A-111_AM 7.pdf
PDF 664 KB Posted
- Solicitation number
- W912DS25RA002
About this file
This document is a Reflected Ceiling Plan (RCP) architectural drawing for the United States Military Academy at West Point, specifically for Building 606, a General Instruction Building. The drawing details the first floor east ceiling layout, including ceiling types, grid configurations, lighting fixtures, and specific installation notes. The project is part of the FY2024 New York District renovation, with the solicitation number W912DS19C0034QPK and an issue date of 2 September 2025.
The RCP includes detailed specifications for ceiling installations, such as panel centering, grid adjustments, lighting coordination, and special requirements for specific rooms like IT spaces. Notable technical details include provisions for moisture-resistant gypsum wallboard, metal drip pans beneath sprinkler piping, protective metal cages for sprinkler heads in sensitive areas, and specific ceiling height annotations ranging from 8' to 11' above finished floor (AFF). The drawing provides comprehensive guidance for contractors on ceiling system installation, emphasizing precise coordination between different building trades and systems.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
B11 A1 A1.3 A1.5 A1.9 A2
D1 D2 D3 D4 D5
A3 A4 A5 A6A2.7 A3.2 A3.7 A4.2 A4.4 A4.6 A5.1
W29
BA
BB
BE
BF
BG
BH
AA
AB
AC
CL1
AD
AE
DB
DA
DC
CL2
E1
A-301
C1
A-306
117116
124125126127
129130
ST1
AT 9' - 0" AFF
AT 9' - 0" AFF
AT 9' - 0" AFF
AT 9' - 0" AFF
AT 9' - 0" AFF
AT 8' - 6" AFF
AT 9' - 0" AFF
AT 9' - 0" AFF
AT 9' - 0" AFF
AT 9' - 0" AFF
AT 9' - 10" AFF
AT 9' - 10" AFF
AT 9' - 10" AFF
AT 9' - 1" AFF
EXPOSED
AT 9' - 0" AFF
19' - 1" 7' - 1" 8' - 3" 13' - 7" 1' - 3" 13' - 0" 8' - 5" 4' - 10" 13' - 3" 6' - 10 1/2" 6' - 4 1/2" 13' - 3" 13' - 3" 13' - 2" 1' - 7" 28' - 9"
/2
5'
0"
15' - 7 1/4" 10' - 4" 30' - 10" 16' - 4" 11' - 2 3/8"
1"
/4
/2
1/ 2"
AT 8' - 7" AFF
AT 8' - 7" AFF
GWB
AT 8' - 6" AFF
AT 8' - 7" AFF
AT 8' - 7" AFF
AT 8' - 7" AFF
GWB
AT 8' - 6" AFF
607*/606
AT 8' - 7" AFF
GWB
AT 8' - 6" AFF
GWB
AT 8' - 6" AFF
607*/606
AT 8' - 7" AFF
607*/606
AT 10' - 8" AFF
GWB
AT 10' - 7" AFF
GWB
AT 11' - 8" AFF
AT 8' - 6" AFF
AT 8' - 6" AFF
GWB
AT 9' - 6" AFF
607*/606
AT 9' - 7" AFF PREPARE AND PAINT THE
PLASTER CEILING(FIELD
AND RIBS) TO MATCH THE
APPEARANCE OF CLEANED
STONE WALLS. SEE DIGITAL
APPROXIMATED COLOR
"BENJAMIN MOORE 996
ASHEN TAN REFERENCED IN
THE BCA REPORT.
608*/603
AT 9' - 7" AFF
608*/ 603
AT 9' - 7" AFF
608*/603
AT 9' - 7" AFF
GWB
AT 9' - 6" AFF
ELEVATOR
SHAFT
C4
A-304
C4
A-304
C1
A-305
C1
A-305
AT 9' - 10" AFF
WINDOW HEAD
HT: 10'-6 1/2" AFF
WINDOW HEAD HT:
10'-5 3/4" AFF
WINDOW HEAD HT:11'-2 1/4" AFF
(ENTRY LEVEL)
GWB
AT 9' - 6" AFF
GWB
AT 8' - 6" AFF
GWB
AT 8' - 6" AFF
GWB
AT 9' - 6" AFF
GWB
AT 8' - 6" AFF
84' - 3 5/8"
608*/603
AT 11' - 9" AFF
EQ 6' - 0" EQ
OPEN TO ABOVE
PNT 901
OPEN TO ABOVE
PNT 901
OPEN TO ABOVE
PNT 901
OPEN TO ABOVE
PNT 901
OPEN TO ABOVE
PNT 901
OPEN TO ABOVE
PNT 901
2' - 0"
E Q
0"
EQ 6' - 0" EQ
SLOPE
CEILING.
