FJRP159073-EP-101-Amd03.pdf
PDF 477 KB Posted
- Attached to
- C-17 Refueling Hydrant System Ramp Expansion
- Solicitation number
- W91242-18-R-0002
View the file
Other files
Show 40 more
Latest 50 of 114 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
M M M
FS
FS
FS
PT
JY
JY
JY
DPT
DPT
PIT
JY
JY
JY
JY
PIT
PIT
JY
JY
DPT
DPT
PT
PT
HS
HS
HS
MOV
MOV
MOV
ZS
ZS
ZS
ZS
ZS
ZS
TSH
TSH
TSH
MOV
LSH
LSL
J
J
J
J J
J
PC
S c a l e
F o r
M i c r o f i l m i n g
I n c h e s
M i l l i m e t e r s date detailed checkeddesigned ofsheet sheets project contract rev.drawing file
NORTH CAROLINA AIR NATIONAL GUARD
DOUGLAS INTERNATIONAL AIRPORT
CHARLOTTE, NORTH CAROLINA
KANSAS CITY, MISSOURI
ENGINEERS ARCHITECTS & CONSULTANTS
Project No. - FJRP159073
C-17 TYPE III HYDRANT
REFUELING SYSTEM/
RAMP EXPANSION
94893
C O
P Y
R I G
H T
B U
R N
S
M c D
O N
N E
L L
E
N G
I N
E E
R I N
G
C
O M
P A
N Y
I N
C
D
2 3
C
4 5
A
B
EP101
94893EP101.DWG
PUMP SHELTER POWER PLAN
A. FANGMAN
DECEMBER 2016 J. LITTLE
S. LACY
B2
PUMP SHELTER POWER PLAN
SCALE: 3/16" = 1'-0"
8'0 4' 16'
FP-3FP-2FP-1
FILTER
SEPARATOR
(TYP)
M C
C
MDS
FACP
ATG SYSTEM
BACKBOARD
WALL MOUNTED
GRAPHICS
DISPLAY PANEL
DESK FOR PC,
MONITOR,
TELEPHONE,
& PRINTER
PUMP CONTROL PANEL
PANEL PB
PANEL PA
COMMUNICATIONS
BACKBOARD
T-2 TRANSFORMER
(MOUNTED ABOVE
PANEL PA)
TIGHTNESS
TEST
PANEL
EPDS-3
A1
ENLARGED POWER PLAN
SCALE: 3/8" = 1'-0"
4'0 2' 8'
ATG
PUMP ROOM
CONTROL
ROOM
MECH ROOM
MEN'S/WOMEN'S
TOILET
STORAGE
EPDS-5
EPDS-4
LIGHTING
CONTACTOR
PCV-1BPCV-1 D/FV-1
RETURN
VENTURI
ISSUE
VENTURI
FSI-1 FSI-2
FSI-3
FSR-1 FSR-2
EP101
A1
N
N
PUMP-3, FSI-3, AND
ASSOCIATED ELECTRICAL
EQUIPMENT IS BID OPTION
EPDS-6
EPDS-2
DAY TANK
1. REFER TO ES051 FOR HAZARDOUS AREA CLASSIFICATIONS WITHIN OR NEAR THE PUMP
SHELTER. A FUTURE ANG PROJECT IS ANTICIPATED TO ADD WALLS TO THE PUMP SHELTER
AND THEREFORE, ALL ELECTRICAL EQUIPMENT AND RACEWAYS INSTALLED WITHIN THE
PERIMETER OF AND BENEATH THE PUMP SHELTER CANOPY SHALL BE RATED CLASS I,
DIVISION 1. EQUIPMENT SHALL BE SPECIFICALLY APPROVED BY UL OR FACTORY MUTUAL
FOR THE HAZARDOUS AREA CLASSIFICATION.
2. EACH CONDUIT ORIGINATING IN OR PASSING THROUGH OR UNDER A HAZARDOUS AREA AND
PENETRATING CONTROL ROOM WALLS, ROOF, OR FLOOR SHALL HAVE EXPLOSION PROOF
SEALING FITTINGS INSTALLED IN THE INTERIOR OF THE CONTROL ROOM.
3. FOR CLARIFICATION PURPOSES NOT ALL CONDUIT JUNCTION BOXES ARE INDICATED.
PROVIDE CONDUIT JUNCTION BOXES AS NECESSARY.
