITING 5KV HOMERUN PLANS

366 EA708 AIRFIELD CIRCUITING 5KV HOMERUN PLANS

367 EA709 AIRFIELD CIRCUITING 5KV HOMERUN PLANS

368 EA710 AIRFIELD CIRCUITING 5KV HOMERUN PLANS

369 EA711 AIRFIELD CIRCUITING 5KV HOMERUN PLANS

370 EA712 AIRFIELD CIRCUITING 5KV HOMERUN PLANS

371 EA713 AIRFIELD CIRCUITING 5KV HOMERUN PLANS

372 EA714 AIRFIELD CIRCUITING 5KV HOMERUN PLANS

373 EA715 AIRFIELD CIRCUITING 5KV HOMERUN PLANS

374 EA716 AIRFIELD CIRCUITING 5KV HOMERUN PLANS

375 EA717 AIRFIELD CIRCUITING 5KV HOMERUN PLANS

376 EA718 AIRFIELD CIRCUITING 5KV HOMERUN PLANS

377 EA719 AIRFIELD CIRCUITING 5KV HOMERUN PLANS

378 EA720 AIRFIELD CIRCUITING 5KV HOMERUN PLANS

379 EA721 AIRFIELD CIRCUITING 5KV HOMERUN PLANS

380 EA722 AIRFIELD CIRCUITING 5KV HOMERUN PLANS

381 EA723 AIRFIELD CIRCUITING 5KV HOMERUN PLANS

382 EA724 AIRFIELD CIRCUITING MALSR 2.4KV AND

CONTROL

383 EA801 ALCMS ARCHITECTURE DIAGRAM

384 EA802 ALCMS SCHEDULE AND WIRING DIAGRAM

385 EA803 ALCMS ATCT WIRING DIAGRAM

386 EA804 ALCMS BEACON CONTROL DETAILS

387 EA805 ATCT RISER DIAGRAM

388 EA806 VAULT MISCELLANEOUS DETAILS

389 EA901 JUNCTION CAN PLAZA LAYOUT DIAGRAMS

390 EA902 JUNCTION CAN PLAZA LAYOUT DIAGRAMS

391 EA903 JUNCTION CAN PLAZA LAYOUT DIAGRAMS

392 EA904 JUNCTION CAN PLAZA LAYOUT DIAGRAMS

393 EA905 JUNCTION CAN PLAZA LAYOUT DIAGRAMS

394 EA906 JUNCTION CAN PLAZA LAYOUT DIAGRAMS

395 EA907 JUNCTION CAN PLAZA LAYOUT DIAGRAMS

INDEX

DESIGN SHEET NO. DESCRIPTION

396 EA908 JUNCTION CAN PLAZA LAYOUT DIAGRAMS

397 EA909 JUNCTION CAN PLAZA LAYOUT DIAGRAMS

398 EA910 JUNCTION CAN PLAZA LAYOUT DIAGRAMS

399 EA911 AIRFIELD LIGHTING HANDHOLE LAYOUT

DIAGRAMS

400 ES101

AIRFIELD LIGHTING VAULT EXTERIOR

ELECTRICAL AND TELECOMMUNICATIONS

DISTRIBUTION PLAN

401 ES102

AIRFIELD LIGHTING VAULT EXTERIOR

ELECTRICAL AND TELECOMMUNICATIONS

DISTRIBUTION PLAN

402 ES103

AIRFIELD LIGHTING VAULT EXTERIOR

ELECTRICAL AND TELECOMMUNICATIONS

DISTRIBUTION PLAN

403 ES104

AIRFIELD LIGHTING VAULT EXTERIOR

ELECTRICAL AND TELECOMMUNICATIONS

DISTRIBUTION PLAN

404 ES105

AIRFIELD LIGHTING VAULT EXTERIOR

ELECTRICAL AND TELECOMMUNICATIONS

DISTRIBUTION PLAN

405 ES501 ELECTRICAL AND TELECOMMUNICATIONS

MANHOLE DETAILS

406 ES502 ELECTRICAL HANDHOLE DETAIL

407 ES503 TELECOMMUNICATIONS HANDHOLE DETAIL

408 ES504 PAD-MOUNTED TRANSFORMER AND SWITCH

DETAILS

409 ES505 ELECTRICAL SITE DUCTBANK DETAILS

410 ES506 MOUNTAIN RAMP ELECTRICAL DETAILS

411 ES507 MOUNTAIN RAMP ELECTRICAL DETAILS

412 ES508 FIBER TERMINATION DETAILS

413 ES509 FIBER TERMINATION WIRING DIAGRAM

414 ES601 ELECTRICAL SITE PARTIAL SINGLE LINE

DIAGRAM

415 ES602 ELECTRICAL SITE CIRCUIT AND CABLE

SCHEDULE

416 ES603

ELECTRICAL SITE MANHOLES, POWER

HANDHOLES, AND COMMUNICATION

HANDHOLES

417 ES604

MOUNTAIN RAMP APRON LIGHTING PARTIAL

SINGLE LINE DIAGRAM AND PANEL

SCHEDULE

418 ES605 MOUNTAIN RAMP HIGH MAST LIGHTING

CONTROL WIRING DIAGRAM

419 ES701 UTILITY STRUCTURE FOLDOUT DIAGRAMS

420 ES702 UTILITY STRUCTURE FOLDOUT DIAGRAMS

421 ES703 UTILITY STRUCTURE FOLDOUT DIAGRAMS

422 ES704 UTILITY STRUCTURE FOLDOUT DIAGRAMS

423 ES705 UTILITY STRUCTURE FOLDOUT DIAGRAMS

424 ES706 UTILITY STRUCTURE FOLDOUT DIAGRAMS

425 ES707 UTILITY STRUCTURE FOLDOUT DIAGRAMS

426 ES708 UTILITY STRUCTURE FOLDOUT DIAGRAMS

427 T-001 TELECOM LEGEND

428 T-101 TELECOMMUNICATIONS FIRST FLOOR PLAN

429 T-102 TELECOMMUNICATIONS TOWER PLAN

430 T-501 TELECOM DETAILS

431 T-601 TELECOM RISER DIAGRAMS

INDEX

DESIGN SHEET NO. DESCRIPTION

432 T-602 TELECOM OSP SINGLE LINE DIAGRAM

H . B

AR

N

H

AR

T

T.

M

O R

R

IS

C . T

W

IG

G

E.

J

AR

G

ER

D

R

AW

IN

G

IN

D

EX

GI004

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

SU

BM

IT

TE

D B

Y:

C H

EC

KE

D B

Y:

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

IS

SU

E D

AT

E:

SI

ZE

M

AR

K

D

ES

C R

IP

TI

O N

D

AT

E

SHEET ID

CUI

CUI

C :\T

EM

P\

PW

_W

O R

K\

ES

T-

LS

\D M

S5

\D

1G

I0

-G I0

.D

W G

1:

:5

PM

/1 7/

M O

R R

IS

T3

N

EW

Y O

R K

D

IS

TR

IC

T N

EW

Y

O R

K, N

Y

-25 A

PR

. 2

AN

SI

D

W H

EE

LE

R -S

AC

K

AR

M

Y

AI

R

FI

EL

D

, F O

R T

D R

U M

, N Y

R U

N W

AY

3-

A

IR

FI

EL

D L

IG

H

TI

N

G R

EP

AI

R P

R O

JE

C

T W

2-

D S-

-D

W

2D S2

3F

R

TA

S U

BM

IS

SI

O

N

US Army Corps of Engineers

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

PR

E-

AW

AR

D

R E-

PH

AS

H . B

AR

N

H

AR

T

T.

M

O R

R

IS

C . T

W

IG

G

E.

J

AR

G

ER

N

O

TE

S, A

BB

R

EV

IA

TI

O

N S, A N

D L

EG

EN

D

GI005

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

SU

BM

IT

TE

D B

Y:

C H

EC

KE

D B

Y:

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

IS

SU

E D

AT

E:

SI

ZE

M

AR

K

D

ES

C R

IP

TI

O N

D

AT

E

SHEET ID

CUI

CUI

C :\T

EM

P\

PW

_W

O R

K\

ES

T-

LS

\D M

S5

\D

1G

I0

.D W

G

:0 0:

