This document is an Asbestos Abatement Legend and Notes for Building 606 Renovation at the United States Military Academy, West Point, NY. The document details extensive asbestos-containing materials (ACM) that must be removed prior to renovation, including floor tiles, mastic, stair treads, duct seam sealant, window frame caulk, window glazing, and fiberglass duct insulation. The contractor is required to submit a detailed plan for government approval at least 20 working days before commencing work, detailing safe removal, characterization, segregation, manifesting, transport, and disposal procedures in accordance with EPA, OSHA, and NYS regulations. Additional environmentally regulated materials such as fluorescent light bulbs, ballasts, smoke detectors, emergency exit signs, fire extinguishers, mercury thermostats, and switches must also be properly removed and disposed of prior to demolition.
The project is being managed by the US Army Corps of Engineers New York District, with the contract number W912DS19C0034 and project number 219208.00. The location and extent of asbestos-containing materials are approximate and provided for bid estimating purposes, with actual quantities and locations to be field verified by the contractor. The document includes a detailed legend with color-coded representations of different types of asbestos-containing materials and their locations, emphasizing the need for comprehensive and careful abatement procedures.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
LEGEND
ABATEMENT NOTES
ADDITIONAL INFORMATION REGARDING HAZARDOUS MATERIALS IS PROVIDED IN THE DOCUMENT, "HAZARDOUS MATERIALS SURVEY REPORT, BUILDING 606 RENOVATION - WEST POINT MILITARY
ACADEMY", DATED OCTOBER 14, 2022.
ASBESTOS-CONTAINING FLOOR TILE, FLOOR TILE MASTIC, STAIR TREADS, DUCT SEAM SEALANT, FLASHING TAR, PIPE END SEALANT,WINDOW FRAME CAULK, WINDOW GLAZING AND SEAM SEALANT ON FIBERGLASS DUCT INSULATION
HAVE BEEN IDENTIFIED IN THE BUILDING AND SHALL BE ABATED IN ACCORDANCE WITH PROJECT
SPECIFICATION SECTION 02 82 00 AND EPA, OSHA AND NYS REGULATIONS PRIOR TO RENOVATION.
PRESUMED ASBESTOS-CONTAINING INSULATION INSIDE DRY TRANSFORMER, WOOD PANELING
ADHESIVE, FIRE DOORS, CERAMIC FLOOR TILE GROUT AND ADHESIVE, 1' x 1' CEILING TILE AND
THE LOCATION AND EXTENT OF ACM SHOWN ON DRAWINGS ARE APPPROXIMATE AND PROVIDED AS
A REFFERENCE FOR BID ESTIMATING PURPOSES. ACTUAL QUANTITIES AND LOCATIONS OF ACM
SHALL BE FIELD VERIFIED BY THE CONTRACTOR.
WHERE MULTIPLE LAYERS OF FLOORING ARE PRESENT, THE ABATEMENT CONTRACTOR SHALL
REMOVE ALL LAYERS OF NON-ASBESTOS CONTAINING FLOORING ABOVE AND BELOW FINISHES
ASBESTOS FLOOR TILE MASTIC IS PRESUMED TO EXTEND UNDERNEATH SHEETROCK WALLS AND
SHALL BE REMOVED PRIOR TO INTERIOR DEMOLITION.
FLUORESCENT LIGHT BULBS AND BALLASTS SHALL BE REMOVED, HANDLED AND DISPOSED OF IN
ACCORDANCE WITH APPLICABLE REGULATIONS AND SPECIFICATION SECTION 02 84 16.
OTHER ENVIRONMENTALLY REGULATED MATERIALS INCLUDING SMOKE DETECTORS, EMERGENCY
EXIT SIGNS, FIRE EXTINGUISHERS AND MERCURY THERMOSTATS AND SWITCHES MUST BE
REMOVED AND PROPERLY DISPOSED OF BY THE CONTRACTOR PRIOR TO DEMOLITION.
