FJRP159073-C-511-Amd03.pdf

PDF 410 KB Posted

Attached to
C-17 Refueling Hydrant System Ramp Expansion Federal contract opportunity
Solicitation number
W91242-18-R-0002
Issued by
Department of the Army North Carolina Army National Guard

View the file

Other files for this federal contract opportunity

Other files attached to C-17 Refueling Hydrant System Ramp Expansion, newest first.
File Type Posted
FJRP159073-CG104-Amendment_0007.pdf PDF
Amendment_0007.pdf PDF
33_52_43.28_Amd03.pdf PDF
Revised_13_34_19_Amendment_0006.pdf PDF
Revised_08_71_00_Amendment_0006.pdf PDF
FJRP159073-A-601-Amendment_0006.pdf PDF
Amendment_0005.pdf PDF
Questions_and_Answers_40-77__W91242-18-R-0002.pdf PDF
FJRP159073-M-401-Amd03.pdf PDF
FJRP159073-CU-224-Amd03.pdf PDF
FJRP159073-M-604-Amd03.pdf PDF
Amendment_0003_Exhibit_A_Performance_Relevancy_Questionnaire_Specialized_Experience.pdf PDF
FJRP159073-ES-502-Amd03.pdf PDF
FJRP159073-M-302-Amd03.pdf PDF
FJRP159073-M-513-Amd03.pdf PDF
1.1_Drawings-INDEX_SHEET_(1).pdf PDF
FJRP159073-M-501-Amd03.pdf PDF
01_50_00_Amd03.pdf PDF
FJRP159073-MS504-Amd03.pdf PDF
33_09_53_Amd03.pdf PDF
FJRP159073-GC-003-Amd03.pdf PDF
FJRP159073-M-301-Amd03.pdf PDF
1._Drawings_-COVER_SHEET.pdf PDF
FJRP159073-M-002-Amd03.pdf PDF
32_05_33_Amd03.pdf PDF
FJRP159073-MS503-Amd03.pdf PDF
01_33_29_Amd03.pdf PDF
FJRP159073-M-603-Amd03.pdf PDF
FJRP159073-B-101-Amd03_(1).pdf PDF
FJRP159073-CU-223-Amd03.pdf PDF
31_32_11_Amd03.pdf PDF
EXIBIT_H_Proposal_Price_Schedule.pdf PDF
FJRP159073-GC-002-Amd03.pdf PDF
FJRP159073-GC-001-Amd03.pdf PDF
SpecTOC_Amd03.pdf PDF
33_52_80_Amd03.pdf PDF
Exhibit_D_Letter_of_Commitment.pdf PDF
FJRP159073-MS501-Amd03.pdf PDF
FJRP159073-EI-503-Amd03.pdf PDF
W91242-18-R-0002-0002.pdf PDF
Pre-Proposal_Conference_PPT_Presentation_W91242-18-R-0002_v.pptx PPTX presentation
Pre-proposal_Conference_Sign_in_sheet.pdf PDF
Exhibit_C_Past_Performance_Questionnaire_Package.pdf PDF
7_-_VISITOR_REQUEST_WORKSHEET,_2_PGS.pdf PDF
Exhibit_A_Performance_Relevancy_Questionnaire_Specialized_Experience.pdf PDF
1.6_Drawings-CATHODIC_PROTECTION.pdf PDF
Exhibit_F_Small_Business_Participation_Format.pdf PDF
Exhibit_G_-_Subcontracting_Plan_Format.pdf PDF
1.1_Drawings-INDEX_SHEET_(1).pdf PDF
1._Drawings_-COVER_SHEET.pdf PDF
Show all 50

C-17 Refueling Hydrant System Ramp Expansion has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FUEL LINE

c

L FUEL LINE

c

L

18"

CLEAR

(MIN)

SIDEWALL CLEARANCE (8"

MIN)

O D

P

I P

E

S E

E

P

R O

F I L

E

D E

P T

H

V

A R

I E

S

SAND

EMBEDMENT

(SEE NOTE 1)

FUEL PIPE

PLASTIC WARNING

TAPE WITH FUEL LINE

NOTED

COMPACTED EARTH BACKFILL

TRENCH WALL

BRACED, SLOPED,

OR AS REQUIRED

FOR STABILITY (TYP)

PER OSHA

STANDARDS

FINISH GRADE

1. SEE SPECIFICATION SECTION 31 00 00 FOR FUEL PIPE SAND

BEDDING MATERIAL.