A

M

/1 7/

M O

R R

IS

T3

N

EW

Y O

R K

D

IS

TR

IC

T N

EW

Y

O R

K, N

Y

-25 A

PR

. 2

AN

SI

D

W H

EE

LE

R -S

AC

K

AR

M

Y

AI

R

FI

EL

D

, F O

R T

D R

U M

, N Y

R U

N W

AY

3-

A

IR

FI

EL

D L

IG

H

TI

N

G R

EP

AI

R P

R O

JE

C

T W

2-

D S-

-D

W

2D S2

3F

R

TA

S U

BM

IS

SI

O

N

US Army Corps of Engineers

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

6W4" 6 WAY DUCT WITH 4" DIAMETER CONDUIT

@ AT

AC ASPHALT CONCRETE

ACP ACCESS CONTROL POINT

APP ACCIDENT PREVENTION PLAN

ACM ASBESTOS CONTAINING MATERIALS

AFLV AIRFIELD LIGHTING VAULT

ALCMS AIRPORT LIGHTING CONTROL AND MONITORING

SYSTEM

ALS APPROACH LIGHTING SYSTEM

ALSF APPROACH LIGHTING SYSTEM WITH SEQUENCED

FLASHING LIGHTS

ARFF AIRCRAFT RESCUE AND FIREFIGHTING

A.S.T.M. AMERICAN SOCIETY FOR TESTING AND MATERIALS

ATCT AIR TRAFFIC CONTROL TOWER

ATS AUTOMATIC TRANSFER SWITCH

B.G.S BELOW GRADED SURFACE

BLDG. BUILDING

B.M. BENCHMARK

BMP BEST MANAGEMENT PRACTICES

C&D CONSTRUCTION AND DEMOLITION DEBRIS

CCR CONSTANT CURRENT REGULATOR

CE CONCRETE ENCASED

C/L, ℄ CENTERLINE

CLIN CONTRACT LINE ITEM NUMBER

CLR. CLEAR

CLSM CONTROLLED LOW-STRENGTH MATERIAL

COL. COLUMN

CONC. CONCRETE

CONT. CONTINUOUS

CONST. CONSTRUCTION

COORD. COORDINATE

COR CONTRACTING OFFICER'S REPRESENTATIVE

CSC CONTRACTOR SECURITY COORDINATOR

CU COPPER

CTL CONTROL

DEB DIRECT EARTH BURIED

DEPT DEPARTMENT

DIA, Ø DIAMETER

DPW DIRECTORATE OF PUBLIC WORKS

E EAST / EASTING

EA. EACH

EL, ELEV ELEVATION

ENGR ENGINEER

EQ. EQUAL

EXIST. EXISTING

EXT. EXTERIOR

FOD FOREIGN OBJECT DEBRIS

FT FEET/FORT

G GRADE

GA. GAGE / GAUGE

GALV. GALVANIZED

GCABC GRADED CRUSHED AGGREGATE BASE COURSE

GND. GROUND

GOVT. GOVERNMENT

HS&E HEALTH, SAFETY AND ENVIRONMENTAL

HH HANDHOLE

HMA HOT MIX ASPHALT

HORIZ. HORIZONTAL

HT. HEIGHT

I.D. INSIDE DIAMETER

ILS INSTRUMENT LANDING SYSTEM

INFO. INFORMATION

INV INVERT

JCP JUNCTION CAN PLAZA

JMF JOB MIX FORMULA

K RATE OF GRADE CHANGE

KGTB WHEELER-SACK ARMY AIRFIELD (AIRPORT CODE)

KO CONTRACTING OFFICER

kV KILOVOLT kVA KILOVOLT-AMPERE kW KILOWATT

L LENGTH

LCD LAND CLEARING DEBRIS

LED LIGHT-EMITTING DIODE

LOC LOCALIZER

LT LIGHT / LEFT

M&R MAINTENANCE AND REHABILITATION

MAX MAXIMUM

MAT. MATERIAL

MFR. MANUFACTURER

MH MANHOLE

MIN MINIMUM

MISC. MISCELLANEOUS

MPT MAINTENANCE AND PROTECTION OF TRAFFIC

N NORTH / NORTHING

NAVD88 NORTH AMERICAN VERTICAL DATUM 1988

NO, # NUMBER

NOI NOTICE OF INTENT

NPDES NATIONAL POLLUTANT DISCHARGE ELIMINATION

SYSTEM

NTP NOTICE TO PROCEED

NTS NOT TO SCALE

NY NEW YORK

NYSDEC NEW YORK STATE DEPARTMENT OF ENVIRONMENTAL

CONSERVATION

NYSDOT NEW YORK STATE DEPARTMENT OF TRANSPORTATION

O.C. ON CENTER

O.D. OUTSIDE DIAMETER

OSHA OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION

PACS PRIMARY AIRPORT CONTROL STATION

PACM POTENTIAL ASBESTOS CONTAINING MATERIALS

PAPI PRECISION APPROACH PATH INDICATOR

PAR PRECISION APPROACH RADAR

PC POINT OF CURVATURE

PCC PORTLAND CEMENT CONCRETE

P.C.F. POUNDS PER CUBIC FOOT

PDM PROGRAM DEPOT MAINTENANCE

PFAS POLYFLUOROALKYL SUBSTANCES

PM PROJECT MANAGER

PPE PERSONAL PROTECTIVE EQUIPMENT

P.S.F. POUNDS PER SQUARE FOOT

P.S.I. POUNDS PER SQUARE INCH

PT POINT OF TANGENCY

PVC POINT OF VERTICAL CURVATURE

PVI POINT OF VERTICAL INTERSECTION

PVT POINT OF VERTICAL TANGENCY

PWR POWER

QTY. QUANTITY

R RADIUS

RP RADIUS POINT

RDM RUNWAY DISTANCE MARKER

REINF. REINFORCED

REQ'D REQUIRED

RMC RIGID METAL CONDUIT

RGS RIGID GALVANIZED STEEL

RT RIGHT

R/W,RWY RUNWAY

S SLOPE

SACS SECONDARY AIRPORT CONTROL STATION

SCH SCHEDULE

SQ. SQUARE

SPEC. SPECIFICATION

SSHO SITE SAFETY AND HEALTH OFFICER

ST STREET

STA STATION

STD STANDARD

SWPPP STORM WATER POLLUTION PREVENTION PLAN

Te THICKENED EDGE THICKNESS

THRU THROUGH

(TYP) TYPICAL

T/W TAXIWAY

UFC UNIFIED FACILITIES CRITERIA

UFGS UNIFIED FACILITIES GUIDE SPECIFICATIONS

USACE UNITED STATES ARMY CORPS OF ENGINEERS

V VOLT

VCC VISITOR CONTROL CENTER

VERT. VERTICAL

VFR VISUAL FLIGHT RULES

VTP VEHICLE TRACKING PADS

WSAAF WHEELER-SACK ARMY AIRFIELD

WZTC WORK ZONE TRAFFIC CONTROL

HAZARDOUS MATERIALS:

1. LEAD BASED PAINTS ARE NOT EXPECTED WITHIN THE PROJECT AREA. DO NOT INCLUDE ANY LEAD BASED PAINT TESTING OR REMOVAL IN THE BID.

2. ACM ARE NOT EXPECTED TO BE LOCATED AROUND THE EXISTING UTILITY LINES. BASE BIDS ON UTILITY LINES REMAINING IN PLACE WITHOUT ABATEMENT WORK BEING

REQUIRED.

3. IMMEDIATELY NOTIFY THE COR IF ANY SUSPECTED ASBESTOS CONTAINING MATERIAL IS ENCOUNTERED DURING THE COURSE OF CONSTRUCTION. TESTING, ABATEMENT, REMOVAL AND DISPOSAL OF PACM AND ACM ARE BEYOND THE SCOPE OF THE CONTRACT AND WILL BE CONSIDERED A DIFFERING SITE CONDITION, IN ACCORDANCE WITH

APPLICABLE FAR AND DFAR CLAUSES.

SCOPE OF WORK SUMMARY:

THE WORK OF THIS CONTRACT CAN GENERALLY BE SUMMARIZED AS FOLLOWS:

1. CIVIL: FULL-DEPTH REMOVAL AND REPLACEMENT OF RUNWAY SHOULDERS INCLUDING SUBGRADE AND BASE COURSE. FULL-DEPTH REMOVAL AND REPLACEMENT OF PORTLAND CEMENT CONCRETE INCLUDING SUBGRADE, SUBBASE, BASE COURSE AND GEOTEXTILE FABRIC ON RUNWAY 03-21 AS INDICATED ON DRAWINGS. REMOVAL AND REPLACEMENT OF RUNWAY 03-21 PAVEMENT MARKINGS AND AFFECTED TAXIWAYS PAVEMENT MARKINGS AS INDICATED ON THE DRAWINGS. REPAIR SHELTER AND SITE INFRASTRUCTURE FOR THE RUNWAY 03-21 INSTRUMENT LANDING SYSTEM. CONSTRUCT ASPHALT VEHICLE ROAD AND PARKING LOT FOR NEW AIRFIELD LIGHTING VAULT.

INSTALLATION OF NEW 8-INCH WATER MAIN LINE AND 2-INCH SERVICE LINE CONNECTED TO THE AFLV. CONSTRUCTION OF EQUIPMENT PADS, SIDEWALKS AND ADDITIONAL CONCRETE PAVEMENT ADJACENT TO THE NEW AFLV. ADDITIONAL WORK ITEMS TO INCLUDE EARTHWORK, MISCELLANEOUS DEMOLITION AND RESTORATION, SITE GRADING AND STABILIZATION, INSTALLATION OF AGGREGATE BASE COURSE, STORM WATER MANAGEMENT, SITE UTILITIES AND MISCELLANEOUS ITEMS REQUIRED TO COMPLETE

WORK.

