MECHANICAL ABBREVIATIONS AND GENERAL NOTE
View the file
Other files
Show 40 more
Latest 50 of 114 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
S c a l e
F o r
M i c r o f i l m i n g
I n c h e s
M i l l i m e t e r s date detailed checkeddesigned ofsheet sheets project contract rev.drawing file
PRELIMINARY - NOT
FOR CONSTRUCTION
NORTH CAROLINA AIR NATIONAL GUARD
DOUGLAS INTERNATIONAL AIRPORT
CHARLOTTE, NORTH CAROLINA
KANSAS CITY, MISSOURI
ENGINEERS ARCHITECTS & CONSULTANTS
Project No. - FJRP159073
C-17 TYPE III HYDRANT
REFUELING SYSTEM/
RAMP EXPANSION
94893
C O
P Y
R I G
H T
B U
R N
S
M c D
O N
N E
L L
E
N G
I N
E E
R I N
G
C
O M
P A
N Y
I N
C
D
2 3
C
4 5
A
B
MECHANICAL
ABBREVIATIONS AND
GENERAL NOTES
FJRP159073-M-002.DWG
M-002
R.PERUEB.COOVER
V.KEEBLE
1. CONTRACTOR SHALL DESIGN AND PROVIDE SEISMIC BRACING AND MOUNTING IN ACCORDANCE
WITH SPECIFICATION SECTION 13 48 00.00 10 AND AS INDICATED.
2. THE DRAWINGS SHOW VARIOUS PIPING SYSTEMS SCHEMATICALLY AND DO NOT ATTEMPT TO
SHOW EXACT DETAILS OF ALL PIPING OR ALL OFFSETS THAT MAY BE REQUIRED. VERIFY ALL
DIMENSIONS, ELEVATIONS AND CONNECTIONS THAT ARE DETERMINED BY EQUIPMENT
SELECTION AND ADJUST SYSTEMS TO ENSURE THAT EQUIPMENT, PIPE, ETC., CAN BE INSTALLED
IN THE ALLOTTED SPACE. NO ADDED COMPENSATION SHALL BE PERMITTED FOR VARIATION
DUE TO EQUIPMENT SELECTION.
3. PIPE SUPPORTS FOR PIPING 2" AND SMALLER ARE NOT SHOWN. PROVIDE SUPPORTS FOR 2"
AND SMALLER PIPING AS DETAILED ON STRUCTURAL DRAWINGS AND IN ACCORDANCE WITH
ASME B31.3 AND UFC 3-460-01, LATEST EDITIONS. SUPPORTS SHALL BE GALVANIZED AND
PROVIDED WITH A TEFLON OR APPROVED DIELECTRIC BARRIER BETWEEN THE SUPPORT AND
THE PIPING, UNLESS INDICATED OTHERWISE.
4. PIPING 2" AND SMALLER IS INDICATED DIAGRAMMATICALLY AND ALL REQUIRED FITTINGS AND
VALVES ARE NOT INDICATED. REFER TO P&ID'S FOR ADDITIONAL VALVES REQUIREMENTS.
5. ALL MAINTENANCE BALL VALVES DOWNSTREAM AND UPSTREAM OF THERMAL RELIEF VALVES
AND SAFETY RELIEF VALVES SHALL BE LOCKED OPEN WITH KEYED ALIKE PADLOCKS. PROVIDE
KEYS TO THE INSTALLATION AT COMMISSIONING.
6. ELBOWS SHALL BE LONG RADIUS UNLESS NOTED OTHERWISE. ELBOWS LOCATED BETWEEN THE
PIG LAUNCHER AND THE RECEIVER, SHALL HAVE A RADIUS THREE TIMES THE PIPE DIAMETER.
TEES WITH BRANCHES 6-INCHES AND LARGER, LOCATED BETWEEN THE PIG LAUNCHER AND PIG
RECEIVER, SHALL HAVE GUIDE BARS AS DETAILED ON THE DRAWINGS.
7. CONTRACTOR SHALL PROTECT NEW AND EXISTING EQUIPMENT AND FACILITIES FROM BLASTING
GRIT AND PAINT OVERSPRAY, SPLATTER, AND DRIPS DURING COATING OPERATIONS. PROVIDE
NECESSARY MASKING, TARPS, SHEETING, AND OTHER COVERING TO PREVENT DAMAGE.
SPECIAL ATTENTION SHALL BE IMPLEMENTED TO PROTECT EQUIPMENT TAGS.
8. PIPE FLANGES SHALL BE ASME B16.5, CLASS 150 UNLESS NOTED OTHERWISE. FLANGES
CONNECTED TO API 610 PUMPS SHALL BE ASME B16.5 CLASS 300.
