W91242-18-R-0002_0003.pdf

PDF 141 KB Posted

Attached to
C-17 Refueling Hydrant System Ramp Expansion
Solicitation number
W91242-18-R-0002
Issued by

View the file

Other files

File Type Posted
Questions_and_Answers_96-101__W91242-18-R-0002.pdf PDF
FJRP159073-CG104-Amendment_0007.pdf PDF
FJRP159073-CG103-Amendment_0007.pdf PDF
Amendment_0007.pdf PDF
33_52_43.28_Amd03.pdf PDF
Questions_and_Answers_78-95__W91242-18-R-0002.pdf PDF
Revised_33_52_80_Amendment_0006.pdf PDF
Revised_08_71_00_Amendment_0006.pdf PDF
Revised_33_52_43_Amendment_0006.pdf PDF
Revised_09_96_00_Amendment_0006.pdf PDF
Revised_09_97_13.27_Amendment_0006.pdf PDF
FJRP159073-A-201-Amendment_0006.pdf PDF
Revised_13_34_19_Amendment_0006.pdf PDF
W91242-18-R-0002_0006.pdf PDF
Revised_09_90_00_Amendment_0006.pdf PDF
FJRP159073-A-601-Amendment_0006.pdf PDF
Amendment_0005_Revised_01_45_00.pdf PDF
Amendment_0004_Section_0010_Price_Schedule.pdf PDF
Amendment_0005.pdf PDF
Questions_and_Answers_40-77__W91242-18-R-0002.pdf PDF
Revised_EXIBIT_H_Proposal_Price_Schedule_Amendment_0004.pdf PDF
Amendment_0004.pdf PDF
Questions_and_Answers_18-38__W91242-18-R-0002.pdf PDF
1._Drawings_-COVER_SHEET.pdf PDF
FJRP159073-M-002-Amd03.pdf PDF
FJRP159073-M-301-Amd03.pdf PDF
FJRP159073-GC-003-Amd03.pdf PDF
32_05_33_Amd03.pdf PDF
FJRP159073-EI-503-Amd03.pdf PDF
Exhibit_F_Small_Business_Participation_Format.pdf PDF
33_09_53_Amd03.pdf PDF
FJRP159073-MS502-Amd03.pdf PDF
FJRP159073-CS-121-Amd03.pdf PDF
FJRP159073-MS504-Amd03.pdf PDF
FJRP159073-M-401-Amd03.pdf PDF
FJRP159073-M-512-Amd03_(1).pdf PDF
33_52_43.13_Amd03.pdf PDF
FJRP159073-EP-101-Amd03.pdf PDF
Exhibit_G_-_Subcontracting_Plan_Format.pdf PDF
33_52_43.11_Amd03.pdf PDF
FJRP159073-EI-602-Amd03.pdf PDF
FJRP159073-C-511-Amd03.pdf PDF
FJRP159073-M-003-Amd03.pdf PDF
FJRP159073-MD902-Amd03.pdf PDF
FJRP159073-MS503-Amd03.pdf PDF
FJRP159073-C-510-Amd03.pdf PDF
FJRP159073-CU-121-Amd03.pdf PDF
FJRP159073-CU-224-Amd03.pdf PDF
FJRP159073-M-502-Amd03.pdf PDF
Amendment_0003_Exhibit_A_Performance_Relevancy_Questionnaire_Specialized_Experience.pdf PDF
Show 40 more

Latest 50 of 114 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FJRP159073

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

See next pages for amendment details. The proposal due date of 02 March 2018 remains unchanged. All questions must be submitted by 20 February 2018, 3PM EST.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 23

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 15-Feb-2018

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W91242-18-R-0002

X 9B. DATED (SEE ITEM 11)

09-Jan-2018

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

15-Feb-2018

CODE

145 AW/ NC AIR NATIONAL GUARD (W91242)

145 AW/MSC CONTRACTING OFFICE - WAWF W91242

4930 MINUTEMAN WAY

CHARLOTTE NC 28208-3866

W91242 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W91242-18-R-0002

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

SUMMARY OF CHANGES

Amendment No. 0003 consists of changes to specifications, drawings and solicitation sections listed below. Revised specifications and drawings are also provided with this amendment. Any additions to the solicitation and specifications sections referenced below are underlined. Any deletions are strikethrough.

Changes to solicitation:

1. Section 00110

2. Section 00120

3. Section 00700

4. Exhibit A

Changes to the specifications:

Spec. Section Summary of Changes 01 30 00 REMOVED references to LEED 03 30 00 REMOVED references to LEED

13 73 19 REMOVE THIS SECTION IN IT'S ENTIRETY

31 32 11 REMOVED references to LEED 32 05 33 REMOVED references to LEED

33 09 53 REVISED PARAGRAPHS 3.6.2.1, 3.6.2.1.1, 3.6.2.1.2, 3.6.2.1.3

33 52 43.11 REVISED PARAGRAPH 2.11

33 52 43.13 REVISED PARAGRAPH 2.2.1, 2.5.8, 2.5.9

33 52 43.28 REVISED PARAGRAPH 2.3.1, 2.4.1

33 52 80 REVISED PARAGRAPH 1.8, 2.2, 2.2.1, 2.2.2, 3.2.1

01 33 29 See Section for changes

01 50 00 See section for changes

Changes to drawings:

Sheet

No. Summary of Changes

M-002

ADDITIONAL NOTE ADDED TO CLARIFY PIPING TO BE INTERNALLY AND

EXTERNALLY COATED.

M-003 CLARIFIED NOTE 5. c.

