MECHANICAL CONSTRUCTION PHASING AND VALVE POSITION SCHEDULES

View the file

Other files

File Type Posted
Questions_and_Answers_96-101__W91242-18-R-0002.pdf PDF
FJRP159073-CG104-Amendment_0007.pdf PDF
FJRP159073-CG103-Amendment_0007.pdf PDF
Amendment_0007.pdf PDF
33_52_43.28_Amd03.pdf PDF
Questions_and_Answers_78-95__W91242-18-R-0002.pdf PDF
Revised_33_52_80_Amendment_0006.pdf PDF
Revised_08_71_00_Amendment_0006.pdf PDF
Revised_33_52_43_Amendment_0006.pdf PDF
Revised_09_96_00_Amendment_0006.pdf PDF
Revised_09_97_13.27_Amendment_0006.pdf PDF
FJRP159073-A-201-Amendment_0006.pdf PDF
Revised_13_34_19_Amendment_0006.pdf PDF
W91242-18-R-0002_0006.pdf PDF
Revised_09_90_00_Amendment_0006.pdf PDF
FJRP159073-A-601-Amendment_0006.pdf PDF
Amendment_0005_Revised_01_45_00.pdf PDF
Amendment_0004_Section_0010_Price_Schedule.pdf PDF
Amendment_0005.pdf PDF
Questions_and_Answers_40-77__W91242-18-R-0002.pdf PDF
Revised_EXIBIT_H_Proposal_Price_Schedule_Amendment_0004.pdf PDF
Amendment_0004.pdf PDF
Questions_and_Answers_18-38__W91242-18-R-0002.pdf PDF
1._Drawings_-COVER_SHEET.pdf PDF
FJRP159073-M-002-Amd03.pdf PDF
FJRP159073-M-301-Amd03.pdf PDF
FJRP159073-GC-003-Amd03.pdf PDF
32_05_33_Amd03.pdf PDF
FJRP159073-EI-503-Amd03.pdf PDF
Exhibit_F_Small_Business_Participation_Format.pdf PDF
33_09_53_Amd03.pdf PDF
FJRP159073-MS502-Amd03.pdf PDF
FJRP159073-CS-121-Amd03.pdf PDF
FJRP159073-MS504-Amd03.pdf PDF
FJRP159073-M-401-Amd03.pdf PDF
FJRP159073-M-512-Amd03_(1).pdf PDF
33_52_43.13_Amd03.pdf PDF
FJRP159073-EP-101-Amd03.pdf PDF
Exhibit_G_-_Subcontracting_Plan_Format.pdf PDF
33_52_43.11_Amd03.pdf PDF
FJRP159073-EI-602-Amd03.pdf PDF
FJRP159073-C-511-Amd03.pdf PDF
FJRP159073-MD902-Amd03.pdf PDF
FJRP159073-MS503-Amd03.pdf PDF
FJRP159073-C-510-Amd03.pdf PDF
FJRP159073-CU-121-Amd03.pdf PDF
FJRP159073-CU-224-Amd03.pdf PDF
W91242-18-R-0002_0003.pdf PDF
FJRP159073-M-502-Amd03.pdf PDF
Amendment_0003_Exhibit_A_Performance_Relevancy_Questionnaire_Specialized_Experience.pdf PDF
Show 40 more

Latest 50 of 114 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

S c a l e

F o r

M i c r o f i l m i n g

I n c h e s

M i l l i m e t e r s date detailed checkeddesigned ofsheet sheets project contract rev.drawing file

PRELIMINARY - NOT

FOR CONSTRUCTION

NORTH CAROLINA AIR NATIONAL GUARD

DOUGLAS INTERNATIONAL AIRPORT

CHARLOTTE, NORTH CAROLINA

KANSAS CITY, MISSOURI

ENGINEERS ARCHITECTS & CONSULTANTS

Project No. - FJRP159073

C-17 TYPE III HYDRANT

REFUELING SYSTEM/

RAMP EXPANSION

94893

C O

P Y

R I G

H T

B U

R N

S

M c D

O N

N E

L L

E

N G

I N

E E

R I N

G

C

O M

P A

N Y

I N

C

D

2 3

C

4 5

A

B

V.KEEBLE

B.COOVER R.PERUE

M-003

FJRP159073-M-003.DWG

1. TWO TANKS MUST BE OPERABLE AT ALL TIMES. AN EXISTING TANK CAN NOT BE REMOVED FROM SERVICE UNTIL THE NEW

TANK IS CONSTRUCTED AND COMMISSIONED. .

