FJRP159073-A-601-Amendment_0006.pdf

PDF 622 KB Posted

Attached to
C-17 Refueling Hydrant System Ramp Expansion
Solicitation number
W91242-18-R-0002
Issued by

About this file

FJRP159073-A-601-Amendment 0006

View the file

Other files

File Type Posted
Questions_and_Answers_96-101__W91242-18-R-0002.pdf PDF
FJRP159073-CG104-Amendment_0007.pdf PDF
FJRP159073-CG103-Amendment_0007.pdf PDF
Amendment_0007.pdf PDF
33_52_43.28_Amd03.pdf PDF
Questions_and_Answers_78-95__W91242-18-R-0002.pdf PDF
Revised_33_52_80_Amendment_0006.pdf PDF
Revised_08_71_00_Amendment_0006.pdf PDF
Revised_33_52_43_Amendment_0006.pdf PDF
Revised_09_96_00_Amendment_0006.pdf PDF
Revised_09_97_13.27_Amendment_0006.pdf PDF
FJRP159073-A-201-Amendment_0006.pdf PDF
Revised_13_34_19_Amendment_0006.pdf PDF
W91242-18-R-0002_0006.pdf PDF
Revised_09_90_00_Amendment_0006.pdf PDF
Amendment_0005_Revised_01_45_00.pdf PDF
Amendment_0004_Section_0010_Price_Schedule.pdf PDF
Amendment_0005.pdf PDF
Questions_and_Answers_40-77__W91242-18-R-0002.pdf PDF
Revised_EXIBIT_H_Proposal_Price_Schedule_Amendment_0004.pdf PDF
Amendment_0004.pdf PDF
Questions_and_Answers_18-38__W91242-18-R-0002.pdf PDF
1._Drawings_-COVER_SHEET.pdf PDF
FJRP159073-M-002-Amd03.pdf PDF
FJRP159073-M-301-Amd03.pdf PDF
FJRP159073-GC-003-Amd03.pdf PDF
32_05_33_Amd03.pdf PDF
FJRP159073-EI-503-Amd03.pdf PDF
Exhibit_F_Small_Business_Participation_Format.pdf PDF
33_09_53_Amd03.pdf PDF
FJRP159073-MS502-Amd03.pdf PDF
FJRP159073-CS-121-Amd03.pdf PDF
FJRP159073-MS504-Amd03.pdf PDF
FJRP159073-M-401-Amd03.pdf PDF
FJRP159073-M-512-Amd03_(1).pdf PDF
33_52_43.13_Amd03.pdf PDF
FJRP159073-EP-101-Amd03.pdf PDF
Exhibit_G_-_Subcontracting_Plan_Format.pdf PDF
33_52_43.11_Amd03.pdf PDF
FJRP159073-EI-602-Amd03.pdf PDF
FJRP159073-C-511-Amd03.pdf PDF
FJRP159073-M-003-Amd03.pdf PDF
FJRP159073-MD902-Amd03.pdf PDF
FJRP159073-MS503-Amd03.pdf PDF
FJRP159073-C-510-Amd03.pdf PDF
FJRP159073-CU-121-Amd03.pdf PDF
FJRP159073-CU-224-Amd03.pdf PDF
W91242-18-R-0002_0003.pdf PDF
FJRP159073-M-502-Amd03.pdf PDF
Amendment_0003_Exhibit_A_Performance_Relevancy_Questionnaire_Specialized_Experience.pdf PDF
Show 40 more

Latest 50 of 114 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

2"

SCHEDULE

DOOR PER 2"

4"

SC

H E

DU

LE

DO

OR

P

ER

2"

SCHEDULE

DOOR PER 2"

2"

SC

H E

DU

LE

DO

OR

P

ER

1.1 1.2NL-IN

DO

OR

P

ER

S

CH

ED

UL

E

SCHEDULE

DOOR PER

DO

OR

P

ER

S

CH

ED

UL

E

2'

- 1

1" 6"

6" 8"

SCHEDULE

DOOR PER

F

F-IN OH-S

SC

H E

DU

LE

DO

OR

P

ER

SCHEDULE

DOOR PER

3'

- 4

4'

- 0

3' - 4"

W1

2" TYP.