M-301

REVISED NOTE 3. ADDED CARBON STEEL TO STAINLESS STEEL INTERFACE

CALL-OUTS.

M-302

REVISED NOTE 3. ADDED CARBON STEEL TO STAINLESS STEEL INTERFACE

CALL-OUTS.

M-303

REVISED NOTE 2. ADDED CARBON STEEL TO STAINLESS STEEL INTERFACE

CALL-OUTS.

M-401 CLARIFIED THE HYDRANT RETURN LINE PIPE MATERIAL.

M-501 REVISED NOTE 18. CHANGED THE WORD "INSTALL" TO "PROVIDE"

M-502 REVISED NOTE 18. CHANGED THE WORD "INSTALL" TO "PROVIDE"

M-512 REMOVED REFERENCE TO "BRONZE".

M-513

REMOVED REFERENCE TO "STAINLESS STEEL" FOR DRAIN ASSEMBLY DETAIL.

REFER TO SPECS.

M-603 ADDED CARBON STEEL TO STAINLESS STEEL INTERFACE CALL-OUTS.

M-604 ADDED CARBON STEEL TO STAINLESS STEEL INTERFACE CALL-OUTS.

MD902

ADDED CLARIFICATION TO THE EXTENT OF PRODUCT RECOVERY PIPE

REMOVAL.

MS501 REMOVED REFERENCE TO "BRONZE", DETAIL B3.

MS502 REMOVED REFERENCE TO "BRONZE", DETAIL B3.

MS503 REMOVED REFERENCE TO "BRONZE", NOTE 7.

MS504 REMOVED REFERENCE TO "BRONZE", DETAIL C1.

GC001

REVISED NOTE #1 STATING PHASING PLAN IS CONCEPTUAL AND FOR

INFORMATION ONLY.

GC002

REVISED NOTE #1 STATING PHASING PLAN IS CONCEPTUAL AND FOR

INFORMATION ONLY.

GC003

REVISED NOTE #1 STATING PHASING PLAN IS CONCEPTUAL AND FOR

INFORMATION ONLY.

ES401

REVISED PLAN - INTRINSICALLY SAFE WIRING FOR TANK LEVELS PLACED IN

SEPARATE CONDUIT.

ES502 REVISED DETAIL - INTRINSICALLY SAFE WIRING AND CONDUIT SEALS MODIFIED

EP101

REVISED PLAN - INTRINSICALLY SAFE WIRING FOR TANK LEVELS PLACED IN

SEPARATE CONDUIT.

EI501

REVISED PCP DETAIL TO INCLUDE INTRINSICALLY SAFE RELAYS FOR TANK

LEVELS.

EI503 REVISED DETAIL TO SHOW INTRINSICALLY SAFE RELAY CONTACTS.

EI504 REVISED DETAIL TO SHOW INTRINSICALLY SAFE FIELD WIRING.

EI602 REVISED DETAIL TO SHOW INTRINSICALLY SAFE FIELD WIRING.

E-703 REVISED CIRCUIT SCHEDULE TO SHOW INTRINSICALLY SAFE FIELD WIRING.

CS121

ADDED CALLOUTS FOR CONTAINMENT DRAIN MANHOLE AND DIKE

CONTAINMENT DRAIN INLET

CU121

ADDED INV. (CONTAINMENT DRAIN MH, DIKE CONTAINMENT DRAIN INLET,

CONNECTION TO EXIST.)

CU223 REVISED WATER LINE DIA. IN PROFILE

CU224 REVISED WATER LINE DIA. IN PROFILE

C-510 MOVED TYPICAL VALVE BOX ASSEMBLY DETAIL FROM C-511 TO C-510

C-511 ADDED DIKE CONTAINMENT DRAIN INLET DETAIL

B-101 NO CHANGES. Contractor Request for clear file B-102 NO CHANGES. Contractor Request for clear file

SECTION 00010 - SOLICITATION CONTRACT FORM

The Issued By organization has changed from

145 AW/ NC AIR NATIONAL GUARD (W91242)

145 AW/MSC CONTRACTING OFFICE - WAWF W91242

4930 MINUTEMAN WAY

CHARLOTTE NC 28208-3866

to

USPFO FOR NORTH CAROLINA (W91242)

ATTN:KYLE LAURICELLA

PURCHASING & CONTRACTING

4201 REEDY CREEK RD

RALEIGH NC 27607-6412

SECTION 00100 - BIDDING SCHEDULE/INSTRUCTIONS TO BIDDERS

The following have been modified:

SECTION 0110

Section 00110 Submission Requirements and Instructions

Section 00110

1. PROPOSAL PREPARATION INSTRUCTIONS

1.1. These instructions prescribe the format of proposals, and describe the approach for the development and presentation of the proposal data. They are designed to ensure the submission of necessary information to provide for the understanding and comprehensive evaluation of proposals. Carefully review this section prior to commencing proposal preparation. All solicitation amendments must be acknowledged in accordance with Section 00100, FAR Provision 52.215-1, Instruction to Offerors – Competitive Acquisition.

1.2. Offerors are cautioned to strictly comply with all instructions within this solicitation to ensure submission of a complete proposal. Failure to furnish a complete proposal, at the time of proposal submission, may result in the proposal being unacceptable to the Government and eliminated from consideration for award.

2. PROPOSAL CONTENT

2.1. Prospective offerors shall submit the following volumes in two three separate packages:

2.1.1. Volume 1, Volume 2 and Volume 3: Electronic Copy: Provide one (1) electronic copy of all of the Volumes proposal information (except Volume 1 - SF 1442 front and back, Section 00010 CLINs 0001 - 0006, and Exhibit H -Proposal Schedule. These items are to be submitted hard copy). Electronic copies shall be submitted on CD/DVD saved in Microsoft Word format or Adobe Acrobat.

