File Type Posted
Questions_and_Answers_96-101__W91242-18-R-0002.pdf PDF
Amendment_0007.pdf PDF
FJRP159073-CG103-Amendment_0007.pdf PDF
33_52_43.28_Amd03.pdf PDF
Questions_and_Answers_78-95__W91242-18-R-0002.pdf PDF
FJRP159073-A-601-Amendment_0006.pdf PDF
Revised_33_52_80_Amendment_0006.pdf PDF
Revised_09_96_00_Amendment_0006.pdf PDF
Revised_09_97_13.27_Amendment_0006.pdf PDF
FJRP159073-A-201-Amendment_0006.pdf PDF
Amendment_0005.pdf PDF
Amendment_0005_Revised_01_45_00.pdf PDF
FJRP159073-MS503-Amd03.pdf PDF
01_33_29_Amd03.pdf PDF
FJRP159073-M-603-Amd03.pdf PDF
FJRP159073-B-101-Amd03_(1).pdf PDF
31_32_11_Amd03.pdf PDF
FJRP159073-CU-223-Amd03.pdf PDF
FJRP159073-GC-002-Amd03.pdf PDF
EXIBIT_H_Proposal_Price_Schedule.pdf PDF
FJRP159073-GC-001-Amd03.pdf PDF
SpecTOC_Amd03.pdf PDF
33_52_80_Amd03.pdf PDF
Exhibit_D_Letter_of_Commitment.pdf PDF
FJRP159073-MS501-Amd03.pdf PDF
FJRP159073-EI-503-Amd03.pdf PDF
FJRP159073-CS-121-Amd03.pdf PDF
Exhibit_G_-_Subcontracting_Plan_Format.pdf PDF
33_52_43.11_Amd03.pdf PDF
FJRP159073-EI-602-Amd03.pdf PDF
FJRP159073-M-502-Amd03.pdf PDF
FJRP159073-E-703-Amd03.pdf PDF
Exhibit_C_Past_Performance_Questionnaire_Package.pdf PDF
FJRP159073-ES-401-Amd03_(1).pdf PDF
03_30_00_Amd03.pdf PDF
Exhibit_B_Subcontractor_Consent_Form.pdf PDF
FJRP159073-EI-501-Amd03.pdf PDF
Questions_and_Answers_1-17__W91242-18-R-0002.pdf PDF
Pre-proposal_Conference_Sign_in_sheet.pdf PDF
1.3_Drawings-CIVIL_1_of_4.pdf PDF
1.6_Drawings-CATHODIC_PROTECTION.pdf PDF
Exhibit_F_Small_Business_Participation_Format.pdf PDF
Exhibit_G_-_Subcontracting_Plan_Format.pdf PDF
1.1_Drawings-INDEX_SHEET_(1).pdf PDF
1._Drawings_-COVER_SHEET.pdf PDF
1.5_Drawings-ARCHITECTURE.pdf PDF
6_-_SAP_SINGLE_SOURCE_DETERMINATION,_1_PGS.pdf PDF
1.7_Drawings-MECHANICAL.pdf PDF
8_-_PRE-PROPOSAL_SITE_VISIT_INSTRUCTIONS.pdf PDF
1.9_Drawings-FIRE_DETECTION.pdf PDF
Show all 50

C-17 Refueling Hydrant System Ramp Expansion has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

C-17 Type III Fuel System & Ramp Expansion FJRP159073 145th Airlift Wing, North Carolina Air National Guard

Section 32 05 33 Page 1

SECTION 32 05 33

LANDSCAPE ESTABLISHMENT

02/10

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

ASTM INTERNATIONAL (ASTM)

ASTM D2103 (2015) Standard Specification for Polyethylene Film and Sheeting

ASTM D5851 (1995; R 2015) Planning and Implementing a Water Monitoring Program

U.S. GREEN BUILDING COUNCIL (USGBC)

LEED NC (2009) Leadership in Energy and Environmental Design(tm) New Construction Rating System

1.2 DEFINITIONS

1.2.1 Pesticide

Any substance or mixture of substances, including biological control agents, that may prevent, destroy, repel, or mitigate pests and are specifically labeled for use by the U.S. Environmental Protection Agency (EPA). Also, any substance used as a plant regulator, defoliant, disinfectant, or biocide. Examples of pesticides include fumigants, herbicides, insecticides, fungicides, nematicides, molluscicides, and rodenticides.