2. ELECTRICAL: REMOVAL AND REPLACEMENT OF ALL RUNWAY EDGE, THRESHOLD AND END LIGHTS INCLUDING CONDUIT, CABLE, BASE CANS AND HANDHOLES ON RUNWAY 03-21. REMOVE AND REPLACE RUNWAY 03-21 PRECISION APPROACH PATH INDICATORS AND WIND CONES. REMOVE AND REPLACE THE APPROACH LIGHTING SYSTEM WITH SEQUENCED FLASHING LIGHTS FIXTURES WITHIN THE RUNWAY 03 DISPLACED THRESHOLD INCLUDING CONDUIT, CABLE, BASE CANS AND HANDHOLES AS INDICATED.

REMOVAL AND REPLACEMENT OF AIRFIELD GUIDANCE SIGNS, MANDATORY PILOT INSTRUCTION SIGNS AND DISTANCE REMAINING MARKING SIGNS AS INDICATED ON THE DRAWINGS. REMOVAL AND REPLACEMENT OF TAXIWAY EDGE LIGHTS INCLUDING CONDUIT AND CABLE AS INDICATED. INSTALL AIRFIELD LIGHTING HOME RUN DUCT BANK WITH A JUNCTION CAN PLAZA SYSTEM AND INSTALL NEW AIRFIELD LIGHTING CABLE WITHIN THE PROJECT FOOTPRINT. REMOVAL AND REPLACEMENT OF MOUNTAIN RAMP HIGH-MAST LIGHT POWER AND COMMUNICATIONS JUNCTION BOXES, SECONDARY CABLING FROM EXISTING TRANSFORMERS AND NEW FIBER OPTIC CONTROL COMMUNICATIONS CONNECTION. PROVIDE MEDIUM-VOLTAGE DISTRIBUTION AND INFRASTRUCTURE FOR NEW AIRFIELD LIGHTING VAULT. PROVIDE SWITCHBOARDS, PANELBOARDS, EMERGENCY GENERATOR AND ANCILLARY EQUIPMENT WITHIN NEW VAULT TO SUPPORT CONSTANT CURRENT SWITCHGEAR STYLE REGULATORS AND AIRFIELD LIGHTING CONTROL AND MONITORING SYSTEM WITH NODE LOCATIONS AS INDICATED.

3. AIRFIELD LIGHTING VAULT: NEW CONSTRUCTION OF A 3,200 SQUARE FOOT AIRFIELD LIGHTING VAULT BUILDING (AFLV). STRUCTURAL, MECHANICAL, PLUMBING, ELECTRICAL, LIGHTING, COMMUNICATIONS, FIRE DETECTION / MASS NOTIFICATION, DIRECT DIGITAL CONTROLS AND RELATED BUILDING MANAGEMENT SYSTEMS AS INDICATED ON THE

CONTRACT DOCUMENTS.

ABBREVIATIONS:

EXISTING UTILITY LEGEND:

E EXISTING ELECTRICAL HANDHOLE / JUNCTION BOX TO REMAIN

EXISTING COMMUNICATIONS MANHOLE TO REMAIN

EXISTING RUNWAY / TAXIWAY LIGHT FIXTURE AND BASE CAN TO REMAIN

EXISTING ELETRICAL CONDUIT / DUCTBANK TO REMAIN

EXISTING COMMUNICATIONS CONDUIT / DUCTBANK TO REMAIN

EXISTING GAS LINE

EXISTING WATERMAIN LINE

C

COMM

G

W

EXISTING SANITARY SEWER LINESAN

EXISTING AIRFIELD SIGN

EXISTING STORM WATER LINESD

EXISTING UTILITY FEATURE

POLYFLUOROALKYL SUBSTANCES (PFAS):

1. SOILS CONTAINING POLYFLUOROALKYL SUBSTANCES (PFAS) WILL BE ENCOUNTERED WHEN PERFORMING CONSTRUCTION, EXCAVATION OR MAINTENANCE ACTIVITIES

WITHIN THE KNOWN AREAS OF PFAS CONTAMINATION INDICATED ON THE DRAWINGS. THE KNOWN AREAS OF PFAS CONTAMINATION INDICATED ON THE DRAWINGS WERE BASED ON THE MOST RECENT STUDY PERFORMED AT WSAAF AND ARE APPROXIMATE. THE EXACT LIMITS OF THE KNOWN AREAS OF PFAS CONTAMINATION ON THE AIRFIELD MAY VARY. COORDINATE WASTE COLLECTION AND DISPOSAL IN ADVANCE WITH THE FORT DRUM DPW ENVIRONMENTAL OFFICE.

2. HANDLE, STOCKPILE, AND DISPOSE ALL EXCAVATED MATERIAL CREATED WITHIN AREAS OF PFAS CONTAMINATION IN ACCORDANCE WITH THE PROJECT SPECIFICATIONS AND THE "MANAGEMENT POLICY FOR PFAS CONTAMINATED SOILS ORIGINATING ON FORT DRUM" DOCUMENT ATTACHED TO SECTION 02 61 13. THE PLACEMENT OF EXCESS SPOILS AT THE LCD LANDFILL IS ALLOWABLE AFTER THE CONTRACTOR HAS EXHAUSTED ALL MEANS TO MANAGE EXCESS SOILS ON SITE. EVERY EFFORT SHOULD BE MADE TO KEEP AS MUCH SOIL ON SITE AS POSSIBLE TO MINIMIZE THE AMOUNT OF SOILD THAT IS HAULED TO THE LCD LANDFILL.

3. FOR BIDDING PURPOSES, ASSUME ALL SOIL LOCATED WITHIN THE KNOWN AREAS OF PFAS CONTAMINATION INDICATED ON THE DRAWINGS IS CONTAMINATED AND DOES NOT MEET THE NYSDEC PART 360 REGULATIONS FOR "UNRESTRICTED USE". FOR BIDDING PURPOSES, ASSUME ALL SOIL LOCATED OUTSIDE THE KNOWN AREAS OF PFAS CONTAMINATION INDICATED ON THE DRAWINGS IS "UNRESTRICTED USE" SOIL MEETING THE NYSDEC PART 360 REGULATIONS FOR "UNRESTRICTED USE".

4. A TRAINED ENVIRONMENTAL MANAGER PER SPECIFICATION SECTION 01 57 19 MUST BE ON SITE AT ALL TIMES DURING CONSTRUCTION ACTIVITIES NEAR OR WITHIN THE KNOWN AREAS OF PFAS CONTAMINATION. ADHERE TO ALL APPLICABLE FEDERAL, STATE AND LOCAL RULES AND REGULATIONS WHILE PERFORMING WORK WITHIN OR NEAR THE KNOWN AREAS OF PFAS CONTAMINATION TO INCLUDE WETTING OF EXCAVATION AREAS PRIOR TO AND THROUGHOUT EXCAVATION ACTIVITIES AND USE OF THE

APPROPRIATE PPE.

5. TOPSOIL AND HYDROSEED AREAS WHERE CONTAMINATED SOIL WAS SPREAD WITHIN 24-HOURS OF PLACEMENT TO PREVENT WIND-BORNE MIGRATION. SURVEY THE AREA WHERE THE SOIL WAS SPREAD TO INCLUDE THE DISTURBED LIMITS AND AT A 50-FOOT GRID. PROVIDE THE SURVEY DATA TO THE GOVERNMENT FOR REVIEW AND APPROVAL. NO ADDITIONAL COST OR SCHEDULE EXTENSIONS WILL BE CONSIDERED BY THE GOVERNMENT FOR REGRADING REQUIRED BY THE CONTRACTOR TO CORRECT ISSUES OBSERVED WITH FEATHERING THE MATERIAL TO MATCH THE EXISTING GRADES AND DRAINAGE PATTERNS.

PR

E-

AW

AR

D

R E-

PH

AS

AR

N

H

AR

T

T.

M

O R

R

IS

C . T

W

IG

G

E.

J

AR

G

ER

G

EN

ER

AL

C

O N

ST

R

U C

TI

O

N N

O

TE

S

GI006

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

SU

BM

IT

TE

D B

Y:

C H

EC

KE

D B

Y:

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

IS

SU

E D

AT

E:

SI

ZE

M

AR

K

D

ES

C R

IP

TI

O N

D

AT

E

SHEET ID

CUI

CUI

C :\T

EM

P\

PW

_W

O R

K\

ES

T-

LS

\D M

S5

\D

1G

I0

.D W

G

:0 0:

A

M

/1 7/

M O

R R

IS

T3

N

EW

Y O

R K

D

IS

TR

IC

T N

EW

Y

O R

K, N

Y

-25 A

PR

. 2

AN

SI

D

W H

EE

LE

R -S

AC

K

AR

M

Y

AI

R

FI

EL

D

, F O

R T

D R

U M

, N Y

R U

N W

AY

3-

A

IR

FI

EL

D L

IG

H

TI

N

G R

EP

AI

R P

R O

JE

C

T W

2-

D S-

-D

W

2D S2

3F

R

TA

S U

BM

IS

SI

O

N

US Army Corps of Engineers

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

1. CONSTRUCTION ACCESS SHALL BE AS SHOWN IN THESE DRAWINGS UNLESS OTHERWISE APPROVED BY THE CONTRACTING OFFICER.

2. GASOLINE ALLEY ACP IS CLOSED AND IS EXPECTED TO REOPEN AT THE END OF Q1 OF FY 2027. CONTRACTOR IS TO USE THE ALTERNATE HAUL ROUTE SHOWN ON SHEET GC101 WHILE GASOLINE ALLEY ACP IS CLOSED. CONTRACTOR WILL NOT BE PERMITTED TO USE THE ALTERNATE HAUL ROUTE AFTER GASOLINE ALLEY ACP IS REOPENED. ADDITIONAL GATES FOR AIRFIELD ACCESS, AND THEIR ASSOCIATED PHASES, ARE SHOWN ON GC100. ALL DELIVERIES MUST BE MADE DURING NORMAL WORKING HOURS. CONTRACTOR ACCESS TO THE AIRFIELD WILL BE THROUGH THE GATES INDICATED ON THE DRAWINGS.

