W912DS19C0034 PN 94078 Repair Building 606 Revised RTA Drawings - Volume 3.pdf
PDF 45 MB Posted
- Solicitation number
- W912DS25RA002
View the file
Other files
Show 40 more
Latest 50 of 148 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
LOCATION MAP
PROJECT
LOCATION
BUILDING RENDERING
BLDG 606 MARGINS OF EXCELLENCE (MOE):
MOE 1: UPGRADED ARCH FLOOR FINISHES (CORRIDORS AND HALLWAYS). REFER TO MARGINS OF
EXCELLENCE (MOE) DRAWINGS IN VOLUME 2 FOR SCOPE.
BASE BID: PROVIDE LUXURY VINYL TILE LVT-307 IN LIEU OF TERRAZZO TER-352, AND LVT-308 IN
LIEU OF TER-353. MONOLITHIC INSTALL WITH NO MEDALLIONS.
MOE OPTION: PROVIDE TERRAZZO FLOORING WITH INLAID MEDALLIONS WHERE INDICATED IN
DRAWINGS.
MOE 2: ROOF PAVER SYSTEM AT ROOF #3. REFER TO ROOF PLANS IN VOLUME 2 FOR SCOPE.
BASE BID: OMIT ROOF PAVER SYSTEM INCLUDING PEDESTALS, STAINLESS STEEL AND GLASS
GUARDRAIL. PROVIDE EXTENDED STRINGERS AND (5) TREADS AT ROOF TOP STAIR #14.
MOE OPTION: PROVIDE ROOF PAVER SYSTEM AND GUARDRAIL AS INDICATED IN DRAWINGS;
PROVIDE ROOF TOP STAIR #14 AS INDICATED.
MOE 3: UPGRADED ARCH WALL WAINSCOT FINISH (CORRIDORS AND HALLWAYS).
INCLUDES: 3.1, 3.2, AND 3.3. REFER TO MARGINS OF EXCELLENCE (MOE) DRAWINGS IN VOLUME 2 FOR
SCOPE.
3.1 UPGRADED ARCH WALL WAINSCOT FINISH.
BASE BID: PROVIDE EPOXY PAINT OVER GWB IN LIEU OF TILE-202. PROVIDE TILE-401 BASE AND
METAL TRIM AT TOP OF BASE.
MOE OPTION: PROVIDE PORCELAIN CERAMIC TILE TILE-202 WAINSCOT AND METAL TRIM ABOVE
TILE-401 WHERE SCHEDULED AND INDICATED IN DRAWINGS.
3.2: UPGRADED ARCH WALL PROTECTIVE FINISH (CORRIDORS AND HALLWAYS).
BASE BID: PROVIDE EPOXY PAINT OVER GWB IN LIEU OF WOOD FACED HPL PANELS. MOUNT
COAT HOOKS DIRECTLY ON WALL SURFACE. PROVIDE METAL TRIM AT TOP OF TILE-401.
MOE OPTION: PROVIDE WOOD FACED HPL WALL PANELS WD-803 AND METAL TRIM WHERE
INDICATED IN DRAWINGS.
3.3: UPGRADED ARCH WALL BASE FINISH (CORRIDORS AND HALLWAYS) WHERE MOE 3.1 AND 3.2
OCCUR.
BASE BID: PROVIDE VINYL BASE VB-403 OVER GWB WALL FINISH WITH PAINT.
MOE OPTION: PROVIDE PORCELAIN CERAMIC TILE TILE-401 BASE AND METAL TRIM AT TOP OF
BASE WHERE INDICATED IN DRAWINGS.
MOE 4: UPGRADED CORRIDOR AND HALLWAY CEILING SYSTEMS. REFER TO MARGINS OF
EXCELLENCE (MOE) DRAWINGS IN VOLUME 2 FOR SCOPE.
BASE BID: IN LIEU OF METAL PANEL CEILING MPC-607 PROVIDE ACOUSTIC PANEL CEILING
APC-606. IN LIEU OF MPC-608 PROVIDE APC-609.
MOE OPTION: PROVIDE METAL PANEL CEILING MPC-607 AND MPC-608 WHERE INDICATED IN
DRAWINGS.
ARCHITECTURAL
PLUMBING
MECHANICAL
FIRE PROTECTION
STRUCTURAL
CIVIL
ELECTRICAL
IMAGE FOR ILLUSTRATIVE PURPOSES ONLY
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D A
T E
US Army Corps of Engineers ®
SOLICITATION NO.:
CONTRACT NO.:
ISSUE DATE.:
VOLUME:
File Path:
Plot Date:
M A
R K
D E
S C
R
IP
T
IO
N
P R
O J E
C T
N O
Autodesk Docs://West Point Bldg 606/219208-WP606-G20.rvt
5/14/2025 4:23:42 PM
G-001.3
C O
V E
R S
H E
E T
V
O L
U N
IT
E
D S
T A
T E
S M
IL
IT
A R
Y A
C A
D E
M Y
W
E S
T P
O
IN
T
N Y
P N
F
Y
N E
W Y
O R
K D
IS
T
R
IC
T N
E W
Y O
R K
N
Y
E A
L
E A
L
M P
K
V N
M A
Y
W
D
S
C
Q P
K J
O B
N O
.0
REV. RTA SUBMISSION
R E
P A
IR
B
L D
G
G E
N E
R A
L I N
S T
R U
C T
IO
N
B L
D G
NEW YORK DISTRICT
UNITED STATES MILITARY ACADEMY, WEST POINT, NY
PN 94078 FY2024
REPAIR BLDG 606, GENERAL INSTRUCTION BLDG
W912DS19C0034
13 MAY 2025
QPK JOB NO: 219208.00
3 OF 4 - FIRE PROTECTION, FIRE ALARM,
PLUMBING, AND MECHANICAL
ARCHITECTURAL
PLUMBING
MECHANICAL
FIRE PROTECTION
STRUCTURAL
CIVIL
ELECTRICAL
ARCHITECTURAL
PLUMBING
MECHANICAL
FIRE PROTECTION
STRUCTURAL
CIVIL
ELECTRICAL
4/4/2025
4/4/2025
4/4/2025
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D A
T E
File Path:
Plot Date:
M A
R K
D E
S C
R
IP
T
IO
N
P R
O J E
C T
N O
Autodesk Docs://West Point Bldg 606/219208-WP606-G20.rvt
5/12/2025 11:57:04 AM
G-004.1
D R
A W
IN
G
L
IS
T
V O
L
U N
IT
E
D S
T A
T E
S M
IL
IT
A R
Y A
C A
D E
M Y
W
E S
T P
O
IN
T
N Y
P N
N E
W Y
O R
K D
IS
T
R
IC
T N
E W
Y O
R K
N
Y
E A
L
E A
L
M P
K
V N
M A
Y
W
D
S
C
Q P
K J
O B
N O
.0
REV. RTA SUBMISSION
R E
P A
IR
B
L D
G
G E
N E
R A
L I N
S T
R U
C T
IO
N
B L
D G
INDEX OF DRAWINGS - VOL 1
SHEET NUMBER SHEET TITLE
GENERAL
G-001.1 COVER SHEET - VOL 1
G-002.1 DRAWING LIST - VOL 1
G-002.2 DRAWING LIST - VOL 2
G-002.3 DRAWING LIST - VOL 3
G-002.4 DRAWING LIST - VOL 4
LIFE SAFETY
G-003 LIFE SAFETY CODE SUMMARY
G-100 BASEMENT LIFE SAFETY PLAN
G-101 FIRST FLOOR LIFE SAFETY PLAN
G-102 SECOND FLOOR LIFE SAFETY PLAN
G-103 THIRD FLOOR LIFE SAFETY PLAN
G-104 FOURTH FLOOR LIFE SAFETY PLAN
G-105 FIFTH FLOOR LIFE SAFETY PLAN
ABATEMENT
H-001 ABATEMENT NOTES
H-100 BASEMENT ASBESTOS ABATEMENT PLAN
H-101 1ST FLOOR EAST ASBESTOS ABATEMENT PLAN
H-102 1ST FLOOR WEST ASBESTOS ABATEMENT PLAN
H-103 2ND FLOOR EAST ASBESTOS ABATEMENT PLAN
H-104 2ND FLOOR WEST ASBESTOS ABATEMENT PLAN
H-105 3RD FLOOR EAST ASBESTOS ABATEMENT PLAN
H-106 3RD FLOOR WEST ASBESTOS ABATEMENT PLAN
H-107 4TH FLOOR EAST ASBESTOS ABATEMENT PLAN
H-108 4TH FLOOR WEST ASBESTOS ABATEMENT PLAN
H-109 5TH FLOOR WEST ASBESTOS ABATEMENT PLAN
H-110 ROOF EAST ASBESTOS ABATEMENT PLAN
CIVIL
C-001 GENERAL INFORMATION
C-002 CONSTRUCTION VEHICLE ACCESS ROUTE PLAN
C-003 CONSTRUCTION ACCESS PLAN
C-004 CONSTRUCTION STAGING PLAN
C-005 PEDESTRIAN CIRCULATION AND DIRECTIONAL SIGNAGE PLAN
C-006 CONTRACT LINE ITEM NUMBER (CLIN) 002 PLAN
CD-101 DEMOLITION PLAN
CD-101.1 DEMOLITION ENLARGEMENT PLANS
CD-101.2 DEMOLITION ENLARGEMENT PLANS
CD-101.3 DEMOLITION ENLARGEMENT PLANS
CD-101.4 DEMOLITION ENLARGEMENT PLANS
CD-102 EROSION & SEDIMENT CONTROL PLAN
C-101 LAYOUT PLAN
C-101.1 LAYOUT PLAN ENLARGEMENTS
C-101.2 LAYOUT PLAN ENLARGEMENTS
C-101.3 LAYOUT PLAN ENLARGEMENTS
C-102 GRADING & STORM SYSTEM PLAN
C-102.1 GRADING & STORM SYSTEM ENLARGEMENT PLAN
C-102.2 GRADING & STORM SYSTEM ENLARGEMENT PLAN
C-102.3 GRADING & STORM SYSTEM ENLARGEMENT PLANS
C-102.4 UNDERGROUND STORMWATER DETENTION SYSTEM ENLARGEMENT PLAN
C-102.5 GRADING & STORM SYSTEM ENLARGEMENT PLANS
C-103 PLANTING PLAN
C-104 AMERICAN WATER UTILITY PLAN
C-501 DETAILS
C-502 DETAILS
C-503 DETAILS
C-504 DETAILS
C-505 DETAILS
C-506 DETAILS
C-507 STORM PIPE NETWORK
V-001 EXISTING CONDITIONS PLAN
V-002 EXISTING CONDITIONS PLAN
STRUCTURAL
S-001 GENERAL NOTES
S-002 GENERAL NOTES
SD-100 BASEMENT STRUCTURAL REMOVAL PLAN
SD-101 FIRST FLOOR STRUCTURAL REMOVAL PLAN-EAST
SD-102 FIRST FLOOR STRUCTURAL REMOVAL PLAN-WEST