CONTRACTOR SHALL SUBMIT A PLAN FOR GOVERNMENT APPROVAL AT LEAST 20 WORKING DAYS
PRIOR TO COMMENCEMENT OF WORK DETAILING PROCEDURES FOR THE SAFE REMOVAL,
CHARACTERIZATION, SEGREGATION, MANIFESTING, TRANSPORT AND DISPOSAL OF THESE
MATERIALS IN ACCORDANCE WITH APPLICABLE REGULATION.
ASBESTOS-CONTAINING
FLOOR TILE
PRESUMED ASBESTOS
ADHESIVE BEHIND
WOOD PANELING
PRESUMED ASBESTOS
GROUT AND ADHESIVE
ASSOCIATED WITH
CERAMIC FLOORING
WHITE PIPE END SEALANT
GREEN AND BLACK
TERRAZZO FLOORING
WHITE DUCT SEAM SEALANT
CARPET AND TILE OVER
ASBESTOS-CONTAINING
FLOOR MASTIC
TILE OVER
ASBESTOS-CONTAINING
FLOOR MASTIC
WINDOW FRAME CAULK
BLACK FLASHING TAR
ON ROOF PARAPET
WHITE SEAM SEALANT ON FIBERGLASS
DUCT INSULATION.
TAN,WHITE AND RED DUCT SEAM
SEALANT. INSULATION INSIDE DRY
TRANSFORMER
WHITE SEAM SEALANT ON FIBERGLASS
DUCT INSULATION. TAN AND RED DUCT
SEAM SEALANT.
ASBESTOS-CONTAINING
FLOOR MASTIC
PRESUMED ASBESTOS 1' X 1'
CEILING TILE AND
ASSOCIATED ADHESIVE
ADHESIVE, AND HORIZONTAL AND VERTICAL WATERPROOFING HAVE BEEN IDENTIFIED IN THE BUILDING
AND SHALL BE ABATED IN ACCORDANCE WITH PROJECT SPECIFICATION SECTION 02 82 00 AND EPA, OSHA AND NYS REGULATIONS PRIOR TO RENOVATION.
LEAD LINED WALLS AND DOORS SHALL BE REMOVED, HANDLED AND DISPOSED OF IN ACCORDANCE
WITH APPLICABLE REGULATIONS. SEE ARCHITECTURAL DRAWINGS FOR LOCATIONS.
IDENTIFIED AS ASBESTOS CONTAINING.
HORIZONTAL
AND VERTICAL
WATERPROOFING
WINDOW GLAZING
STAIR TREADS
US Army Corps of Engineers ®
SHEET ID
U S
A
R M
Y
C
O R
P
O
F
E
N G
I N
E E
R S
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
S I Z
E
C H
E C
K E
D
B
Y
A N
S I
D
I S
S U
E
D
A T
E
C O
N T
R A
C T
N
S O
L I C
I T
A T
I O
N
N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D A
T E
File Path:
Plot Date:
M A
R K
D E
S C
R I P
T I O
N
P R
O J E
C
O
C T
O B
E
ADDENDUM #6
A D
D E
N D
U M
H-001
N E
W
Y
O R
K
D
I S
T R
I C
T
N E
W
Y
O R
K
N
Y
B R
H
M K
H
J N
M W
D
S C
Q P
K
J O
B
N
SCALE: NO SCALE
A1
ASBESTOS ABATEMENT LEGEND
B R
H
U N
I T
D
A
T E
S
M
I L I T
A R
Y
A
C A
D E
M Y
W
E S
T
P
O I N
T
N
Y
P
F
Y
R E
P A
I
B
L D
G
G
E N
E R
A L
I N
S T
R U
C T
I O
N
B
L D
G
A B
A T
E M
E N
T
N
O T
| Sheets and Views |
| H-001 |
File details come from the government source that posted it. Updated .