4. IF NO CONDUIT SIZE IS INDICATED REFER TO DETAIL B3 ON DRAWING ES052 FOR MINIMUM
CONDUIT SIZE.
5. REFER TO B3 ON DRAWING ES052 FOR CONDUIT AND EQUIPMENT INSTALLATION
REQUIREMENTS.
GENERAL NOTES: THIS DRAWING ONLY
RECEPTACLES SHALL BE TIED TOGETHER ON SPECIFIED CIRCUIT.
CONNECTIONS ARE NOT SHOWN FOR CLARIFICATION PURPOSES. SEE
PANEL PB SCHEDULE ON DRAWING E-701.
MOUNT RECEPTACLE BEHIND GRAPHICS DISPLAY PANEL. POWER AND
COMMUNICATIONS CONDUCTORS TO PANEL SHALL BE CONCEALED WHERE
POSSIBLE.
FUSED DISCONNECT WHERE REQUIRED BY MANUFACTURER.
MOUNT OFF NORTH SIDE OF BUILDING FACING ABOVEGROUND STORAGE
TANKS.
KEYED NOTES: THIS DRAWING ONLY
1. 1-1/2"C: C.PCP.ZS141, C.PCP.ZS142, C.PCP.ZS143, C.PCP.ZS144, C.PCP.ZS145, C.PCP.ZS146
2. 3"C: P.MCC.FP1, C.MCC.FP1.H, C.MCC.FP1.TS
3. 3"C: P.MCC.FP2, C.MCC.FP2.H, C.MCC.FP2.TS
4. 3"C: P.MCC.FP3, C.MCC.FP3.H, C.MCC.FP3.TS
5. 1"C: C.PCP.FP1.FS,C.PCP.FP2.FS,C.PCP.FP3.FS
6. 1"C: C.MCC.FP1.HS, C.MCC.FP2.HS, C.MCC.FP3.HS
7. 1"C: C.PCP.MOV151, C.PCP.MOV152, C.PCP.MOV153, C.PCP.MOV154
8. 1"C: C.PCP.BPCV.JY, C.PCP.DFV.JY, C.PCP.PCV.JY
9. 1"C: IC.PCP.PT151, IC.PCP.PT.152, IC.PCP.DPT.RET
10. 1"C: C.MCC,EPDS2, C.MCC.PCP.1, C.MCC.PCP.2, C.MCC.PCP.3, C.MCC.PCP.4, C.MCC.PCP.5, C.MCC.PCP.6, C.MCC.PCP.7, C.MCC.PCP.8, C.MCC.PCP.9
11. 2-1/2"C: C.PCP.T1.ZS1, C.PCP.T1.ZS2, C.PCP.T1.ZS3, C.PCP.T1.ZS4, C.PCP.T2.ZS1, C.PCP.T2.ZS2, C.PCP.T2.ZS3, C.PCP.T2.ZS4, C.PCP.T3.ZS1, C.PCP.T3.ZS2, C.PCP.T3.ZS3, C.PCP.T3.ZS4, C.PCP.PRT.ZSC
1"C: C.ATG.PCP
1-1/2"C: C.PCP.T1.L, C.PCP.T2.L, C.PCP.T3.L (I.S.)
S.PCP.CHH5
S.ATG.PCP
12. 2" C: C.MCC.T1.JY, C.MCC.T2.JY, C.MCC.T3.JY, C.MCC.EPDS7, C.MCC.EPDS8, C.MCC.EPDS9, C.MCC.FTP.H, C.MCC.FTP.TS, C.MCC.FTP.FS
13. 1"C: IC.PCP.PT151, IC.PCP.PT.152, IC.PCP.DPT.RET
1"C: IC.PCP.FP1.PT
1"C: IC.PCP.PIT.DIS, IC.PCP.DPT.ISS
14. 1-1/2"C: C.PCP.ZS141, C.PCP.ZS142, C.PCP.ZS143, C.PCP.ZS144, C.PCP.ZS145, C.PCP.ZS146
1"C: C.PCP.FP1.FS, C.PCP.FP2.FS, C.PCP.FP3.FS
1-1/2"C: C.PCP.MOV151, C.PCP.MOV152, C.PCP.MOV153, C.PCP.MOV154, C.PCP.BPCV.JY,
C.PCP.DFV.JY, C.PCP.PCV.JY
1"C: C.PCP.DT.L
1"C: C.PCP.ES.FS
15. 1"C: C.MCC.FP1.HS, C.MCC.FP2.HS, C.MCC.FP3.HS
1"C: C.MCC.EPDS4
1"C: C.MCC.EPDS5
1"C: C.MCC.EPDS6
1"C: C.MCC.FS1.JY, C.MCC.FS2.JY, C.MCC.FS3.JY
1"C: C.MCC.ES.FS
16. 1"C: IC.ATG.T1, IC.ATG.T2, IC.ATG.T3
1"C: IC.ATG.PRT, IC.ATG.PRT.LD (I.S.)