SD-103 SECOND FLOOR STRUCTURAL REMOVAL PLAN-EAST
SD-104 SECOND FLOOR STRUCTURAL REMOVAL PLAN-WEST
SD-105 THIRD FLOOR STRUCTURAL REMOVAL PLAN-EAST
SD-106 THIRD FLOOR STRUCTURAL REMOVAL PLAN-WEST
SD-107 FOURTH FLOOR STRUCTURAL REMOVAL PLAN-EAST
SD-108 FOURTH FLOOR STRUCTURAL REMOVAL PLAN-WEST
SD-109 FIFTH FLOOR STRUCTURAL REMOVAL PLAN-WEST
SD-110 ROOF STRUCTURAL REMOVAL PLAN-EAST
SD-111 ROOF STRUCTURAL REMOVAL PLAN-WEST
SD-301 REMOVAL SECTIONS & DETAILS
S-100 BASEMENT FOUNDATION PLAN
S-101 FIRST FLOOR FRAMING PLAN-EAST
S-102 FIRST FLOOR FRAMING PLAN-WEST
S-103 SECOND FLOOR FRAMING PLAN-EAST
S-104 SECOND FLOOR FRAMING PLAN-WEST
S-105 THIRD FLOOR FRAMING PLAN-EAST
S-106 THIRD FLOOR FRAMING PLAN-WEST
S-107 FOURTH FLOOR FRAMING PLAN-EAST
S-108 FOURTH FLOOR FRAMING PLAN-WEST
S-109 FIFTH FLOOR FRAMING PLAN-WEST
S-110 ROOF FRAMING PLAN-EAST
S-111 ROOF FRAMING PLAN-WEST
S-112 MISCELLANEOUS FRAMING PLANS
S-113 MISCELLANEOUS FRAMING PLANS
S-114 MISCELLANEOUS FRAMING PLANS
S-115 MISCELLANEOUS FRAMING PLANS
INDEX OF DRAWINGS - VOL 1
SHEET NUMBER SHEET TITLE
S-116 MISCELLANEOUS FRAMING PLANS
S-201 LATERAL BRACE ELEVATIONS & DETAILS
S-202 LATERAL BRACE ELEVATIONS & DETAILS
S-203 ELEVATOR CMU WALL ELEVATIONS
S-204 FRAMING ELEVATIONS
S-301 FOUNDATION SECTIONS & DETAILS
S-302 FOUNDATION SECTIONS & DETAILS
S-303 FOUNDATION SECTIONS & DETAILS
S-304 FOUNDATION SECTIONS & DETAILS
S-305 FOUNDATION SECTIONS & DETAILS
S-306 FOUNDATION SECTIONS & DETAILS
S-310 CFMF DETAILS
S-311 FLOOR FRAMING SECTIONS & DETAILS
S-312 FLOOR FRAMING SECTIONS & DETAILS
S-313 FLOOR FRAMING SECTIONS & DETAILS
S-314 FLOOR FRAMING SECTIONS & DETAILS
S-315 FLOOR FRAMING SECTIONS & DETAILS
S-316 FLOOR FRAMING SECTIONS & DETAILS
S-317 FLOOR FRAMING SECTIONS & DETAILS
S-318 FLOOR FRAMING SECTIONS & DETAILS
S-319 FLOOR FRAMING SECTIONS & DETAILS
S-320 FLOOR FRAMING SECTIONS & DETAILS
S-321 ROOF FRAMING SECTIONS & DETAILS
S-322 ROOF FRAMING SECTIONS & DETAILS
S-323 ROOF FRAMING SECTIONS & DETAILS
S-324 ROOF FRAMING SECTIONS & DETAILS
S-325 ROOF FRAMING SECTIONS & DETAILS
S-326 ROOF FRAMING SECTIONS & DETAILS
S-601 COLUMN SCHEDULE
S-602 COLUMN SCHEDULE
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D A
T E
File Path:
Plot Date:
M A
R K
D E
S C
R
IP
T
IO
N
P R
O J E
C T
N O
Autodesk Docs://West Point Bldg 606/219208-WP606-G20.rvt
5/12/2025 11:57:10 AM
G-004.2
D R
A W
IN
G
L
IS
T
V O
L
U N
IT
E
D S
T A
T E
S M
IL
IT
A R
Y A
C A
D E
M Y
W
E S
T P
O
IN
T
N Y
P N
N E
W Y
O R
K D
IS
T
R
IC
T N
E W
Y O
R K
N
Y
E A
L
E A
L
M P
K
V N
M A
Y
W
D
S
C
Q P
K J
O B
N O
.0
REV. RTA SUBMISSION
R E
P A
IR
B
L D
G
G E
N E
R A
L I N
S T
R U
C T
IO
N
B L
D G
INDEX OF DRAWINGS - VOL 2
SHEET NUMBER SHEET TITLE
GENERAL
G-001.2 COVER SHEET - VOL 2
G-003.1 DRAWING LIST - VOL 1
G-003.2 DRAWING LIST - VOL 2
G-003.3 DRAWING LIST - VOL 3
G-003.4 DRAWING LIST - VOL 4
ARCHITECTURAL
A-001 ABBREVIATIONS & SYMBOLS
A-002 GENERAL LEGENDS AND NOTES
A-003 PARTITION & RATED CEILING INFORMATION
A-004 HEAD OF WALL DETAILS
A-005 FLOOR PLANS - OVERALL PLAN AND SCOPE DELINEATION
A-006 FLOOR PLANS - OVERALL PLAN AND SCOPE DELINEATION
A-007 FLOOR PLANS - OVERALL PLAN AND SCOPE DELINEATION
A-008 FLOOR PLAN - OVERALL PLAN AND SCOPE DELINEATION
A-009 MARGIN OF EXCELLENCE (MOE) - BASEMENT & FIRST FLOOR
A-010 MARGIN OF EXCELLENCE (MOE) - SECOND & THIRD FLOOR
A-011 MARGIN OF EXCELLENCE (MOE) - FOURTH & FIFTH FLOOR
AD-100 BASEMENT REMOVAL PLAN
AD-101 FIRST FLR REMOVAL PLAN - EAST
AD-102 FIRST FLR REMOVAL PLAN - WEST
AD-103 SECOND FLR REMOVAL PLAN - EAST
AD-104 SECOND FLR REMOVAL PLAN - WEST
AD-105 THIRD FLR REMOVAL PLAN - EAST
AD-106 THIRD FLR REMOVAL PLAN - WEST
AD-107 FOURTH FLR REMOVAL PLAN - EAST
AD-108 FOURTH FLR REMOVAL PLAN - WEST
AD-109 FIFTH FLR REMOVAL PLAN - WEST
AD-110 ROOF REMOVAL PLAN - EAST
AD-111 ROOF REMOVAL PLAN - WEST
AD-301 REMOVAL BLDG SECTIONS
AD-302 REMOVAL BLDG SECTIONS
AD-303 REMOVAL ELEVATION
AD-310 WALL SECTIONS - REMOVALS
AD-311 WALL SECTIONS - REMOVALS
AD-312 WALL SECTIONS - REMOVALS
AD-313 WALL SECTIONS & DETAILS - REMOVALS
AD-501 PLAN DETAILS - EXTERIOR REMOVALS
A-100 BASEMENT FLOOR PLAN - EAST
A-101 FIRST FLOOR PLAN - EAST
A-102 FIRST FLOOR PLAN - WEST
A-103 SECOND FLOOR PLAN - EAST
A-104 SECOND FLOOR PLAN - WEST
A-105 THIRD FLOOR PLAN - EAST
A-106 THIRD FLOOR PLAN - WEST
A-107 FOURTH FLOOR PLAN - EAST
A-108 FOURTH FLOOR PLAN - WEST
A-109 FIFTH FLOOR PLAN - WEST
A-110 BASEMENT PLAN - RCP
A-111 FIRST FLOOR EAST - RCP
A-112 FIRST FLOOR WEST - RCP
A-113 SECOND FLOOR EAST - RCP
A-114 SECOND FLOOR WEST - RCP
A-115 THIRD FLOOR EAST - RCP
A-116 THIRD FLOOR WEST - RCP
A-117 FOURTH FLOOR EAST - RCP
A-118 FOURTH FLOOR WEST - RCP
A-119 FIFTH FLOOR WEST - RCP
A-120 ROOF PLAN - EAST
A-121 ROOF PLAN - WEST
A-122 PARTIAL ROOF PLANS & ROOF DETAILS
A-123 ENLARGED DUNNAGE PLANS
A-124 ROOF DETAILS
A-201 EAST BLDG ELEVATIONS
A-202 NORTH EAST BLDG ELEVATION
A-203 NORTH WEST BLDG ELEVATION
A-204 SOUTH EAST BLDG ELEVATION
A-205 SOUTH WEST BLDG ELEVATIONS
A-206 BLDG ELEVATIONS
A-207 ELEVATIONS - RTU-R-1 SCREENS
A-208 ELEVATIONS - RTU-R-2 SCREENS
A-301 BUILDING SECTIONS
A-302 BUILDING SECTIONS
A-303 BUILDING SECTIONS
A-304 BUILDING SECTIONS
A-305 BUILDING SECTIONS
A-306 BUILDING SECTIONS
A-307 WALL SECTIONS
A-308 WALL SECTIONS
A-309 WALL SECTIONS
A-310 WALL SECTIONS
A-311 WALL SECTIONS
A-312 WALL SECTIONS
A-313 WALL SECTIONS
A-314 WALL SECTIONS
A-315 WALL SECTIONS
A-316 WALL SECTIONS
A-317 WALL SECTIONS
A-318 WALL SECTIONS
A-319 WALL SECTIONS
A-320 WALL SECTIONS
A-321 WALL SECTIONS
A-322 WALL SECTIONS
A-323 WALL SECTIONS
A-324 WALL SECTIONS
A-401 INFILL - ENLARGED PLANS 1-3
A-402 INFILL- ENLARGED PLANS 4&5
A-403 ELEV CORE - ENLARGED PLANS B&1
A-404 ELEV CORE - ENLARGED PLANS 2&3
A-405 ELEV CORE - ENLARGED PLANS 4&5
A-406 ELEV CORE - ENLARGED SECTION
A-407 INFILL STAIR SECTIONS
A-408 INFILL STAIR PLANS
A-409 ENLARGED PLANS - STAIR #1
A-410 ENLARGED PLAN - 1ST FLR TLTS & STAIR #2
A-411 ENLARGED PLAN - 2ND FLR TLTS & STAIR #2
INDEX OF DRAWINGS - VOL 2
SHEET NUMBER SHEET TITLE
A-412 ENLARGED PLAN - 3RD & 4TH TLTS & STAIR #2
A-413 ENLARGED PLAN - 5TH FLR TLTS & STAIR #2
A-414 SECTIONS - STAIR 2
A-415 ENLARGED TLT PLANS & ELEVS
A-416 ENLARGED PLANS & ELEVS
A-417 ENLARGED PLANS & ELEVS
A-418 ENLARGED PLAN & STAIR DETAILS
A-419 INT ELEVATION & STAIR & RAMP DETAILS
A-450 INT ELEVATIONS - BSMT & 1ST FLR CORR
A-451 INT ELEVATIONS - 1ST FLOOR & ELEV LOBBY
