Solicitation Amendment W912DS25RA0020004 SF 30.pdf

PDF 3 MB Posted

Attached to
Repair Bldg. 606, General Instruction Building, Math and System Engineering Center (MSEC) USMA at West Point, NY
Solicitation number
W912DS25RA002
Issued by

About this file

This is a Standard Form 30 (SF-30) Amendment of Solicitation/Modification of Contract for a repair project for Building 606, issued by the U.S. Army Corps of Engineers (W2SSD Contracting Division). The amendment (Number 0004) extends the proposal due date from 03 October 2025 to 17 October 2025 at 2:00 PM EDT and provides additional responses and new drawings/attachments.

The amendment modifies the list of drawing sheets, adding four new contract documents (A-124_AM 4, A-564_AM 4, A-601_AM 4, and A-602_AM 4), each with one page. The project involves a comprehensive repair of Building 606, with multiple specification manual volumes and drawing sets dated between May and September 2025. The contract includes various technical drawings covering architectural, civil, electrical, structural, and mechanical aspects, with reference number W912DS19C0034 and Project Number 94078.

View the file

Other files

File Type Posted
23 30 00_AM 9.pdf PDF
I-113_AM 6.pdf PDF
I-100.4_AM 6.pdf PDF
A-206_AM 6.pdf PDF
A-314_AM 6.pdf PDF
A-313_AM 6.pdf PDF
A-312_AM 6.pdf PDF
MP-104_AM 6.pdf PDF
S-312_AM 6.pdf PDF
S-115_AM 6.pdf PDF
S-105_AM 6.pdf PDF
05 51 33_AM 6.pdf PDF
33 61 13.13_AM 6.pdf PDF
I-130_AM 6.pdf PDF
I-100.1_AM 6.pdf PDF
AD-301_AM 6.pdf PDF
A-305_AM 6.pdf PDF
A-102_AM 6.pdf PDF
Lead Inspection Report Summary.pdf PDF
SF24-23a.pdf_safe AM 5.pdf PDF
Solicitation Amendment W912DS25RA0020005 SF 30.pdf PDF
A-551_AM 5.pdf PDF
MSEC- Building 606 - Amendment 5 - RFIs - 8 Oct 25 rev JF.pdf PDF
A-124_AM 4.pdf PDF
A-601_AM 4.pdf PDF
E-601 - DIAGRAMS - ONE-LINE_AM3.pdf PDF
Criteria and Factors for Evaluation_Basis of Award_Evaluation Criteria_Rating System_AM 3 revised.pdf PDF
MS-100_AM3.pdf PDF
01 91 19_AM3.pdf PDF
01 30 00_AM3.pdf PDF
Site Walk through sign in sheet_04Sept25.pdf PDF
S-318.pdf PDF
S-112.pdf PDF
A-406.pdf PDF
A-122.pdf PDF
A-120.pdf PDF
Solicitation Amendment W912DS25RA0020002 SF 30.pdf PDF
E-513.pdf PDF
A-121.pdf PDF
07 60 00.pdf PDF
MSEC- Building 606 - Amendment 1 - RFIs - 20 Aug 25.pdf PDF
Solicitation - W912DS25RA002.pdf PDF
JA-004-25 Best Cylinders MSEC - 31 Jan 25 signedJF sDL -_Redacted.pdf PDF
JA-008-25 IDS MSEC - 31 Jan 25 signedJF sDL_Redacted.pdf PDF
JA-006-25 CAC MSEC - 31 Jan 25 signedJF sDL -_Redacted.pdf PDF
W912DS19C0034 PN 94078 Repair Building 606 Revised RTA Drawings - Volume 3.pdf PDF
W912DS19C0034 PN 94078 Repair building 606 REV.RTA Specification Manual Volume 2.pdf PDF
W912DS19C0034 PN 94078 Repair Building 606 Revised RTA Drawings - Volume 4.pdf PDF
W912DS19C0034 PN 94078 Repair building 606 REV.RTA Specification Manual Volume 3.pdf PDF
W912DS19C0034 PN 94078 Repair building 606 REV.RTA Specification Manual Volume 1.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER.

If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

16C. DATE SIGNED

Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

Section 00 01 15 - List of Drawing Sheets

The attachments table has changed from:

Identifier Document Name Document Description Reference Identifier

Date Line Item Page Numbers

Document Type

Provided Under Separate Cover

W912DS19C0034

PN 94078 Repair building 606 REV.