DUMP TRUCK TRAFFIC FOR RUNWAY WORK WILL BE ALLOWED THROUGH GATE 13. THE CONTRACTOR MUST PROVIDE AN ACP GUARD, AT THE CONTRACTOR'S EXPENSE, AT ALL TIMES WHILE ACCESSING ANY GATE TO THE AIRFIELD. ACP GUARD MUST SECURE GATE TO THE SATISFACTION OF THE CONTRACTING OFFICER WHEN THE GATE IS NOT BEING USED. OBTAIN BADGES FOR ALL CONTRACTOR PERSONNEL THROUGH THE VISITOR CONTROL CENTER. CONTRACTOR TO COORDINATE WITH INSTALLATION THROUGH COR FOR REQUIRED AIRFIELD DRIVER TRAINING. THE CONTRACTOR'S ACP GUARD MUST ONLY PERMIT THE PRIME CONTRACTOR AND ITS SUBCONTRACTOR CONSTRUCTION VEHICLES ACCESS TO THE AIRFIELD. PRIVATELY OWNED VEHICLES OF THE PRIME CONTRACTOR AND ITS SUBCONTRACTOR EMPLOYEES ARE NOT CONSTRUCTION VEHICLES AND ARE NOT ALLOWED ON THE AIRFIELD.

3. MAXIMUM SPEED OF ALL CONTRACTOR VEHICLES MUST BE 25 MPH WHEN TRAVELING ON WSAAF PROPERTY UNLESS FOLLOWING OTHERWISE POSTED SPEED LIMITS. MAXIMUM SPEED LIMIT ON THE

INSTALLATION IS 10 MPH WHEN PASSING SOLDIERS/PEDESTRIANS.

4. THIS PROJECT IS ON WSAAF PROPERTY. FOLLOW ALL WSAAF SECURITY AND SAFETY REQUIREMENTS IN ACCORDANCE WITH CONTRACT REQUIREMENTS AT ALL TIMES.

5. ALL CONTRACTOR AUTHORIZED VEHICLES AND CONSTRUCTION EQUIPMENT MUST DISPLAY A YELLOW FLASHING BEACON OR A 3'-0" x 3'-0" INTERNATIONAL ORANGE AND WHITE CHECKERED FLAG (12-INCH SQUARES) DISPLAYED IN FULL VIEW ABOVE THE VEHICLES IN ACCORDANCE WITH FAA AC 150/5210-5 CURRENT EDITION. A YELLOW FLASHING BEACON MUST BE USED DURING NIGHT OPERATIONS (FLAG NOT ACCEPTABLE). VEHICLES WHICH ARE NOT MARKED OR LIGHTED MUST BE ESCORTED BY A VEHICLE THAT IS EQUIPPED WITH THE APPROPRIATE MARKING AND LIGHTING DEVICES. ONLY VEHICLES MARKED

WITH THE CONTRACTOR'S COMPANY NAME WILL BE ALLOWED IN THE PROJECT AREAS.

6. USE OF UNAUTHORIZED HAUL ROUTES WILL NOT BE ACCEPTABLE. HAUL TRUCKS MUST BE COVERED AT ALL TIMES. IMMEDIATELY CLEAN AND REMOVE ANY FOREIGN OBJECTS, SPILLAGE, DEBRIS, OR DUST AS A RESULT OF HAULING OPERATIONS AT THE EXPENSE OF THE CONTRACTOR AND TO THE SATISFACTION OF THE COR. IMMEDIATELY CLEAN AND REMOVE THE MATERIAL. HAULING ACROSS ACTIVE

TAXIWAYS OR RUNWAYS IS STRICTLY PROHIBITED WITHOUT PRIOR APPROVAL FROM THE COR.

7. PREPARE AN ENVIRONMENTAL PREVENTION PLAN (EPP) IN ACCORDANCE WITH SPECIFICATION SECTION 01 35 26 AND IN ACCORDANCE WITH ALL APPLICABLE FEDERAL, STATE AND LOCAL RULES AND REGULATIONS PRIOR TO BEGINNING CONSTRUCTION ACTIVITIES. THE CONTRACTOR MUST HAVE AN APPROVED EPP PRIOR TO STARTING CONSTRUCTION.

8. KEEP ALL AIRFIELD PAVEMENT FREE OF DEBRIS AND SEDIMENT DEPOSITED AS A RESULT OF HAULING OR OTHER CONSTRUCTION ACTIVITY AT ALL TIMES. PROVIDE A MINIMUM OF ONE MOTORIZED VACUUM STREET SWEEPER ON SITE AT ALL TIMES TO CONTINUOUSLY CLEAN THE SURFACE OF ALL ACTIVE APRONS AND PAVED VEHICLE SERVICE ROADS OF ANY FOREIGN OBJECT DEBRIS THAT MAY RESULT FROM HAULING ACTIVITIES OR ANY OTHER CONSTRUCTION ACTIVITIES. NO AMOUNT OF FOD WILL BE TOLERATED OR ALLOWED ON ANY ACTIVE AIRFIELD PAVEMENTS.

9. THE APPROXIMATE LIMIT OF THE CONTRACTOR'S PARKING AND STAGING AREA FOR MATERIAL STOCKPILING, LABS, AND OFFICE TRAILERS IS SHOWN ON THE DRAWINGS. THE EXACT LOCATION AND LIMITS OF THE CONTRACTOR'S PARKING AND STAGING AREA MUST BE ESTABLISHED BY THE CONTRACTOR WITH THE APPROVAL OF THE COR.

10. THE REQUIRED UTILITIES FOR THE CONTRACTOR'S STAGING AREA MUST BE ARRANGED FOR BY THE CONTRACTOR DIRECTLY WITH THE APPROPRIATE UTILITY AGENCY, CONTRACTING OFFICER AND FORT DRUM. IT IS THE CONTRACTOR'S RESPONSIBILITY TO DETERMINE THE AVAILABILITY OF UTILITIES AND TO ENCLOSE, SECURE, AND SET UP THEIR OPERATIONAL AREA. IMMEDIATELY PRIOR TO MOBILIZATION, CONFIRM WITH FORT DRUM ON THE AVAILABILITY FOR THE BASE TO PROVIDE TEMPORARY WATER. FORT DRUM WILL PROVIDE TEMPORARY ELECTRICAL AND NATURAL GAS SERVICE AT NO COST TO THE CONTRACTOR. THE CONTRACTOR IS RESPONSIBLE FOR ALL COSTS ASSOCIATED WITH THE INSTALLATION, REMOVAL AND SITE RESTORATION FOR TEMPORARY UTILITY SERVICE FROM THE POINTS OF CONNECTION TO THE CONTRACTOR PRIMARY STAGING AREA. COORDINATE THE POINTS OF CONNECTIONS TO FORT DRUM UTILITIES WITH FORT DRUM ENGINEERING. ALL OTHER TEMPORARY UTILITY SERVICE REQUIRED AT THE STAGING AREA WILL BE AT THE CONTRACTOR'S EXPENSE AND MUST BE COORDINATED DIRECTLY WITH THE UTILITY SERVICE OWNER. THE CONTRACTOR IS RESPONSIBLE FOR ALL COSTS ASSOCIATED WITH PROVIDING PORTABLE SANITARY FACILITIES AT THE STAGING AREA. PRIOR TO INSTALLING TEMPORARY UTILITIES, INSTALL UTILITY GRADE METERS FOR ALL UTILITY SERVICES PROVIDED BY FORT DRUM AND AS REQUIRED BY THE UTILITY SERVICE OWNER OR UTILITY SERVICE PROVIDER. PROVIDE METER READINGS AS PART OF THE MONTHLY INVOICE SUBMITTAL TO THE COR AND FORT DRUM ENERGY MANAGER FOR FORT DRUM OWNED UTILITY SERVICES. PROVIDE A MINIMUM 48 HOURS NOTICE TO THE GOVERNMENT TO INSPECT ALL TEMPORARY UTILITY CONNECTIONS PRIOR TO

ACTIVATING UTILITIES FOR USE.