2. REQUIRED OUTAGES FOR MECHANICAL PIPING TIE-INS SHALL BE COORDINATED WITH THE BASE A MINIMUM OF 30 DAYS

PRIOR TO THE REQUIRED OUTAGE. OUTAGES SHALL BE LIMITED TO 3 DAYS INCLUDING THE WEEKEND, UNLESS

OTHERWISE COORDINATED WITH THE BASE.

3. TEMPORARY CROSSOVER CONNECTIONS BETWEEN THE NEW AND EXISTING PIPING MANIFOLDS MAY BE REQUIRED TO

ALLOW FOR CONTINUED OPERATION OF TWO TANKS.

4. MECHANICAL PHASING REQUIREMENTS SHALL BE COORDINATED WITH THE CIVIL PHASING REQUIREMENTS. THE

10” HYDRANT LOOP AND HHTC STAND PIPING SHALL BE CONSTRUCTED AND PHASED IN ACCORDANCE WITH THE CIVIL

PLANS.

5. SUGGESTED MECHANICAL PHASING SEQUENCE - TANK AND PUMP SHELTER. PHASING SEQUENCE MAY BE MODIFIED

PROVIDED OPERATING CONDITIONS ARE MET AND OUTAGES ARE LIMITED.

a. TYPE III PUMP SHELTER CONSTRUCTION.

b. TANK 3 CONSTRUCTION AND HYDROSTATIC TEST.

c. CONSTRUCT 6" STAINLESS STEEL UNDERGROUND PIPING FROM THE TYPE III PUMP SHELTER TO THE UNDERGROUIND

TRUCK OFFLOAD PIPING TIE-IN AND MAKE THE TIE-IN CONNECTION. TANK 1 AND 2 WILL REMAIN IN OPERATION AND

THE EXISTING ABOVEGROUND COMPONENT OF THE 6" TRUCK OFFLOAD PIPING/TANK FILL WILL REMAIN IN USE.

d. CONSTRUCT 8" FILL LINE FROM THE PUMP SHELTER'S SIX VALVE MANIFOLD TO NEW TANK 3. A TEMPORARY SPOOL TO

AVOID CONFLICT WITH THE EXISTING FILL AND SUCTION LINES WILL BE REQUIRED. PERMANENT FLANGES TO REMAIN

SHALL BE WELD NECK FLANGES. TEMPORARY FLANGES THAT WILL BE REMOVED UPON CONSTRUCTION COMPLETION

MAY BE SLIP ON TYPE OR WELD NECK TYPE.

e. CONSTRUCT 6"/12" SUCTION HEADER FROM NEW TANK 3 TO ABOVEGROUND SUCTION PIPING TIE IN LOCATION (6").

PROVIDE FLANGED CONNECTIONS TO ALLOW FOR THE INSTALLATION OF LATER PHASES OF SUCTION PIPING

INSTALLATION.

f. HYDROSTATICALLY PRESSURE TEST AND FLUSH NEW SECTIONS OF SUCTION AND FILL LINES. COMMISSION TANK 3.

g. TRANSFER FUEL FROM EXISTING TANK 2 USING THE EXISTING TRUCK FILLSTANDS AND REFULER TRUCK DEFUELING

CONNECTIONS. (MAX RATED FLOWRATE WITH BOTH PUMPS RUNNING 600 GPM, LIKELY LESS BASED ON PUMP HEAD

AVAILABLE). ALL REMAINING FUEL/WATER LOCATED IN THE BOTTOM OF THE TANK MAY BE REMOVED BY VAC TRUCK

USING THE EXISTING LOW SUCTION NOZZLE.