A-452 INT ELEVATIONS - 1ST & 2ND FLR CORR
A-453 INT ELEVATIONS - 2ND FLR CORR
A-454 INT ELEVATIONS - 3RD FLR CORR
A-455 INT ELEVATIONS - 3RD FLR CORR
A-456 INT ELEVATIONS - 4TH FLR CORR
A-457 INT ELEVATIONS - 4TH FLR CORR
A-458 INT ELEVATIONS - 5TH FLR CORR
A-459 INT ELEVATIONS - 1ST FLR EAST CLASSROOM & WD PANELS
A-460 INT ELEVATIONS - BASEMENT CLASSROOMS
A-461 INT ELEVATIONS - 1ST FLR EAST CLASSROOMS
A-462 INT ELEVATIONS - 1ST FLR EAST CLASSROOMS
A-463 INT ELEVATIONS - 1ST FLR EAST CLASSROOMS
A-464 INT ELEVATIONS - 1ST FLR EAST CLASSROOMS
A-465 INT ELEVATIONS - 1ST FLR EAST/WEST CLASSROOMS
A-466 INT ELEVATIONS - 1ST FLR WEST CLASSROOMS
A-467 INT ELEVATIONS - 1ST FLR WEST CLASSROOMS
A-468 INT ELEVATIONS - 3RD FLR EAST CLASSROOMS
A-469 INT ELEVATIONS - 3RD FLR EAST/WEST CLASSROOMS
A-470 INT ELEVATIONS - 3RD FLR WEST CLASSROOMS
A-471 INT ELEVATIONS - 3RD/4TH FLR WEST/EAST CLASSROOMS
A-472 INT ELEVATIONS - 4TH FLR EAST CLASSROOMS
A-473 INT ELEVATIONS - 4TH FLR WEST CLASSROOMS
A-474 INT ELEVATIONS - 4TH FLR WEST CLASSROOMS
A-475 INT ELEVATIONS - 5TH FLR WEST CLASSROOMS
A-476 INT ELEVATIONS - 5TH FLR WEST CLASSROOMS
A-477 INT ELEVATION - 2ND FLR HISTORIC CORRIDORS
A-478 INT ELEVATION - 3RD FLR HISTORIC CORRIDORS
A-479 INT ELEVATION - 3RD FLOOR MATH LAB
A-501 PLAN DETAILS - EXTERIOR
A-502 PLAN DETAILS - EXTERIOR
A-503 PLAN DETAILS - EXTERIOR
A-504 PLAN DETAILS - EXTERIOR
A-505 PLAN DETAILS - EXTERIOR
A-506 EXTERIOR DETAILS
A-507 EXTERIOR DETAILS
A-508 EXTERIOR STAIR DETAILS
A-509 EXTERIOR STAIR DETAILS
A-510 EXTERIOR STAIR DETAILS
A-511 EXTERIOR STAIR DETAILS
A-551 ELEVATOR DETAILS
A-552 STAIR 1 DETAILS
A-553 STAIR 2 DETAILS
A-554 STAIR 2 DETAILS
A-555 INFILL STAIR DETAILS
A-556 INFILL STEPPED SEATING DETAILS
A-557 REFLECTED CEILING DETAILS
A-558 REFLECTED CEILING DETAILS
A-559 TOILET ROOM DETAILS
A-560 MILLWORK DETAILS
A-561 2ND FLR HISTORIC CORRIDOR INFILL DETAILS
A-562 3RD FLR HISTORIC CORRIDOR INFILL DETAILS
A-563 OPERABLE PARTITION DETAILS
A-564 DETAILS - INTERIOR
A-565 DETAILS - INTERIOR
A-566 STAIR 2 DETAILS
A-601 BASEMENT, 1ST & 2ND FLR DOOR SCHEDULES
A-602 3RD - ROOF FLRS DOOR SCHEDULES
A-603 DOOR AND FRAME TYPES
A-604 BORROWED LITE TYPES
A-605 BL DETAILS
A-607 DOOR DETAILS
A-608 DOOR JAMB DETAILS
A-609 DOOR THRESHOLD DETAILS
A-610 WINDOW SCHEDULE & TYPES
A-611 WINDOW DETAILS
A-612 WINDOW DETAILS
A-613 WINDOW DETAILS
A-614 WINDOW DETAILS
A-615 CURTAINWALL TYPES
A-616 CURTAIN WALL TYPES
INTERIORS
I-100.1 BASE BID BASEMENT & 1ST FLR ROOM FINISH SCHEDULE & FINISH LEGEND
I-100.2 BASE BID 2ND FLR ROOM FINISH SCHEDULE
I-100.3 BASE BID 3RD FLR ROOM FINISH SCHEDULE
I-100.4 BASE BID 4TH & 5TH FLR ROOM FINISH SCHEDULES
I-100.5 MOE ROOM FINISH SCHEDULE - ALL FLOORS
I-101 BASEMENT FLOOR FINISH PLAN
I-102 FIRST FLOOR FINISH PLAN - EAST
I-103 FIRST FLOOR FINISH PLAN - WEST
I-104 SECOND FLOOR FINISH PLAN - EAST
I-105 SECOND FLOOR FINISH PLAN - WEST
I-106 THIRD FLOOR FINISH PLAN - EAST
I-107 THIRD FLOOR FINISH PLAN - WEST
I-108 FOURTH FLOOR FINISH PLAN - EAST
I-109 FOURTH FLOOR FINISH PLAN - WEST
I-110 FIFTH FLOOR FINISH PLAN - WEST
I-111 ENLARGED PLANS - 1ST & 2ND FLR FINISHES
I-112 ENLARGED PLANS - 3RD & 4TH FLR FINISHES
I-113 ENLARGED PLANS - 5TH FLOOR FINISHES
I-120.1 SIGN DETAILS
I-120.2 SIGNAGE TYPES
I-120.3 SIGNAGE SCHEDULE
I-121 BASEMENT FLOOR SIGNAGE PLAN
I-122 FIRST FLOOR SIGNAGE PLAN- EAST
I-123 FIRST FLOOR SIGNAGE PLAN- WEST
I-124 SECOND FLOOR SIGNAGE PLAN - EAST
INDEX OF DRAWINGS - VOL 2
SHEET NUMBER SHEET TITLE
I-125 SECOND FLOOR SIGNAGE PLAN - WEST
I-126 THIRD FLOOR SIGNAGE PLAN - EAST
I-127 THIRD FLOOR SIGNAGE PLAN -WEST
I-128 FOURTH FLOOR SIGNAGE PLAN - EAST
I-129 FOURTH FLOOR SIGNAGE PLAN - WEST
I-130 FIFTH FLOOR SIGNAGE PLAN - WEST
I-140 FURNITURE SCHEDULE
I-141 BASEMENT FLOOR FURNITURE PLAN
I-142 FIRST FLOOR FURNITURE PLAN - EAST
I-143 FIRST FLOOR FURNITURE PLAN - WEST
I-144 SECOND FLOOR FURNITURE PLAN - EAST
I-145 SECOND FLOOR FURNITURE PLAN - WEST
I-146 THIRD FLOOR FURNITURE PLAN - EAST
I-147 THIRD FLOOR FURNITURE PLAN - WEST
I-148 FOURTH FLOOR FURNITURE PLAN - EAST
I-149 FOURTH FLOOR FURNITURE PLAN - WEST
I-150 FIFTH FLOOR FURNITURE PLAN - WEST
STRUCTURAL FIRE RESISTANCE
AF-100 BASEMENT - RCP - EXST FIREPROOFING - STRUCTURAL FIRE RESISTANCE
AF-101 FIRST FLOOR EAST - RCP - EXST FIREPROOFING - STRUCTURAL FIRE
RESISTANCE
AF-102 FIRST FLOOR WEST - RCP - EXST FIREPROOFING - STRUCTURAL FIRE
RESISTANCE
AF-103 SECOND FLOOR EAST - RCP - EXST FIREPROOFING - STRUCTURAL FIRE
RESISTANCE
AF-104 SECOND FLOOR WEST - RCP - EXST FIREPROOFING - STRUCTURAL FIRE
RESISTANCE
AF-105 THIRD FLOOR EAST - RCP - EXST FIREPROOFING - STRUCTURAL FIRE
RESISTANCE
AF-106 THIRD FLOOR WEST - RCP - EXST FIREPROOFING - STRUCTURAL FIRE
RESISTANCE
AF-107 FOURTH FLOOR EAST - RCP - EXST FIREPROOFING - STRUCTURAL FIRE
RESISTANCE
AF-108 FOURTH FLOOR WEST - RCP - EXST FIREPROOFING - STRUCTURAL FIRE
RESISTANCE
AF-109 FIFTH FLOOR WEST - RCP - EXST FIREPROOFING - STRUCTURAL FIRE
RESISTANCE
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D A
T E
File Path:
Plot Date:
M A
R K
D E
S C
R
IP
T
IO
N
P R
O J E
C T
N O
Autodesk Docs://West Point Bldg 606/219208-WP606-G20.rvt
5/12/2025 11:57:15 AM
G-004.3
D R
A W
IN
G
L
IS
T
V O
L
U N
IT
E
D S
T A
T E
S M
IL
IT
A R
Y A
C A
D E
M Y
W
E S
T P
O
IN
T
N Y
P N
N E
W Y
O R
K D
IS
T
R
IC
T
N E
W Y
O R
K
N Y
E A
L
E A
L
M P
K
V N
M A
Y
W
D
S
C
Q P
K J
O B
N O
.0
REV. RTA SUBMISSION
R E
P A
IR
B
L D
G
G E
N E
R A
L I N
S T
R U
C T
IO
N
B L
D G
INDEX OF DRAWINGS - VOL 3
SHEET NUMBER SHEET TITLE
GENERAL
G-001.3 COVER SHEET - VOL 3
G-004.1 DRAWING LIST - VOL 1
G-004.2 DRAWING LIST - VOL 2
G-004.3 DRAWING LIST - VOL 3
G-004.4 DRAWING LIST - VOL 4
FIRE PROTECTION
FX001 FIRE PROTECTION COVER SHEET
FXD100 BASEMENT FIRE PROTECTION DEMO PLAN
FXD101 FIRST FLOOR FIRE PROTECTION DEMO PLAN - EAST
FXD102 FIRST FLOOR FIRE PROTECTION DEMO PLAN - WEST
FXD103 SECOND FLOOR FIRE PROTECTION DEMO PLAN - EAST
FXD104 SECOND FLOOR FIRE PROTECTION DEMO PLAN - WEST
FXD105 THIRD FLOOR FIRE PROTECTION DEMO PLAN - EAST
FXD106 THIRD FLOOR FIRE PROTECTION DEMO PLAN - WEST
FXD107 FOURTH FLOOR FIRE PROTECTION DEMO PLAN - EAST
FXD108 FOURTH FLOOR FIRE PROTECTION DEMO PLAN - WEST
FXD109 COOLING TOWER AND CHILLER FIRE PROTECTION DEMO PLAN - WEST
FX100 BASEMENT FIRE PROTECTION PLAN
FX101 FIRST FLOOR FIRE PROTECTION PLAN - EAST