9. PROVIDE FLUID TIGHT PLUGS , CAPS, OR CLASS 150 BLIND FLANGES AT ALL PIPE TERMINATIONS.
10. PROVIDE FBE COATING A MINIMUM OF 6 INCHES BEYOND TRANSITION FROM BELOWGROUND TO
ABOVEGROUND PIPING.
11. CONTRACTOR SHALL PROVIDE AND MAINTAIN TEMPORARY SECONDARY CONTAINMENT OF
STORAGE TANKS AT ALL TIMES AS REQUIRED TO COMPLETE ITS WORK. THE TEMPORARY
SECONDARY CONTAINMENT DIKEWALLS SHALL PROVIDE THE MINIMUM REQUIRED SECONDARY
CONTAINMENT VOLUME AND BE IMPERVIOUS.
12. CONTRACTOR SHALL PROVIDE TEMPORARY PIPE SUPPORTS AS REQUIRED TO COMPLETE ITS
WORK.
13. COORDINATE CONSTRUCTION OF ALL MECHANICAL FUELING WORK WITH STRUCTURAL, CIVIL, ELECTRICAL WORK, ETC., SHOWN ON OTHER CONTRACT DOCUMENTS AND DRAWINGS.
14. COORDINATE APRON, FOUNDATION, AND SLAB PIPE SLEEVE REQUIREMENTS WITH FOUNDATION
AND CIVIL CONTRACTORS.
15. NEW AND EXISTING PIPE ELEVATIONS ARE BASED ON THE BEST AVAILABLE INFORMATION
AVAILABLE. CONTRACTOR SHALL BE RESPONSIBLE FOR FIELD VERIFYING ELEVATIONS AND
RESULTING ADJUSTMENTS REQUIRED TO COMPLETE PIPING WORK. CONTRACTOR SHALL
ESTABLISH TOP-OF-CONTRETE ELEVATIONS FOR PIPE SUPPORTS BASED ON PIPE SUPPORT
DETAILS INDICATED IN THE CONTRACT DRAWINGS.
16. PIPING DIMENSIONS INDICATED ARE GENERALLY ROUNDED TO THE NEAREST INCH.
17. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO FIELD-VERIFY EXISTING STRUCTURES, UTILITIES, AND SURVEY INFORMATION, AND TO TAKE NECESSARY PRECAUTIONS DURING
DEMOLITION AND CONSTRUCTION. CONTRACTOR SHALL VERIFY EXISTENCE AND MARK
LOCATIONS OF ALL UTILITIES, INCLUDING SERVICE CONNECTIONS TO UNDERGROUND UTILITIES, PRIOR TO BEGINNING WORK. CONTRACTOR SHALL CONTACT THE CONTRACTING OFFICER AND
ALL ASSOCIATED UTILITY COMPANIES AND AGENCIES TO IDENTIFY THE LOCATION OF UTILITIES.
18. WHERE PIPE SUPPORT GAPS ARE INDICATED, CONTRACTOR SHALL ENSURE THAT THE PIPES
AND PIPE SUPPORT ASSEMBLIES ARE CONSTRUCTED AND INSTALLED WITH THE PROPER GAPS
ON EACH SIDE. ASSUMED PIPE INSTALLATION TEMPERATURE IS 75 DEGREES FAHRENHEIT FOR
GAP MEASUREMENT PURPOSES. WINTER AND SUMMER EXTREME DESIGN TEMPERATURES ARE
30 DEGREES FAHRENHEIT AND 130 DEGREES FAHRENHEIT RESPECTIVELY. REFER TO
STRUCTURAL PIPE SUPPORT DRAWINGS FOR ADDITIONAL INSTALLATION REQUIREMENTS.
19. ALL CARBON STEEL CARRIER PIPE LARGER THAN 2-1/2 INCHES AND ALL FITTINGS 6 INCHES AND
LARGER SHALL BE INTERNALLY LINED PER SPECIFICATION SECTION 33 52 80. NO STAINLESS
STEEL PIPING SHALL BE INTERNALLY LINED.
GENERAL MECHANICAL NOTES:
NOVEMBER 2016
AutoCAD SHX Text
DATE
AutoCAD SHX Text
REV.
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
INIT
AutoCAD SHX Text
REVISIONS
AutoCAD SHX Text 10/13/17
AutoCAD SHX Text
B-3 FINAL SUBMITTAL
AutoCAD SHX Text
AutoCAD SHX Text 02/07/18
AutoCAD SHX Text
AMENDMENT 0003
AutoCAD SHX Text
AutoCAD SHX Text
BC
AutoCAD SHX Text
BC
| 2018-02-07T15:13:49-0600 | |
| Coover, Bra |
File details come from the government source that posted it.