Text version
FLOW
CONCRETE MANHOLE
ADAPTER
12" LONG STUB (MIN.)
FLOW
NEW PIPE
S E
E
P
R O
F I L
E
F O
R
I N
V E
R T
E
L E
V
D/2 (6" MIN.)
CORE DRILL NEW
PIPE OPENING
THEORETICAL
TOP OF PIPE
FILL CONCRETE
INV.
ELEV.
EXISTING
MANHOLE
EXISTING
PIPE
NON-SHRINK GROUT
AROUND PIPE
NOTES:
1. CORE CUT SHALL BE MADE WITHOUT SPALLING OR DAMAGE TO THE
EXISTING STRUCTURE.
2. PIPE CONNECTION THROUGH MANHOLE WALL SHALL BE MADE WITH
GROUTING RING GASKET AND NON-SHRINK GROUT.
3. EXISTING INVERT CHANNEL SHALL BE RE-SHAPED TO
ACCOMMODATE NEW INVERT.
SCALE: NTS
PIPE CONNECTION TO EXISTING MANHOLE
C1
M I N
12"
MIN
M I N
STRUCTURAL CONCRETE PLACED
AGAINST UNDISTURBED EARTH
P I P
E
O
D
12"
MIN
SUPPORT PIPE ON SOLID
CONCRETE BLOCKS MIN 12"X12"
PLACE CONCRETE TO
NEAREST JOINT EACH
END OF ENCASEMENT
AS SHOWN ON PROFILE
EXISTING
CONCRETE PAVEMENT
ASPHALT PAVEMENT
REPLACEMENT
CONCRETE PAVEMENT
REPLACEMENT
12"
(TYP)
12"
(TYP)
24"
DOWELS SHALL BE
GROUTED INTO EXISTING
PAVEMENT (12" MIN)
6 X 6 - W4.0 X W4.0 WWF
EXCAVATION LIMITS
BASE
COURSE (6" MIN)
SEE NOTE 3
6" COMPACTED
SUBGRADE
ASPHALTIC
CONCRETE
(2" MIN)
CONCRETE BASE
COURSE (6" MIN)
6" COMPACTED
SUBGRADE
SAW CUT (TYP)
CONCRETE
(6" MIN)
M I N
M I N
V A
R I E
S
FINAL BACKFILL
AS SPECIFIED
SURFACE
TREATMENT
AS SPECIFIED
INITIAL BACKFILL HAND-TAMPED
COMPACTION ABOVE TOP OF PIPE
PIPE EMBEDMENT
MATERIAL AS SPECIFIED
P I P
E
O
D
FINISH GRADE
TRENCH WIDTH
AS SPECIFIED
GRADE CRUSHED AGGREGATE
BASE COURSE (6" MIN)
WARNING
IDENTIFICATION
TAPE (SEE NOTE 3)
NOTES:
1. BOTTOM OF TRENCH AND BEDDING MATERIAL SHALL PROVIDE UNIFORM
LONGITUDINAL SUPPORT FOR BOTTOM SECTION OF PIPE.
2. FINAL BACKFILL UNDER PAVEMENTS MAYBE SUBJECT TO ADDITIONAL
COMPACTION REQUIREMENTS AND TESTING.
3. BURIED WARNING AND IDENTIFICATION TAPE SHALL BE PROVIDED IN
ACCORDANCE WITH SPECIFICATIONS.
4. TRENCH DETAIL IS NOT APPLICABLE TO JET FUEL PIPING. SEE DETAIL C1
ON SHEET C511 FOR FUEL PIPE TRENCH
NOTES:
1. WIDTH OF PAVEMENT REMOVAL SHALL BE MINIMUM 3-FEET EITHER SIDE OF UTILITY CENTERLINE AND TO THE
NEXT PAVEMENT PANEL OR JOINT LIMIT WHENEVER FEASIBLE.
2. THICKNESS OF ALL REPLACEMENT COURSES SHALL BE EQUAL TO EXISTING BUT SHALL NOT BE LESS THAN
INDICATED.
3. BASE COURSE SHALL BE PORTLAND CEMENT CONCRETE TO REPLACE EXISTING CONCRETE BASE, AND SHALL
BE ASPHALTIC CONCRETE BASE TO REPLACE ALL OTHER BASE MATERIALS.
4. FULL DEPTH SAWCUTS SHALL BE MADE AROUND THE PERIMETER OF THE AREA TO BE PATCHED AND SHALL BE
MADE AT EXISTING JOINTS AND PERPENDICULAR TO THE PAVEMENT EDGE AND CENTERLINE WHENEVER
FEASIBLE. SAWCUTS THAT EXTEND OUTSIDE THE AREA OF REMOVAL AND REPLACEMENT SHALL BE FILLED
WITH AN EPOXY-BASED GROUT MEETING THE REQUIREMENTS OF ASTM C881 TYPE III.
5. EXISTING CONCRETE PAVEMENT SHALL BE SAWCUT AND REMOVED TO NEAREST JOINT TO PREVENT PARTIAL
PANEL REMOVAL.
6. CONCRETE REPLACEMENT PANELS SHALL BE SIZED TO MATCH THE EXISTING CONCRETE PANEL SIZES
WHENEVER FEASIBLE AND SHALL HAVE A MAXIMUM LENGTH/WIDTH RATIO OF 1.25.
NOTE:
1. PIPE SHALL BE SECURELY BRACED VERTICALLY AND HORIZONTALLY
TO PREVENT FLOATATION DURING CONCRETE PLACEMENT
SCALE: NTS
CONCRETE ENCASEMENT
C3
SCALE: NTS
PAVEMENT REMOVAL AND REPLACEMENT
FOR UTILITY TRENCH
A5
SCALE: NTS
UTILITY TRENCH
A1
6" COMPACTED SUBGRADE
(EXISTING MATERIAL)
TACK COAT
V A
R I E
S
M
A X
PIPE EMBEDMENT
MATERIAL BASE SHALL BE INSTALLED ON
COMPACTED BACKFILL AT A MIN. OF
4" ABOVE VALVE FLANGE OR
OPERATOR BODY
SOCKET
1" DIA. COLD ROLLED STEEL OR
1.5" DIA. HEAVY STEEL PIPE
1/4" STEEL GRAVEL SHIELD DIA.
3/4" LESS THAN SHAFT I.D.
SHAFT
OPERATING NUT
WATER PRINTED ON LID
2'
CROWN PAVEMENT
8" THICK CONCRETE
COLLAR
SCALE: NTS
TYPICAL VALVE BOX ASSEMBLY
C4
S c a l e
F o r
M i c r o f i l m i n g
I n c h e s
M i l l i m e t e r s date detailed checkeddesigned ofsheet sheets project contract rev.drawing file
NORTH CAROLINA AIR NATIONAL GUARD
DOUGLAS INTERNATIONAL AIRPORT
CHARLOTTE, NORTH CAROLINA
KANSAS CITY, MISSOURI
ENGINEERS ARCHITECTS & CONSULTANTS
Project No. - FJRP159073
C-17 TYPE III HYDRANT
REFUELING SYSTEM/
RAMP EXPANSION
94893
C O
P Y
R I G
H T
B U
R N
S
M c D
O N
N E
L L
E
N G
I N
E E
R I N
G
C
O M
P A
N Y
I N
C
D
2 3
C
4 5
A
B
AD
11/02/16 D.MUETING
A.DORMAN R.BARUTH
UTILITY DETAILS 2
C-510 0
FJRP159073-CU501.dwg
AD
| 2018-02-09T10:20:32-0600 | |
| Burchett, Crai |
File details come from the government source that posted it.