GLASS TYPES:

REFERENCE SPECIFICATION FOR GLASS TYPES

1 LOW-E INSULATED SAFETY GLAZING (1")

2 INSULATED LAMINATED (1")

GENERAL NOTES: ROOM FINISH SCHEDULE

REFER TO SPECIFICATIONS FOR THE BASIS OF DESIGN OR

EQUIVALENT MANUFACTURER TECHNICAL REQUIREMENTS.

REFER TO INTERIOR ELEVATIONS, REFLECTED CEILING

DRAWINGS, AND ENLARGED PLAN DRAWINGS FOR ADDITIONAL

FINISH PLACEMENT INFORMATION.

REFER TO ELECTRICAL DRAWINGS, MECHANICAL DRAWINGS,

STRUCTURAL DRAWINGS AND COMMUNICATION DRAWINGS

FOR COORDINATION OF BUILDING FINISHES TO BUILDING

SYSTEMS.

REFER TO REFLECTED CEILING DRAWINGS FOR CEILING

HEIGHTS AND CEILING MATERIAL EXTENTS.

PROVIDE BLOCKING AS REQUIRED TO SECURE ALL WALL

MOUNTED ITEMS INCLUDING TOILET FIXTURES, TOILET

ACCESSORIES, MILLWORK, AND ANY OTHER WALL MOUNTED

OBJECT.

UNLESS NOTED OTHERWISE, ALL INTERIOR EXPOSED

STRUCTURAL STEEL TO BE PAINTED PE-1.

1.

2.

3.

4.

5.

6.

ALL INTERIOR DOORS/FRAMES AND INTERIOR SURFACE OF

EXTERIOR DOORS/FRAMES TO BE PA-2.

INTERIOR CAULKING TO MATCH ADJACENT WALL FINISH COLOR.

ALL EXPOSED CONCRETE FLOORS SHALL BE SEALED.

PAINT ALL EXPOSED STRUCTURAL STEEL ELEMENTS,

MISCELLANEOUS STEEL, PIPING, HANGERS, VALVES AND CONDUITS

EXCEPT PRE-FINISHED LINER PANELS AND FOAM GENERATORS.

THE PAINT COLOR SHALL BE AS INDICATED ON SCHEDULE. ALL FIRE

PROTECTION PIPING COLOR SHALL BE SAFETY RED.

ALL EXPOSED MECHANICAL AND ELECTRICAL EQUIPMENT AND

ASSOCIATED SUPPORTING EQUIPMENT TO BE PAINTED TO MATCH

ADJOINING SURFACE UNLESS OTHERWISE REQUIRED BY CODE.

COORDINATE WITH MECHANICAL / ELECTRICAL FOR FINISHES ON

MECHANICAL OR ELECTRICAL EQUIPMENT.

DO NOT PAINT PRE-FINISHED ITEMS, FINISHED METAL SURFACES,

OPERATING PARTS, LABELS OR WARNINGS.

7.

8.

9.

10.

11.

12.

GENERAL NOTES: THIS SHEET ONLY

DIMENSIONS GIVEN IN DOOR, WINDOW AND LOUVER

SIZE COLUMN ARE FINISHED OPENING DIMENSIONS.

REFERENCE DRAWING A-611 FOR EXTERIOR DOOR,

WINDOW AND LOUVER DETAILS.

REFERENCE DRAWING A-201 FOR EXTERIOR MATERIAL

LEGEND.

1.

2.

3.

DOOR FRAME

RE: DOOR

SCHEDULE

DOOR

RE: DOOR SCHEDULE

FINISH FLOOR

RE: ROOM FINISH

SCHEDULE

SEALANT

DO

OR

H

EI

G H T

S E E

DO

OR

S

CH

ED

UL

E

FRAME WIDTH

SEALANT TYP.