2.1.2. Volume 1, Price proposal, pro forma documents: submit one original, (1) one hard copy in accordance with instructions contained herein.

2.1.2.1 Volume 2, Part 1 – Technical Capability Proposal: submit one original and (4) four hard copies.

2.1.2.2 Volume 2, Part 2 – Past/Present Performance Information: submit one original and (4) four hard copies

2.1.3. Volume 3- Factor 3 Small Business Participation Plan: submit one original and (2) hard copies

2.3. After compiling all required information, submit original and specified number of copies to the following office:

ATTN: SMSgt Bryant K Alexander 145th Airlift Wing Contracting Office 4930 Minuteman Way

Charlotte, NC 28208

Mark the front of the envelope/box with the following: “PROPOSAL No. W91242-18-R-0002, DO NOT OPEN--- Competitive Acquisition”.

2.4. PROPOSAL FORMAT

2.4.1. Purpose: These instructions prescribe the format of proposals, and describe the approach for the development and presentation of the proposed data. The proposal shall include all of the information requested in the specific instructions. Failure to include all information requested may adversely affect the evaluation.

2.4.2. A proposal that merely reiterates or promises to accomplish the requirements of the RFP will be considered unacceptable. A proposal that is orderly and sufficiently documented will be easy for the Government to understand and will enable the Government to perform a thorough and fair evaluation.

2.4.3. Offerors are cautioned to submit enough information to enable the evaluation committee to fully ascertain each offeror’s capability to perform all of the requirements contemplated by this solicitation. All commitments made in the proposal may become a part of the resultant contract. The data submitted with each proposal should be complete and concise, but not overly elaborate. Excessive reliance on promotional brochures is discouraged.

2.4.4. Written proposals shall be prepared on standard 8.5 x 11 inch paper (charts must be submitted on 8.5 x 11 or 8.5 x 14 or 11x17 inch paper) and shall be in a legible font size (10 min.). All pages of each proposal shall be appropriately numbered, and identified with the RFP number. For ease of reference, consecutive page numbering with tabs is required. Type size for graphics, charts, diagrams and tables shall be of an appropriate font and size for the application, and must be clearly readable without magnification assistance to the normal eye. Text lines will be no less than single-space. To the maximum extent practicable, proposal submission shall be double sided. Where page limits exist a page is defined as one single side of a page. Double sided pages count as 2 pages. Unless otherwise stated, tabs, indexes and dividers do not count in the page count.

2.4.5. Binding: Elaborate format and binding are neither necessary nor desirable. All binders will be capable of lying flat when opened. Three ring binders are preferred. The cover and spine of each binder will clearly identify the offeror’s name, Project number, RFP number, RFP title and copy number, (e.g. copy 2 of 3). The original for each volume will be clearly identified on the cover and the spine. All binders will allow for easy removal and replacement of pages.

2.4.6. Indexing: Each binder will contain a “Table of Contents” for that volume. The “Table of Contents” will identify major areas, paragraphs and subparagraphs by number and title, as well as by page number and volume locations. Tab indexing will be used to identify Sections as appropriate.

2.4.7. Electronic Copy: Provide one (1) electronic copy of all of the Volumes proposal information. Electronic copies shall be submitted on CD/DVD saved in Microsoft Word format or Adobe Acrobat.

2.4.8. If revised proposals are requested, all proposal revisions shall be submitted on colored paper as page changes with each page identified by date and page number. Revised pages shall be printed on one side and punched with a 3-hole punch along the left margin. The number of revised copies to be submitted is the same as the initial proposal in accordance with FAR 15.306 (a). Requests for such information do not constitute discussions.

2.4.9. The offeror shall be held responsible for the validity of all information supplied in his/her proposal, including that provided by potential subcontractors. Should subsequent investigation disclose that the facts and conditions were not as stated, the proposal may be rejected.

2.5. PROPOSAL VOLUME CONTENTS: Each offeror’s proposal shall be submitted as set forth below and all information shall be confined to the appropriate part to facilitate independent evaluation. Proposals, which do not include the requested minimum information, may be eliminated from further consideration for award. All potential offerors must be registered in the System for Award Management at time of proposal submission. See FAR Provision 52.204-7, System for Award Management.

2.5.1. VOLUME 1, PRICE/COST INFORMATION AND PRO FORMA DOCUMENTS

2.5.1.1. Offerors shall provide all price/cost information necessary to provide a meaningful basis for Government's analysis and evaluation of price/cost for the project set forth in Section 00120 of this solicitation. The Government is not, and does not intend on, requesting certified cost or pricing data. In order to better understand the prices proposed, the contractor shall provide a basis of estimate in the form of a narrative to explain the proposed prices for each CLIN and the three (3) largest cost items for each section of the base bid and each option line item. The Government is not seeking a review of separate cost elements and the narrative should be provided with the price proposal in Volume I. In order to better understand the prices proposed, the contractor shall provide a narrative to explain the thought process, approach and rationale used to arrive at the proposed prices. The narrative shall also discuss the three (3) largest cost items. The Government is not seeking a review of separate cost elements nor is looking for further breakdown of the prices proposed. The narrative should be provided with the price proposal in Volume I.

2.5.1.2. Provide an introductory page to include Cage Code, DUNS Number, Tax Identification Number (TIN), points of contact, authorized negotiators, contact phone, and email addresses. Also, include your business socioeconomic status, e.g. small business, woman-owned small business, HUBZone small business, etc.

