About this file

This is an architectural floor plan (Sheet A-105) for the US Army Corps of Engineers project to repair Building 606, a General Instruction Building at the United States Military Academy in West Point, NY. The document shows a detailed third floor plan of the east side of the building, with specific room designations including administrative offices, classrooms, collaboration spaces, hallways, elevators, and restrooms. The project is identified with Contract Number W912DS19C0034, Project Number 94078, and is part of the FY2024 New York District work. The drawing is dated 2 September 2025 and includes Addendum #6, with a scale of 1/8" = 1'-0" and includes 30 keyed notes providing specific construction and design instructions for partition alignments, window treatments, insulation requirements, and other architectural details.

View the file

Other files

File Type Posted
MSEC- Building 606 - Amendment 9 - RFIs - 5 Nov 25.pdf PDF
A-601_AM 9.pdf PDF
08 71 00_AM 9.pdf PDF
MP-101_AM 7.pdf PDF
E-611_AM 7.pdf PDF
08 71 00_AM 7.pdf PDF
MSEC- Building 606 - Amendment 7 - RFIs - 21 Oct 25.pdf PDF
I-130_AM 6.pdf PDF
I-100.1_AM 6.pdf PDF
AD-301_AM 6.pdf PDF
A-305_AM 6.pdf PDF
A-102_AM 6.pdf PDF
A-413_AM 6.pdf PDF
A-502_AM 6.pdf PDF
A-504_AM 6.pdf PDF
MP-107_AM 6.pdf PDF
MP-105_AM 6.pdf PDF
MP-101_AM 6.pdf PDF
MH-101_AM 6.pdf PDF
S-322_AM 6.pdf PDF
S-315_AM 6.pdf PDF
S-107_AM 6.pdf PDF
07 52 00_AM 6.pdf PDF
08 60 45_AM 6.pdf PDF
08 81 00_AM 6.pdf PDF
A-551_AM 5.pdf PDF
MSEC- Building 606 - Amendment 5 - RFIs - 8 Oct 25 rev JF.pdf PDF
A-601_AM 4.pdf PDF
Solicitation Amendment W912DS25RA0020004 SF 30.pdf PDF
MS-100_AM3.pdf PDF
01 91 19_AM3.pdf PDF
01 30 00_AM3.pdf PDF
E-513.pdf PDF
A-121.pdf PDF
07 60 00.pdf PDF
Site Walk through sign in sheet_04Sept25.pdf PDF
S-318.pdf PDF
S-112.pdf PDF
A-406.pdf PDF
A-122.pdf PDF
MSEC- Building 606 - Amendment 1 - RFIs - 20 Aug 25.pdf PDF
Solicitation - W912DS25RA002.pdf PDF
W912DS19C0034 PN 94078 Repair Building 606 Revised RTA Drawings - Volume 4.pdf PDF
W912DS19C0034 PN 94078 Repair building 606 REV.RTA Specification Manual Volume 3.pdf PDF
W912DS19C0034 PN 94078 Repair building 606 REV.RTA Specification Manual Volume 1.pdf PDF
JA-004-25 Best Cylinders MSEC - 31 Jan 25 signedJF sDL -_Redacted.pdf PDF
JA-008-25 IDS MSEC - 31 Jan 25 signedJF sDL_Redacted.pdf PDF
JA-006-25 CAC MSEC - 31 Jan 25 signedJF sDL -_Redacted.pdf PDF
W912DS19C0034 PN 94078 Repair Building 606 Revised RTA Drawings - Volume 3.pdf PDF
W912DS19C0034 PN 94078 Repair building 606 REV.RTA Specification Manual Volume 2.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

UP

B11 A1 A1.3 A1.5 A1.9 A2

D1 D2 D3 D4 D5

A3 A4 A5 A6A2.7 A3.2 A3.7 A4.2 A4.4 A4.6 A5.1

W29

BA

BB

BE

BF

BG

BH

AA

AB

AC

AD

AE

DB

DA

DC

CL2

A-201C3

A-202

C1

A-204

C1

A-201C1

+189'-0"

E1

A-301

____________ E1

A-301

C1

A-306

C1

A-306

ELEV

HISTORIC CORRIDOR

DEPT RECEPT

HALLWAY

DEPT HEAD

ADMIN

PROF

COLLAB

BREAK RM

CORRIDOR

ADMIN

ADMIN

ADMIN

STORAGE

COLLAB

COLLAB

HC TLT

HC TLT

HALL

ELECT

COLLAB

SM CONF

CLASSROOM

CLASSROOM

ADMIN

SM CONF

A-404

A6

DN TO 3W

UP TO 4W

+183'-6"