GWB
AT 10' - 10" AFF
GWB
AT 10' - 10" AFF
2' - 0"
6'
E Q
AT 11' - 2" AFF
EQ 20' - 0" EQ
8' - 0"
6' - 0"
E Q
5'
E Q
C4
EQ EQ
C4 C4
E Q
3'
E Q
E Q
6'
E Q
C
A
-1
A1.1
B11.1
44' - 0"
A8/ A-557
F
A
-5
S
IM
F
A
-5
F
A
-5
SIM
D1/ A-557
SIM
AT 9' - 10" AFF
WT-808 (3)WT-808 (5)WT-808 (5)
W T
-8
W T
-8
WT-808
W T
-8
5)
WT-808 (3)
WT-808 (3)
W T
-8
3)
W T
-8
3)
W T
-8
3)WT-808 (3)WT-808 (2)
WT-808WT-808 (2)WT-808 (3) WT-808 (3)
WT-808 WT-808 (3)
WT-808 (3)
W T
-8
3)
RECESSED
WT-808
113A
AT 9' - 0" AFF
D1
A-558
A7
A-556
BC
9' - 4" 5' - 9"
C4
E Q
E Q
EQ EQ
EQ 6' - 0" EQ
C L C L
C L C L
C L C L
C L C L
C L C L
C L C L
6'
6'
6'
6'
4'
4'
4'
5'
5'
5'
6'
3'
/4
E Q
E Q
E Q
CL
EQ EQ
608*/ 603
AT 8' - 7" AFF
1/ 2"
3'
1/ 4"
GWB
AT 8' - 2" AFF
GWB
AT 8' - 6" AFF
GWB
AT 8' - 6" AFF
GWB
AT 8' - 6" AFF
GWB
AT 8' - 0" AFF
E Q
SUSPENDED
ACOUSTIC
CEILING
(RECTANGULAR)
SUSPENDED
ACOUSTIC
CEILING
(SQUARE)
GWB
SUPPLY
DIFFUSER
GRILLE
RETURN
REGISTER GRILLE
LINEAR SUPPLY
DIFFUSER
LINEAR RETURN
REGISTER
CAN LIGHT
FIXTURE
SURFACE MOUNT
LIGHT FIXTURE
RECESS MOUNT
LIGHT FIXTURE
EQ = EQUAL
SPACES (IN ROOM)
LAYOUT INSTRUCTIONS
START GRID AT
THIS WALL
GRID IN ROOM
WITH ARROW
ALIGNS WITH GRID
IN ROOM WITH DOT
LINEAR DROP
LIGHT FIXTURE
FINISH
CEILING
HEIGHT
CEILING TAG
GRAPHIC SYMBOLS
AT 10' - 0" AFF
NORTH
LOADING DOCK CONNECTOR
EAST
EAST
(1 STORY)
WEST
TYPICAL CEILING NOTES:
1. CEILING TYPE 601 AND 602 PANELS TO BE CENTERED IN ROOM, BOTH
WAYS, UNO.
2. CEILING TYPE 604-608 PANEL AREAS ARE TO BE FULL SIZE PANELS
(WIDTH x LENGTH). GRID IS ADJUSTED TO INCLUDE LIGHTING.
3. MOUNT WINDOW SHADES BETWEEN JAMBS, UNO.
4. PROVIDE MOISTURE RESISTANT GWB WHERE GWB MATERIAL IS
INDICATED IN SHOWER AND TOILET ROOMS.