2.5.1.3. Offer and Section 00010 – Complete in its entirety the “Offeror” portion of the Standard Form (SF) 1442.

An official having the authority to contractually bind your company must sign the SF 1442 in accordance with FAR

4.102. One copy of the SF 1442 is required to have an original signature. All amendments to the solicitation must be acknowledged on the second page of the SF 1442.

2.5.1.4. Section 00010 – Insert the price/cost associated with the project in the line items. All line items (CLINs) must be priced to be considered. In addition, the proposal schedule in Exhibit H must accompany the proposal package in volume 1. A PDF document has been included as Exhibit H to this solicitation.

2.5.1.5 An original bid bond and valid Power of Attorney are required with submission of the proposal at the time and date stated on the SF1442 block 13. Bid bond must be on the most current SF24 form and must include original signatures and raised seals or original stamps for both the principal and surety(ies). Rejection of a bid bond shall be in accordance with FAR 28.101-4 Noncompliance with bid guarantee requirements. Power of attorney must have a raised seal or original stamp of the surety company showing a date between solicitation open and close verifying the original power of attorney is still in full force and effect.

2.5.1.6. Representations and Certifications- Section 00600- insert the required certifications and representations and return only those shown in section 00600. Return the entire Section 00600 with your proposal. All other required representations and certifications are to be completed on line in the System for Award Management (SAM) www.sam.gov.

2.5.1.7. Joint Venture Requirements - Parties wishing to propose as a joint venture must submit, with the Pro Forma documents, an executed copy of the joint venture agreement. The joint venture agreement shall be executed in accordance with FAR 4.102(d). Each joint venture partner shall submit evidence satisfactory to the Contracting

Officer that its Board of Directors has approved its participation in the joint venture or by an instrument of similarly binding character in the case of an unincorporated entity. Offerors are reminded that to obtain an award the awardee, to include a joint venture, must be registered in the System for Award Management (SAM) database. Applicable to set-aside solicitations: Joint Ventures must meet applicable size standards (See FAR Subpart 19.1). Submit with the proposal any size determination for the Joint Venture entity received from the Small Business Administration. A Joint Venture where-in one party is not a small business may be referred to the Small Business Administration (IAW FAR 19.302 (b)) to determine eligibility. All questions regarding Joint Ventures must be directed to the Small Business Administration (SBA) and not the Contracting Officer.

2.5.1.8 Subcontracting Plan: If the Offeror proposing on this solicitation is a large business concern, in accordance with the definition as identified in FAR Clause 52.219-1, “SMALL BUSINESS PROGRAM REPRESENTATION”, the firm must submit a small business subcontracting plan in accordance with FAR Clause 52.219-9 (Deviation 2016-O0009) SMALL BUSINESS SUBCONTRACTING PLAN and DFARS 252.219-7003 Alt I, “SMALL BUSINESS SUBCONTRACTING PLAN” (see Section 00700 of this solicitation for the full Clauses).

2.5.1.9.1 The Small Business Subcontracting Plan shall be thorough, complete, and in accordance with AFARS Appendix DD and FAR Clause 52.219-9 (Deviation 2016-O0009), as it will be incorporated into the contract upon award of the contract to the Offeror, if acceptable and upon final approval of the Contracting Officer. The Small Business Subcontracting Plan format at Exhibit G may be utilized.

2.5.1.9.2 The Plan shall include a description of the types of services the firm proposes to subcontract with small business (SB), small disadvantaged business (SDB), woman-owned small business (WOSB), HUBZone business, and service-disabled veteran-owned small business (SDVOSB), along with the proposed percentages of their participation, to demonstrate a plan to meet the subcontracting goals that will apply to these contracts. The Offeror shall provide specific information on proposed subcontracted effort for this project.

2.5.2. VOLUME 2, PART 1, OFFEROR TECHNICAL CAPABILITY PROPOSAL

2.5.2.1. Volume 2 Part 1 is comprised of two (2) sub-factors and their sub-elements. Subfactor 1 Demonstrated Experience and Key Personnel (sub-element 1: Demonstrated Experience, sub-element 2: Key Personnel); Subfactor 2 Technical Approach Plan and Construction Schedule (sub-element 1: Technical Approach Plan, sub-element 2:

Construction Schedule).

2.5.2.1.1. Government acknowledges that the technical proposal will involve discussion of some of the same projects/contracts discussed in the Past Performance volume. While Past Performance examines how an offeror performed in the past, so as to determine the probability of success on future projects, this subfactor examines the offeror’s experience with complex multidiscipline project management and execution and how the offeror demonstrates an understanding of the contract’s requirements taking this experience into consideration.

2.5.2.2. Subfactor 1 Demonstrated Experience and Key Personnel. Projects submitted under Demonstrated Experience are limited to 3 single pages for each project, exclusive of table of contents, tabs, and dividers. Resumes for key personnel are limited to 3 single pages for each key personnel. Pages in excess of the limit will not be evaluated. If pages in excess of the limit are provided, only the first 3 pages will be evaluated.

2.5.2.2.1 Sub-factor 1, sub-element 1, Demonstrated Experience: Provide a minimum of 2 and a maximum of 5 completed or currently well underway projects and turn over no more than 10 years 8 years receding the date of this solicitation that demonstrated experience of the offeror and its team members (i.e. major subcontractors) in successfully completing the construction of projects for hydrant refueling systems and ramp expansions with similar characteristics to those identified in this solicitation. If a project is identified as one where LEED Silver or higher certification was achieved, the offeror shall provide full documentation as evidence to confirm that this certification was achieved. If no experience in LEED Certification so state and indicate in detail how you plan to overcome this lack of experience. The onus is solely on the offeror to indicate in detail how the offeror plans to overcome this lack of experience. A well underway project is defined as 100% designed and at least 50% of construction progress completed. If a project is presented and has not been completed, the offeror shall explain which elements of the work are not completed and shall provide the completion percentage. If a project is presented and has not been accepted by the client, the offeror shall explain which elements of the work are not completed and shall provide supporting documentation from the client to confirm physical completion of the project.