FX102 FIRST FLOOR FIRE PROTECTION PLAN - WEST
FX103 SECOND FLOOR FIRE PROTECTION PLAN - EAST
FX104 SECOND FLOOR FIRE PROTECTION PLAN - WEST
FX105 THIRD FLOOR FIRE PROTECTION PLAN - EAST
FX106 THIRD FLOOR FIRE PROTECTION PLAN - WEST
FX107 FOURTH FLOOR FIRE PROTECTION PLAN - EAST
FX108 FOURTH FLOOR FIRE PROTECTION PLAN - WEST
FX109 FIFTH FLOOR FIRE PROTECTION PLAN - WEST
FX110 ROOF FIRE PROTECTION PLAN
FX701 FIRE PROTECTION RISER DIAGRAM
FX702 FIRE PROTECTION DETAILS
FIRE ALARM
FA001 FIRE ALARM COVER SHEET
FAD100 BASEMENT FIRST AND SECOND FLOOR FIRE ALARM DEMO PLANS
FAD101 THIRD AND FOURTH FLOOR FIRE ALARM DEMO PLANS
FAD102 FIFTH FLOOR AND ROOF FIRE ALARM PLANS
FA100 BASEMENT FIRE ALARM PLAN
FA101 FIRST FLOOR FIRE ALARM PLAN - EAST
FA102 FIRST FLOOR FIRE ALARM PLAN - WEST
FA103 SECOND FLOOR FIRE ALARM PLAN - EAST
FA104 SECOND FLOOR FIRE ALARM PLAN - WEST
FA105 THIRD FLOOR FIRE ALARM PLAN - EAST
FA106 THIRD FLOOR FIRE ALARM PLAN - WEST
FA107 FOURTH FLOOR FIRE ALARM PLAN - EAST
FA108 FOURTH FLOOR FIRE ALARM PLAN - WEST
FA109 FIFTH FLOOR FIRE ALARM PLAN - WEST
FA110 ROOF FIRE ALARM PLAN - EAST
FA111 ROOF FIRE ALARM PLAN - WEST
FA701 FIRE ALARM RISER DIAGRAM
FA702 FIRE ALARM DETAILS
FA703 FIRE ALARM DETAILS
PLUMBING
P-001 PLUMBING GENERAL NOTES
PD-100 BASEMENT DEMOLITION PLAN
PD-100U BASEMENT BELOW SLAB DEMOLITION PLAN
PD-101 FIRST FLOOR EAST DEMOLITION PLAN
PD-102 FIRST FLOOR WEST DEMOLITION PLAN
PD-102U FIRST FLOOR WEST BELOW SLAB DEMOLITION PLAN
PD-103 SECOND FLOOR EAST DEMOLITION PLAN
PD-104 SECOND FLOOR WEST DEMOLITION PLAN
PD-105 THIRD FLOOR EAST DEMOLITION PLAN
PD-106 THIRD FLOOR WEST DEMOLITION PLAN
PD-107 THIRD FLOOR MEZZANINE DEMOLITION PLAN
PD-108 FOURTH FLOOR EAST DEMOLITION PLAN
PD-109 FOURTH FLOOR WEST DEMOLITION PLAN
PD-113 MECHANICAL ROOM DEMOLITION PLAN
PD-114 COOLING TOWER AND CHILLER DEMOLITION PLAN
PL100 BASEMENT DRAINAGE PIPING PLAN
PL101 FIRST FLOOR EAST DRAINAGE PIPING PLAN
PL102 FIRST FLOOR WEST DRAINAGE PIPING PLAN
PL103 SECOND FLOOR EAST DRAINAGE PIPING PLAN
PL104 SECOND FLOOR WEST DRAINAGE PIPING PLAN
PL105 THIRD FLOOR EAST DRAINAGE PIPING PLAN
PL106 THIRD FLOOR WEST DRAINAGE PIPING PLAN
PL107 FOURTH FLOOR EAST DRAINAGE PIPING PLAN
PL108 FOURTH FLOOR WEST DRAINAGE PIPING PLAN
PL109 FIFTH FLOOR WEST DRAINAGE PIPING PLAN
PL110 ROOF PLAN EAST DRAINAGE PIPING PLAN
PL111 ROOF PLAN WEST DRAINAGE PIPING PLAN
PP100 BASEMENT SERVICE PIPING PLAN
PP101 FIRST FLOOR EAST SERVICE PIPING PLAN
PP102 FIRST FLOOR WEST SERVICE PIPING PLAN
PP103 SECOND FLOOR EAST SERVICE PIPING PLAN
PP104 SECOND FLOOR WEST SERVICE PIPING PLAN
PP105 THIRD FLOOR EAST SERVICE PIPING PLAN
PP106 THIRD FLOOR WEST SERVICE PIPING PLAN
PP107 FOURTH FLOOR EAST SERVICE PIPING PLAN
PP108 FOURTH FLOOR WEST SERVICE PIPING PLAN
PP109 FIFTH FLOOR WEST SERVICE PIPING PLAN
P-400 ENLARGED PLANS - FIRST FLOOR PART 1
P-401 ENLARGED PLANS - FIRST FLOOR PART 2
P-402 ENLARGED PLANS - SECOND AND THIRD FLOORS
P-403 ENLARGED PLANS - FOURTH AND FIFTH FLOORS
P-500 PLUMBING DETAILS, SHEET 1
INDEX OF DRAWINGS - VOL 3
SHEET NUMBER SHEET TITLE
P-501 PLUMBING DETAILS, SHEET 2
P-600 PLUMBING SCHEDULES
P-701 STORM DRAINAGE RISER DIAGRAM EAST
P-702 STORM DRAINAGE RISER DIAGRAM WEST
P-703 DOMESTIC WATER RISER DIAGRAM EAST
P-704 DOMESTIC WATER RISER DIAGRAM WEST
P-705 SANITARY DRAINAGE RISER DIAGRAM EAST
P-706 SANITARY DRAINAGE RISER DIAGRAM WEST
MECHANICAL
M-001 HVAC GENERAL NOTES
M-002 HVAC GENERAL NOTES
MD-100 BASEMENT DEMOLITION PLAN - DUCTWORK
MD-101 FIRST FLOOR DEMOLITION PLAN EAST - DUCTWORK
MD-102 FIRST FLOOR DEMOLITION PLAN WEST - DUCTWORK
MD-103 SECOND FLOOR DEMOLITION PLAN EAST - DUCTWORK
MD-104 SECOND FLOOR DEMOLITION PLAN WEST - DUCTWORK
MD-105 THIRD FLOOR DEMOLITION PLAN EAST - DUCTWORK
MD-106 THIRD FLOOR DEMOLITION PLAN WEST - DUCTWORK
MD-107 FOURTH FLOOR DEMOLITION PLAN EAST - DUCTWORK
MD-108 FOURTH FLOOR DEMOLITION PLAN WEST - DUCTWORK
MD-109 FIFTH FLOOR DEMOLITION PLAN WEST - DUCTWORK
MD-110 ROOF LEVEL EAST DEMOLITION PLAN - DUCTWORK
MD-111 ROOF LEVEL WEST DEMOLITION PLAN - DUCTWORK
MPD-100 BASEMENT DEMOLITION PLAN - PIPING
MPD-101 FIRST FLOOR DEMOLITION PLAN EAST - PIPING
MPD-102 FIRST FLOOR DEMOLITION PLAN WEST - PIPING
MPD-103 SECOND FLOOR DEMOLITION PLAN EAST - PIPING
MPD-104 SECOND FLOOR DEMOLITION PLAN WEST - PIPING
MPD-105 THIRD FLOOR DEMOLITION PLAN EAST - PIPING
MPD-106 THIRD FLOOR DEMOLITION PLAN WEST - PIPING
MPD-107 FOURTH FLOOR DEMOLITION PLAN EAST - PIPING
MPD-108 FOURTH FLOOR DEMOLITION PLAN WEST - PIPING
MPD-109 FIFTH FLOOR DEMOLITION PLAN WEST - PIPING
MS-100 MECHANICAL SITE PLAN
MH-100 BASEMENT FLOOR PLAN - DUCTWORK
MH-101 FIRST FLOOR PLAN EAST - DUCTWORK
MH-102 FIRST FLOOR PLAN WEST - DUCTWORK
MH-103 SECOND FLOOR PLAN EAST - DUCTWORK
MH-104 SECOND FLOOR PLAN WEST - DUCTWORK
MH-105 THIRD FLOOR PLAN EAST - DUCTWORK
MH-106 THIRD FLOOR PLAN WEST - DUCTWORK
MH-107 FOURTH FLOOR PLAN EAST - DUCTWORK
MH-108 FOURTH FLOOR PLAN WEST - DUCTWORK
MH-109 FIFTH FLOOR PLAN WEST - DUCTWORK
MH-110 ROOF LEVEL EAST - HVAC PLAN
MH-111 ROOF LEVEL WEST - HVAC PLAN
MP-100 BASEMENT FLOOR PLAN - PIPING
MP-101 FIRST FLOOR PLAN EAST - PIPING
MP-102 FIRST FLOOR PLAN WEST - PIPING
MP-103 SECOND FLOOR PLAN EAST - PIPING
MP-104 SECOND FLOOR PLAN WEST - PIPING
MP-105 THIRD FLOOR PLAN EAST - PIPING
MP-106 THIRD FLOOR PLAN WEST - PIPING
MP-107 FOURTH FLOOR PLAN EAST - PIPING
MP-108 FOURTH FLOOR PLAN WEST - PIPING
MP-109 FIFTH FLOOR PLAN WEST - PIPING
MP-110 ROOF LEVEL EAST - PIPING
MP-111 ROOF LEVEL WEST - PIPING
M-301 BUILDING SECTIONS
M-302 BUILDING SECTIONS
M-303 BUILDING SECTIONS
M-401 MECHANICAL - ENLARGED PLAN
M-402 MECHANICAL - ISOMETRIC
M-501 HVAC DETAILS
M-502 HVAC DETAILS
M-503 HVAC DETAILS
M-504 HVAC DETAILS
M-601 EQUIPMENT SCHEDULE
M-602 EQUIPMENT SCHEDULE
M-603 EQUIPMENT SCHEDULE
M-604 EQUIPMENT SCHEDULE
M-605 EQUIPMENT SCHEDULE
M-606 EQUIPMENT SCHEDULE
M-607 EQUIPMENT SCHEDULE
M-611 CHILLED WATER FLOW DIAGRAM
M-612 HOT WATER FLOW DIAGRAM
M-613 STEAM FLOW DIAGRAM
M-614 AIRFLOW DIAGRAM
M-701 HVAC CONTROLS
M-702 HVAC CONTROLS
M-703 HVAC CONTROLS
M-704 HVAC CONTROLS
M-705 HVAC CONTROLS
M-706 HVAC CONTROLS
M-707 HVAC CONTROLS
M-708 HVAC CONTROLS
M-709 HVAC CONTROLS
M-710 HVAC CONTROLS
M-711 HVAC CONTROLS
M-712 HVAC CONTROLS
M-713 HVAC CONTROLS
M-714 HVAC CONTROLS
M-715 HVAC CONTROLS
M-716 HVAC CONTROLS
M-717 HVAC CONTROLS
M-718 HVAC CONTROLS
M-719 HVAC CONTROLS
