Electric and Water Utilities on the Concrete Batch Plant Site.pdf
PDF 90 KB Posted
- Solicitation number
- W912DS25RA003
About this file
This document is a site utility map for a Concrete Batch Plant site, detailing electrical and water utility infrastructure requirements. The aerial map shows a 3-Phase Overhead Electric Power line and a 10-inch HDPE Water Line located along Kennedy Avenue, with multiple connection points marked. The accompanying notes specify contractor responsibilities: for electrical utilities, the contractor must provide the transformer and complete all required connections; for water utilities, the contractor must make all required connections. The document is marked as Controlled Unclassified Information (CUI), indicating it contains sensitive but unclassified data requiring controlled distribution.
View the file
Other files
Show all 49
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Electric and Water Utilities on the Concrete Batch Plant Site
Notes:
Electric: Contractor to provide the transformer and to make all the required connections.
Water: Contractor to make all the required connections.
3-Phase Overhead Electric Power 10 In HDPE Water Line