11. INSPECT THE CONSTRUCTION HAUL ROUTES ON EXISTING PAVEMENT WITH PHOTOGRAPH DOCUMENTATION BEFORE AND AFTER CONSTRUCTION WITH THE COR. REPAIR ANY DAMAGE TO THE HAUL ROUTE PAVEMENTS OR ACCESS ROADS AT THE CONTRACTOR'S EXPENSE. ROADWAYS MUST BE MAINTAINED THROUGHOUT THE PROJECT DURATION TO ALLOW SAFE USE BY FORT DRUM. PROVIDE A HAUL ROAD RELEASE SIGNED BY FORT DRUM DPW, THE CONTRACTOR AND USACE UPON COMPLETION OF THE PROJECT AND AFTER THE HAUL ROUTES HAVE BEEN RESTORED TO ORIGINAL OR BETTER CONDITION.

12. SUBMIT A WORK PLAN A MINIMUM OF 30-CALENDAR DAYS PRIOR TO BEGINNING CONSTRUCTION ACTIVITIES ON THE PROJECT. AT A MINIMUM, THE WORK PLAN MUST INCLUDE A SCHEDULE OF ACTIVITIES, METHODS OF EXCAVATING, PROPOSED EXCAVATION EQUIPMENT, TEMPORARY STORAGE METHODS, PROPOSED TEMPORARY STORAGE LOCATION ON SITE, CONTRACTOR SPECIFIC MEASURES WHEN WORKING IN THE AREAS INCLUDED IN THE WORK PLAN, PROPOSED DISPOSAL LOCATIONS FOR CONTAMINATED SOIL AND PROPOSED DISPOSAL LOCATIONS FOR UNRESTRICTED USE SOIL.

13. DO NOT ALLOW EQUIPMENT OR OTHER VEHICLES TO PARK ON ACTIVE TAXIWAYS, TOWWAYS, OR WITHIN THE CLEARANCE BOUNDARY LIMITS INDICATED ON THE PHASING SERIES SHEETS AT ANY TIME. ALL ACTIVE RUNWAYS, TAXIWAYS, AND APRONS MUST REMAIN CLEAR FOR AIRCRAFT AND EMERGENCY VEHICLES.

14. THE CONTRACTOR IS RESPONSIBLE FOR ANY IMPROVEMENTS NECESSARY TO UPGRADE EXISTING ABANDONED ROADS OR TO CREATE ADDITIONAL ROADS FOR USE AS HAUL ROUTES AS NECESSARY FOR THIS PROJECT. REMOVE TEMPORARY ROADS AT THE CONCLUSION OF THE PROJECT AND RETURN AREAS TO PREVIOUS CONDITION UNLESS OTHERWISE DIRECTED BY THE CONTRACTING OFFICER.

15. EXISTING UNDERGROUND UTILITIES AND STRUCTURES ARE SHOWN AT APPROXIMATE LOCATIONS AND DEPTHS. THERE MAY BE OTHER EXISTING UTILITIES OR STRUCTURES LOCATED WITHIN THE PROJECT AREA WHICH ARE NOT PRESENTLY KNOWN. PRIOR TO CONSTRUCTION, CONTACT UNDERGROUND UTILITIES CALL CENTER OF NEW YORK FOR EXACT LOCATIONS OF UNDERGROUND UTILITIES (1-800-962-7962) AND FORT DRUM DPW TO OBTAIN DIG PERMITS AND UTILITY CLEARANCES. USE GROUND PENETRATING RADAR ACROSS ALL PAVEMENT SURFACES IDENTIFIED FOR REMOVAL PRIOR TO BEGINNING DEMOLITION. VERIFY THE LOCATION OF ALL EXISTING UTILITIES PRIOR TO ANY DEMOLITION TO ENSURE THAT ONLY THE UTILITIES AND FEATURES MARKED FOR DEMOLITION ARE REMOVED, AND ALL OTHER UTILITIES AND FEATURES ARE NOT DISTURBED. ANY UTILITIES TO REMAIN, WHICH ARE DISTURBED BY THE CONTRACTOR, MUST BE REPAIRED BY THE CONTRACTOR AT NO ADDITIONAL COST TO THE GOVERNMENT. CONTRACTOR MAY NOT BEGIN ANY EXCAVATION UNTIL ALL NAVAID, AIRFIELD LIGHTING, ELECTRICAL, COMMUNICATION CABLES AND ALL OTHER UNDERGROUND UTILITIES LOCATED IN

THE CONSTRUCTION AREA HAVE BEEN IDENTIFIED BY THE CONTRACTOR.

16. IMMEDIATELY REPAIR ANY DAMAGE TO UTILITIES, AT THE CONTRACTOR'S EXPENSE, AS DIRECTED BY THE COR, IN THE EVENT OF CONTRACTOR INFLICTED DAMAGE TO EXISTING UTILITIES AND CABLES THAT ARE MARKED IN THE FIELD AND SHOWN TO REMAIN. IMMEDIATELY NOTIFY THE WSAAF PROJECT MANAGER AND AIRFIELD MANAGEMENT POINT OF CONTACT WHENEVER UTILITIES ARE DAMAGED BY THE CONTRACTOR. INSPECT UTILITIES AND NOTIFY THE CONTRACTING OFFICER OF ANY PRIOR DAMAGE BEFORE STARTING WORK IN THE PROJECT AREA.

17. CONTROL DUST FROM THEIR OPERATIONS TO A LEVEL ACCEPTABLE TO THE COR AND IN ACCORDANCE WITH ALL APPLICABLE PERMITS AT ALL TIMES. PROVIDE VACUUM SWEEPER TRUCKS, WATER TRUCKS, AND OTHER EQUIPMENT NECESSARY TO CONTROL DUST AND DEBRIS AT ALL TIMES. POSITION ALL EQUIPMENT REQUIRED TO CONTROL THE DUST WITHIN THE LIMITS OF CONSTRUCTION AND IN GOOD WORKING CONDITION. ALL METHODS FOR CONTROLLING DUST AND DEBRIS IS SUBJECT TO THE APPROVAL OF THE COR. DUST AND DEBRIS CONTROL MUST BE STRICTLY MONITORED DUE TO ITS IMPACT ON AIRCRAFT SAFETY. FAILURE TO PROPERLY CONTROL DUST AND DEBRIS OR TO IMMEDIATELY RESPOND TO ANY REQUEST TO DO SO WILL RESULT IN CONSTRUCTION ACTIVITIES BEING STOPPED BY THE THE GOVERNMENT UNTIL DUST AND DEBRIS CAN BE PROPERLY CONTROLLED. CONSTRUCTION SCHEDULE EXTENSIONS WILL NOT BE GRANTED FOR LOST TIME ASSOCIATED WITH DUST AND DEBRIS

WORK STOPPAGES.

18. HOLD WEEKLY MEETINGS WITH THE WSAAF PROJECT MANAGER AND OTHER INTERESTED PARTIES TO COORDINATE CLOSURES, WORK AREAS, CONTRACTOR ACCESS, AND CONSTRUCTION SCHEDULES.

PROVIDE A MINIMUM TWO WEEK SCHEDULE OF PROPOSED CONSTRUCTION ACTIVITIES PRIOR TO EACH WEEKLY MEETING. ADDITIONAL MEETINGS MAY BE HELD AS NECESSARY.

19. THE GOVERNMENT RESERVES THE RIGHT TO CONTRACT, AND PERFORM, OTHER WORK ON, OR NEAR, THE WORK COVERED BY THIS CONTRACT. WHEN SEPARATE CONTRACTS ARE WITHIN THE WORK LIMITS OF ANY ONE PROJECT, EACH CONTRACTOR MUST CONDUCT THEIR WORK SO AS NOT TO INTERFERE OR HINDER THE PROGRESS OF ANY OTHER CONTRACTORS WORKING IN THE SAME AREA.

20. CONFORM TO ALL LOCAL, REGIONAL, STATE AND FEDERAL REGULATIONS REGARDING THE PROTECTION OF THE ENVIRONMENT THROUGHOUT THE DURATION OF THE PROJECT. ACQUIRE, AT THE CONTRACTOR'S EXPENSE, ANY AND ALL PERMITS ASSOCIATED WITH THE CONSTRUCTION ACTIVITIES TO BE ACCOMPLISHED BY THE CONTRACTOR. CONSTRUCTION SCHEDULE EXTENSIONS WILL NOT BE

GRANTED FOR THE TIME REQUIRED TO COMPLETE THE APPLICABLE PERMITS.

21. PRIOR TO BEGINNING ANY WORK, VERIFY VERTICAL AND HORIZONTAL CONTROL FROM THE INFORMATION GIVEN ON THE SURVEY CONTROL PLAN. INFORM THE ENGINEER OF ANY DISCREPANCIES NOTED IN THE DESIGN SURVEY INFORMATION. IN THE EVENT OF A CONFLICT BETWEEN THE ORIGINAL DESIGN SURVEY AND THE CONTRACTOR SITE VERIFICATION SURVEY, THE ENGINEER MUST EVALUATE THE NEW INFORMATION AND PROVIDE DESIGN REVISIONS BEFORE THE CONTRACTOR CAN COMMENCE WITH THE WORK.

22. THE CONTRACTOR MUST BE AVAILABLE AS REQUIRED BY THE COR, WSAAF PROJECT MANAGER, OR WSAAF AIRFIELD OPERATIONS MANAGER, DURING THE PROJECT TO MAINTAIN PHASING SAFETY DEVICES OR CORRECT DUST AND DEBRIS ISSUES, AS DESIRED BY THE WSAAF PROJECT MANAGER OR AIRFIELD MANAGEMENT.