M-720 HVAC CONTROLS
M-721 HVAC CONTROLS
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D A
T E
File Path:
Plot Date:
M A
R K
D E
S C
R
IP
T
IO
N
P R
O J E
C T
N O
Autodesk Docs://West Point Bldg 606/219208-WP606-G20.rvt
5/12/2025 11:57:20 AM
G-004.4
D R
A W
IN
G
L
IS
T
V O
L
U N
IT
E
D S
T A
T E
S M
IL
IT
A R
Y A
C A
D E
M Y
W
E S
T P
O
IN
T
N Y
P N
N E
W Y
O R
K D
IS
T
R
IC
T N
E W
Y O
R K
N
Y
E A
L
E A
L
M P
K
V N
M A
Y
W
D
S
C
Q P
K J
O B
N O
.0
REV. RTA SUBMISSION
R E
P A
IR
B
L D
G
G E
N E
R A
L I N
S T
R U
C T
IO
N
B L
D G
INDEX OF DRAWINGS - VOL 4
SHEET NUMBER SHEET TITLE
GENERAL
G-001.4 COVER SHEET - VOL 4
G-005.1 DRAWING LIST - VOL 1
G-005.2 DRAWING LIST - VOL 2
G-005.3 DRAWING LIST - VOL 3
G-005.4 DRAWING LIST - VOL 4
ELECTRICAL
E-001 ELECTRICAL GENERAL NOTES, NOMENCLATURE AND ABBREVIATIONS
E-002 ELECTRICAL SYMBOL LIST
EDS100 SITE EXISTING CONDITIONS AND DEMOLITION PLAN
ED100 ELECTRICAL DEMOLITION PLAN - BASEMENT
ED101 ELECTRICAL DEMOLITION PLAN - FIRST FLOOR - EAST
ED102 ELECTRICAL DEMOLITION PLAN - FIRST FLOOR - WEST
ED103 ELECTRICAL DEMOLITION PLAN - SECOND FLOOR - EAST
ED104 ELECTRICAL DEMOLITION PLAN - SECOND FLOOR - WEST
ED105 ELECTRICAL DEMOLITION PLAN - THIRD FLOOR - EAST
ED106 ELECTRICAL DEMOLITION PLAN - THIRD FLOOR - WEST
ED107 ELECTRICAL DEMOLITION PLAN - FOURTH FLOOR - EAST
ED108 ELECTRICAL DEMOLITION PLAN - FOURTH FLOOR - WEST
ED109 ELECTRICAL DEMOLITION PLAN - FIFTH FLOOR - WEST
ED120 ELECTRICAL DEMOLITION PLAN - ROOF - EAST
ED121 ELECTRICAL DEMOLITION PLAN - ROOF - WEST
ES100 ELECTRICAL SITE PLAN
ES101 ELECTRICAL SITE UTILITY PLAN
ES102 TRAILER SITE PLAN
ES200 SITE LIGHTING PLAN
EP100 ELECTRICAL POWER PLAN - BASEMENT
EP101 ELECTRICAL POWER PLAN - FIRST FLOOR - EAST
EP102 ELECTRICAL POWER PLAN - FIRST FLOOR - WEST
EP103 ELECTRICAL POWER PLAN - SECOND FLOOR - EAST
EP104 ELECTRICAL POWER PLAN - SECOND FLOOR - WEST
EP105 ELECTRICAL POWER PLAN - THIRD FLOOR - EAST
EP106 ELECTRICAL POWER PLAN - THIRD FLOOR - WEST
EP107 ELECTRICAL POWER PLAN - FOURTH FLOOR - EAST
EP108 ELECTRICAL POWER PLAN - FOURTH FLOOR - WEST
EP109 ELECTRICAL POWER PLAN - FIFTH FLOOR - WEST
EP120 ELECTRICAL POWER PLAN - ROOF - EAST
EP121 ELECTRICAL POWER AND LIGHTING PLAN - ROOF- WEST
EL100 ELECTRICAL LIGHTING PLAN - BASEMENT
EL101 ELECTRICAL LIGHTING PLAN - FIRST FLOOR - EAST
EL102 ELECTRICAL LIGHTING PLAN - FIRST FLOOR - WEST
EL103 ELECTRICAL LIGHTING PLAN - SECOND FLOOR - EAST
EL104 ELECTRICAL LIGHTING PLAN - SECOND FLOOR - WEST
EL105 ELECTRICAL LIGHTING PLAN - THIRD FLOOR - EAST
EL106 ELECTRICAL LIGHTING PLAN - THIRD FLOOR - WEST
EL107 ELECTRICAL LIGHTING PLAN - FOURTH FLOOR - EAST
EL108 ELECTRICAL LIGHTING PLAN - FOURTH FLOOR - WEST
EL109 ELECTRICAL LIGHTING PLAN - FIFTH FLOOR - WEST
EL120 ELECTRICAL LIGHTING PLAN - ROOF - EAST
EL121 ELECTRICAL LIGHTING PLAN - ROOF - WEST
E-501 ENLARGED PLANS
E-510 DETAILS - ELECTRICAL
E-511 DETAILS - ELECTRICAL
E-512 DETAILS - ELECTRICAL
E-513 DETAILS - ELECTRICAL
E-514 DOOR SECURITY DETAILS
E-601 DIAGRAMS - ONE-LINE
E-602 DIAGRAMS - ONE-LINE
E-603 DIAGRAMS - ONE-LINE
E-604 DIAGRAMS - ONE-LINE
E-605 DIAGRAMS - ONE-LINE
E-606 DIAGRAMS - ONE-LINE
E-610 PANELBOARD SCHEDULES
E-611 PANELBOARD SCHEDULES
E-612 PANELBOARD SCHEDULES
E-613 PANELBOARD SCHEDULES
E-614 PANELBOARD SCHEDULES
E-615 PANELBOARD SCHEDULES
E-616 PANELBOARD SCHEDULES
E-617 PANELBOARD SCHEDULES
E-618 PANELBOARD SCHEDULES
E-619 PANELBOARD SCHEDULES
E-620 PANELBOARD SCHEDULES
E-621 PANELBOARD SCHEDULES
E-622 PANELBOARD SCHEDULES
E-623 PANELBOARD SCHEDULES
E-624 PANELBOARD SCHEDULES
E-625 PANELBOARD SCHEDULES
E-626 PANELBOARD SCHEDULES
E-627 PANELBOARD SCHEDULES
EL601 SCHEDULES - LUMINAIRE
EL602 SCHEDULES - LUMINAIRE
EL603 SCHEDULES - LUMINAIRE
EL604 SCHEDULES - LUMINAIRE
EL605 SCHEDULES - LUMINAIRE
EL611 DIAGRAMS - LIGHTING CONTROLS
EL612 DIAGRAMS - LIGHTING CONTROLS
EL613 DIAGRAMS - LIGHTING CONTROLS
E701 GROUNDING DIAGRAM
HP801 HVAC, PLUMBING, AND ELECTRICAL COORDINATION SCHEDULE
HP802 HVAC, PLUMBING, AND ELECTRICAL COORDINATION SCHEDULE
HP803 HVAC, PLUMBING, AND ELECTRICAL COORDINATION SCHEDULE AND FLOOR
BOX SCHEDULE
INDEX OF DRAWINGS - VOL 4
SHEET NUMBER SHEET TITLE
TELECOMMUNICATIONS
TN-000 TELECOMMUNICATIONS COVER SHEET
TN-001 TELECOMMUNICATIONS - SYMBOL LEGEND
TN-003 TELECOMMUNICATIONS - AUDIOVISUAL ABBREVIATIONS AND CABLE TYPES
SCHEDULE
TN-004 TELECOMMUNICATIONS - AUDIOVISUAL DEVICE MOUNTING STANDARDS
SYMBOL LEGEND
TN-200 TELECOMMUNICATIONS PLAN - BASEMENT
TN-201 TELECOMMUNICATIONS PLAN - FIRST FLOOR - EAST
TN-202 TELECOMMUNICATIONS PLAN - FIRST FLOOR - WEST
TN-203 TELECOMMUNICATIONS PLAN - SECOND FLOOR - EAST
TN-204 TELECOMMUNICATIONS PLAN - SECOND FLOOR - WEST
TN-205 TELECOMMUNICATIONS PLAN - THIRD FLOOR - EAST
TN-206 TELECOMMUNICATIONS PLAN - THIRD FLOOR - WEST
TN-207 TELECOMMUNICATIONS PLAN - F0URTH FLOOR - EAST
TN-208 TELECOMMUNICATIONS PLAN - FOURTH FLOOR - WEST
TN-209 TELECOMMUNICATIONS PLAN - FIFTH FLOOR - WEST
TN-300 TELECOMMUNICATIONS CEILING PLAN - BASEMENT
TN-301 TELECOMMUNICATIONS CEILING PLAN - FIRST FLOOR - EAST
TN-302 TELECOMMUNICATIONS CEILING PLAN - FIRST FLOOR - WEST
TN-303 TELECOMMUNICATIONS CEILING PLAN - SECOND FLOOR - EAST
TN-304 TELECOMMUNICATIONS CEILING PLAN - SECOND FLOOR - WEST
TN-305 TELECOMMUNICATIONS CEILING PLAN - THIRD FLOOR - EAST
TN-306 TELECOMMUNICATIONS CEILING PLAN - THIRD FLOOR - WEST
TN-307 TELECOMMUNICATIONS CEILING PLAN - FOURTH FLOOR - EAST
TN-308 TELECOMMUNICATIONS CEILING PLAN - FOURTH FLOOR - WEST
TN-309 TELECOMMUNICATIONS CEILING PLAN - FIFTH FLOOR - WEST
TN-400 TELECOMMUNICATIONS PATHWAY PLAN - BASEMENT
TN-401 TELECOMMUNICATIONS PATHWAY PLAN - FIRST FLOOR - EAST
TN-402 TELECOMMUNICATIONS PATHWAY PLAN - FIRST FLOOR - WEST
TN-403 TELECOMMUNICATIONS PATHWAY PLAN - SECOND FLOOR - EAST
TN-404 TELECOMMUNICATIONS PATHWAY PLAN - SECOND FLOOR - WEST
TN-405 TELECOMMUNICATIONS PATHWAY PLAN - THIRD FLOOR - EAST
TN-406 TELECOMMUNICATIONS PATHWAY PLAN - THIRD FLOOR - WEST
TN-407 TELECOMMUNICATIONS PATHWAY PLAN - FOURTH FLOOR - EAST
TN-408 TELECOMMUNICATIONS PATHWAY PLAN - FOURTH FLOOR - WEST
TN-409 TELECOMMUNICATIONS PATHWAY PLAN - FIFTH FLOOR - WEST
TN-600 TELECOMMUNICATIONS ENLARGED PLANS - BASEMENT MDF
TN-601 TELECOMMUNICATIONS ENLARGED PLANS - FIRST FLOOR IT ROOMS
TN-602 TELECOMMUNICATIONS ENLARGED PLANS - SECOND FLOOR IT ROOMS
TN-603 TELECOMMUNICATIONS ENLARGED PLANS - SECOND FLOOR IT ROOM