1"C: C.ATG.PCP
S.ATG.PCP
17. 4"C: T.PS.B39, T.B72.PS
S.CMH1.PS
18. 1C: C.MCC.EPDS1, C.MCC.EPDS10-13
S.CMH1.MCC
19. 1"C: PA-16, PA-22, PA-28, PA-34; 1"C: PA-39, PA-43; 1"C: PA-44
20. 1"C: PB-26; 1"C: PB-29; 1"C: PB-31; 1"C: (3) PB-32; 1"C: PB-33
21. 1"C: C.MCC.FS1.JY, C.MCC.FS2.JY, C.MCC.FS3.JY
22. 1"C: PA-7, PA-40
23. 1"C: PB-20, PB-22, PB-40
24. 1"C: PA-7, PA-40, PB-20, PB-40
25. 1"C: C.MCC.PRT.L1, C.MCC.PRT.L2, C.MCC.PRT.L3 (I.S.)
CIRCUIT CALLOUTS
1"C:
C.MCC.EPDS4
3/4"C:
C.MCC.FS1.JY
3/4"C:
C.MCC.FS3.JY
3/4"C:
C.MCC.FS2.JY
1"C:
C.MCC.EPDS5
1"C:
C.PCP.DT.L
3/4"C:
IC.PCP.PIT.DIS
2-1/2"C: P.T2.PB
2"C: PA-1
1"C:
IC.PCP.FP1.PT
1"C:
IC.TTP.PIT.HYD
1"C:
C.MCC.EPDS3
(3) 4"C: P.MDS.MCC;
S.ATS.MCC
2"C: P.MCC.PA
(3) 4"C: SEC-1;
S.TPS1.MDS
(2) 4"C: P.GPS.ATS;
S.GPS.ATS;
1"C: C.GPS.ATS
MCC
1"C:
PA-11
1"C:
PA-17
1"C:
PA-23
1"C:
PA-29
1"C: C.PCP.ES.FS;
1"C: C.MCC.ES.FS
EEW/S
UH-101
WATER
HEATER
AHU-101
HP-101
1"C:
PB-34
3/4"C:
PB-13
3/4"C:
PB-17
3/4"C.
PA-10
1"C:
C.MCC.EPDS6
1"C:
IC.TTP.PIT.HYD
MCC MCC
2 3 4
3/4"C:
IC.PCP.DPT.ISS
GFI
WP
GFI
WP
VIBRATING / RESONATING
ALARM HORNS (TYP)
GFI1
EP501
A1
1"C: P.MCC.FTP1;
S.MCC.EHH1;
S.MCC.CHH5
3/4"C:
PB-8
3/4"C:
PB-1
3/4"C:
PB-18
3/4"C: PB-
10,12,14
3/4"C:
PB-24
(3) 4"C: P.MDS.ATS;
S.MDS.ATS
3/4"C:
PB-23
3/4"C.
PB-21
3/4"C.
PB-3
EF-102
APPROXIMATE
LOCATION
OF CP-1
EF-101
1 2
3/4"C:
C.PCP.VH1,
C.PCP.RH1
3/4"C:
C.PCP.VH2,
C.PCP.RH2
3/4"C:
C.TTP.PCP
1"C:
T.ES.PHONE1
1"C: T.ES.PCPES
1"C:
T.ES.PHONE2
EP501
C3
C.PC.LC
SEE B2 ON THIS
DRAWING FOR
CONTINUATION
3/4"C:
PB-27
3/4"C:
PB-25
ATS WITH PULLBOX
1"C: C.PCP.B39MCC;
S.CMH1.PCP
S.PS.CHH5
S.PNLS.EHH1
(LOCATE BENEATH
PANELS PA & PB)
S.CMH1.DESK
1"C: T.ES.RTU
1"C: C.MCC.FACP
(TYP)
1"C: PB-35,
PB-39
File details come from the government source that posted it.