2.5.2.2.1.2 If any portion of the work provided as demonstrated experience is subcontracted, clearly identify that work as such and provide the required experience of that subcontractor as it relates to work the subcontractor is to perform. In addition, a letter of commitment, using Exhibit D, from the subcontractor shall be submitted in order to consider their demonstrated experience. Also provide a completed Exhibit B, “Subcontractor/Team/Key Personnel Information and Consent Form" for all proposed subcontractors or the information will not be considered.

2.5.2.2.1.3 If any firm has multiple functions or divisions, limit the project examples to those performed by the division, unit or team member submitting the offer.

2.5.2.2.1.4 If the offeror is a joint venture, each firm shall provide information demonstrating experience relevant to their role on this project.

2.5.2.2.1.5 The prime contractor and team members shall each demonstrate recent, relevant experience on projects that are similar in nature, magnitude, and complexity to the work described in this solicitation using Exhibit A, Performance Relevancy Questionnaire/Company Specialized Experience. The Government intends to use Exhibit A Part 1 information in the evaluation of demonstrated experience for Subfactor 1, sub-element 1. A reiteration of the information provided in Exhibit A is neither required nor desired. Offeror should reference this information by providing a short summation of their relevant experience to meet the submission requirements of this sub-factor.

2.5.2.2.2 Sub-factor 1, sub-element 2, Key Personnel: Discuss and provide experience of key construction personnel including, but not limited to, Project Manager, Project Superintendent(s), Quality Control Manager (on site) and Safety Manager. Refer to Division 01 Specification Section 01000 for the minimum qualification requirements for key personnel. Additionally, indicate the key construction personnel experience and their required qualifications in assigned roles with building to USGBC LEED® standards. The individual assigned the role of LEED point of contact for this project will be required to demonstrate LEED Professional Accreditation (LEED BD+C, LEED ID, etc.) and experience on LEED projects they have worked on or certified. Indicate whether each individual has had a significant role in any of the cited project examples under Demonstrated Experience, sub-element 1. If no experience so state and indicate in detail how you plan to overcome this lack of experience. The onus is solely on the offeror to indicate in detail how the offeror plans to overcome this lack of experience. In the event the intended person is not part of the offeror’s organization at the time the proposal is submitted then a completed Exhibit B, “Subcontractor/Team/Key Personnel Information and Consent Form” is also required or the information will not be considered. In addition, a letter of commitment, using Exhibit D, from the subcontractor key personnel shall be provided.

2.5.2.3. Subfactor 2, Technical Approach Plan and Construction Schedule: Each element or topic required to be described in the Technical Approach Plan is limited to 2 pages each. Each item listed under each character bullet (B thru H) required to be described in the Technical Approach Plan is limited to 2 pages each. The requirements in item A is limited to 4 pages. The construction schedule itself is not subject to page limits; however any narrative accompanying the construction schedule submission is limited to 5 pages, excluding tabs and indexes.

2.5.2.3.4 Subfactor 2, Sub-Element 1, Technical Approach Plan: Provide information that describes the offeror’s organization and intended technical approach to execute the requirements. Clearly but concisely describe the organizational and technical approach to project management and execution. The Technical Approach Plan will be incorporated into the contract.

The Technical Approach Plan shall include the following:

A. Describe how the work will be executed from start to completion. Provide a sequence of activities which represent work through the entire project from mobilization to demobilization.

Describe how the company intends to achieve LEED Silver Certification for hydrant refueling systems and ramp expansions in accordance with all requirements specified in the specifications. Also identify the individual and/or entity that will be assigned as the LEED Point of Contact. As indicated in paragraph 2.5.2.2.2 in Section 00110, the individual assigned as LEED POC will be required to demonstrate LEED Professional Accreditation (LEED BD+C, LEED ID, etc.) and experience on LEED projects they have worked on or certified. Qualifications requirement will be evaluated under Factor 1, sub-element 2, Key Disciplines. If the offeror intends to subcontract this portion of the work, a letter of commitment for the subcontractor will be required.

B. Basis for proposed timeframes in sub-element 2, Construction Schedule, shall be provided including all assumed contingencies (i.e. adverse weather, mechanical shut-down, other issues, etc)

C. Describe the time control capabilities and systems to be used to plan construction and how the schedule will be used to manage construction. Discuss internal procedures for handling delays to minimize time growth or “schedule creep”. Include a narrative discussing the scheduling processes and resource allocation that ensure completion and control of schedule progress from beginning to the end of the project.

D. Describe what firms, their resources and how their resources will be utilized, their roles and responsibilities and any contractual arrangements that have been established. Clearly describe any teaming or joint venture arrangements, including a clear description of each firm’s roles and responsibilities on the project. Include a simple organizational chart, illustrating the organization, including the proposed quality control group(s). Present a matrix of responsibilities for each firm in executing the key work breakdown structure activities of the project, including construction activities for each major feature (i.e., site work, utilities, etc.).

E. Describe the proposed management structure for the team, describing how the construction process will be managed and the authorities and the delegations of authority within the team. Include a key personnel organization chart that clearly depicts the key positions and the names of the personnel, their firm affiliations and their job locations and their job/position title within the organization. The key personnel organization chart shall be consistent with the corporate organization chart, with the matrix of responsibilities assigned to the list of key personnel.