RTA Specification Manual Volume 1

Specification

W912DS19C0

034 PN 94078

Repair building 606

REV.RTA

Specification Manual Volume 1

13 May 2025 1395 Attachment No

0010 A-121 Drawings A-121 03 Sep 2025 1 Attachment No

0011 A-122 Drawings A-122 03 Sep 2025 1 Attachment No

0012 A-319 Drawings A-319 03 Sep 2025 1 Attachment No

0013 A-406 Drawings A-406 03 Sep 2025 1 Attachment No

0014 C-101 Drawings C-101 03 Sep 2025 1 Attachment No

0015 E-513 Drawings E-513 03 Sep 2025 1 Attachment No

0016 S-112 Drawings S-112 03 Sep 2025 1 Attachment No

0017 S-318 Drawings S-318 03 Sep 2025 1 Attachment No

0018 01 30 00-_AM3 Specification 01 30 00-

_AM3

21 Aug 2025 Attachment No

0019 01 91 19_AM3 Specification 01 91 19_AM3 23 Apr 2025 Attachment No

W912DS19C0034

PN 94078 Repair building 606 REV.

RTA Specification Manual Volume 2

Specification

W912DS19C0

034 PN 94078

Repair building 606

REV.RTA

Specification Manual Volume 2

13 May 2025 1172 Attachment No

E-512 - Details - Electrical AM3

Drawings E-512 - Details

- Electrical

AM3

17 Sep 2025 Attachment No

E-601- Diagrams - One Line AM3

Drawings E-601- Diagrams - One Line AM3

17 Sep 2025 Attachment No

E-618 Panelboard Schedules AM3

Drawings

E-618 Panelboard Schedules

AM3

17 Sep 2025 Attachment No

HP802 HVAC

Plumbing and Electrical Coordination Schedule AM3

Drawings

HP802 HVAC

Plumbing and Electrical Coordination Schedule AM3

17 Sep 2025 Attachment No

0024 M 303 AM3 Drawings M 303 AM3 17 Sep 2025 Attachment No

0025 MS 100 AM3 Drawings MS 100 AM3 17 Sep 2025 Attachment No

W912DS19C0034

PN 94078 Repair building 606 REV.

RTA Specification Manual Volume 3

Specification

W912DS19C0

034 PN 94078

Repair building 606

REV.RTA

Specification Manual Volume 3

13 May 2025 1181 Attachment No

W912DS19C0034

PN 94078 Repair Building 606 Revised RTA

Drawings

W912DS19C0

034 PN 94078

Repair Building 606

13 May 2025 118 Attachment No

W912DS25RA0020004

Drawings - Volume

Revised RTA Drawings - Volume 1

W912DS19C0034

PN 94078 Repair Building 606 Revised RTA Drawings - Volume

Drawings

W912DS19C0

034 PN 94078

Repair Building 606 Revised RTA Drawings - Volume 2

13 May 2025 236 Attachment No

W912DS19C0034

PN 94078 Repair Building 606 Revised RTA Drawings - Volume

Drawings

W912DS19C0

034 PN 94078

Repair Building 606 Revised RTA Drawings - Volume 3

13 May 2025 188 Attachment No

W912DS19C0034

PN 94078 Repair Building 606 Revised RTA Drawings - Volume

Drawings

W912DS19C0

034 PN 94078

Repair Building 606 Revised RTA Drawings - Volume 4

13 May 2025 177 Attachment No

0008 07 60 00 Specification 07 60 00 03 Sep 2025 21 Attachment No

0009 A-120 Drawings A-120 03 Sep 2025 1 Attachment No

To:

Identifier Document Name Document Description Reference Identifier

Date Line Item Page Numbers

Document Type

Provided Under Separate Cover

W912DS19C0034

PN 94078 Repair building 606 REV.

RTA Specification Manual Volume 1

Specification

W912DS19C0

034 PN 94078

Repair building 606

REV.RTA

Specification Manual Volume 1

13 May 2025 1395 Attachment No

0010 A-121 Drawings A-121 03 Sep 2025 1 Attachment No

0011 A-122 Drawings A-122 03 Sep 2025 1 Attachment No

0012 A-319 Drawings A-319 03 Sep 2025 1 Attachment No

0013 A-406 Drawings A-406 03 Sep 2025 1 Attachment No

0014 C-101 Drawings C-101 03 Sep 2025 1 Attachment No

0015 E-513 Drawings E-513 03 Sep 2025 1 Attachment No

0016 S-112 Drawings S-112 03 Sep 2025 1 Attachment No

0017 S-318 Drawings S-318 03 Sep 2025 1 Attachment No

0018 01 30 00-_AM3 Specification 01 30 00-

_AM3

21 Aug 2025 19 Attachment No

0019 01 91 19_AM3 Specification 01 91 19_AM3 23 Apr 2025 10 Attachment No

W912DS19C0034

PN 94078 Repair building 606 REV.

