I-113_AM 6.pdf
PDF 401 KB Posted
- Solicitation number
- W912DS25RA002
About this file
This document is an architectural drawing (Sheet I-113) for the United States Military Academy at West Point, NY, specifically showing an enlarged plan for the 5th floor elevator lobby finishes in Building 606. The project is a repair and renovation effort for the General Instruction Building, with the project number 94078 for FY2024, managed by the New York District of the US Army Corps of Engineers. The drawing provides detailed specifications for floor and wall finishes, including notes on installation requirements for various materials such as quartz panels (QTZ), tile (TILE), and specific trim details. Key finish notes include instructions for installing quartz panels in corridors and elevator walls, tile patterns, and replacement of existing expansion joint covers, with some variations noted for different modifications of the original bid (MOE 1 and MOE 3).
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
UP
UP
B9.8
B10 B11 A1
BB
BE
AC
AD
AE
CL2
A1
A-406
A5
A-407
A1
A-407
A1
A-414
C4
A-304
C4
A-304
C1
A-305
C1
A-305
A5
A-313
A1.1B11.1
A7
A-414
ELEV
ALIGN
PNT 901QTZ 802.PNT 901
TILE 202.
PNT 901PNT 901
T
IL
E
T
IL
E
QTZ 802.
TILE 203.
ROOM FINISHES AS
PER SCHEDULED.
FLR TILE 201
12' - 7" 1' - 8" 17' - 5" 1' - 2"
8'
3" 8'
1/ 2"
TER 354
Q T
Z
QTZ 801.
Q T
Z
Q T
Z
Q T
Z
QTZ 801.
Q T
Z
A
LI
G N
T
Y P
A
LI
G
N
T Y
P
DN TO
4E
QTZ 802.
4E BELOW
4 EAST BELOW
AUGMENTED VR LAB
STAIR 2
ST2
CORRIDOR
ELEV LOBBY
2'
6" 8'
5"
7'
4" 7'
4"
3'
6" 3'
6"
2'
4"
ALUM
STOREFRONT.
ALUM
STOREFRONT.
4' - 0" 4' - 0"
4'
0"
ROOM FINISHES
AS SCHEDULED.
EXST STONE
WALL.
Q T
Z
Q T
Z
QTZ 801.
2'
0"
A-451D4
SIM
D-201
QTZ 801.
BC
A1
A-554
A-207D5
TER-353*/
LVT-308
TER 352*/
LVT-307
TER 352*/
LVT-307
TER-353*/
LVT-308
TER-353*/
LVT-308
TER 352*/
LVT-307
TER 352*/
LVT-307
TER-353*/
LVT-308
TER 352*/
LVT-307
TER-353*/
LVT-308
TER-353*/
LVT-308
TER 352*/
LVT-307
B5
A-406
STAIR 10 6
NORTH
LOADING DOCK CONNECTOR
EAST
EAST
(1 STORY)
WEST
1. BASE BID
A. QTZ IN CORRIDORS: INSTALL QTZ PANELS ABOVE TILE 401 (12" HIGH TILE
BASE). SEE INTERIOR ELEVATIONS FOR HEIGHT. SEE A-559 FOR TRIM DETAILS.
B. QTZ AT ELEVATOR WALL (WEST WALL AT ELEVATOR LOBBY): INSTALL QTZ
PANELS FROM FLOOR TO CEILING. SEE A-559 FOR TRIM DETAILS.
2. FOR TYPICAL TOILET ROOM AND STAIR 1 & 2 TILE PATTERNS SEE A6 / I-100.3.
3. REFER TO INTERIOR ELEVATIONS AND ENLARGED DETAILS FOR WALL FINISH
EXTENTS
4. MOE 1
A. *TER-352 AND *TER-353 REPLACE THE BASE BID LVT-307 AND LVT-308.
5. MOE 3
A. *WD 803: 6'-0" HIGH PANEL ABOVE 401 (12" HIGH TILE BASE), INSTALL w/
MET-805-807 ALUM TRIM. SEE DTL E8/A-459.
B. *TILE 202: ABOVE 401 (12" HIGH TILE BASE), INSTALL w/ SCHLUTER SCHEINE AE
CAP, SCHLUTER FINEC @ OUTSIDE CORNERS. THIS OCCURS ON ALL CORRIDOR
WALLS, UNLESS NOTED OTHERWISE. NOT ALL WALL ELEVATIONS ARE SHOWN.
SEE A-559 FOR TRIM DETAILS.
6. REPLACE EXISTING FLOOR, WALL AND CEIILNG EXPANSION JOINT COVERS AT
EACH LEVEL OF STAIR 3 AND STAIR 4.
FINISH PLAN NOTES:
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D A
T E
File Path:
Plot Date:
M A
R K
D E
S C
R
IP
T
IO
N
P R
O J E
C T
N O
Autodesk Docs://West Point Bldg 606/219208-WP606-A20.rvt
10/13/2025 12:20:06 PM
I-113
E N
L A
R G
E D
P L
A N
S
T
H F
L O
O R
F
IN
IS
H
E S
U N
IT
E
D S
T A
T E
S M
IL
IT
A R
Y A
C A
D E
M Y
W
E S
T P
O
IN
T
N Y
P N
F
Y
N E
W Y
O R
K D
IS
T
R
IC
T N
E W
Y O
R K
N
Y
E P
E K
K
L
M P
K
V N
S
E P
T E
M B
E R
W
D
S
C
Q P
K J
O B
N O
.0
ADDENDUM #6
R E
P A
IR
B
L D
G
G E
N E
R A
L I N
S T
R U
C T
IO
N
B L
D G
SCALE: 1/4" = 1'-0"B6
ENLARGED PLAN - 5TH FLR ELEV LOBBY FINISHES
SCALE: 1" = 160'-0"
KEY PLAN - EAST
SCALE: 1/4" = 1'-0"
FINISH NOTES
A
D D
E N
D U
M
/1
/2
File details come from the government source that posted it. Updated .