F. Describe the team’s quality control approach, corporate systems and capabilities to maintain quality control of construction. Describe the proposed quality control organization, including the proposed staffing plan. Provide information on how you will handle internal and external requests for information, shop drawings, submittal reviews, progress meetings, contract completion, closeout, as-built, and completion documentation. Proposal must demonstrate adequate quality control processes to give the government confidence of the offeror’s ability to successfully manage the material submittal process, and ensure subcontractor compliance with contract documents.

G. The proposed Quality Control answers should provide a detailed explanation of how quality issues are dealt with on various types of construction projects for all items identified above and meetings, inspections, submittal reviews, correction of non-compliant work and how you intend to ensure non-reoccurrence and reporting of quality problems to Government officials. There is no need to submit a quality control plan as the successful offeror will provide that after award.

H. Describe the offeror’s proposed safety program and the firm’s familiarity with, and/ or plans to adhere to, OSHA standards, USACE EM 385- 1-1 (Safety Manual) and standard State OSHA safety requirements, if applicable. (Note: A Safety Plan is not required).

Describe steps taken to promote safety during construction during the past three (3) years.

2.5.2.3.5 Sub-factor 2, Sub-Element2, Construction Schedule: is obtained for the purposes of evaluating an offerors understanding of the requirements of the schedule and commissioning.

2.5.2.3.1. Provide Construction Schedule in a Gantt chart that shows the complete project schedule from Notice to Proceed date of 6 July 2018 to include all construction activities as well as concurrent activities, and outline the critical path activities that will show successful execution of the construction project within the period of performance requirements per FAR 52.211-10. Provide a Critical Path Method Construction Schedule in a Gantt chart format that shows the complete project schedule from Notice to Proceed date of 6 July 2018 to include all construction activities as well as concurrent activities, and highlight the critical path activities that will show successful execution of the construction project within the period of performance requirements per FAR 52.211-10.

2.5.3. VOLUME 2, PART 2 OFFEROR PAST/PRESENT PERFORMANCE INFORMATION

2.5.3.1. Volume 2 Part 2 is obtained for the purpose of evaluating Past/Present Performance. Past/Present Performance includes current/on-going performance that is complete to 50% or greater within 10 years 8 years preceding this solicitation for the prime contractor and major subcontractors intended to be used for the performance of this solicitation. If a project submitted was completed by the offeror’s major subcontractor, the offeror is responsible for coordinating with their major subcontractor and submitting a completed Performance Relevancy Questionnaire. Volume 2, Part 2, includes the offeror’s Performance Relevancy Questionnaire, Exhibit A Parts 1 and 2; and any discussion and or additional information, awards, letters, etc. concerning past/present performance the offeror includes. Offerors are cautioned to complete all the questions on the Exhibit A Parts 1 and Part 2.

Detailed instructions are included in Exhibit A.

2.5.3.2. Offerors shall use the Reference Package, Exhibit C, to obtain references from past and present clients.

2.5.3.3. Past/Present Performance, which includes current on-going (present) performance that is complete to 50% or greater within 8 10 years preceding this solicitation will be evaluated using the evaluation criteria set forth in Section 00120 of the solicitation. If the offeror represents the combining of two or more companies, joint venture or formal teaming agreement, for the purpose of this RFP, each company shall complete Exhibit As and obtain Exhibit C references. The Government may contact these references and may consider this information as well as information obtained from any other sources when evaluating the offeror's past/present performance.

2.5.3.4. Offerors shall discuss their performance using the Performance Relevancy Questionnaire format, Exhibit A, Part 1. Prepare not more than five (5) of these documents. Contractors should select their projects carefully because the quality of the contractor’s relevant performance is more important than the quantity of projects submitted.

2.5.3.5. Use the Exhibit A format to provide information that demonstrates a history of performance on contracts that are similar in scope, complexity, and cost magnitude to this project’s plans and specifications. Explain what aspects of the contract you find relevant to the proposed effort and identify how each contract ranks, in terms of relevancy, with respect to the other contracts addressed in proposal.

2.5.3.6. Offerors should consider the currency and relevancy of the past/present performance information to be considered, the performance must have been completed during the past eight (8) years ten (10) years. The period begins eight (8) years ten (10) years prior to the solicitation release date and includes current performance.

Performance that is more current may have greater impact than older performance.

2.5.3.7. In determining relevancy to the solicitation requirement, offerors should consider the similarity of construction methods employed, size, scope, cost magnitude, location, client type (e.g. federal government) and complexity of work performed to those required for the proposed effort. Location should also be considered.

2.5.3.8. Offerors are encouraged to include with their proposal information any problems encountered on the identified contracts and the offeror's correction actions.

2.5.3.9. Offerors lacking relevant present/past performance experience may submit information regarding predecessor companies, key personnel who have relevant experience or subcontractors that will perform major or critical aspects of the requirement if such information is relevant to this acquisition. Such information shall, as a minimum, include:

Name(s) of Predecessor Company/Subcontractor and/or Key Personnel Complete Address Telephone, Fax Number and email address Brief synopsis of the experience- A resume may be submitted for "Key Personnel" Describe relevancy to this project

2.5.3.10 Provide three (3) references, for each Predecessor Company, Subcontractor or Key Personnel. Clearly identify the contractor/individual for whom the reference information concerns.