19' - 1" 7' - 1" 8' - 3" 13' - 7" 1' - 3" 13' - 0" 8' - 5" 4' - 10" 13' - 3" 6' - 10 1/2" 6' - 4 1/2" 13' - 3" 13' - 3" 13' - 2" 1' - 7" 28' - 9"

ADMIN

ELEV LOBBY

+187'-3"

/4

/8

0"

/8

/2

305A

312B

313314315316

320321

353A

353B

16 A

16 A

11 A

11 A

9 A

9 A

7 A

11 A

16 A11 A16 A

7 A

9 A9 A9 A

16 A 16 A

7 A

4 A

9 A

STAIR 1

ST1

13' - 3 5/8" 17' - 6" 6' - 5" 12' - 4"

DF/BF

7 A

14 A

2 A

DF/BF

16 A

16 A

VERTICAL LIFT

PARTITION

(STC 55 MIN).

M A

T C

H L

IN

E

C

A -1

146' - 4"

A-417

A1+187'-3"

A-401

A6

A-409

A4

C4

A-304

C4

A-304

C1

A-305

C1

A-305

1'

/2

8'

4'

6'

/2

1/ 4"

15' - 7 1/4" 10' - 4" 30' - 10" 16' - 4" 11' - 2 3/8"

4'

/4

1'

/4

0'

/2

6'

5'

/2

7'

9'

A-454 G5E5

C1/ A-454

A1/ A-454

18' - 3"

16 A16 A

10' - 1" 9 3/8" 0'

M

COF

BL11

BL2

7 A

5 A

SHAFT 14 A1 A

STAIR 7

STAIR 8

'-1

BL9

2' - 2" 2' - 6"

2' - 2" 2' - 6"

2 A 4 A 2 A

2 A

3'

/8

15 16

4 A

18 18

BL12

10"

5' - 7 3/4"

RREF

329B

53' - 1 1/2"

1 C

1 C

/4

3'

/4

/8

3"

A1.1B11.1

AREAWAY

(BELOW)

STAIR 22

(BELOW)

ROOF BELOW,

/SEE A1 A-120

ROOF BELOW,

/SEE A1 A-120

COLLAB

DN

UP

BL13

BL17

OPEN

'-1

/2

A-468

E7

E3 C3

C7

A3

A7 A-468 A-469

F3

F6 A-469

F3

F6 A-468 A7

OPH

A-469

D3

2 - 8 2 - 6

2 - 6 2 - 8

2 - 6

(X3)

2 - 8 2 - 6 2 - 8

2 - 82 - 62 - 62 - 8

2 - 8 2 - 6

2 - 6

2 - 8

(X3)

2 - 6

8'-2 3/8" 7'-7 1/2"17' - 4 1/2" 1' - 2" 22' - 1 3/4"

5 1/8"

9' - 9 3/8" 9' - 6" 14' - 5 1/8" 17' - 8" 21' - 8" 21' - 8 5/8" 22' - 1 3/4" 8' - 10 1/2" 3' - 6" 1' - 10 1/4"

10' - 5 3/4"

/8

/2

6'

/4

8'

/8

16 A

A-478

A1

313A

BC

A-468A1

2 - 1B 2 - 1B

2 - 1B

16 A

BL20

BL20

BL20

BL20

BL24

BL24

BL24

E - 3E - 3

E - 3 E - 3

E - 3

E - 2

E

E - 2

E - 2

E - 2

E - 2

E - 2

E - 2

E - 3

E - 3

E - 2

E - 2

E - 3

E - 3

E - 3

E - 3

E - 3

E - 3 E - 3

OPH

13 A

13 A

13 A 13 A

E - 2

2'

1/

/4

5/ 8"

324 325 326 312A 305B

C L

9A

(ABV)

9A

(ABV)

7 A

6'-0"

5J

(ABV)

2 - 1A

NORTH

LOADING DOCK CONNECTOR

EAST

EAST

(1 STORY)

WEST

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

File Path:

Plot Date:

M A

R K

D E

S C

R

IP

T

IO

N

P R

O J E

C T

N O

Autodesk Docs://West Point Bldg 606/219208-WP606-A20.rvt

10/13/2025 2:15:22 PM

A-105

T H

IR

D

F L

O O

R P

L A

N

E A

S T

U N

IT

E

D S

T A

T E

S M

IL

IT

A R

Y A

C A

D E

M Y

W

E S

T P

O

IN

T

N Y

P N

F

Y

N E

W Y

O R

K D

IS

T

R

IC

T N

E W

Y O

R K

N

Y

E P

M

K

S M

S

M P

K

V N

S

E P

T E

M B

E R

W

D

S

C

Q P

K J

O B

N O

.0

ADDENDUM #6

R E

P A

IR

B

L D

G

G E

N E

R A

L I N

S T

R U

C T

IO

N

B L

D G

SCALE: 1/8" = 1'-0"A1

THIRD FLOOR PLAN - EAST

SCALE: 1" = 160'-0"

