This document is an electrical one-line diagram (Sheet E-601) for a US Army Corps of Engineers project at the United States Military Academy in West Point, NY. The detailed schematic shows the electrical distribution system for Building 606, including a main switchboard (MSWBD-1) rated at 2000A, 480Y/277V, with multiple distribution panels, transformers, and electrical equipment across various basement rooms. The project is associated with Contract No. W912DS19C0034QPK, with issue dates of 13 May 2025 and subsequent addendums on 09/12/2025 and 10/13/2025. Key components include a 1500/1680KVA transformer, UPS systems, fire pump connections, and various panels with different amperage ratings, all designed with specific short-circuit interrupting ratings and using copper conductors.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
GF
GFSC
2000AF
2000AT
100% RATED
LSIG ARMS
GF
GFSC
1200AF
1200AT
LSIG
ARMS
GF
GFSC
400AF
400AT
LSIG
GF
GFSC
400AF
400AT
LSIG
GF
GFSC
400AF
400AT
LSIG
GF
GFSC
400AF
400AT
LSIG
2 3 4 5 7 13
MAIN SWITCHBOARD MSWBD-1
2000A, 480Y/277V BUS, SERVICE ENTRANCE RATED
MSWBD
1-3
DISTRIBUTION PANEL DP-EB-1
22 KAIC MIN
400A, 480Y/277V BUS
4 7
225AT
225AF
60AT
100AF
P A
N E
L
P P
-E B
-1
1 3
ELECTRONIC
METERING
MSWBD
1-4
MSWBD
1-5
A
F /3
P S
P A
C E
A
F /3
P S
P A
C E
S P
A R
E
65/55 C RISE
1500/1680KVA, 3 PHASE, 60 HZ
4.16X13.8KV-480Y/277V
XFMR T1
5.75% IMPEDANCE
W
(1
SPD
65 KAIC MIN
GF
GFSC
400AF
400AT
LSIG
MSWBD
1-6
GF
GFSC
800AF
800AT
LSIG
S P
A R
E
110AT
225AF
P A
N E
L A
P -E
B -1
W
P A
N E
L M
P -E
B -1
100AT
100AF
30AT
100AF
W
OUTDOOR PAD MOUNTED
TRANSFORMER
BASEMENT
ELEC. ROOM B14
BASEMENT
MECH. ROOM B16
GF
GFSC
225AF
150AT
LSIG
60AT
100AF
LSIG
GF
GFSC
400AF
400AT
LSIG
S P
A R
E
GF
GFSC
100AF
70AT
LSIG
SEE DWG
NOTE 2
A
F /3
P
S P
A C
E
SPD
VFI
200A
LA
10KV LA
10KV
P A
N E
L
L P
-E B
-1
W
BASEMENT
ELEC. ROOM B14
c b a c b a
W
T
T-AP-EB-1
75KVA, 3Ø, 60HZ
480 - 208Y/120V c b a c b a
4W100T
T-MP-EB-1
30KVA, 3Ø, 60HZ
480 - 208Y/120V
BASEMENT
MECH. ROOM B16
TO DP-E1-1
FOR CONT. SEE
S.L.D. DWG. E-602
TO DP-E2-1
FOR CONT. SEE
S.L.D. DWG. E-602
800AF
800AT
SEPARATE FIRE PUMP TAP
SECTION
125A
200A ST
ELEVATOR
CONTROLLER
VFD
FA
BASEMENT
ELEC. ROOM B14
BASEMENT
MECH. ROOM B16
S P
A R
E
BASEMENT
ELEC. ROOM B14
TO DP-E3-1
FOR CONT. SEE
S.L.D. DWG. E-603
TO DP-E4-1
FOR CONT. SEE
S.L.D. DWG. E-603
MSWBD
1-7
TO SWBD SW-W1-1
FOR CONT. SEE S.L.D.
DWG. E-604
EXISTING
MANHOLE MH-4D
SEE DWG. NOTE 7
SEE DWG. NOTE 6
SEE DWG. NOTE 3
SEE DWG. NOTE 5
GENERAL NOTES:
1. FOR SYMBOLS AND ABBREVIATIONS, REFER TO DRAWING E-001 AND E-002.
2. ALL SHORT CIRCUIT INTERRUPTING RATINGS SHOWN, WHETHER A.I.C. OR
M.V.A.I.C. ARE CALCULATED RMS SYMMETRICAL VALUES AT THE LINE
TERMINALS OF THE EQUIPMENT, WITH THE EXCEPTION OF 10,000 A.I.C. VALUES.
THE WITHSTAND SHORT CIRCUIT CURRENT RATINGS OF PROTECTIVE DEVICES,
TRANSFER SWITCHES AND BUS BRACING MUST BE EQUAL TO OR GREATER
THAN THE VALUES INDICATED.
3. UNLESS OTHERWISE NOTED ALL SPACES, CIRCUIT BREAKERS, MOTOR CIRCUIT
PROTECTORS (MCP), AND/OR SWITCHES ARE THREE (3) POLE.
4. JUNCTION AND PULL BOXES ARE NOT NECESSARILY SHOWN ON THIS DRAWING
AND MUST BE PROVIDED WHERE NECESSARY AND SIZED IN ACCORDANCE WITH
THE NATIONAL ELECTRICAL CODE AND INSTALLED WHERE REQUIRED.
5. THE ELECTRICAL CONTRACTOR MUST VERIFY CIRCUIT BREAKER AND FUSE
SIZES SERVING THE ELEVATOR BASED UPON APPROVED SUBMITTAL AND
PROVIDE APPROPRIATELY SIZED DEVICES.
6. ALL ELECTRICAL DISTRIBUTION EQUIPMENT AND ALL CONDUCTORS SHALL BE
COPPER. ALUMINUM IS NOT ACCEPTABLE.
7. UPS ALARMS MUST REPORT TO THE BUILDING AUTOMATION SYSTEM (BAS).
REFER TO SPECIFICATION SECTION 26 33 53 FOR ADDITIONAL INFORMATION.
DRAWING NOTES:
1 PAD MOUNTED TEMPORARY GENERATOR CONNECTION BOX, NEMA 4X
STAINLESS STEEL ENCLOSURE. 1600A, 480/277V, 3P, 4W, 65 KAIC. SERIES 16
CAM CONNECTION POINTS, HINGED TEMPORARY CABLE ACCESS COVER. 20A,
120V GFI DUPLEX RECEPTACLE & 50A, 208V, 1 PHASE RECEPTACLE INTEGRAL TO
ENCLOSURE.
2 PROVIDE SHARK 200 POWER METER, CONNECT TO DPW BASE WIDE CONTROL
SYSTEM. REFER TO DETAIL A4/E-513.
3 CIRCUIT BREAKER TO BE LOCKED IN THE CLOSED POSITION. PROVIDE LABEL
WITH 1" HIGH LETTERING TO READ "FIRE PUMP DISCONNECTING MEANS."
4 CONNECT TO ELECTRICAL POWER MONITORING SYSTEMS (EPMS).
5 CONTRACTOR TO PROVIDE AND INSTALL SECONDARY CONDUCTORS BETWEEN
TRANSFORMER AND SWITCHBOARD. CABLE CUTSHEETS TO BE SUBMITTED TO
CLP FOR REVIEW AND APPROVAL PRIOR TO PURCHASE.
6 15KV CONDUCTORS AND DUAL-VOLTAGE TRANSFORMER WITH INTEGRAL
SWITCHES AND VFI PROVIDED AND INSTALLED BY CITY LIGHT AND POWER. ALL
PRIMARY CONNECTIONS ARE TO BE PROVIDED BY CLP, ALL SECONDARY
CONNECTIONS BY THE CONTRACTOR.
7 TRANSFORMER IMPEDANCE SHOWN IS NOMINAL BASED ON INDUSTRY
STANDARDS. FINAL IMPEDANCE TO BE DETERMINED BY MANUFACTURER.
5-[4-750KCMIL, 4"C]
WITH (1) SPARE 4" C IN DUCTBANK
240KA
80KA
KWD
KWH
BATT
35 KAIC
MIN
N.C.
N.C.
N.O.
150AT
250AF
225AF
150AT
150AF
150AT
150AF
150AT
c b a c b a
T-UPS-1
45KVA, 3Ø, 60HZ
480 - 208Y/120V
W
225AF
150AT
W
T
DISTRIBUTION PANEL
DUP-EB-1
10 KAIC MIN225A, 208Y/120V BUS
100AT
100AF
2 4
100AT
100AF
P A
N E
L
U P
-E B
-1
P A
N E
L
U P
-E B
-2
KWD
KWH
KWD
KWH
IN
V
E R
T E
R
IN
V -E
B -1
2KW
277V,1P
KK
GF
GFSC
2000AF
2000AT
100% RATED
LSIG ARMS
TEMPORARY
GENERATOR TAP
BOX.
SEE DWG. NOTE 1
SEE DWG.
NOTE 3
BASEMENT
ELEC. ROOM B14
BASEMENT
UPS. ROOM B09
225AF
200AT
NE
CONTROLLER
FIRE PUMP 65
KAIC
W
3W175
3W175
FIRE PUMP
SHUNT TRIP
REMOTE EMERGENCY SHUT
DOWN SWITCH TO BE LOCATED
AS DIRECTED BY GOVERNMENT
SEE DWG
NOTE 4
(TYP.)
A
F /3
P S
P A
C E
W
3W45
BASEMENT
UPS ROOM B09
4W150
SPD
30AT
100AF
80KA
W
W
100AT
100AF
S P
A R
E
UPS-1 40KW
(30KW N+1 EXPANDABLE
TO 40KW N+1)
W
W
3W150
3W150
800A
800A
225A
400A
GF
GFSC
800AF
800AT
LSIG
GF
GFSC
225AF
225AT
LSIG
W
(1
W
TO FUTURE
TEMPORARY
CHILLER
TO FUTURE
TEMPORARY
BOILER
10 11
(3) #3 MI CABLE
W
(3) #3 MI CABLE
SPD
80KA
W
BASEMENT
ROOM MDF B10
BASEMENT
ROOM MDF B10
60A
60A
MIN #2 G.E.C
MIN #8 G.E.C
MIN #6 G.E.C
7.5
CONTROL
PANEL
WITH VFD
CONTROL
PANEL
WITH VFD
CONTROL
PANEL
WITH VFD
CONTROL
PANEL
WITH VFD
7.5 7.5 7.5
AHU-B-1 (SUPPLY FANS)
W
30A
60A
CONTROL
PANEL
WITH VFD
CONTROL
PANEL
WITH VFD
CONTROL
PANEL
WITH VFD
CONTROL
PANEL
WITH VFD
3 3 3
AHU-B-1 (RETURN FANS)
W
ELEVATOR
POWER MODULE
c b a c b a
35 KAIC
ROOM. ELEC. B14
S P
A R
E
GF
GFSC
400AF
400AT
LSIG
KWD
KWH
TO SUBSTATION B-PMS1
TO SUBSTATION B-PMS1
W
(1
W
(1
W
(1
W
(1
W
(1
2#12, #12G, 3/4"C
150AT
250AF
30AT
100AF
SPD
80KA
W
4W60
P A
N E
L
F P
-E B
-1
BASEMENT
ELEC. ROOM B14
GF
GFSC
400AF
400AT
LSIG
N.C.
N.O.
2RESPONSE TO RFI #345
NOT FOR
CONSTRUCTION
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
P R
O J E
C T
N O
E-601
D
IA
G R
A M
S
O N
E -L
IN
E
U N
IT
E
D S
T A
T E
S M
IL
IT
A R
Y A
C A
D E
M Y
W
E S
T P
O
IN
T N
Y P
/N
F
Y
N E
W Y
O R
K D
IS
T
R
IC
T N
E W
Y O
R K
N
Y
M J P
M J P
D K
M
A Y
W D
S C
Q P
K J
O B
N O
.0
REV RTA SUBMISSION
R E
P A
IR
B
L D
G
G
E N
E R
A L I N
S T
R U
C T
IO
N
B L D
G
A
D D
E N
D U
M
/1
/2
A
D D
E N
D U
M
/1
/2
File details come from the government source that posted it. Updated .