2.5.3.9. Past Performance References – REQUIRED – A “Final” Performance Evaluation (Construction) (alsoreferred to as CPARS Evaluation) issued for a project may be included in lieu of sending out reference package forthe project. OR Offerors shall prepare and submit to prior client(s) of all the projects listed on your Exhibit Asubmission a Reference Package (Exhibit C) (Detailed instructions are included in Exhibit C Package). This includes correspondence explaining the requirement to obtain an independent evaluation of prior contract performance, and the Past Performance Questionnaire for use in evaluating Past Performance. Inform references that completed Performance Questionnaire should be returned to the Contracting Officer via email at:

Zachary.D.Leddy.mil@mail.mil AND Bryant.k.alexander.mil@mail.mil to arrive NO LATER THAN the closing date for receipt of proposals. Offeror must not review the Past Performance Questionnaire prior to submission. They are to be submitted by the client/evaluator directly to the Contracting Officer. Offeror's should follow-up and encourage references to get the questionnaires to the Contracting Officer in a timely manner.

2.5.3.10. In assessing past performance, the Government may also consider the past/present performance of the offeror’s key personnel, Project Manager, Quality Control Manager and Site Superintendent, as it relates to previous projects. In the event the intended key personnel for this solicitation’s project do not have demonstrated past performance in the project(s) submitted in the Exhibit A’s, the Government reserves the right to obtain reference information if additional information is required.

2.5.3.11. Each key person without prior past performance history demonstrated on the submitted Exhibit A shall provide a summary of experience or a resume. In the event the intended person is not part of the offeror’s organization at the time the proposal is submitted then a completed Exhibit B, “Subcontractor/Team/Key Personnel Information and Consent Form” or Letter of Intent, is also required or the information will not be considered. As a reminder and in accordance with Section 00110 and 00120 paragraphs 2.5.2.2.2 and 2.2.3.3, in the event the intended person is not part of the offeror’s organization at the time the proposal is submitted then a completed Exhibit B, “Subcontractor/Team/Key Personnel Information and Consent Form” is also required or the information will not be considered. The Government may seek additional references and reserves the right to use the information provided to obtain additional references.

2.5.3.12. In assessing past performance, the Government may also consider the past/present performance of the offeror’s key personnel, Project Manager, Quality Control Manager and Project Superintendent, as it relates to previous projects. In the event the intended key personnel for this solicitation’s project do not have demonstrated past performance in the project(s) submitted in the Exhibit A’s, the Government reserves the right to obtain reference information if additional information is required.

2.5.3.12.1. Each key person without prior past performance history demonstrated on the submitted Exhibit A shall provide a summary of experience or a resume. In the event the intended person is not part of the offeror’s organization at the time the proposal is submitted then a completed Exhibit B, “Subcontractor/Team/Key Personnel Information and Consent Form” or Letter of Intent, is also required or the information will not be considered. The Government may seek additional references and reserves the right to use the information provided to obtain additional references.

2.5.3.13. Offerors are advised that the Government may use all data provided by the offeror in this volume and data obtained from any other sources, to include, but not limited to, data independently obtained from other Government or commercial sources; from any other sources available to the Government, to include, but not limited to, the Past Performance Information Retrieval System (PPIRS), Federal Awardee Performance and Integrity Information System (FAPIIS), Electronic Subcontract Reporting System (eSRS), or other databases; interviews with Program/Project Managers, Contracting Officers or rely upon personal business experience with the offeror. The Government reserves the rights to obtain and evaluate past performance information from any source it deems appropriate. While the Government may elect to consider data obtained from other sources, the burden of providing current accurate and complete past/present performance information rests with the offeror.

2.5.4 VOLUME 3, SMALL BUSINESS PARTICIPATION PLAN

2.5.4.1 All offerors shall identify the extent to which Small Businesses (SBs), Service-Disabled Veteran-Owned Small Businesses (SDVOSBs), HUBZone Small Businesses, Small Disadvantaged Businesses (SDBs), and Woman- Owned Small Businesses (WOSBs) would be utilized in the performance of this proposed contract. For small businesses, as defined by the North American Industry Classification System (NAICS) Code applicable to this solicitation, the offeror shall identify their own participation as a SB, SDVOSB, HUBZONE SB, SDB, or WOSB, and it will be considered in evaluating the proposed Small Business Participation Plan (use Exhibit F –Small Business Participation Plan).

Offerors must propose goals for Small Business Participation. Small business participation goals are to be an estimated percentage of total contract dollars (total proposed amount including options). Provide an overall goal to be accomplished through collective small business participation from any type of small business, to include all small business programs, and propose individual goals for each small business program utilizing Exhibit F. The work to be performed directly by a small business prime offeror will be included the offeror’s Small Business Participation goal.

This factor includes a minimum Total Small Business Participation goal (for all types of small business combined) for this acquisition of 34% of total contract dollars (total proposed amount including options).

Separate and distinct from the Small Business Participation Plan, large business offerors must also submit a Subcontracting Plan, as required by FAR 52.219-9 (Deviation 2016-O0009), under Volume 1.. Large businesses will not be eligible for award if they fail to submit an acceptable Subcontracting Plan. The Subcontracting Plan will be based on subcontracted dollars rather than total contract dollars but shall reflect and be consistent with the commitments to small business firms outlined in the Extent of Participation of Small Businesses (i.e., dollars shown for each type of small business in each of the plans should match).

END OF SECTION 00110

SECTION 120

PROPOSAL EVALUATION AND BASIS FOR AWARD

1. GENERAL INFORMATION

1.1. This solicitation is for a Firm Fixed Price Contract. The Government intends to award a single contract to a qualified offeror deemed responsible in accordance with the Federal Acquisition Regulation (FAR), whose proposal conforms to all the RFP's requirements and is judged to represent the Best Value to the Government in accordance with the evaluation scheme set out in this solicitation. The award will be made based on the best overall (i.e. best value) proposal that is determined to be the most be the most beneficial to the Government, with appropriate consideration given to the four (4) evaluation factors: Technical, Past Performance, Small Business Participation, and Price. The firm that represents the best value to the Government will be selected for award in accordance with FAR 15.1 Source Selection Processes and Techniques.