RTA Specification Manual Volume 2

Specification

W912DS19C0

034 PN 94078

Repair building 606

REV.RTA

Specification Manual Volume 2

13 May 2025 1172 Attachment No

E-512 - Details - Electrical AM3

Drawings E-512 - Details

- Electrical

AM3

17 Sep 2025 1 Attachment No

E-601- Diagrams - One Line AM3

Drawings E-601- Diagrams - One Line AM3

17 Sep 2025 1 Attachment No

E-618 Panelboard Schedules AM3

Drawings

E-618 Panelboard Schedules

AM3

17 Sep 2025 1 Attachment No

HP802 HVAC

Plumbing and Electrical Coordination Schedule AM3

Drawings

HP802 HVAC

Plumbing and Electrical Coordination Schedule AM3

17 Sep 2025 1 Attachment No

0024 M 303 AM3 Drawings M 303 AM3 17 Sep 2025 1 Attachment No

0025 MS 100 AM3 Drawings MS 100 AM3 17 Sep 2025 1 Attachment No

0026 A-124_AM 4 Drawings A-124_AM 4 25 Sep 2025 1 Attachment No

0027 A-564_AM 4 Drawings A-564_AM 4 25 Sep 2025 1 Attachment No

0028 A-601_AM 4 Drawings A-601_AM 4 25 Sep 2025 1 Attachment No

0029 A-602_AM 4 Drawings A-602_AM 4 25 Sep 2025 1 Attachment No

W912DS19C0034

PN 94078 Repair building 606 REV.

RTA Specification Manual Volume 3

Specification

W912DS19C0

034 PN 94078

Repair building 606

REV.RTA

Specification Manual Volume 3

13 May 2025 1181 Attachment No

W912DS19C0034

PN 94078 Repair Building 606 Revised RTA Drawings - Volume

Drawings

W912DS19C0

034 PN 94078

Repair Building 606 Revised RTA Drawings - Volume 1

13 May 2025 118 Attachment No

W912DS19C0034

PN 94078 Repair Building 606 Revised RTA Drawings - Volume

Drawings

W912DS19C0

034 PN 94078

Repair Building 606 Revised RTA Drawings - Volume 2

13 May 2025 236 Attachment No

W912DS19C0034

PN 94078 Repair Building 606 Revised RTA Drawings - Volume

Drawings

W912DS19C0

034 PN 94078

Repair Building 606 Revised RTA Drawings - Volume 3

13 May 2025 188 Attachment No

W912DS19C0034

PN 94078 Repair Building 606 Revised RTA Drawings - Volume

Drawings

W912DS19C0

034 PN 94078

Repair Building 606 Revised RTA Drawings - Volume 4

13 May 2025 177 Attachment No

0008 07 60 00 Specification 07 60 00 03 Sep 2025 21 Attachment No

0009 A-120 Drawings A-120 03 Sep 2025 1 Attachment No

The following contract documents were added:

A-124_AM 4

A-564_AM 4

A-601_AM 4

A-602_AM 4

The following contract documents Page Counts were changed:

DOCUMENT PAGE COUNTS

DOCUMENT NAME FROM TO

A-124_AM 4 none 1

A-564_AM 4 none 1

A-601_AM 4 none 1

A-602_AM 4 none 1

IDCode: J
Page: 1
Pages: 4
AmendNo: 0004
EffDate: 25 SEP 2025
ReqNo:
ProjNo: PANNAD-25-P-0000 000139
IssCode: W912DS
AdmCode:
IssuedBy: W2SD ENDIST NEW YORK

KO CONTRACTING DIVISION, 696 VIRGINIA ROAD

CONCORD, MA 01742-2751

UNITED STATES

BRIAN WINTERS, EMAIL: BRIAN.H.WINTERS@USACE.ARMY.MIL TELEPHONE: 917-790-8083

AdminBy:

SCD: PAS:

ContractorNameAdd:
Code:
FacCode:
SolChg: 1
SolNo: W912DS25RA002
SolDate: 08 AUG 2025
AwardChg: Off
AwardNo:
AwardDate:
Amended: 1
OffrExt: 1
OffrNoEx: Off
NoCopies: 1
ApprData: SEE SECTION G - CONTRACT ADMINISTRATION DATA
ChgeOrd: Off
ChgeOrder:
Modify: Off
SuppAgre: Off
SuppAuth:
ModOthr: Off
OthrSpec:
NoReq: Off
Require: Off
Copies:
Descript: AMENDMENT 0004 PROVIDES THE FOLLOWING UPDATES:

1. PROPOSAL DUE DATE CHANGE: DUE DATE HAS BEEN EXTENDED FROM "03 OCTOBER 2025" TO "17 OCTOBER 2025" AT 2:00 PM EDT.

2. PROVIDES ADDITIONAL RESPONSES TO RFIS.

3. PROVIDES ADDITIONAL DRAWINGS/ATTACHMENTS.

ContNameTitle:
CoNameTitle: NICHOLAS EMANUEL
ContDate:
CODate: 26 SEP 2025

File details come from the government source that posted it. Updated .