S c a l e
F o r
M i c r o f i l m i n g
I n c h e s
M i l l i m e t e r s date detailed checkeddesigned ofsheet sheets project contract rev.drawing file
NORTH CAROLINA AIR NATIONAL GUARD
DOUGLAS INTERNATIONAL AIRPORT
CHARLOTTE, NORTH CAROLINA
KANSAS CITY, MISSOURI
ENGINEERS ARCHITECTS & CONSULTANTS
Project No. - FJRP159073
C-17 TYPE III HYDRANT
REFUELING SYSTEM/
RAMP EXPANSION
94893
C O
P Y
R I G
H T
B U
R N
S
M c D
O N
N E
L L
E
N G
I N
E E
R I N
G
C
O M
P A
N Y
I N
C
D
2 3
C
4 5
A
B
C O
P Y
R I G
H T
ENLARGED PLAN -
PUMP SHELTER
M-401
FJRP159073-M-401.DWG
V.KEEBLE
B.COOVER R.PERUE
A1
ENLARGED PLAN - PUMP SHELTER
SCALE: 1/4"=1'-0"
N
GENERAL NOTES: THIS DRAWING ONLY
1. REFER TO DRAWINGS M-001 AND M-002 FOR
LEGENDS, ABBREVIATIONS AND GENERAL PROJECT
NOTES.
2. REFER TO SECTIONS FOR CLARITY OF STACKED
PIPING.
3. EXTEND FBE COATING A MINIMUM OF 6 INCHES
ABOVE GRADE
4. REFER TO SECTION C1 ON M-302 FOR STACKED
PIPE.
5. ALL LARGE BORE MANUAL VALVES LOCATED 72
INCHES OR HIGHER ABOVE FINISHED FLOOR SHALL
BE PROVIDED WITH CHAIN OPERATORS.
6. NOT USED.
7. SMALL BORE PIPING IS SHOWN SCHEMATICALLY.
REFER TO P&ID FOR SIZES. REFER TO THE
APPROPRIATE DETAIL ON M-511 TO M-514.
8. REFER TO S-551 TO S-555 FOR PIPE SUPPORT
DETAILS.
INDICATES BID OPTION 3
8" DBB W/ LIMIT
SWITCH (TYP OF 6)
12" CS 12" CS
FP-3
900 GPM
API 610
10" CS
10" CS
10" CS
FSI-3
900 GPM
10" ISSUE
VENTURI
SURGE ARRESTOR
TANK (TYP OF 2)
S
U C
T I O
N
T
O
T
K
FP-2
900 GPM
API 610
FP-1
900 GPM
API 610
FCV-3
FSI-2
900 GPM
FSI-1
900 GPM
FSR-2
900 GPM
FSR-1
900 GPM
FROM EXISTING TRUCK
OFFLOAD (NOTE 3) FOR
CONTINUATION ON
CU228
6" SUPPLY TO HHT
CHECKOUT STAND
(NOTE 3)
T
O
T
K
T
O
T
K
PS-2
PS-2C
PS-2
PS-2
PS-2
10" DBB PLUG
VALVE (TYP OF 3)
PS-8
PS-4
PS-4CPS-4
10" CS
10" CS
6" CS
6" BALL VALVE
(TYP OF 3)
NOTE 5
6" BALL VALVE
(TYP OF 3)
(NOTE 5)
6" DBB
PLUG VALVE
8" MOV
BALL VALVE
8" DBB PLUG
VALVE
6" DBB
PLUG VALVE
PS-2
PS-2
PS-2
8" BALL VALVE
NOTE 5
6" BALL VALVE
(NOTE 5) (TYP OF 2)
8" BALL
VALVE
(NOTE 5)
8" BALL VALVE
(NOTE 5)
8" BALL VALVE
(NOTE 5)
RETURN FROM HHT
CHECKOUT STAND
(NOTE 3)
8" CS
8" CS
AG
UG
AG
UG
PS-2
10"X6" FOT
REDUCER
(TYP OF3)
8" CS
6" BALL
VALVE
6" BASKET
STRAINER
8" CS
8"X6"
REDUCER
(TYP OF 2)
FSCV-4
FSCV-5
FSCV-1
FSCV-2
FSCV-3
FCV-1
FCV-2
FLOW SWITCH
(TYP OF 3)
D/FV-1
SEE NOTE 4
8" BALL
VALVE
P S
C
P S
C
P S
C
PS-2
PS-7 PS-7
PS-2C
6" CS
C
S
6" CS6" CS
C
S
6" CS
6" CS
C
S
C
S
PS-7
PS-7
PS-2
PS-6
PS-2C
PS-2
PS-2
PS-5
PS-2
PS-5
PS-2
MAV
PG
PG
TRV
PRESSURE
TRANSMITTER
ASSEMBLY
(FP-1 ONLY)
MAV
PG
PG
TRV
MAV
PG
PG
TRV
TRV
TRV
MAV
MAV
MAV
PG
PG
PG
MAV
TRV
TRV
TRV
TRVTRV
TRV
TRV
KEYED NOTES: THIS DRAWING ONLY
IF BID OPTION IS SELECTED DO NOT PROVIDE
FLANGES AS INDICATED.