23. RETAIN A LICENSED LAND SURVEYOR FOR ALL PAVEMENT, UTILITY AND FIELD STAKEOUT AT THE CONTRACTOR'S EXPENSE. SURVEY ALL EXISTING UNDERGROUND UTILITIES ENCOUNTERED THROUGHOUT THE PROJECT. PROVIDE SURVEY INFORMATION, TO INCLUDE LOCATION, DEPTH, AND UTILITY INFORMATION TO THE WSAAF PROJECT MANAGER AND AS PART OF THE CLOSEOUT DOCUMENTS.

24. PROVIDE AS-BUILT RECORD DRAWINGS IN ACCORDANCE WITH CONTRACT REQUIREMENTS .THE PRIME CONTRACTOR MUST RETAIN THE SERVICES OF A LICENSED LAND SURVEYOR TO COMPLETE THE AS-BUILT RECORD SURVEY AND RETAIN A LICENSED PROFESSIONAL ENGINEER AND ARCHITECT, AS APPLICABLE, TO PREPARE THE AS-BUILT RECORD DRAWINGS. AS-BUILT RECORD DRAWINGS MUST BEAR THE SEAL AND SIGNATURE OF THE LICENSED PROFESSIONAL FOR THE APPLICABLE ENGINEERING AND ARCHITECTURAL DISCIPLINES. THE AS-BUILT RECORD SURVEY MUST BEAR THE SEAL AND SIGNATURE OF THE LICENSED LAND SURVEYOR. ALL PROFESSIONALS MUST BE LICENSED IN THE STATE OF NEW YORK.

25. SUBMIT AND OBTAIN A FORT DRUM EXCAVATION PERMIT IN ACCORDANCE WITH THE MOST RECENT VERSION OF THE FORT DRUM GARRISON POLICY 23-11, EXCAVATION PERMITS. SURVEY ALL UTILITY MARKINGS PRIOR TO STARTING EXCAVATION WORK. MAINTAIN UTILITY MARKINGS THROUGHOUT THE DURATION OF THE PROJECT CONSTRUCTION. PHYSICALLY VERIFY THE HORIZONTAL AND VERTICAL LOCATIONS OF EXISTING UTILITIES PRIOR TO CONSTRUCTION TO IDENTIFY ANY EXISTING UTILITY CONFLICTS WITH THE DESIGN PLANS. USE GROUND PENETRATING RADAR ACROSS ALL PAVEMENT

SURFACES IDENTIFIED FOR REMOVAL PRIOR TO BEGINNING DEMOLITION.

26. SUBMIT A SNOW AND ICE REMOVAL PLAN AS PART OF THE CONTRACTOR'S WORK PLAN SUBMITTAL TO THE GOVERNMENT FOR REVIEW AND APPROVAL PRIOR TO BEGINNING CONSTRUCTION ACTIVITIES.

THE CONTRACTOR IS RESPONSIBLE FOR ALL COSTS ASSOCIATED WITH THE REMOVAL OF SNOW AND ICE WITHIN THE DEFINED CONSTRUCTION FREE ZONES AS NEEDED TO COMPLETE THE PROJECT. FORT DRUM WILL NOT REMOVE SNOW OR ICE WITHIN THE CONTRACTORS ESTABLISHED CONSTRUCTION FREE ZONES. THE CONTRACTOR IS RESPONSIBLE FOR ALL SNOW AND ICE MANAGEMENT AND REMOVAL OPERATIONS REQUIRED TO CLEAR PORTIONS OF RUNWAY 03-21 FROM SNOW AND ICE TO ALLOW FOR WORK TO PROCEED DURING PHASE 2. IN ADDITION, PRIOR TO TURNING OVER PORTIONS OF THE PROJECT TO THE GOVERNMENT AND PRIOR TO REMOVING LOW-PROFILE BARRICADES AND FREE ZONE BOUNDARY FENCES PLACED AS PART OF THE PROJECT, REMOVE ALL SNOW AND ICE FROM ALL PAVED SURFACES LOCATED WITHIN THE CONSTRUCTION FREE ZONES AND AROUND AIRFIELD GUIDANCE SIGNS AND LIGHTS, TO THE SATISFACTION OF THE CONTRACTING OFFICER AT NO ADDITIONAL COST TO THE GOVERNMENT. THE SNOW AND ICE REMOVAL PLAN MUST INCLUDE PROPOSED SNOW STOCKPILE LOCATIONS. COORDINATE THE PROPOSED LOCATIONS TO STOCKPILE SNOW WITH WSAAF OPERATION, PW ROADS AND GROUNDS PRIOR TO INCLUDING THE PROPOSED LOCATIONS ON THE PLAN. ALL STOCKPILED SNOW MUST REMAIN BELOW THE AIRSPACE SURFACES INDICATED ON SHEET GI103. COORDINATE WITH FORT DRUM ROADS AND GROUNDS FOR APPROVED DEICING AGENTS. ROAD SALT IS NOT PERMITTED AS A DEICING AGENT.

27. COORDINATE WITH THE DPW SOLID WASTE MANAGER PRIOR TO BEGINNING CONSTRUCTION OPERATIONS. ALL CONSTRUCTION AND DEMOLITION DEBRIS (C&D) WILL BE DISPOSED OF OFF GOVERNMENT PROPERTY IN ACCORDANCE WITH ALL FEDERAL, STATE AND LOCAL LAW AND REGULATIONS TO INCLUDE NYS 6 CCR 364 REQUIREMENTS FOR TRANSPORTATION OF MATERIALS AND NYS 6 CCR 360. REFER TO THE FT. DRUM CONSTRUCTION & DEMOLITION DEBRIS DOCUMENT ATTACHED TO SECTION 01 74 19 FOR ADDITIONAL REQUIREMENTS. APPLY THE MOST STRINGENT REQUIREMENT IN THE EVENT OF A CONFLICT AMONG THE LAWS, REGULATIONS OR REQUIREMENTS. RECORD ALL SOLID WASTE GENERATED, RECYCLED OR DISPOSED OF AS A RESULT OF PROJECT ACTIVITIES (INCLUDING ALL C&D DEBRIS).

RECORD WEIGHT FOR MATERIAL DISPOSED OF AT A PERMITTED FACILITY USING WEIGHT TICKETS. RECORD THE APPROXIMATE WEIGHT AND VOLUME FOR MATERIAL REUSED OR RECYCLED AS PART OF THIS PROJECT. DOCUMENT ALL SOLID WASTE GENERATED AS PART OF THIS PROJECT ON THE MONTHLY SOLID WASTE REPORT. SUBMIT THE MONTHLY SOLID WASTE REPORT TO THE GOVERNMENT AS PART OF THE MONTHLY INVOICE SUBMITTAL. THE CONTRACTOR IS RESPONSIBLE FOR ALL COSTS FOR THE TRANSPORTATION AND DISPOSAL OF C&D WASTE AT NO ADDITIONAL COST TO THE GOVERNMENT.

28. ALL CONCRETE AND ASPHALT WASTE GENERATED ON THE PROJECT WILL BECOME THE PROPERTY OF THE CONTRACTOR. REMOVE CONCRETE AND ASPHALT WASTE FROM GOVERNMENT PROPERTY AT NO ADDITIONAL COST TO THE GOVERNMENT. RECYCLE METAL WASTE GENERATED FROM CONSTRUCTION ACTIVITIES AT A LOCATION OFF GOVERNMENT PROPERTY IN ACCORDANCE WITH LOCAL, STATE AND FEDERAL LAWS AND REGULATIONS. THE CONTRACTOR MAY TEMPORARILY STORE METAL WASTE GENERATED FROM CONSTRUCTION ACTIVITIES IN A ROLL OFF DUMPSTER LOCATED IN THE CONTRACTOR'S STAGING AREA. IF ELECTING TO TEMPORARILY STORE THE METAL WASTE, THE CONTRACTOR IS RESPONSIBLE FOR ALL COSTS ASSOCIATED WITH PROVIDING THE ROLL OFF DUMPSTER AND THE TRANSPORT OF THE METAL WASTE FROM THE CONSTRUCTION SITE TO THE ROLL OFF DUMPSTERS. PROVIDE WEIGHTS AND VOLUMES OF ALL DISPOSED WASTE, TO INCLUDE C&D AND RECYCLED MATERIAL, TO THE FT DRUM DPW ENVIRONMENTAL DIVISION AS PART OF THE MONTHLY SOLID WASTE REPORT. PROVIDE VOLUMES AND WEIGHTS SUPPORTED BY CERTIFIED WEIGHT TICKETS PROVIDED BY THE

LICENSED RECEIVING FACILITY.