ELEVATIONS
TN-604 TELECOMMUNICATIONS ENLARGED PLANS - THIRD FLOOR IT ROOMS
TN-605 TELECOMMUNICATIONS ENLARGED PLANS - FOURTH FLOOR IT ROOMS
TN-606 TELECOMMUNICATIONS ENLARGED PLANS - FOURTH FLOOR IT ROOM
ELEVATIONS
TN-607 TELECOMMUNICATIONS ENLARGED PLANS - FIFTH FLOOR IT ROOMS
TN-611 TELECOMMUNICATIONS ENLARGED PLANS - CLASSROOM TYPE A
TN-612 TELECOMMUNICATIONS ENLARGED PLANS - CLASSROOM TYPE B
TN-613 TELECOMMUNICATIONS ENLARGED PLANS - CLASSROOM TYPE C
TN-614 TELECOMMUNICATIONS ENLARGED PLANS - CLASSROOM TYPE D
TN-615A TELECOMMUNICATIONS ENLARGED PLANS - SMALL CONFERENCE ROOM
TYPE A1
TN-615B TELECOMMUNICATIONS ENLARGED PLANS - SMALL CONFERENCE ROOM
TYPE A2
TN-616A TELECOMMUNICATIONS ENLARGED PLANS - LARGE CONFERENCE ROOM
TYPE B1
TN-616B TELECOMMUNICATIONS ENLARGED PLANS - LARGE CONFERENCE ROOM
TYPE B2
TN-617 TELECOMMUNICATIONS ENLARGED PLANS - MATHEMATICS LAB
TN-618 TELECOMMUNICATIONS ENLARGED RCP - MATHEMATICS LAB
TN-619 TELECOMMUNICATIONS ENLARGED PLANS - 3-WAY DIVISIBLE CLASSROOM
TN-620 TELECOMMUNICATIONS ENLARGED PLANS - 2-WAY DIVISIBLE CLASSROOM
TN-621A TELECOMMUNICATIONS ENLARGED PLANS - COLLAB
TN-621B TELECOMMUNICATIONS ENLARGED PLANS - COLLAB
TN-622 TELECOMMUNICATIONS ENLARGED PLANS - OFFICE
TN-623 TELECOMMUNICATIONS ENLARGED PLANS - SIGNAGE
TN-701 TELECOMMUNICATIONS RISER DIAGRAMS
TN-801 TELECOMMUNICATIONS EQUIPMENT DETAILS
TN-900 OUTSIDE PLANT CABLE MAP
SOUND MASKING
TK-000 SOUND MASKING COVER SHEET
TK-300 SOUND MASKING LAYOUT - BASEMENT
TK-301 SOUND MASKING LAYOUT - FIRST FLOOR - EAST
TK-302 SOUND MASKING LAYOUT - FIRST FLOOR - WEST
TK-303 SOUND MASKING LAYOUT - SECOND FLOOR - EAST
TK-304 SOUND MASKING LAYOUT - SECOND FLOOR - WEST
TK-305 SOUND MASKING LAYOUT - THIRD FLOOR - EAST
TK-306 SOUND MASKING LAYOUT - THIRD FLOOR - WEST
TK-307 SOUND MASKING LAYOUT - FOURTH FLOOR - EAST
TK-308 SOUND MASKING LAYOUT - FOURTH FLOOR - WEST
TK-309 SOUND MASKING LAYOUT - FIFTH FLOOR - WEST
TK-701 SOUND MASKING EQUIPMENT DETAILS
RESTORATION
R-001 TREATMENT NOTES AND QUANITITIES
R-101 FIRST FLOOR PLAN - EAST
R-103 SECOND FLOOR PLAN - EAST
R-105 THIRD FLOOR PLAN - EAST
R-201 EAST BLDG ELEVATIONS
R-202 NORTH EAST BLDG ELEVATION
R-203 NORTH WEST BLDG ELEVATION
R-204 SOUTH EAST BLDG ELEVATIONS
R-205 SOUTH WEST BLDG ELEVATIONS
R-206 WEST BLDG ELEVATIONS
R-303 EAST ELEVATION - LOADING DOCK
R-304 EAST BLDG ELEVATIONS
R-305 WEST BLDG ELEVATION
R-501 DETAILS
A ---------------------
A.F.C. ABOVE FINISHED CEILING
A.F.F. ABOVE FINISHED FLOOR
A.F.G. ABOVE FINISHED GRADE
AHJ AUTHORITY HAVING JURISDICTION
AHU AIR HANDLING UNIT
ARCH. ARCHITECT
B ---------------------
BFP BACK FLOW PREVENTER
BLK BLACK
C ---------------------
CL CENTERLINE
CLG. CEILING
CO CLEANOUT
CONC. CONCRETE
CONN. CONNECTION
CONST. CONSTRUCTION
CONTR. CONTRACTOR
D ---------------------
DEMO. DEMOLITION
DIA. DIAMETER
DN DOWN
DW DOMESTIC WATER
DWG. DRAWING
DSP DRY STANDPIPE
E ---------------------
(E) EXISTING
E.C. ELECTRICAL CONTRACTOR
ELEC. ELECTRICAL
ELEV. ELEVATOR
(R) EXISTING RELOCATED
EQUIP. EQUIPMENT
EXP EXPOSED
F ---------------------
FD FLOOR DRAIN
FDC FIRE DEPARTMENT CONNECTION
FDV FIRE DEPARTMENT VALVE
FDVC FIRE DEPARTMENT VALVE CABINET
FEC FIRE EXTINGUISHER CABINET
FH FIRE HYDRANT
FHC FIRE HOSE CABINET
FHR FIRE HOSE RACK
FL. FLOOR
FP FIRE PUMP
FS FLOW SWITCH
FUT. FUTURE
G ---------------------
GA. GAUGE
G.C. GENERAL CONTRACTOR
GPM GALLON PER MINUTE
GWB GYPSUM WALL BOARD
H ---------------------
HP HORSEPOWER
HT. HEIGHT
HVAC HEATING, VENTILATING, AIR CONDITIONING
I ---------------------
I.D. INSIDE DIMENSION
ITC INSPECTORS TEST CONNECTION
K ---------------------
KW KILOWATT
L ---------------------
LT. LIGHT
M ---------------------
MAX. MAXIMUM
MFR. MANUFACTURER
MIN. MINIMUM
MTD. MOUNTED
N ---------------------
(N) NEW
NC NORMALLY CLOSED
NIC NOT IN CONTRACT
NO NORMALLY OPEN
N.T.S. NOT TO SCALE
O ---------------------
O.D. OUTSIDE DIMENSION
OS&Y OUTSIDE SCREW & YOKE
OH ORDINARY HAZARD
P ---------------------
P.C. PLUMBING CONTRACTOR
PIV POST INDICATOR VALVE
PRV PRESSURE REDUCING VALVE
PSI POUNDS PER SQUARE INCH
PT PAINT
GENERAL ABBREVIATIONS
R ---------------------
REQ. REQUIRED
RPZ REDUCED PRESSURE ZONE
S ---------------------
SF SQUARE FEET
SLV. SLEEVE
SP STANDPIPE
SPEC. SPECIFICATION
SPR SPRINKLER
STD. STANDARD
SYS. SYSTEM
T ---------------------
TEMP. TEMPERATURE
TS TAMPER SWITCH
TYP. TYPICAL
U ---------------------
U.O.N. UNLESS OTHERWISE NOTED
V ---------------------
V VOLT
W ---------------------
WHT WHITE
WP WEATHERPROOF
WSP WET STANDPIPE
SYMBOLS ---------------------
* DISTANCE DOWN FROM CEILING
+ DISTANCE ABOVE FINISHED FLOOR
FIRE PROTECTION SYMBOLS
BUILDING CONSTRUCTION CODE DATA
BUILDING CODE: INTERNATIONAL BUILDING CODE, 2018
FIRE CODE: UFC 3-600-01, DESIGN: FIRE PROTECTION ENGINEERING FOR FACILITIES, (8
AUGUST 2016, WITH CHANGE 6, 6 MAY 2021)
SITE LOCATION: WEST POINT, NY
FIRE SUPRESSION SYSTEM: FULLY SPRINKLERED
PROPOSED WORK SHALL COMPLY WITH:
NFPA 13, 14 - 2019, NFPA 20 - 2022, NATIONAL ELECTRICAL CODE - 2020
UFC 3-600-01, DESIGN: FIRE PROTECTION ENGINEERING FOR FACILITIES, (8 AUGUST
2016, WITH CHANGE 6, 6 MAY 2021)
STANDPIPE PIPINGF
SPR WET SPRINKLER PIPING
DSP DRY SPRINKLER PIPING
DRAIN LINED
NEW SIDEWALL SPRINKLER HEAD
NEW PENDANT SPRINKLER HEAD
NEW UPRIGHT SPRINKLER HEAD
NEW CONCEALED SPRINKLER HEAD
NEW SEMI-RECESSED SPRINKLER HEAD
CHECK VALVE
PRESSURE REDUCING VALVE
SPRINKLER FLOOR CONTROL STATION
FIRE DEPARTMENT VALVE
VALVE IN DROP
SHUT-OFF VALVE
O.S.&Y. VALVE WITH TAMPER SWITCH
MONITORED FIRE VALVE
M
FLOW SWITCH
FS
BACKFLOW PREVENTER
PRESSURE GAGE & COCK
DIRECTION OF FLOW
DIRECTION OF DRAINAGE
SIAMESE FIRE DEPARTMENT
CONNECTION
PITCH DOWN PIPE
SERVICE RISER UP/DOWN
ELBOW DOWN
SPRINKLER DRAIN RISER WITH 2 1/2"
HOSE END TEST CONNECTION
STRAINER
UNION OR FLANGED CONNECTION
PIPE CAP
VALVE & VALVE BOX
STANDPIPE RISER DESIGNATION
F
STANDPIPE DRAIN RISER DESIGNATION
D
PRESSURE REDUCING
FIRE DEPARTMENT VALVE
NEW DRY SIDEWALL SPRINKLER HEAD
PRESSURE REDUCING
SPRINKLER FLOOR CONTROL STATION
STORZ FIRE DEPARTMENT CONNECTION
1. DESIGN AND INSTALLATION SHALL BE SUPERVISED BY A CERTIFIED FIRE PROTECTION SPECIALIST WHO IS A PROFESSIONAL REGISTERED FIRE PROTECTION ENGINEER AND SHALL HAVE SERVED IN A
SIMILAR CAPACITY FOR AT LEAST THREE SYSTEMS THAT HAVE PERFORMED IN THE MANNER
INTENDED FOR A PERIOD OF NOT LESS THAN 6 MONTHS.