h. DEMOLISH EXISTING 6-INCH FILL AND SUCTION TO THE FURTHEST EXTENT ALLOWABLE TO LEAVE TANK 1 IN

OPERATION. PROVIDE FLANGE AND BLIND FLANGE OR WELD CAP ON EXISTING FILL AND SUCTION PIPING TO REMAIN .

i. MAKE ALL ALTERATIONS TO TANK 2 AND CONDUCT HYDROSTATIC TEST.

j. CONSTRUCT 8" FILL LINE FROM THE PUMP SHELTER'S SIX VALVE MANIFOLD TO EXISTING TANK 2.

k. CONTINUE CONSTRUCTION OF 12" SUCTION HEADER TO NEW SUCTION NOZZLE ON EXISTING TANK 2. PROVIDE

FLANGED CONNECTIONS TO ALLOW FOR THE INSTALLATION OF LATER PHASES OF SUCTION PIPING INSTALLATION.

l. HYDROSTATICALLY PRESSURE TEST AND FLUSH NEW SECTIONS OF SUCTION AND FILL LINES. COMMISSION TANK 2.

m.TRANSFER FUEL FROM EXISTING TANK 1 USING THE EXISTING TRUCK FILLSTANDS AND REFULER TRUCK

DEFUELING CONNECTIONS. ALL REMAINING FUEL/WATER LOCATED IN THE BOTTOM OF THE TANK MAY BE REMOVED

BY VAC TRUCK USING THE EXISTING LOW SUCTION NOZZLE.

n. DEMOLISH REMAINING EXISTING 6" FILL AND SUCTION PIPING FROM TANK 1 TO THE TIE-INS INDICATED IN BULLET 5c

AND 5e. PROVIDE WELD NECK FLANGE AND BLIND FLANGE ON THE SUCTION TIE-IN TEE (BULLET 5e). PROVIDE WELD

CAP ON THE TANK FILL TIE-IN TEE (BULLET 5c)

o. MAKE ALL ALTERATIONS TO TANK 1 AND CONDUCT HYDROSTATIC PRESSURE TEST.

p. CONTINUE CONSTRUCTION OF 12" SUCTION LINE FROM THE NEW SUCTION HEADER TO THE NEW NOZZLE ON

EXISTING TANK 2. CONTINUE 12" SUCTION PIPING FROM THE SUCTION HEADER TO THE PUMP SUCTION HEADER AT

THE PUMP SHELTER.

q. HYDROSTATICALLY PRESSURE TEST AND FLUSH NEW SECTIONS OF SUCTION, FILL AND ISSUE LINES. COMMISSION

TANK 1.

r. UPON COMPLETION OF THE HHTC STAND AND HYDRANT LOOP PIPING, HYDROSTATICALLY PRESSURE TEST AND

FLUSH NEW SECTIONS OF ISSUE AND RETURN LINES. COMPLETE FULL SYSTEM COMMISSIONING.

MECHANICAL

CONSTRUCTION PHASING

AND VALVE POSITION SCHEDULES

MECHANICAL CONSTRUCTION PHASING NOTES:

DECEMBER 2016

AutoCAD SHX Text

DATE

AutoCAD SHX Text

REV.

AutoCAD SHX Text

DESCRIPTION

AutoCAD SHX Text

INIT

AutoCAD SHX Text

REVISIONS

AutoCAD SHX Text 10/13/17

AutoCAD SHX Text

B-3 FINAL SUBMITTAL

AutoCAD SHX Text

AutoCAD SHX Text 02/07/18

AutoCAD SHX Text

AMENDMENT 0003

AutoCAD SHX Text

AutoCAD SHX Text

BC

AutoCAD SHX Text

BC

2018-02-07T15:14:13-0600
Coover, Bra

File details come from the government source that posted it.