29. THE INFORMATION PROVIDED IN THESE PLANS IS TO ASSIST THE CONTRACTOR IN ASSESSING THE NATURE AND EXTENT OF THE EXISTING CONDITIONS WHICH MAY BE ENCOUNTERED DURING THE COURSE OF WORK. LIMITED FIELD SURVEY WAS PERFORMED AND THE INFORMATION PROVIDED IS SUPPORTED VIA "AS-BUILT DATA". ALL LOCATIONS OF EXISTING UTILITIES SHOWN IN THE DRAWINGS ARE CONSIDERED APPROXIMATE AND MUST BE FIELD VERIFIED BY THE CONTRACTOR. EXISTING EDGES OF PAVEMENTS AND ALL PAVEMENT MARKINGS FOR TAXIWAYS BEYOND THE EXISTING RUNWAY 3-21 HOLD MARKINGS SHOWN ARE APPROXIMATE AND WERE DERIVED FROM EXISTING GIS BASEMAPPING AND AS-BUILT DATA PROVIDED BY THE GOVERNMENT.

30. THE CONTRACTOR MUST FIRST COORDINATE WITH FORT DRUM DEPARTMENT OF PUBLIC WORKS TO LOCATE AND IDENTIFY ALL EXISTING UTILITIES AT LOCATIONS THAT WILL BE TIED INTO OR AT LOCATIONS OF POTENTIAL CONFLICTS TO THE CONSTRUCTION OF FACILITIES SHOWN IN THESE PLANS. THE NECESSARY ELEVATIONS MUST BE OBTAINED AT THESE LOCATIONS TO DETERMINE THAT THE PROPER CLEARANCE BETWEEN NEW AND EXISTING INFRASTRUCTURE ARE OBTAINED. FIELD ADJUST PROPOSED UTILITIES WITH EXISTING UTILITIES TO MITIGATE CONFLICTS AT NO ADDITIONAL COST TO THE GOVERNMENT. THE COR AND FORT DRUM ENGINEERING MUST APPROVE FIELD ADJUSTMENTS PRIOR TO CONSTRUCTION. PROVIDE THE COR THE LOCATIONS AND ELEVATIONS OF POSSIBLE CONFLICTS IMMEDIATELY FOR REVIEW AND/OR RESOLUTION AND APPROVAL. THE CONTRACTOR MUST NOT ORDER ANY MATERIALS OR PROCEED WITH ANY ELEMENT OF WORK WHICH MAY BE AFFECTED BY POTENTIAL CONFLICTS UNTIL ALL CONFLICTS HAVE BEEN FIRST RESOLVED AND APPROVED FOR CONSTRUCTION BY THE COR. COORDINATE WITH THE COR TO HAVE A FORT DRUM REPRESENTATIVE ONSITE TO WITNESS ALL TEMPORARY AND PERMANENT UTILITY TIE-IN CONNECTIONS TO EXISTING FORT DRUM UTILITIES.

31. LOCATE HORIZONTAL AND VERTICAL LOCATIONS OF UTILITIES PRIOR TO PERFORMING EXCAVATION. LOCATE ALL EXISTING UTILITIES AND HAND DIG WITHIN FIVE (5) FEET OF ANY KNOWN OR SUSPECTED EXISTING UNDERGROUND UTILITIES. NEW UTILITIES INSTALLED MUST MAINTAIN A 1 FOOT OFFSET HORIZONTALLY AND VERTICALLY FROM EXISTING UTILITIES.

32. CONTRACTOR MUST MOBILIZE A CONCRETE BATCH PLANT AT THE LOCATION INDICATED ON THE DRAWINGS. THE CONTRACTOR MUST BATCH ALL AIRFIELD CONCRETE REQUIRED ON THE PROJECT USING THE CONTRACTOR'S ONSITE BATCH PLANT. THE PROPOSED CONTRACTOR BATCH PLANT STAGING AREA IS LOCATED ON GOVERNMENT PROPERTY. THE LIMITS SHOWN ARE APPROXIMATE. CONTRACTOR IS RESPONSIBLE FOR ALL WORK AND COSTS REQUIRED TO PREPARE THE BATCH PLANT STAGING AREA PRIOR TO MOBILIZING EQUIPMENT. CONTRACTOR MUST COMPLY WITH ALL NYS DEC REQUIREMENTS.

EROSION AND SEDIMENT CONTROL DEVICES SHALL BE IN LINE WITH THE 2024 NYSDEC STORMWATER MANAGEMENT DESIGN MANUAL AND APPROVED BY OWNER PRIOR TO MOBILIZING EQUIPMENT.

CONTRACTOR MUST SUBMIT STORMWATER MANAGEMENT PLAN TO OWNER FOR APPROVAL PRIOR TO IMPLEMENTING. UTILITIES FOR THE BATCH PLANT STAGING AREA MUST BE ARRANGED FOR BY THE CONTRACTOR DIRECTLY WITH THE APPROPRIATE UTILITY AGENCY, CONTRACTING OFFICER AND FORT DRUM. IT IS THE CONTRACTOR'S RESPONSIBILITY TO ENCLOSE, SECURE, AND SET UP THEIR OPERATIONAL AREA. THE CONTRACTOR IS RESPONSIBLE FOR ALL COSTS ASSOCIATED WITH THE INSTALLATION, REMOVAL AND SITE RESTORATION FOR TEMPORARY UTILITY SERVICE FROM THE POINTS OF CONNECTION TO THE CONTRACTOR BATCH PLANT STAGING AREA. COORDINATE THE POINTS OF CONNECTIONS TO FORT DRUM UTILITIES WITH FORT DRUM ENGINEERING. FORT DRUM WILL PROVIDE TEMPORARY ELECTRICAL AND WATER SERVICE AT NO COST TO THE CONTRACTOR. THE CONTRACTOR IS RESPONSIBLE FOR ALL COSTS ASSOCIATED WITH PROVIDING PORTABLE SANITARY FACILITIES AT THE BATCH PLANT STAGING AREA. PRIOR TO INSTALLING TEMPORARY UTILITIES, INSTALL UTILITY GRADE METERS FOR ALL UTILITY SERVICES PROVIDED BY FORT DRUM AND AS REQUIRED BY THE UTILITY SERVICE OWNER OR UTILITY SERVICE PROVIDER. PROVIDE METER READINGS AS PART OF THE MONTHLY INVOICE SUBMITTAL TO THE COR AND FORT DRUM ENERGY MANAGER FOR FORT DRUM OWNED UTILITY SERVICES. PROVIDE A MINIMUM 48 HOURS NOTICE TO THE GOVERNMENT TO INSPECT ALL TEMPORARY UTILITY CONNECTIONS PRIOR TO ACTIVATING UTILITIES FOR USE.

33. CONTRACTOR IS NOT AUTHORIZED TO DEMOBILIZE THE CONCRETE BATCH PLANT UNTIL RECEIVING GOVERNMENT APPROVAL ON ALL AIRFIELD CONCRETE LOT SUBMITTALS. THE GOVERNMENT WILL PROVIDE NO CONSIDERATION ON CONTRACT EXTENSIONS OR COSTS ASSOCIATED WITH THE REQUIREMENTS TO REMOBILIZE AN ONSITE CONCRETE BATCH PLANT IN THE EVENT ADDITIONAL AIRFIELD PLACEMENT IS REQUIRED AND THE CONTRACTOR DEMOBILIZED THE ONSITE BATCH PLANT PRIOR TO RECEIVING FULL APPROVAL ON ALL CONCRETE LOT SUBMITTALS.

GENERAL NOTES:

1. CONDUCT ALL ACTIVITIES IN A SAFE MANNER. DEVELOP AN ACCIDENT PROTECTION PLAN (APP) AND APPOINT A SITE SAFETY AND HEALTH OFFICER (SSHO) IN ACCORDANCE WITH SPECIFICATION SECTION 01 35 26 WHO WILL TRAIN ALL WORKERS IN ACCORDANCE WITH THE APPROVED APP PLAN. COMPLETE RECURRING SAFETY TRAINING THROUGHOUT THE DURATION OF THE PROJECT. THE GOVERNMENT CAN DIRECT A STOPPAGE OF WORK IF NOTICED OF WORK BEING CONDUCTED IN AN UNSAFE MANNER.

2. A CONSTRUCTION FREE ZONE ON THIS PROJECT IS DEFINED AS A WORK ZONE WITH THE BOUNDARIES DEFINED BY THE PLACEMENT OF THE REQUIRED CONSTRUCTION CONTROL DEVICES INDICATED ON THE DRAWINGS. THE CONTRACTOR IS RESPONSIBLE FOR THE PROCUREMENT, MAINTENANCE AND INSTALLATION OF ALL CONSTRUCTION CONTROL DEVICES REQUIRED TO ESTABLISH THE CONSTRUCTION FREE ZONE. CONTRACTOR PERSONNEL ARE AUTHORIZED UNRESTRICTED MOVEMENT WITHIN THE DEFINED CONSTRUCTION FREE ZONE ONCE ALL CONSTRUCTION CONTROL DEVICES ARE INSTALLED TO MATCH THE CONSTRUCTION SAFETY AND PHASING PLAN. THE CONTRACTOR, SUBCONTRACTORS, AND OTHER PERSONNEL ARE REQUIRED TO STAY WITHIN THE DEFINED CONSTRUCTION FREE ZONE LIMITS.

THE CONTRACTOR MUST CONTROL ACCESS TO THE CONSTRUCTION FREE ZONE USING AN ENTRY AUTHORIZATION LIST AND CHECKING IDENTIFICATION CARDS.

