FJRP159073-GC-001-Amd03.pdf
PDF 459 KB Posted
- Attached to
- C-17 Refueling Hydrant System Ramp Expansion
- Solicitation number
- W91242-18-R-0002
View the file
Other files
Show 40 more
Latest 50 of 114 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
S
D
PIV
CO
S
D
D
PIV
CO
H
H
T
P
G
S
G
S
S
S
S
C
E
S
EO
I
D
D
D
E
T
T
SPSP
D
D
1 STORY
METAL FRAME
BUILDING
EXISTING 1 STORY
BLOCK
BUILDING
1 STORY
BLOCK
BUILDING
MONITORING
WELL (TYP)
W
D D
W
EXISTING
MOORING
POINT (TYP)
T
D
W
D
H
E
R
C
U
L
E
B
L
V
D
H
E
R
C
U
L
E
B
L
V
D
S c a l e
F o r
M i c r o f i l m i n g
I n c h e s
M i l l i m e t e r s date detailed checkeddesigned ofsheet sheets project contract rev.drawing file
NORTH CAROLINA AIR NATIONAL GUARD
DOUGLAS INTERNATIONAL AIRPORT
CHARLOTTE, NORTH CAROLINA
KANSAS CITY, MISSOURI
ENGINEERS ARCHITECTS & CONSULTANTS
Project No. - FJRP159073
C-17 TYPE III HYDRANT
REFUELING SYSTEM/
RAMP EXPANSION
94893
C O
P Y
R I G
H T
B U
R N
M c D
O N
N E
L L
E
N G
I N
E E
R I N
G
C
O M
P A
N Y
I N
C
D
2 3
C
4 5
A
B
N
B1
CONSTRUCTION - PHASE 1
SCALE: 1"=100'
100' 200'0
AD
FUTURE HANGAR
BY OTHERS
PHASE 1 - DEMOLISH EXISTING
ACCESS ROAD AND INSTALL ALL
ASSOCIATED UNDERGROUND
FUELING AND MISCELLANEOUS
UTILITIES. GRADE TO APPROPRIATE
ELEVATIONS REQUIRED FOR NEW
ACCESS ROAD CONSTRUCTION
PHASE 1 - DEMOLISH EXISTING
STORAGE YARD ASPHALT AND
MISCELLANEOUS STRUCTURES
PHASE 1 - APRON EXPANSION
DEMOLISH THE EXISTING BLAST FENCE CONCRETE FOUNDATION
AND ASPHALT SHOULDER AND GRADE TO APPROPRIATE
ELEVATIONS REQUIRED FOR NEW PAVEMENT INSTALLATION.
CONSTRUCTION - PHASE 1 NOTES:
1. PHASING PLAN SHOWN IS CONCEPTUAL AND FOR INFORMATION ONLY. CONTRACTOR MAY
SUBMIT ALTERNATIVE PHASING PLANS FOR APPROVAL BY THE CONTRACTING OFFICER AND
THE INSTALLATION.
2. BID OPTION CONSTRUCTION ACCESS OR BASE BID. CONTRACTOR SHALL DELINEATE A
CONSTRUCTION ZONE OR WORK AREA AROUND THE PROJECT PERIMETER FOR THE ENTIRE
DURATION OF CONSTRUCTION BY USE OF EXISTING FENCES OR NEW FENCES MEETING THE
STANDARDS FOR THE NORTH CAROLINA AIR NATIONAL GUARD AS NEEDED. SIGNAGE SHALL BE
INSTALLED ON FENCING, AND OTHER BARRICADES IN ACCORDANCE WITH SPECIFICATION
SECTION 01 50 00. CONTRACTOR IS REQUIRED TO MAINTAIN CONSTRUCTION
SAFETY/SECURITY FENCES AROUND THEIR WORK AREAS TO PROTECT AGAINST DAMAGE OR
THEFT OF MATERIALS AND EQUIPMENT.
3. ALL CLEARING, GRUBBING, AND MOWING SHALL BE COMPLETED PER REQUIREMENTS OF
CHARLOTTE - DOUGLAS INTERNATIONAL AIRPORT AND THE NORTH CAROLINA AIR NATIONAL
GUARD AND SHALL BE MAINTAINED THROUGHOUT THE CONTRACT DURATION.
4. CONTRACTOR SHALL NOT CROSS ESTABLISHED AIRFIELD SECURITY PERIMETER FENCE
WITHOUT COORDINATING WITH BASE SECURITY AND AIRFIELD OPERATIONS.
5. CONTRACTOR'S SHALL MAINTAIN ADEQUATE ACCESS FOR SEMI-TRUCK DELIVERIES AND
PERSONNEL TO ALL EXISTING SITE FACILITIES THROUGHOUT CONSTRUCTION.
PHASE 1 - BID OPTION
GRADE TO APPROPRIATE
ELEVATIONS REQUIRED FOR
NEW PAVEMENT INSTALLATION
LEGEND
PHASE 1
WORK AREAS
PHASE 1
BID OPTION
PHASE 1 - CONSTRUCT BBL TANK
WITH CONTAINMENT AND
RETAINING WALL. SEE MECHANICAL
DRAWINGS FOR DETAILED FUEL
SYSTEM SEQUENCING.
LOW PROFILE
BARRICADES
GC501
B3
LOW PROFILE
BARRICADES
GC501
B3
12/02/16 D.MUETING
A.DORMAN R.BARUTH
CONSTRUCTION - PHASE 1
GC001 0
FJRP159073-GC001.dwg
1 02/07/18 AMENDMENT 0003
AD
| 2018-02-06T07:39:25-0600 | |
| Dorman, Andrew |
File details come from the government source that posted it.