2. CONTRACTOR SHALL PERFORM ALL WORK IN ACCORDANCE WITH ALL APPLICABLE CODES
(INCLUDING BUT NOT LIMITED TO THOSE SHOWN BELOW), STANDARDS AND LOCAL ORDINANCES
HAVING JURISDICTION.
3. APPLICABLE CODES:
NFPA 13 (2019 EDITION)
NFPA 14 (2019 EDITION)
NFPA 20 (2022 EDITION)
NFPA 72 (2019 EDITION)
NFPA 101 (2021 EDITION)
UFC 3-600-01, DESIGN: FIRE PROTECTION ENGINEERING FOR FACILITIES, (8 AUGUST 2016, WITH
CHANGE 6, 06 MAY 2021)
4. HYDRANT FLOW TEST TO BE PERFORMED BY CONTRACTOR WITHIN 6 MONTHS OF DRAWING
SUBMISSION. FOR BIDDING PURPOSES, UTILIZE THE FOLLOWING FLOW TEST INFORMATION:
A. 63PSI STATIC, 56 PSI @ 1150GPM - 6/2/22
5. CONTRACTOR SHALL PROVIDE AN AUTOMATIC WET-PIPE SPRINKLER SYSTEM AND MANUAL, WET
CLASS I STANDPIPE SYSTEM THROUGHOUT WORK AREA. SYSTEMS SHALL BE DESIGNED IN
ACCORDANCE WITH THE PROPER OCCUPANCY CLASSIFICATION AND HAZARD RATING PER NFPA 13, NFPA 14, AND UFC 3-600-01. THESE PROVISIONS SHALL INCLUDE COORDINATION OF FIRE SPRINKLER
AND STANDPIPE SYSTEM WITH OTHER TRADES.
6. THESE DESIGN DOCUMENTS REPRESENT A DIAGRAMMATIC LAYOUT OF THE SYSTEM AND DO NOT INCLUDE ALL REQUIRED SYSTEM COMPONENTS. PIPE SIZES LISTED ARE A MINIMUM. AT THEIR OWN
RISK, THE CONTRACTOR MAY REDUCE THE PIPE SIZES LISTED IF THE PROPOSED SIZES ARE
JUSTIFIED BY HYDRAULIC CALCULATIONS AND APPROVED.
7. CONTRACTOR SHALL PROVIDE TESTING OF THE FIRE SUPPRESSION SYSTEMS IN ACCORDANCE WITH
APPLICABLE CODES, STANDARDS, LOCAL ORDINANCES HAVING JURISDICTION, ENGINEER AND
OWNER. PROVIDE ALL APPROVED EQUIPMENT FOR TESTING.
8. FOR THE FIRE SPRINKLER SYSTEMS, WHERE CEILING TILE IS PROVIDED, THE CONTRACTOR SHALL
INSTALL FIRE SPRINKLERS CENTERED IN TILE.
9. WHERE OBSTRUCTIONS TO FIRE SPRINKLER DISCHARGE EXIST, SPRINKLERS SHALL BE LOCATED
WITH RESPECT TO THIS OBSTRUCTION IN ACCORDANCE WITH NFPA 13. THIS INCLUDES FIRE
SPRINKLERS BENEATH DUCT WORK AND OTHER OBSTRUCTIONS WIDER THAN 48".
10. CONTRACTOR SHALL COORDINATE FIRE SPRINKLER LOCATIONS WITH ARCHITECTURAL DRAWINGS
AND REFLECTED CEILING PLANS.
11. COORDINATE LOCATIONS OF ALL FIRE PROTECTION PIPING WITH BUILDING STRUCTURAL,
MECHANICAL, AND ELECTRICAL ELEMENTS INCLUDING, BUT NOT LIMITED TO, STRUCTURAL MEMBERS AND SYSTEMS, AIR DUCTS AND OUTLETS, LIGHT FIXTURES AND SIMILAR EQUIPMENT AND MATERIAL
THAT MAY INTERFERE WITH THE PROPER INSTALLATION AND OPERATION OF THESE SYSTEMS.
INSTALLATION DRAWINGS SUBMITTED FOR APPROVAL SHALL BE COORDINATED WITH ALL TRADES.
12. PROVIDE ALL NECESSARY PARTS, ACCESSORIES AND LABOR TO INSTALL THE NEW SPRINKLER
PIPING.
13. REPAIR OR REPLACE ANY COMPONENT/WORK DAMAGED BY THE CONTRACTOR INSTALLING THE FIRE
SPRINKLER SYSTEM.
14. PROVIDE SLEEVES FOR ALL PIPING PENETRATING WALLS, FLOORS, AND CEILINGS.
15. SEAL, CAULK AND PROVIDE UL LISTED FIRE STOP SYSTEM AROUND ALL OPENINGS, PENETRATIONS AND SLEEVES THROUGH FIRE RATED WALLS, FLOORS, PARTITIONS, CEILINGS, ETC. UL LABELED AND LISTED FIRE RATED MATERIALS, FIRE STOPS, ETC. SHALL BE USED IN ACCORDANCE WITH THIS
REQUIREMENT AND OTHER SPECIFICATION SECTIONS.
16. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO PROTECT ALL BUILDING COMPONENTS AND
FINISHES FROM DAMAGE. THE CONTRACTOR SHALL, AT HIS EXPENSE, RESTORE TO ORIGINAL
CONDITION AREAS OR FINISHES DAMAGED BY THIS WORK.
17. CONTRACTOR SHALL PROVIDE SPRINKLER SYSTEM SHOP DRAWINGS IN ACCORDANCE WITH NFPA 13, UFC 3-600-01, AND HYDRAULIC CALCULATIONS SIGNED AND SEALED BY A QUALIFIED FIRE
PROTECTION ENGINEER. PROVIDE INSTALLATION DETAILS OF SPECIAL CONDITIONS, AND SUBMIT TO
THE GOVERNMENT FOR REVIEW. NO WORK SHALL BEGIN WITHOUT APPROVED SHOP DRAWINGS.
18. LOCATION OF FIRE SPRINKLER HEADS: THE SPACING OF SPRINKLER HEADS SHALL NOT EXCEED
THAT PERMITTED BY NFPA 13 AND UFC 3-600-01 FOR THE HAZARD OCCUPANCY CLASSIFIED.
19. FOR WET PIPE FIRE SPRINKLER SYSTEMS, BLACK STEEL PIPING SHALL BE SCHEDULE 40 PIPE.
SCHEDULE 40 AND SCHEDULE 10 PIPING SHALL HAVE GROOVED OR SCREW TYPE FITTINGS AND
COUPLINGS. THREADING SHALL BE NATIONAL PIPE THREAD (NPT) THREADING. PRESS-FIT FITTINGS SHALL NOT BE UTILIZED. PIPING PRIOR TO THE BACKFLOW PREVENTER SHALL BE SUITABLE FOR
POTABLE WATER SERVICE AS OUTLINED IN UFC 3-600-01, SECTION 9-6.6.4.
20. ALL SECTIONS OF ALL PIPING SHALL BE DRAINABLE. END OF LINE AUXILIARY DRAINS SHALL BE INSTALLED ABOVE FINISHED CEILINGS OR IN CORRIDORS AS PER NFPA 13. AUXILIARY DRAINS SHALL CONSIST OF A BALL VALVE WITH MALE HOSE THREAD AND CAP. AUXILIARY DRAIN LOCATIONS SHALL HAVE A SIGN ATTACHED TO THE FINISHED CEILING GRID (OR HANG NEAR THE CONNECTION IN
CORRIDORS) STATING "AUXILIARY DRAIN".
21. PIPE HANGERS AND SUPPORTS: PROVIDE PIPE SUPPORTS, HANGERS, AND CLAMPS IN ACCORDANCE
WITH NFPA 13 AND UFC 3-600-01.
22. FIRE SPRINKLER HEADS SHALL BE IN CONFORMANCE WITH NFPA 13. RELEASE ELEMENTS SHALL BE SUITABLE FOR SPECIFIC APPLICATION. PROVIDE QUICK RESPONSE HEADS IN ALL LIGHT HAZARD
AREAS AND ALL OTHER OCCUPANCIES IN WHICH THEIR USE IS LISTED OR APPROVED.
23. PRELIMINARY TESTING: IN THE PRESENCE OF THE CONTRACTING OFFICER OR HIS APPOINTED
REPRESENTATIVE, CONTRACTOR SHALL HYDROSTATICALLY TEST ALL WET-PIPE SPRINKLER
SYSTEMS AS REQUIRED BY NFPA 13 AND UFC 3-600-01.
24. PIPING IDENTIFICATION: PIPE LABELING SHALL BE IN ACCORDANCE WITH MIL-STD-101 AS MODIFIED
BY UFC 3-600-01, SECTION 9-6.8.
25. CLEANING AND PROTECTION: CONTRACTOR SHALL CLEAN DIRT AND DEBRIS FROM FIRE SPRINKLERS
AND PIPING.
26. FIRE SPRINKLER PIPE SHALL BE INSTALLED AS HIGH AS POSSIBLE USING NECESSARY FITTINGS TO
MAINTAIN MAXIMUM HEADROOM. USE OF AUXILIARY DRAINS AND THEIR LOCATIONS SHALL BE
APPROVED BY AHJ AND ENGINEER DURING SHOP DRAWING SUBMITTAL PHASE AND SHALL BE
COORDINATED WITH OTHER TRADES.
27. CONTRACTOR SHALL PROVIDE FIRE SPRINKLER SYSTEM SHOP DRAWINGS THAT INCLUDE ALL INFORMATION AS OUTLINED IN SECTION 27.1.3 OF NFPA 13 (2019 EDITION), AS WELL AS WATER
SUPPLY INFORMATION AND WATER SUPPLY TREATMENT INFORMATION. THE FIRE SPRINKLER
HYDRAULIC CALCULATIONS SHALL INCLUDE A SUMMARY SHEET, GRAPH SHEET, DETAILED
WORKSHEETS AND HYDRAULIC REPORT IN ACCORDANCE WITH SECTIONS 27.4.2, 27.4.3, 27.4.4, 27.4.5
OF NFPA 13 (2019 EDITION).
28. THE AUTHORITY HAVING JURISDICTION IS USACE. CONTRACTOR SHALL PROVIDE ALL NECESSARY
EQUIPMENT FOR TESTING AS DIRECTED BY THE AUTHORITY HAVING JURISDICTION.
29. WATER SUPPLY IS FROM WATER MAINS INSTALLED BY AMERICAN WATER. CONTRACTOR MUST
COORDINATE WITH COR.
SYSTEM SUMMARY
GENERAL NOTES
1. OWNER: GOVERNMENT
2. LOCATION: BUILDING 606, WEST POINT NY
3. SYSTEM DESCRIPTION: AUTOMATIC WET-PIPE SPRINKLER SYSTEM THROUGHOUT WORK AREA.
4. FIRE PROTECTION ENGINEER OF RECORD: EWINGCOLE, PHILADELPHIA, PA
5. DESCRIPTION OF HAZARDS:
LIGHT HAZARD: OFFICE, BREAK ROOMS, CLASSROOMS, RESTROOMS, CORRIDORS, AND
SIMILAR AREAS.