1.2.2 Stand of Turf

95 percent ground cover of the established species.

1.2.3 Planter Beds

A planter bed is defined as an area containing one or a combination of the following plant types: Shrubs, vines, wildflowers, annuals, perennials, ground cover, and a mulch topdressing excluding turf. Trees may also be found in planter beds.

1.3 RELATED REQUIREMENTS

Section 32 92 19 SEEDING applies to this Section for installation of seed requirements, with additions and modifications herein.

1.4 SUBMITTALS

../Word/32 92 19.doc

Section 32 05 33 Page 2

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for Contractor Quality Control approval. Submittals with an "S" are for inclusion in the Sustainability eNotebook, in conformance to Section 01 33 29 SUSTAINABILITY REPORTING.

Submit the following in accordance with Section 01 33 00 SUBMITTAL

PROCEDURES:

SD-01 Preconstruction Submittals

Integrated Pest Management Plan; G

SD-03 Product Data

Local/Regional Materials; (LEED NC)

Submit documentation indicating distance between manufacturing facility and the Project Site. Indicate distance of raw material origin from the Project Site. Indicate relative dollar value of local/regional materials to total dollar value of products included in Project.

Fertilizer; G

Hose; (LEED NC) G

Mulches Topdressing; (LEED NC) G

Submit documentation indicating percentage of post-industrial and post-consumer recycled content per unit of product. Indicate relative dollar value of recycled content products to total dollar value of products included in Project.

Organic Mulch Materials; G

Submit documentation indicating type of biobased material in product and biobased content. Indicate relative dollar value of biobased content products to total dollar value of products included in Project.

SD-07 Certificates

Maintenance inspection report

Plant quantities; G

SD-10 Operation and Maintenance Data

Maintenance

1.5 DELIVERY, STORAGE, AND HANDLING

1.5.1 Delivery

Deliver fertilizer, gypsum, iron to the site in original containers bearing manufacturer's chemical analysis, name, trade name, or trademark, and indication of conformance to state and federal laws. Instead of containers, ../Word/01 33 29.doc ../Word/01 33 00.doc

Section 32 05 33 Page 3 fertilizer, gypsum may be furnished in bulk with a certificate indicating the above information.

1.5.2 Storage

1.5.2.1 Fertilizer, Lime, Iron, Mulch Storage

Material shall be stored in designated areas. Lime and fertilizer shall be stored in cool, dry locations away from contaminants.

1.5.2.2 Antidessicants Storage

Do not store with fertilizers or other landscape maintenance materials.

1.5.3 Handling

Do not drop or dump materials from vehicles.

1.6 SUSTAINABLE DESIGN REQUIREMENTS

1.6.1 Local/Regional Materials

Use materials or products extracted, harvested, or recovered, as well as manufactured, within a 500 mile radius from the Project Site, if available from a minimum of three sources. See Section 01 33 29 LEED(tm) DOCUMENTATION for cumulative total local material requirements. Landscaping materials may be locally available.

1.7 MAINTENANCE

Submit Operation and Maintenance (O&M) Manuals for planting materials.

Include instructions indicating procedures during one typical year including variations of maintenance for climatic conditions throughout the year.

Provide instructions and procedures for watering; promotion of growth, including fertilizing, pruning, and mowing; and integrated pest management.

Develop a water monitoring program for surface and ground water on the Project Site in accordance with ASTM D5851 and consistent with the water management program utilized during construction operations.