BOTH SIDES

DOOR FRAME

RE: SCHEDULE

DOOR

RE: DOOR SCHEDULE

BATT INSULATION

2"

DO

OR

W

ID

TH

SE

E

DO

OR

S

CH

ED

UL

E

JAMB ANCHORS

3 PER JAMB MIN.

1/2" 1/2"

FRAME WIDTH

METAL STUD WALL

RE: FLOOR PLANS FOR

WALL TYPE

SEALANT TYP. BOTH

SIDES

DOOR FRAME

RE: DOOR SCHEDULE

DOOR

RE: DOOR SCHEDULE

METAL STUD WALL

RE: FLOOR PLANS FOR

WALL TYPE

BATT INSULATION

1/2"1/2"

2"

DO

OR

H

EI

GH

T

SE

E

DO

OR

S

CH

ED

UL

E

FRAME WIDTH

date detailed checkeddesigned ofsheet sheets project contract rev.drawing file

DESCRIPTION

1 5432

A

B

C

D

C O

PY

R

IG

H

T

BU

R

N S

M

C D

O N

N

EL

L

EN

G

IN

EE

R

IN

G

C O

M

PA

N Y, IN

C

C-17 TYPE III HYDRANT

REFUELING SYSTEM/

RAMP EXPANSION

KANSAS CITY, MISSOURI

INITDATEREV.

REVISIONS

ENGINEERS ARCHITECTS & CONSULTANTS

NORTH CAROLINA AIR NATIONAL GUARD

DOUGLAS INTERNATIONAL AIRPORT

CHARLOTTE, NORTH CAROLINA

Project No. - FJRP159073

2/

/2

:5 7:

P

M

FJRP159073-A-601.dwg

A-601 94893

DOOR, WINDOW, LOUVER & ROOM FINISH

SCHEDULES

OCTOBER 2017

L. SUNDERLAND E. VELAZQUEZ

A. CANTORIA

DOOR SCHEDULE

DOOR

NUMBER

DOOR FRAME

ASSEMBLY

RATING

DETAIL

HARDWARE

SET REMARKS

SIZE

TYPE MATERIAL FINISH TYPE MATERIAL FINISH HEAD JAMB SILLWIDTH HEIGHT

102A PR. 3' - 0" 7' - 0" NL-IN HM PE-1 1.2 HM PE-1 - C1/A-611 B1/A-611 A1/A-611 1.0 102B - 3' - 0" 7' - 0" NL-IN HM PE-1 1.2 HM PE-1 - C1/A-611 B1/A-611 A1/A-611 2.0 102C - 3' - 4" 4' - 10" OH-S STL PREFIN STL PREFIN 3 HR C2/A-611 B2/A-611 A2/A-611 - 1 102D - 3' - 4" 4' - 10" OH-S STL PREFIN STL PREFIN 3 HR C2/A-611 B2/A-611 A2/A-611 - 1

103 - 3' - 0" 7' - 0" F HM PE-1 1.1 HM PE-1 - B2/A-601 B3/A-601 B5/A-601 3.0

104 PR. 3' - 0" 7' - 0" F-IN HM PE-1 1.2 HM PE-1 - C1/A-611 B1/A-611 A1/A-611 4.0

105 - 3' - 0" 7' - 0" F-IN HM PE-1 1.2 HM PE-1 - C1/A-611 B1/A-611 A1/A-611 5.0

DOOR AND FRAME LEGEND

FINISH

FINISH PE-1* PAINT-EPOXY

FINISH PREFIN PREFINISHED

MATERIAL

MATERIAL HM HOLLOW METAL

SIZE

SIZE - SINGLE DOOR

SIZE PR PAIR OF DOORS

TYPE

TYPE F FLUSH

TYPE F-IN FLUSH INSULATED

TYPE NL-IN NARROW LITE INSULATED

TYPE OH-S COILING FIRE SHUTTER

* FIELD APPLY PER PAINT SPECIFICATION FOR APPLICABLE

SUBSTRATE AND EXPOSURE.