ORDINARY HAZARD: ELECTRONIC EQUIPMENT ROOMS, TELEPHONE CLOSETS, PUMP ROOMS,
STORAGE ROOMS, BOILER ROOMS, MECHANICAL ROOMS, SWITCHGEAR
ROOMS, AND SIMILAR AREAS.
6. FIRE SPRINKLER SYSTEMS - MINIMUM RATE WATER APPLICATION (DENSITY):
LIGHT HAZARD (LH) : 0.1 GPM/ 1500 SF
ORDINARY HAZARD (OH) : 0.2 GPM/ 2500 SF
7. MAX. AREA OF SPRINKLER COVERAGE: LH - 225 SF, OH - 130 SF.
8. FIRE SPRINKLER SYSTEM BACKFLOW PREVENTER - A PRESSURE LOSS SHALL BE APPLIED TO THE
HYDRAULIC CALCULATIONS MAXIMUM OF MANUFACTURER'S DATA SHEET OR 8 PSI.
9. CONTRACTOR SHALL PERFORM A NEW FIRE HYDRANT FLOW TEST PRIOR TO SHOP DRAWING
SUBMITTALS. RESULTS FROM THIS NEW FIRE HYDRANT FLOW TEST SHALL BE USED FOR THE DESIGN.
10. NOT ALL EQUIPMENT THAT SHALL BE PART OF THE FIRE SPRINKLER SYSTEM IS SHOWN (I.E., PIPE HANGERS, ETC.). IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO PROVIDE ALL NECESSARY
EQUIPMENT AND MATERIALS PER NFPA 13 AND SHOW ON THE SHOP DRAWINGS.
11. FIRE SPRINKLER SYSTEMS - FOR CONTROL VALVES AND FLOW SWITCHES ABOVE HARD CEILING, PROVIDE AN APPROVED ACCESS HATCH WITH PROPER LABELING.
12. UPRIGHT SPRINKLER HEADS SHALL BE PROVIDED IN AREAS WITHOUT SUSPENDED CEILINGS, SUCH AS, STORAGE ROOMS, SECURITY ROOMS, STAIRWAYS, MECHANICAL ROOMS, ELECTRICAL ROOMS, IT
ROOMS, JANITOR CLOSETS, AND LOADING DOCK/RECEIVING AREAS.
13. CONCEALED SPRINKLER HEADS SHALL BE PROVIDED IN AREAS WITH FINISHED CEILINGS, SUCH AS, PRIVATE OFFICES, OPEN OFFICES, FINISHED STORAGE SPACES, COPY/PRINT ROOMS, PANTRY/BREAKROOMS, GATHERING AREAS WITH FINISHED CEILINGS, SUCH AS, CONFERENCE ROOMS, TEAM ROOMS, BUILDING LOBBIES, ELEVATOR LOBBIES, AND DISPLAY AREAS.
SPRINKLER AREA BOUNDARY LINE
FM
FLOW METER
OH ORDINARY HAZARD
POST INDICATOR VALVE
FIRE PUMP SCHEDULE
JP-01
FP-01
UNIT No. SERVICE
FP SYSTEM
(FIRE PUMP)
FP SYSTEM
(JOCKEY PUMP)
HORIZONTAL
SPLIT CASE
MULTI-STAGE
CENTRIFUGAL
CASING
TYPE
DESIGN
CAPACITY
(GPM)
DESIGN
HEAD
(PSI)
CASING SIZE
SUCTION
(INCHES)
DISCHARGE
(INCHES)
HP RPM
FIRE PUMP /
JOCKEY PUMP
MOTOR DATA
BASIS OF DESIGN
MANUF. PUMP
MODEL NO.
REMARKS CONTROLLER
6"
1 1/4"
6"
1 1/4"
AURORA
AURORA
5-481-17
PVM2-60D
CENTRIFUGAL, ALL
BRONZE, UL LISTED
TURBINE
JOSLYN CLARK
JOSLYN CLARK
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D A
T E
File Path:
Plot Date:
M A
R K
D E
S C
R
IP
T
IO
N
P R
O J E
C T
N O
Autodesk Docs://West Point Bldg 606/219208-WP606-FP20.rvt
5/12/2025 3:47:13 PM
FX001
F
IR
E P
R O
T E
C T
IO
N
C O
V E
R S
H E
E T
U N
IT
E
D S
T A
T E
S M
IL
IT
A R
Y A
C A
D E
M Y
W
E S
T P
O
IN
T N
Y P
N
F
Y
N E
W Y
O R
K D
IS
T
R
IC
T N
E W
Y O
R K
N
Y
P K
R Z
P K
M
A Y
W D
D
S C
Q P
K J
O B
N O
.0
REV. RTA SUBMISSION
R E
P A
IR
B
L D
G
G
E N
E R
A L I N
S T
R U
C T
IO
N
B L D
G
R
1. DEMOLISH ALL EXISTING ABOVE GRADE PIPING,
VALVES, SPRINKLERS, AND ASSOCIATED EQUIPMENT.
2. CAP ALL EXISTING BELOW GRADE PIPING TO REMAIN
UNLESS CONNECTION IS DIRECTED IN PLUMBING NEW
WORK DRAWINGS.
REFERENCE: UNITED STATES MILITARY ACADEMY
CONVERSION OF BUILDING NO. 606, LEO A. DALY
COMPANY, 1979
NOTES:
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D A
T E
File Path:
Plot Date:
M A
R K
D E
S C
R
IP
T
IO
N
P R
O J E
C T
N O
Autodesk Docs://West Point Bldg 606/219208-WP606-FP20.rvt
5/12/2025 3:47:50 PM
FXD100
B A
S E
M E
N T
F
IR
E P
R O
T E
C T
IO
N
D E
M O
P L A
N
U N
IT
E
D S
T A
T E
S M
IL
IT
A R
Y A
C A
D E
M Y
W
E S
T P
O
IN
T N
Y P
N
F
Y
N E
W Y
O R
K D
IS
T
R
IC
T N
E W
Y O
R K
N
Y
P K
R Z
C W
M
A Y
W D
D
S C
Q P
K J
O B
N O
.0
REV. RTA SUBMISSION
R E
P A
IR
B
L D
G
G
E N
E R
A L I N
S T
R U
C T
IO
N
B L D
G
SCALE: 1/8" = 1'-0"A1
BASEMENT FIRE PROTECTION DEMO PLAN
2. CAP ALL EXISTING BELOW GRADE PIPING TO REMAIN
UNLESS CONNECTION IS DIRECTED IN PLUMBING NEW
WORK DRAWINGS.
REFERENCE: UNITED STATES MILITARY ACADEMY
CONVERSION OF BUILDING NO. 606, LEO A. DALY
COMPANY, 1979
NOTES:
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D A
T E
File Path:
Plot Date:
M A
R K
D E
S C
R
IP
T
IO
N
P R
O J E
C T
N O
Autodesk Docs://West Point Bldg 606/219208-WP606-FP20.rvt
5/12/2025 3:47:56 PM
FXD101
F
IR
S T
F L O
O R
F
IR
E P
R O
T E
C T
IO
N
D E
M O
P L A
N
E A
S T
U N
IT
E
D S
T A
T E
S M
IL
IT
A R
Y A
C A
D E
M Y
W
E S
T P
O
IN
T N
Y P
N
F
Y
N E
W Y
O R
K D
IS
T
R
IC
T N
E W
Y O
R K
N
Y
P K
R Z
C W
M
A Y
W D
D
S C
Q P
K J
O B
N O
.0
REV. RTA SUBMISSION
R E
P A
IR
B
L D
G
G
E N
E R
A L I N
S T
R U
C T
IO
N
B L D
G
FIRST FLOOR FIRE PROTECTION DEMO PLAN - EAST
2. CAP ALL EXISTING BELOW GRADE PIPING TO REMAIN
UNLESS CONNECTION IS DIRECTED IN PLUMBING NEW
WORK DRAWINGS.
REFERENCE: UNITED STATES MILITARY ACADEMY
CONVERSION OF BUILDING NO. 606, LEO A. DALY
COMPANY, 1979
NOTES:
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D A
T E
File Path:
Plot Date:
M A
R K
D E
S C
R
IP
T
IO
N
P R
O J E
C T
N O
Autodesk Docs://West Point Bldg 606/219208-WP606-FP20.rvt
5/12/2025 3:48:01 PM
FXD102
F
IR
S T
F L O
O R
F
IR
E P
R O
T E
C T
IO
N
D E
M O
P L A
N
W E
S T
U N
IT
E
D S
T A
T E
S M
IL
IT
A R
Y A
C A
D E
M Y
W
E S
T P
O
IN
T N
Y P
N
F
Y
N E
W Y
O R
K D
IS
T
R
IC
T N
E W
Y O
R K
N
Y
P K
R Z
C W
M
A Y
W D
D
S C
Q P
K J
O B
N O
.0
REV. RTA SUBMISSION
R E
P A
IR
B
L D
G
G
E N
E R
A L I N
S T
R U
C T
IO
N
B L D
G
FIRST FLOOR FIRE PROTECTION DEMO PLAN - WEST
2. CAP ALL EXISTING BELOW GRADE PIPING TO REMAIN
UNLESS CONNECTION IS DIRECTED IN PLUMBING NEW
WORK DRAWINGS.
REFERENCE: UNITED STATES MILITARY ACADEMY
CONVERSION OF BUILDING NO. 606, LEO A. DALY
COMPANY, 1979
NOTES:
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D A
T E
File Path:
Plot Date:
M A
R K
D E
S C
R
IP
T
IO
N
P R
O J E
C T
N O
Autodesk Docs://West Point Bldg 606/219208-WP606-FP20.rvt
5/12/2025 3:48:06 PM
FXD103
S E
C O
N D
F L O
O R
F
IR
E P
R O
T E
C T
IO
N
D E
M O
P L A
N
E A
S T
U N
IT
E
D S
T A
T E
S M
IL
IT
A R
Y A
C A
D E
M Y
W
E S
T P
O
IN
T N
Y P
N
F
Y
N E
W Y
O R
K D
IS
T
R
IC
T N
E W
Y O
R K
N
Y
P K
R Z
C W
M
A Y
W D
D
S C
Q P
K J
O B
N O
.0
REV. RTA SUBMISSION
R E
P A
IR
B
L D
G
G
E N
E R
A L I N
S T
R U
C T
IO
N
B L D
G
SCALE: 1/8" = 1'-0"A2
SECOND FLOOR FIRE PROTECTION DEMO PLAN - EAST
2. CAP ALL EXISTING BELOW GRADE PIPING TO REMAIN
UNLESS CONNECTION IS DIRECTED IN PLUMBING NEW
WORK DRAWINGS.
REFERENCE: UNITED STATES MILITARY ACADEMY
CONVERSION OF BUILDING NO. 606, LEO A. DALY
COMPANY, 1979
NOTES:
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D A
T E
File Path:
Plot Date:
M A
R K
D E
S C
R
IP
T
IO
N
P R
O J E
C T
N O
Autodesk Docs://West Point Bldg…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .