MECHANICAL CONSTRUCTION PHASING AND VALVE POSITION SCHEDULES
View the file
Other files
Show 40 more
Latest 50 of 114 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
S c a l e
F o r
M i c r o f i l m i n g
I n c h e s
M i l l i m e t e r s date detailed checkeddesigned ofsheet sheets project contract rev.drawing file
PRELIMINARY - NOT
FOR CONSTRUCTION
NORTH CAROLINA AIR NATIONAL GUARD
DOUGLAS INTERNATIONAL AIRPORT
CHARLOTTE, NORTH CAROLINA
KANSAS CITY, MISSOURI
ENGINEERS ARCHITECTS & CONSULTANTS
Project No. - FJRP159073
C-17 TYPE III HYDRANT
REFUELING SYSTEM/
RAMP EXPANSION
94893
C O
P Y
R I G
H T
B U
R N
S
M c D
O N
N E
L L
E
N G
I N
E E
R I N
G
C
O M
P A
N Y
I N
C
D
2 3
C
4 5
A
B
V.KEEBLE
B.COOVER R.PERUE
M-003
FJRP159073-M-003.DWG
1. TWO TANKS MUST BE OPERABLE AT ALL TIMES. AN EXISTING TANK CAN NOT BE REMOVED FROM SERVICE UNTIL THE NEW
TANK IS CONSTRUCTED AND COMMISSIONED. .
2. REQUIRED OUTAGES FOR MECHANICAL PIPING TIE-INS SHALL BE COORDINATED WITH THE BASE A MINIMUM OF 30 DAYS
PRIOR TO THE REQUIRED OUTAGE. OUTAGES SHALL BE LIMITED TO 3 DAYS INCLUDING THE WEEKEND, UNLESS
OTHERWISE COORDINATED WITH THE BASE.
3. TEMPORARY CROSSOVER CONNECTIONS BETWEEN THE NEW AND EXISTING PIPING MANIFOLDS MAY BE REQUIRED TO
ALLOW FOR CONTINUED OPERATION OF TWO TANKS.
4. MECHANICAL PHASING REQUIREMENTS SHALL BE COORDINATED WITH THE CIVIL PHASING REQUIREMENTS. THE
10” HYDRANT LOOP AND HHTC STAND PIPING SHALL BE CONSTRUCTED AND PHASED IN ACCORDANCE WITH THE CIVIL
PLANS.
5. SUGGESTED MECHANICAL PHASING SEQUENCE - TANK AND PUMP SHELTER. PHASING SEQUENCE MAY BE MODIFIED
PROVIDED OPERATING CONDITIONS ARE MET AND OUTAGES ARE LIMITED.
a. TYPE III PUMP SHELTER CONSTRUCTION.
b. TANK 3 CONSTRUCTION AND HYDROSTATIC TEST.
c. CONSTRUCT 6" STAINLESS STEEL UNDERGROUND PIPING FROM THE TYPE III PUMP SHELTER TO THE UNDERGROUIND
TRUCK OFFLOAD PIPING TIE-IN AND MAKE THE TIE-IN CONNECTION. TANK 1 AND 2 WILL REMAIN IN OPERATION AND
THE EXISTING ABOVEGROUND COMPONENT OF THE 6" TRUCK OFFLOAD PIPING/TANK FILL WILL REMAIN IN USE.
d. CONSTRUCT 8" FILL LINE FROM THE PUMP SHELTER'S SIX VALVE MANIFOLD TO NEW TANK 3. A TEMPORARY SPOOL TO
AVOID CONFLICT WITH THE EXISTING FILL AND SUCTION LINES WILL BE REQUIRED. PERMANENT FLANGES TO REMAIN
SHALL BE WELD NECK FLANGES. TEMPORARY FLANGES THAT WILL BE REMOVED UPON CONSTRUCTION COMPLETION
MAY BE SLIP ON TYPE OR WELD NECK TYPE.
e. CONSTRUCT 6"/12" SUCTION HEADER FROM NEW TANK 3 TO ABOVEGROUND SUCTION PIPING TIE IN LOCATION (6").
PROVIDE FLANGED CONNECTIONS TO ALLOW FOR THE INSTALLATION OF LATER PHASES OF SUCTION PIPING
INSTALLATION.
f. HYDROSTATICALLY PRESSURE TEST AND FLUSH NEW SECTIONS OF SUCTION AND FILL LINES. COMMISSION TANK 3.
g. TRANSFER FUEL FROM EXISTING TANK 2 USING THE EXISTING TRUCK FILLSTANDS AND REFULER TRUCK DEFUELING
CONNECTIONS. (MAX RATED FLOWRATE WITH BOTH PUMPS RUNNING 600 GPM, LIKELY LESS BASED ON PUMP HEAD
AVAILABLE). ALL REMAINING FUEL/WATER LOCATED IN THE BOTTOM OF THE TANK MAY BE REMOVED BY VAC TRUCK
USING THE EXISTING LOW SUCTION NOZZLE.
h. DEMOLISH EXISTING 6-INCH FILL AND SUCTION TO THE FURTHEST EXTENT ALLOWABLE TO LEAVE TANK 1 IN
OPERATION. PROVIDE FLANGE AND BLIND FLANGE OR WELD CAP ON EXISTING FILL AND SUCTION PIPING TO REMAIN .
i. MAKE ALL ALTERATIONS TO TANK 2 AND CONDUCT HYDROSTATIC TEST.
j. CONSTRUCT 8" FILL LINE FROM THE PUMP SHELTER'S SIX VALVE MANIFOLD TO EXISTING TANK 2.
k. CONTINUE CONSTRUCTION OF 12" SUCTION HEADER TO NEW SUCTION NOZZLE ON EXISTING TANK 2. PROVIDE
FLANGED CONNECTIONS TO ALLOW FOR THE INSTALLATION OF LATER PHASES OF SUCTION PIPING INSTALLATION.
l. HYDROSTATICALLY PRESSURE TEST AND FLUSH NEW SECTIONS OF SUCTION AND FILL LINES. COMMISSION TANK 2.
m.TRANSFER FUEL FROM EXISTING TANK 1 USING THE EXISTING TRUCK FILLSTANDS AND REFULER TRUCK
DEFUELING CONNECTIONS. ALL REMAINING FUEL/WATER LOCATED IN THE BOTTOM OF THE TANK MAY BE REMOVED
BY VAC TRUCK USING THE EXISTING LOW SUCTION NOZZLE.
n. DEMOLISH REMAINING EXISTING 6" FILL AND SUCTION PIPING FROM TANK 1 TO THE TIE-INS INDICATED IN BULLET 5c
AND 5e. PROVIDE WELD NECK FLANGE AND BLIND FLANGE ON THE SUCTION TIE-IN TEE (BULLET 5e). PROVIDE WELD
CAP ON THE TANK FILL TIE-IN TEE (BULLET 5c)
o. MAKE ALL ALTERATIONS TO TANK 1 AND CONDUCT HYDROSTATIC PRESSURE TEST.
p. CONTINUE CONSTRUCTION OF 12" SUCTION LINE FROM THE NEW SUCTION HEADER TO THE NEW NOZZLE ON
EXISTING TANK 2. CONTINUE 12" SUCTION PIPING FROM THE SUCTION HEADER TO THE PUMP SUCTION HEADER AT
THE PUMP SHELTER.
q. HYDROSTATICALLY PRESSURE TEST AND FLUSH NEW SECTIONS OF SUCTION, FILL AND ISSUE LINES. COMMISSION
TANK 1.
r. UPON COMPLETION OF THE HHTC STAND AND HYDRANT LOOP PIPING, HYDROSTATICALLY PRESSURE TEST AND
FLUSH NEW SECTIONS OF ISSUE AND RETURN LINES. COMPLETE FULL SYSTEM COMMISSIONING.
MECHANICAL
CONSTRUCTION PHASING
AND VALVE POSITION SCHEDULES
MECHANICAL CONSTRUCTION PHASING NOTES:
DECEMBER 2016
AutoCAD SHX Text
DATE
AutoCAD SHX Text
REV.
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
INIT
AutoCAD SHX Text
REVISIONS
AutoCAD SHX Text 10/13/17
AutoCAD SHX Text
B-3 FINAL SUBMITTAL
AutoCAD SHX Text
AutoCAD SHX Text 02/07/18
AutoCAD SHX Text
AMENDMENT 0003
AutoCAD SHX Text
AutoCAD SHX Text
BC
AutoCAD SHX Text
BC
| 2018-02-07T15:14:13-0600 | |
| Coover, Bra |
File details come from the government source that posted it.