1.2. To arrive at a Best Value decision this acquisition will utilize the FAR Part 15.101-1 tradeoff process unless the lowest priced offeror (with a price deemed reasonable and realistic) is also deemed to be the highest rated in terms of non-price evaluation criteria. If the lowest priced offeror is also the highest rated in terms of non-Price Factors, no tradeoff is necessary. Further, there is no tradeoff necessary between any offer that is lower priced and higher rated in terms of non-Price Factors with respect to any other offers that are higher priced and lower rated for the non-Price Factors. While the Government and the Source Selection Authority will strive for maximum objectivity, the evaluation process, by its nature, is subjective and therefore, professional judgment is implicit throughout the entire evaluation process.

1.3. The source selection process will be conducted in accordance with FAR Subpart 15.3, Source Selection procedures. Offers will be evaluated using the criteria listed in “Evaluation Factors for Award.” Noncompliance with the RFP requirements may raise serious questions regarding an offeror’s technical ability, past performance and/or pricing and may be grounds to eliminate the proposal from consideration for contract award. Failure to include all information requested may adversely affect the evaluation. A proposal that merely reiterates or promises to accomplish the requirements of the RFP will be considered unacceptable. A proposal that is orderly and sufficiently documented will be easy for the Government to understand and will enable the Government to perform a thorough and fair evaluation.

1.4. The Contracting Officer will begin the evaluation process by conducting a proposal compliance review for all timely-received proposals for determination of basic proposal adequacy prior to providing the proposals to the evaluators. Failure to provide a complete proposal may result in the proposal being removed from further consideration for award. Failure to address any factor Technical, Past Performance, Small Business Participation, and Price or any technical sub-factor or sub-element shall be grounds for elimination from evaluation and consideration for award.

1.5. Offerors must ensure that no pricing information is displayed in Volume 2, Technical, Past Performance and Volume 3, Small Business Participation Proposal.

1.6. Although the assessment of Past Performance as a specific evaluation factor is separate and distinct from the Determination of Responsibility required by FAR Part 9, Past Performance information obtained herein will be used during the Government’s responsibility determination. The Government also reserves the right to obtain additional information solely for the purpose of making a responsibility determination from all offerors after receipt of proposals. Requests for responsibility information do not constitute discussions.

1.8. ENFORCEABILITY OF PROPOSAL: The proposal must set forth full, accurate and complete information as required by this solicitation. By submission of the offer, the Offeror agrees that all items proposed (if applicable e.g., key personnel, subcontractors, etc.) will be utilized for the duration of the contract and any substitutions shall require prior Contracting Officer's approval. The award decision for this contract was based, in part, on an evaluation of the key personnel and/or subcontractors the Contractor included in its proposal for the positions and/or items of subcontracted work identified at the end of this paragraph. identified in the offeror's proposal. A major/key subcontractor is defined as any subcontractor that is crucial for successfully completing the project. The Contractor agrees these key personnel and/or subcontractors will be employed as described in its proposal and no substitutes will be employed without prior written approval of the Contracting Officer or Administrative Contracting Officer. The Contractor further agrees that any proposed substitutes shall meet or exceed the qualifications of the original personnel and/or subcontractors. If the Contractor’s proposal did not name a subcontractor for an identified item of work, the Contractor will not be allowed to subcontract that item of work without prior approval of the Contracting Officer or Administrative Contracting Officer. A major/key subcontractor is defined as any subcontractor that is crucial for successfully completing the project.

2. EVALUATION FACTORS FOR AWARD AND RELATIVE IMPORTANCE

2.1. The evaluation factors are (1) Technical, (2) Past/Present Performance (3) Small Business Participation and (4)

Price. To arrive at a Best Value decision, the Source Selection Authority will integrate the evaluation of all four (4) factors as set out in the solicitation. In terms of the relative importance of the factors, the Technical factor is somewhat more important than Present/ Past Performance and the Small Business Participation Factor is significantly less important than Past Performance. When combined however, the non-cost factors are approximately equal to the Price Factor. Note: A rating of red/unacceptable received for any individual sub-factor or sub-element will result in an overall rating of red/unacceptable for the entire factor. The factors, sub-factors and sub-elements relative importance is as follow:

Factor 1- Technical Merit: Technical Merit is slightly more important than Past Performance. For the following sub-factors, Sub-Factor 1 is considered slightly more important than Sub-Factor 2:

a. Sub-Factor 1 – Demonstrated Experience and Key Personnel- For the following sub-elements, Sub-

Element 1 is considered slightly more important than Sub-Element 2

i. Sub Element 1: Demonstrated Experience

ii. Sub Element 2: Key Personnel

b. Sub-Factor 2– Technical Approach Plan and Construction Schedule- For the following sub-elements, sub-Element 1 is considered slightly more important than Sub-Element 2

i. Sub Element 1 – Technical Approach Plan

ii. Sub-Element 2 – Construction Schedule

Factor 2 – Past Performance: Past Performance is slightly less important than the Technical Merit Factor.

Factor 3 – Small Business Participation: Small Business Participation is significantly less important than Past Performance.

2.1.1. The overarching evaluation approach for all factors, sub-factors and sub-elements is as follows:

a. Adequacy of Response. The proposal will be evaluated to determine…