PART 2 PRODUCTS

2.1 POST-PLANT FERTILIZER

2.1.1 Granular Fertilizer

Organic, granular controlled release fertilizer containing minimum percentages, by weight, or plant food nutrients as required by the soil analysis.

2.2 WATER

Source of water shall be approved by the Contracting Officer, and be of suitable quality for irrigation. Use collected storm water or graywater when available.

../Word/01 33 29.doc

Section 32 05 33 Page 4

2.2.1 Hose

Hoses used for watering shall be provided by the Landscape Contractor for temporary irrigation and turf establishment. Landscape Contractor shall remove all hoses from site when maintenance is complete.

2.3 MULCHES TOPDRESSING

Free from noxious weeds, mold, pesticides, or other deleterious materials.

2.3.1 Organic Mulch Materials

Biobased content shall be a minimum of 100 percent. Wood cellulose fiber shall be processed to contain no growth or germination-inhibiting factors, dyed with non-toxic, biodegradable dye to an appropriate color to facilitate visual metering of materials application. Paper-based hydraulic mulch shall contain a minimum of 100 percent post-consumer recycled content. Wood-based hydraulic mulch shall contain a minimum of 100 percent recycled material.

2.3.2 Recycled Organic Mulch

Recycled mulch may include compost, tree trimmings, or pine needles with a gradation that passes through a 2-1/2 by 2-1/2 inch screen. It shall be cleaned of all sticks a minimum 1 inch in diameter and plastic materials a minimum 3 inch length. The material shall be treated to retard the growth of mold and fungi.

2.4 PESTICIDES

Pesticides and herbicides are not permitted. Use black sheet polyethylene conforming to ASTM D2103, minimum thickness 5/32 inch. Submit an Integrated Pest Management Plan, including weed and pest management strategies.

PART 3 EXECUTION

3.1 EXTENT OF WORK

Provide landscape construction maintenance to include mowing, edging, overseeding, aeration, fertilizing, watering, weeding, newly installed landscape areas, unless indicated otherwise, and at all areas inside or outside the limits of the construction that are disturbed by the Contractor's operations.

3.1.1 Policing

The Contractor shall police all landscaped areas. Policing includes removal of leaves, branches and limbs regardless of length or diameter, dead vegetation, paper, trash, cigarette butts, garbage, rocks or other debris.

Policing shall extend to both sides of fencing or walls. Collected debris shall be promptly removed and disposed of at an approved disposal site.

3.1.2 Drainage System Maintenance

The Contractor shall remove all obstructions from surface and subsurface drain lines to allow water to flow unrestricted in swales, gutters, catch basins, storm drain curb inlets, and yard drains. Remove grates and clear debris in catch basins. Open drainage channels are to be maintained free of

Section 32 05 33 Page 5 all debris and vegetation at all times. Edges of these channels shall be clear of any encroachment by vegetation.

3.2 TEMPORARY IRRIGATION

The Landscape Contractor shall provide temporary irrigation for all newly planted turf areas during the maintenance period. Temporary irrigation may be provided by water trucks, temporary irrigation systems, and/or hoses and moveable sprinklers. All materials utilized for temporary irrigation shall be provided by Landscape Contractor and removed at the end of the maintenance period. The Landscape Contractor shall be responsible for maintaining temporary irrigation system components during the establishment period. Water for temporary irrigation shall be provided by the Landscape Contractor unless otherwise approved by the Contracting Officer.

3.2.1 Water Restrictions

The Contractor shall abide by state, local, or other water conservation regulations in force during the establishment period. Temporary use of an Automatic Controller shall be adjusted to comply with the water conservation regulations schedule.