KEY PLAN - EAST

KEYED NOTES-PLAN

NUMBER COMMENT

1 ALIGN FACE OF PARTITION WITH WINDOW JAMB.

2 ALIGN CENTER OF PARTITION WITH CENTER OF WINDOW MULLION OR

CENTER OF COLUMN.

3 ALIGN FACE OF PARTITION WITH FACE OF PARTITION OR COL

ENCLOSURE.

4 COLUMN ENCLOSURE TO BE PTN TYPE 1 (TYP UNO).

5 ALIGN FACE OF PARTITION WITH CORNER OF EXST WALL(S). PROVIDE

GWB CONTROL JOINT AS REQ'D.

6 EXTERIOR COLUMN ENCLOSURE TO BE PTN TYPE 16 (TYP UNO).

7 ALUM STOREFRONT WINDOW SYSTEM ABOVE.

8 PROVIDE WALL THICKNESS AND FINISH TO MATCH EXISTING. REFER

TO DETAIL B9/A-102.

9 SLAB INFILL AT REMOVAL. SEE STRUCT DWGS.

10 EXPOSED STEEL COLUMN, SEE STRUCTURAL DRAWINGS, PROVIDE

INTUMESCENT COATING ON ALL EXPOSED SURFACES. PNT 906 TYP.

11 PROVIDE GALVANIZED METAL GRATING OVER EXISTING SUBFRAME.

12 ROOF LEADER, SEE PLUMBING DWGS.

13 ELECTRICAL CONDUITS, SEE ELECTRICAL DWGS.

14 CLEAN AND REPAIR GRANITE/ LIMESTONE WALL AND SURROUND

(TYPICAL UNLESS NOTED OTHERWISE).

15 PROVIDE 1" MIN CLOSED CELL FOAM INS AT EXTERIOR WALLS (TYP).

16 PROVIDE RADIANT HEATER ENCLOSURE (SEE SECTION DETAIL).

17 PROVIDE LIMESTONE INFILL AT EXISTING OPENINGS, PATTERN TBD.

SEE C1/A-478 ELEVATION.

18 PROVIDE CLEARANCE (NO OBSTRUCTION OF ANY FIXTURE BEYOND

FINISHED SURFACES) ON BOTH SIZE OF FOLDING PARTITION.

19 PROVIDE LIMESTONE SURROUND ADDITION TO FLOOR MATCH

EXISTING.

20 PROVIDE 4’x8’x3/4” FIRE TREATED PLYWOOD COMMUNICATIONS

BACKBOARD; RUN PANELS WALL TO WALL, ORIENTED VERTICALLY,

PAINT EGGSHELL SHEEN WHITE (DO NOT PAINT OVER FIRE RATING

LABELS).

21 PROVIDE 6"H CONC CURB (HOUSE KEEPING PAD) COORD SIZE &

LOCATION WITH MEP DWGS.

23 PROVIDE 1" AIR SPACE BETWEEN PARTITIONS.

24 1" THICK CLOSED CELL SPRAY FOAM (R-6.3). PROVIDE IGNITION

BARRIER.

25 1" THICK CLOSED CELL SPRAY FOAM (R-6.3).

26 RETURN (1) LAYER 1/2" PLYWOOD & (1) 5/8" GWB TYPE X INTO

OPENING; SHIM PLUMB.

27 PROVIDE HEAD, JAMB, AND SILL RETURNS AT BASEMENT WINDOWS;

5/8" GWB OVER 1/2" PLYWOOD, SHIM PLUMB AND LEVEL.

28 PROVIDE SWITCHABLE PRIVACY GLASS.

29 PROVIDE 16 GA FLUSH, MUD IN OR INLAY ACCESS PANEL. REFER TO

FINISHES. REFER TO PLUMBING DRAWINGS.

30 REFER TO PLUMBING DRAWINGS AND SPEC FOR CLEANOUT COVER.

04 8 16268

SCALE: 1/8" = 1'-0"

A

D D

E N

D U

M

/1

/2

Sheets
A-105 - THIRD FLOOR PLAN - EAST

File details come from the government source that posted it. Updated .