5. MOE 4: UPGRADED CORRIDOR AND HALLWAY CEILING SYSTEMS.
WHERE NOTED IN LIEU OF BASE BID APC-606, PROVIDE MOE 4
UPGRADE MPC-607*. IN LIEU OF BASE BID APC-603, PROVIDE MOE 4
MPC-608*
6. WHERE WINDOW HEAD ABOVE APC CEILINGS, REFERENCE DETAIL
A7 / A-310 PROVIDE EXTRUDED ALUMINUM TRIM SIZED AS NEEDED
FOR CLOSURE TO PLENUM AT WINDOW. TYPICAL UNLESS
OTHERWISE NOTED.
7. BEFORE ANY EQUIPMENT OR MATERIALS ARE RELEASED FOR
FABRICATION, THE CONTRACTORS SHALL PRODUCE CEILING
COORDINATION DRAWINGS IN WHICH THE CONTRACTORS FOR ALL
TRADES SHALL SHOW PIPING, DUCTWORK, EQUIPMENT, CONDUIT,
AND LIGHTING FIXTURE LOCATION, ROUTING, SIZE, AND
INSTALLATION HEIGHT. ALL CONFLICTS SHALL BE COORDINATED ON
THESE PLANS PRIOR TO THE INSTALLATION OF ANY IN OR ABOVE
CEILING EQUIPMENT OR UTILITIES. LOCATE ALL FIRE PROTECTION,
PLUMBING, MECHANICAL, ELECTRICAL AND COMMUNICATIONS
ELEMENTS AS TIGHT AS POSSIBLE TO FLOOR STRUCTURE ABOVE.
8. LIGHTING TYPES TO BE COORDINATED WITH CEILING GRID TYPE,
TYPICAL FOR ALL TYPES.
9. PROVIDE 18 GUAGE GALVANIZED STEEL DRIP PANS BENEATH ALL
SPRINKLER PIPING IN MDF, DAS, UPS AND ALL IT ROOMS.
COORDINATE WITH SPRINKLER INSTALLER TO ELIMINATE ANY
IMPACT TO SPRINKLER COVERAGE OR FUNCTION. DRIP PAN
DIMENSIONS: 12"W X 1 1/2"D. SUSPEND PANS FROM THREADED ROD
AT 48" OC.
10. PROVIDE METAL CAGES AT ALL SPRINKLER HEADS IN MDF, UPS AND
ALL IT ROOMS.
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D A
T E
File Path:
Plot Date:
M A
R K
D E
S C
R
IP
T
IO
N
P R
O J E
C T
N O
Autodesk Docs://West Point Bldg 606/219208-WP606-A20.rvt
10/22/2025 12:58:38 PM
A-111
F
IR
S T
F L O
O R
E A
S T
R
C P
U N
IT
E
D S
T A
T E
S M
IL
IT
A R
Y A
C A
D E
M Y
W
E S
T P
O
IN
T
N Y
P N
F
Y
N E
W Y
O R
K D
IS
T
R
IC
T N
E W
Y O
R K
N
Y
E P
M
K
K L
M P
K
V N
S
E P
T E
M B
E R
W
D
S
C
Q P
K J
O B
N O
.0
ADDENDUM #7
R E
P A
IR
B
L D
G
G E
N E
R A
L I N
S T
R U
C T
IO
N
B L
D G
SCALE: 1/8" = 1'-0"A1
FIRST FLOOR RCP - EAST
SCALE: 1/4" = 1'-0"
RCP LEGEND
SCALE: 1" = 160'-0"
KEY PLAN - EAST
04 8 16268
SCALE: 1/8" = 1'-0"
KEYED NOTES-RCP
NUMBER COMMENT
C1 ALIGN GWB SOFFIT TO GWB SOFFIT AND/OR WALL, TYP.
C2 GWB CLG UNDER STAIRS; TYPICAL AT LINK STAIRS.
C3 SLOPED GWB SOFFIT (7/12).
C4 ALIGN EDGE OF CEILING GRID.
A
D D
E N
D U
M
/2
/2
| Sheets |
| A-111 - FIRST FLOOR EAST - RCP |
File details come from the government source that posted it. Updated .