WINDOW SCHEDULE

QUANTITY TYPE

SIZE SILL

HEIGHT

DETAIL

WIDTH HEIGHT HEAD JAMB SILL

2 W1 3' - 4" 4' - 0" 3' - 4" C3/A-611 B3/A-611 A3/A-611

LOUVER SCHEDULE

QUANTITY TYPE

SIZE SILL

HEIGHT

DETAILS

WIDTH HEIGHT HEAD JAMB SILL

1 L1 3' - 0" 2' - 0" 8' - 0" C4/A-611 B4/A-611 A4/A-611

NTSSCALE:C2 FRAME TYPES

NTSSCALE:C1 DOOR TYPES

SCALE: 1/4" = 1'-0"

WINDOW TYPE

0 2' 4' 8'

FINISH LEGEND - BASIS OF DESIGN OR EQUIVALENT

MATERIAL DESCRIPTION MANUF.

MODEL

NUMBER

PRODUCT

NUMBER COLOR REMARKS

BASE

RB-1 RESILIENT RUBBER BASE, 4" HIGH ROPPE - - DARK GRAY 150 STANDARD TOE PROFILE

RB-2 INTEGRAL RESILIENT RUBBER BASE,

4" HIGH

JOHNSONITE IQ OPTIMA - 853 THUNDERHEAD INTEGRAL TO RESILIENT SHEET

FLOORING

RB-3 INTEGRAL RESILIENT RUBBER BASE,

6" HIGH

JOHNSONITE IQ OPTIMA - 853 THUNDERHEAD INTEGRAL TO RESILIENT SHEET

FLOORING

CEILINGS

ACT-1 ACOUSTICAL CEILING TILE, 24" x 24" ARMSTRONG CIRRUS

TEGULAR

584 WHITE

EXP EXPOSED - - - - PAINT PE-1

GWB GYPSUM WALL BOARD - - - - PAINT PE-1

MR GWB MOISTURE RESISTANT GYPSUM

WALL BOARD

- - - - PAINT PE-1

PE-1 PAINT - EPOXY - CEILING SHERWIN WILLIAMS - - WHITE

FLOORING

CS-1 CONCRETE - SEALED - - - -

PE-2 EPOXY - HIGH PERFORMANCE

COATING

- - - - SLIP-RESISTANT; SEE

SPECIFICATION SECTION 09 96

00 HIGH PERFORMANCE

COATINGS

RF-1 RESILIENT FLOORING -

HOMOGENEOUS VINYL SHEET

JOHNSONITE IQ OPTIMA - 853 THUNDERHEAD

WALLS

FRP-1 FIBERGLASS REINFORCED PANEL MARLITE INDURO FRP - D381 FASHION GREY

PA-1 PAINT SHERWIN WILLIAMS - - AGREEABLE GRAY

SW7029

PA-2 PAINT SHERWIN WILLIAMS - - DOVETAIL SW7018 METAL DOORS & FRAMES

ROOM FINISH SCHEDULE

ROOM

NUMBER ROOM NAME FLOOR

BASE WALLS

CEILINGMATERIAL NORTH EAST SOUTH WEST

101 PUMP ROOM PE-2 - - - - - -

102 CONTROL ROOM RF-1 RB-2 PA-1 PA-1 PA-1 PA-1 ACT-1

103 MEN'S/WOMEN'S TOILET RF-1 RB-3 FRP-1 FRP-1 FRP-1 FRP-1 MR GWB

104 MECH ROOM CS-1 RB-1 PA-1 PA-1 PA-1 PA-1 EXP

105 STORAGE CS-1 RB-1 PA-1 PA-1 PA-1 PA-1 GWB

B1

0 3" 6" 9"SCALE: 3" = 1'-0"B5 DOOR SILL

SCALE: 3" = 1'-0"B3 DOOR JAMB

SCALE: 3" = 1'-0"B2 DOOR HEAD

0 3" 6" 9"0 3" 6" 9"

1. MANUALLY OPERATED COILING FIRE SHUTTER W/ FUSIBLE

LINK BOTH SIDES OF WALL. LOCATE FUSIBLE LINK 12 INCHES

FROM THE CEILING.

DOOR SCHEDULE REMARKS:

0 10/13/17 B-3 FINAL SUBMITTAL LS

1 02/22/18 AMENDMENT 000

Sheets
A-601 - DOOR, WINDOW, LOUVER & ROOM FINISH SCHEDULES

File details come from the government source that posted it.