POURED CONCRETE BLOCKS

UNDISTURBED EARTH

BEARING AREA

PRESSURE PIPE

PLACE 1/2" PLYWOOD

BETWEEN CONCRETE

BLOCKING AND PLUG TO

PERMIT REMOVAL FOR FUTURE

EXTENSION OF WATER MAIN

1. PROVIDE CLEARANCE FOR BOLT REMOVAL WHEN PLACING CONCRETE.

2. THRUST BLOCKS SHALL BE 2,000 PSI CONCRETE.

3. BEARING AREAS ARE BASED ON 350 PSI PIPE TEST PRESSURE AND 2000 PSF SOIL BEARING PRESSURE. IF

LESS DENSE SOIL IS ENCOUNTERED, INCREASE BEARING AREA TO PREVENT MOVEMENT UNDER TEST OR

OPERATION PRESSURES.

N

O M

I N

A L

OPEN/SHUT

INDICATOR

P I P

E

D

E P

T H

V

A R

I E

S

8"Ø PIPE (TYP.)

PROVIDE CONNECTING

ADAPTORS AS REQUIRED

INVERT SEE UTILITY

PLANS AND PROFILE

SHEETS

POST INDICATOR GATE

VALVE (MECHANICAL

JOINT)

1. POST INDICATOR VALVES SHALL CONFORM TO NFPA 24.

2. PAINT POST INDICATOR VALVES YELLOW FOR CONTAINMENT

DRAINS.

PAVEMENT OR STRUCTURAL

SLAB

POST INDICATOR

WITH FRANGIBLE

LOCKING

MECHANISM

FINISH

GRADE

NOTE:

NOTES:

NOTES:

c

L

C1

TYPICAL FUEL PIPE TRENCH

A4

POST INDICATOR VALVE (PIV)

SCALE: NOT TO SCALE

A1

TYPICAL THRUST BLOCK

6" MIN

FLEXIBLE

MEMBRANE

LINER (FML)

STAINLESS STEEL

BATTEN BAR/FML

ANCHOR SYSTEM

SEE NOTE 2.

PREPARED SUBGRADE

GEOTEXTILE

6" GRANULAR BASE

4" FUEL RESISTANT

WATER STOP (IF CAST

WITH BOTTOM JOINT)

EPOXY COAT

INTERIOR OF

INLET

NOTES:

1. COAT WALLS AND FLOOR OF STRUCTURE WITH FIELD APPLIED COAL-TAR EPOXY (1-COAT OR

2-COAT SYSTEM), 15-MIL TOTAL MINIMUM THICKNESS, PER MANUFACTURER'S

RECOMMENDATIONS.

2. ATTACH FML TO TOP OF INLET USING CONTINUOUS BATTEN BARS. FML ANCHOR SYSTEM SHALL

CONFORM TO THE MANUFACTURER'S RECOMMENDATIONS.

3. LIGHT DUTY IRON OR GALVANIZED STEEL FRAME AND GRATE. MINIMUM SIZE SHALL BE 2'X2'.

4. INLET STRUCTURE SHALL BE A PRECAST CONCRETE STRUCTURE OF WATER-TIGHT

CONSTRUCTION. THE STRUCTURE CAN BE CAST IN-PLACE AT CONTRACTORS OPTION,

PROVIDED THE DESIGN IS SUBMITTED AND APPROVED.

5. MINIMUM WALL AND SLAB REINFORCING SHALL BE #6 @ 6" EW.

6. INSTALL PIPE SLEEVE PER DETAIL A1, DRAWING S-515. INSTALL SEGMENTED PIPE SEAL (ONE).

M

I N

GRATED TOP

SEE NOTE 3

C4

TYPICAL DIKE CONTAINMENT

DRAIN INLET

SEE NOTE 6

S c a l e

F o r

M i c r o f i l m i n g

I n c h e s

M i l l i m e t e r s date detailed checkeddesigned ofsheet sheets project contract rev.drawing file

NORTH CAROLINA AIR NATIONAL GUARD

DOUGLAS INTERNATIONAL AIRPORT

CHARLOTTE, NORTH CAROLINA

KANSAS CITY, MISSOURI

ENGINEERS ARCHITECTS & CONSULTANTS

Project No. - FJRP159073

C-17 TYPE III HYDRANT

REFUELING SYSTEM/

RAMP EXPANSION

94893

C O

P Y

R I G

H T

B U

R N

S

M c D

O N

N E

L L

E

N G

I N

E E

R I N

G

C

O M

P A

N Y

I N

C

D

2 3

C

4 5

A

B

AD

11/02/16 D.MUETING

A.DORMAN R.BARUTH

UTILITY DETAILS 3

C-511 0

FJRP159073-CU501.dwg

AD

2018-02-09T10:20:59-0600
Burchett, Crai