THE HINGE FOR FILTER SEPARATOR SHALL OPEN
AS INDICATED.
FROM FILTER SEPARATOR DRAIN.
FROM FILTER SEPARATOR PRESSURE SAFETY
VALVE.
TO FILTER SEPARATOR (SLOW FILL).
2" STAINLESS STEEL CARRIER PIPE WITH 4"
CONTAINMENT PIPE WITH EXTERIOR FBE
COATING. ASTM A139, 10 GAUGE SPIRAL WELDED
STEEL. INSTALL PER MANUFACTURERS
RECOMMENDATIONS. DOUBLE WALL PIPE END
SEAL SHALL BE A SEGMENTED ELASTOMERIC
SEAL. MINIMUM TOP OF PIPE SHALL BE 3'-0"
BELOW GRADE. SLOPE THE UNDERGROUND LINE
TOWARDS THE PRODUCT RECOVERY TANK WITH
NO HIGH POINTS AND THE LOW POINT BEING
LOCATED IN THE PRODUCT RECOVERY TANK
VAULT. COORDINATE ELEVATIONS WITH
ELECTRICAL DUCT BANK.
2" CARBON STEEL CARRIER PIPE WITH 4"
CONTAINMENT PIPE WITH EXTERIOR FBE
COATING. ASTM A139, 10 GAUGE SPIRAL WELDED
STEEL. INSTALL PER MANUFACTURERS
RECOMMENDATIONS. DOUBLE WALL PIPE END
SEAL SHALL BE A SEGMENTED ELASTOMERIC
SEAL. MINIMUM TOP OF PIPE SHALL BE 3'-0"
BELOW GRADE. SLOPE THE UNDERGROUND LINE
TOWARDS THE PRODUCT RECOVERY TANK WITH
NO HIGH POINTS AND THE LOW POINT BEING
LOCATED IN THE PRODUCT RECOVERY TANK
VAULT. COORDINATE ELEVATIONS WITH
ELECTRICAL DUCT BANK.
2" SS TO PRT
℄ELEVATION NOT TO
EXCEED 12" ABOVE TOP
OF SLAB
PCV-1
(TYP OF 5)
(TYP OF 5)
(TYP OF 5)
2" SS
2" SS
2" SS
DAY
TANK
MAV
MAV
MAV
MAV
MAV
PG
PG
2" MOV
BALL VALVE
TRV
TRV
PS-2
PRESSURE
INDICATING
TRANSMITTER
10" CS
HYDRANT
RETURN
10" CS
HYDRANT
ISSUE
2" CS LEAK DETECTION
EQUALIZATION LINE
SEE CONT. ON
SHEET M-103
2" SS DRAIN/
TRV LINE
PS-1
2" SS DRAIN/
TRV LINE
M A
T C
H L
I N
E
S
E E
C O
N T
I N
U A
T I O
N
O
N
M
2" CS FROM PRT
FOR CONTINUATION
SEE CU227
FOR CONTINUATION
SEE CU227
SCALE IN FEET
0 2' 4' 8'
NOVEMBER 2016
F
R O
M
P
S T
2" SS SLOW FILL
TRV
MAV
2" SS TO PRT
℄ELEVATION NOT TO
EXCEED 12" ABOVE TOP
OF SLAB
MAV
2" CS
S
AutoCAD SHX Text
DATE
AutoCAD SHX Text
REV.
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
INIT
AutoCAD SHX Text
REVISIONS
AutoCAD SHX Text 10/13/17
AutoCAD SHX Text
B-3 FINAL SUBMITTAL
AutoCAD SHX Text
AutoCAD SHX Text 02/07/18
AutoCAD SHX Text
AMENDMENT 0003
AutoCAD SHX Text
AutoCAD SHX Text
BC
AutoCAD SHX Text A1
AutoCAD SHX Text M-302
AutoCAD SHX Text C1
AutoCAD SHX Text M-301
AutoCAD SHX Text A1
AutoCAD SHX Text M-301
AutoCAD SHX Text C1
AutoCAD SHX Text M-302
AutoCAD SHX Text C1
AutoCAD SHX Text M-303
AutoCAD SHX Text
IF
AutoCAD SHX Text
IF
AutoCAD SHX Text
IF
AutoCAD SHX Text
IF
AutoCAD SHX Text
IF
AutoCAD SHX Text
IF
AutoCAD SHX Text
BC
| 2018-02-07T15:16:12-0600 | |
| Coover, Bra |
File details come from the government source that posted it.