3.2.2 Fire Hydrants

To use a fire hydrant for irrigation, the Contractor shall obtain prior clearance from the Contracting Officer and provide the tools and connections approved for use on fire hydrants. If a fire hydrant is used, Contractor shall provide a reduced pressure backflow preventer for each connection between hose and fire hydrant. Backflow preventer used shall be tested once per month by a certified backflow preventer tester.

3.2.3 Final Acceptance

Upon completion of the maintenance period, all equipment, piping, and hoses utilized for temporary irrigation shall be removed by the Landscape Contractor.

3.3 GROUNDCOVER ESTABLISHMENT PERIOD

Groundcover establishment period will commence on the date that inspection by the Contracting Officer shows that the new turf furnished under this Contract has been satisfactorily installed to a 95 percent stand of coverage. The establishment period shall continue for a period of 365 days.

3.3.1 Frequency of Maintenance

Begin maintenance immediately after turf has been installed. Inspect areas once a week during the installation and establishment period and perform needed maintenance promptly.

3.3.2 Promotion of Growth

Groundcover shall be maintained in a manner that promotes proper health, growth, natural color. Turf shall have a neat uniform manicured appearance, free of bare areas, ruts, holes, weeds, pests, dead vegetation, debris, and unwanted vegetation that present an unsightly appearance. Mow, remove excess clippings, eradicate weeds, water, fertilize, overseed, aerate, Section 32 05 33 Page 6 topdress and perform other operations necessary to promote growth, as approved by Contracting Officer and consistent with approved Integrated Pest Management Plan. Remove noxious weeds common to the area from planting areas by mechanical means.

3.3.3 Mowing

3.3.3.1 Turf

Turf shall be mowed at a uniform finished height. Mow turfed areas to a minimum average height of 2 inches when average height of grass becomes 3 inches. The height of turf is measured from the soil. Mowing of turf shall be performed in a manner that prevents scalping, rutting, bruising, uneven and rough cutting. Prior to mowing, all rubbish, debris, trash, leaves, rocks, paper, and limbs or branches on a turf area shall be picked up and disposed. Adjacent paved areas shall be swept/vacuumed clean.

3.3.4 Turf Edging and Trimming

Perimeter of planter bed edges, sidewalks, driveways, curbs, and other paved surfaces shall be edged. Uniformly edge these areas to prevent encroachment of vegetation onto paved surfaces and to provide a clear cut division line between planter beds, turf, and ground cover. Edging is to be accomplished in a manner that prevents scalping, rutting, bruising, uneven and rough cutting. Edging shall be performed on the same day that turf is mowed. Use of string line trimmers is permitted in "soft" areas such as an edge between turfgrass and a planter bed. Care shall be exercised to avoid damage to any plant materials, structures, and other landscape features.

Trimming around trees, fences, poles, walls, and other similar objects is to be accomplished to match the height and appearance of surrounding mowed turf growth. Trimming shall be performed on the same day the turf's mowed. Care shall be exercised to avoid "Girdling" trees located in turf areas. The use of protective tree collars on trees in turf areas may be utilized as a temporary means to avoid injury to tree trunks. At the end of the plant establishment period Contractor will be responsible for removing all protective tree collars.

3.3.5 Post-Fertilizer Application

Apply turf fertilizer in a manner that promotes health, growth, vigor, color and appearance of cultivated turf areas. The method of application, fertilizer type, and frequencies shall be determined by the laboratory soil analysis results the requirements of the particular turf species. Organic fertilizer shall be used. In the event that organic fertilizer is not producing the desired effect, the Contractor shall contract the Contracting Officer for approval prior to the use of a synthetic type of fertilizer.

Fertilizer shall be applied by approved methods in accordance with the manufacturer's recommendations.

3.3.6 Turf Watering

The Contractor shall perform irrigation in a manner that promotes the health, growth, color and appearance of cultivated vegetation and that complies with all Federal, State, and local water agencies and authorities directives. The Contractor shall be responsible to prevent over watering, water run-off, erosion, and ponding due to excessive quantities or rate of

Section 32 05 33 Page 7 application. The Contractor shall abide by state, local, or other water conservation regulations or restrictions in force during the establishment period.