3. SEPARATE WORK AREAS FROM TRAVEL LANES WITH THE APPROPRIATE TRAFFIC CONTROL DEVICES AND MEASURES. INSTALLATION OF ALL SIGNS, TEMPORARY FENCING, BARRICADES, AND OTHER MEASURES MUST BE APPROVED BY THE WSAAF PROJECT MANAGER AND AIRFIELD MANAGEMENT PRIOR TO COMMENCING ANY WORK.

4. THE WSAAF WILL REMAIN OPERATIONAL DURING CONSTRUCTION. AIRCRAFT WILL HAVE THE RIGHT OF WAY AT ALL TIMES. DO NOT TRAVEL ON ANY ACTIVE AIRFIELD PAVEMENT SURFACES UNLESS PREVIOUSLY APPROVED AND COORDINATED WITH THE COR, THE WSAAF PROJECT MANAGER, AND AIRFIELD MANAGEMENT.

5. THE PROJECT AREAS ARE LOCATED NEAR ACTIVE TAXIWAYS AND RUNWAYS. ALL CONSTRUCTION ACTIVITIES MUST BE CONDUCTED IN A MANNER ACCEPTABLE TO THE COR, THE WSAAF PROJECT MANAGER, AND AIRFIELD MANAGEMENT TO PROVIDE ACCEPTABLE LEVELS OF SAFETY FOR ALL BASE AIRFIELD OPERATIONS AND CONTRACTOR PERSONNEL.

6. PRIOR TO OPENING ANY AIRFIELD PAVEMENT AREAS, REMOVE ALL MATERIALS AND FOREIGN OBJECT DEBRIS FROM THE PAVEMENT SURFACES. ONCE THE PAVEMENTS ARE CLEARED FOR AIRCRAFT OPERATIONS BY WSAAF AIRFIELD MANAGEMENT REPRESENTATIVE, REMOVE ALL BARRICADES AND OTHER TRAFFIC CONTROL DEVICES TO ALLOW REOPENING OF THE PAVEMENT.

7. REPAINT ANY MARKINGS THAT ARE DAMAGED BY THE CONTRACTOR DURING THEIR CONSTRUCTION OPERATIONS.

8. STAGE ALL VEHICLES, EQUIPMENT, AND MATERIAL STOCKPILES WITHIN THE APPROVED STAGING AREA. DURING PHASE 1, TEMPORARILY STORE ALL EQUIPMENT REQUIRED TO COMPLETE THE WORK ACTIVITY BEING COMPLETED ON THE AIRFIELD IN A SINGLE LOCATION AT THE END OF EACH WORK DAY IN THE "MUSTER POINT" LOCATIONS INDICATED ON THE DRAWINGS. THE MUSTER POINT LOCATIONS ARE APPROXIMATE, ADJUST THE LOCATION THROUGHOUT CONSTRUCTION TO THE SATISFACTION OF THE WSAAF MANAGER. ALL STAGED EQUIPMENT MUST REMAIN BELOW THE AIRSPACE SURFACES INDICATED ON SHEET GI103. THE TERM "TEMPORARY" IS DEFINED AS ANY PERIOD NOT EXCEEDING 72 CONSECUTIVE HOURS OF NON-USE. ANY EQUIPMENT NOT USED FOR CONSTRUCTION FOR MORE THAN 72 CONSECUTIVE HOURS MUST BE RETURNED TO THE CONTRACTOR'S STAGING AREA. ALL TEMPORARILY STAGED EQUIPMENT MUST BE SECURED AGAINST JET BLAST, PROP WASH, AND HIGH WINDS TO PREVENT FOREIGN OBJECT DEBRIS. DURING NON-WORKING HOURS OR PERIODS OF LOW VISIBILITY, ALL TEMPORARILY STAGED EQUIPMENT MUST BE MARKED WITH APPROPRIATE BARRICADES AND RED HAZARD LIGHTING. ALL MAJOR STAGED EQUIPMENT MUST DISPLAY A VISIBLE, CURRENT CONTRACTOR EMERGENCY CONTACT NUMBER FOR IMMEDIATE ACCESS AND REMOVAL. THE AIRPORT RESERVES THE RIGHT TO REMOVE AND RELOCATE ANY NON-COMPLIANT EQUIPMENT AT THE CONTRACTOR'S EXPENSE.

9. INTERRUPTION OF EXISTING AIRFIELD LIGHTING SYSTEMS IS NOT PERMITTED, EXCEPT FOR LOCATIONS WITHIN THE PROJECT AREA AS SHOWN ON THE DRAWINGS. ALL AIRFIELD LIGHTING CIRCUITS AFFECTED BY THIS PROJECT MUST BE TEMPORARILY MAINTAINED BY THE CONTRACTOR DURING OPERATIONAL PERIODS AND COORDINATED THROUGH THE PROJECT REPRESENTATIVE. IMMEDIATELY REPLACE ANY AIRFIELD SIGNS AND LIGHTS DAMAGED AS A RESULT OF THE CONTRACTOR'S ACTIVITIES, AT THE CONTRACTOR'S EXPENSE.

10. AIRFIELD LIGHTS MUST BE OPERATIONAL EVERY NIGHT DURING ALL PHASES UNLESS A SPECIFIC OUTAGE HAS BEEN GRANTED BY WSAAF AIRFIELD MANAGEMENT. SUBMIT IN WRITING AN OUTAGE REQUEST TO THE AIRFIELD MANAGER WITH DETAILED INFORMATION ON WHICH SPECIFIC LIGHTS WILL BE OUT OF SERVICE, WHEN OUTAGES WILL BEGIN, WHEN SERVICE WILL BE RESTORED, WHAT WORK WILL BE ACCOMPLISHED DURING THE OUTAGE, WHETHER ALL MATERIAL IS ON SITE, AND AN EMERGENCY CONTINGENCY PLAN IF SERVICE CANNOT BE RESTORED AS PLANNED. SUBMIT THE OUTAGE REQUEST A MINIMUM OF 28 CALENDAR DAYS PRIOR TO THE REQUESTED START DATE. THE AIRFIELD MANAGER WILL ISSUE A WRITTEN OUTAGE APPROVAL TO THE CONTRACTOR WITH ANY SPECIFIC CONDITIONS, WHICH

THE CONTRACTOR MUST FOLLOW DURING THE EXECUTION OF THE OUTAGE.

11. COMPLY WITH ALL REQUIREMENTS OF THE WSAAF, THE USACE EM 385-1-1 AND THE WSAAF AIRFIELD, SAFETY, AND OPERATIONS REGULATIONS. DESIGNATE TO THE WSAAF PROJECT MANAGER IN WRITING THE NAME OF ITS CONTRACTOR SECURITY COORDINATOR (CSC). THE CSC MUST REPRESENT THE CONTRACTOR ON THE SECURITY REQUIREMENTS FOR THE CONTRACT INCLUDING COORDINATING ALL ASPECTS NECESSARY TO BADGE CONTRACTOR AND SUBCONTRACTOR PERSONNEL. IT IS THE CONTRACTOR'S RESPONSIBILITY TO FAMILIARIZE THEMSELVES WITH THE VARIOUS ASPECTS OF THE WSAAF

SECURITY REQUIREMENTS.

12. THE CSC SHALL BE RESPONSIBLE FOR BRIEFING ALL CONTRACTOR AND SUBCONTRACTOR PERSONNEL ON THESE REQUIREMENTS AND PROVISIONS ADOPTED BY WSAAF.

13. PROVIDE THE WSAAF MANAGER AND COR WITH ALL INFORMATION REQUIRED TO PROCESS THE FAA FORM 7460-1 A MINIMUM OF 75 DAYS PRIOR TO CONSTRUCTION, IF REQUIRED. CONSTRUCTION CANNOT

BEGIN WITHOUT THE APPROVAL OF THE FORM 7460-1.

14. PROVIDE ESCORTS THROUGHOUT THE DURATION OF THE PROJECT TO SAFELY CONTROL THE MOVEMENT OF CONSTRUCTION VEHICLES AND PERSONNEL FROM THE AIRFIELD GATE TO THE PROJECT FREE ZONES. THE ESCORT MUST SAFELY LEAD ALL CONSTRUCTION VEHICLES AND PERSONNEL ACROSS THE AIRFIELD PAVEMENT TO THE PROJECT FREE ZONE.

15. ALL CONSTRUCTION VEHICLES MOVEMENT ON THE AIRFIELD MUST BE IN ACCORDANCE WITH WSAAF REQUIREMENTS. MAINTAIN CONSTANT RADIO CONTACT WITH THE ATCT AT ALL TIMES. OBSERVE PROPER RADIO PROCEDURES, AS REQUIRED BY THE CONTRACTING OFFICER, WHEN OPERATING WITHIN RADIO CONTROLLED AREAS OF THE AIRFIELD. NO PERSONNEL OR EQUIPMENT WILL BE ALLOWED IN THE CONTROLLED ZONES OF THE AIRFIELD UNTIL RADIO CONTACT HAS BEEN MADE WITH THE ATCT AND PERMISSION IS GRANTED BY THE ATCT.