3.3.7 Turf Aeration

Upon completion of weed eradication operations and Contracting Officer's approval to proceed, aerate turf areas by approved device. Core, by pulling soil plugs, to a minimum depth of 3 inches. Leave all soil plugs that are produced in the turf area.

Keep clean at all times at least one paved pedestrian access route and one paved vehicular access route to each building. Clean all soil plugs off of other paving when work is complete.

3.3.8 Turf Clearance Area

Trees located in turf areas shall be maintained with a growth free clearance of 18 inches from the tree trunk base. The use of mechanical weed whips to accomplish the turf growth free bed area is prohibited.

3.3.9 Replanting

Replant in accordance with Section 32 92 19 SEEDING and within specified planting dates areas which do not have a satisfactory stand of turf.

Replant areas which do not have a satisfactory stand of other groundcover and grasses.

3.3.10 Final Inspection and Acceptance

Final inspection will be make upon written request from the Contractor at least 10 days prior to the last day of the turf establishment period. Final turf acceptance will be based upon a satisfactory stand of turf. Final acceptance of grass areas will be based upon a stand of 95 percent groundcover of established species.

3.3.11 Unsatisfactory Work

When work is found to not meet design intent and specifications, maintenance period will be extended at no additional cost to the Government until work has been completed, inspected and accepted by Contracting Officer.

3.4 FIELD QUALITY CONTROL

3.4.1 Maintenance Inspection Report

Provide maintenance inspection report to assure that landscape maintenance is being performed in accordance with the specifications and in the best interest of plant growth and survivability. Site observations shall be documented at the start of the establishment period, then quarterly following the start, and at the end of establishment period. Results of site observation visits shall be submitted to the Contracting Officer within 7 calendar days of each site observation visit.

3.4.2 Plant Quantities

../Word/32 92 19.doc

Section 32 05 33 Page 8

The Contractor shall provide Contracting Officer with total exterior area of landscaping such as turf.

-- End of Section --

PART 1 GENERAL
1.1 REFERENCES
1.2 DEFINITIONS
1.2.1 Pesticide
1.2.2 Stand of Turf
1.2.3 Planter Beds
1.3 RELATED REQUIREMENTS
1.4 SUBMITTALS
1.5 DELIVERY, STORAGE, AND HANDLING
1.5.1 Delivery
1.5.2 Storage
1.5.3 Handling
1.6 SUSTAINABLE DESIGN REQUIREMENTS
1.6.1 Local/Regional Materials

1.7 MAINTENANCE

PART 2 PRODUCTS
2.1 POST-PLANT FERTILIZER
2.1.1 Granular Fertilizer
2.2 WATER
2.2.1 Hose
2.3 MULCHES TOPDRESSING
2.3.1 Organic Mulch Materials
2.3.2 Recycled Organic Mulch

2.4 PESTICIDES

PART 3 EXECUTION
3.1 EXTENT OF WORK
3.1.1 Policing
3.1.2 Drainage System Maintenance
3.2 TEMPORARY IRRIGATION
3.2.1 Water Restrictions
3.2.2 Fire Hydrants
3.2.3 Final Acceptance
3.3 GROUNDCOVER ESTABLISHMENT PERIOD
3.3.1 Frequency of Maintenance
3.3.2 Promotion of Growth
3.3.3 Mowing
3.3.4 Turf Edging and Trimming
3.3.5 Post-Fertilizer Application
3.3.6 Turf Watering
3.3.7 Turf Aeration
3.3.8 Turf Clearance Area
3.3.9 Replanting
3.3.10 Final Inspection and Acceptance
3.3.11 Unsatisfactory Work
3.4 FIELD QUALITY CONTROL
3.4.1 Maintenance Inspection Report
3.4.2 Plant Quantities