Questions_and_Answers_96-101__W91242-18-R-0002.pdf

PDF 93 KB Posted

Attached to
C-17 Refueling Hydrant System Ramp Expansion
Solicitation number
W91242-18-R-0002
Issued by

About this file

Questions and Answers (96‐101) W91242-18-R-0002

View the file

Other files

File Type Posted
FJRP159073-CG104-Amendment_0007.pdf PDF
FJRP159073-CG103-Amendment_0007.pdf PDF
Amendment_0007.pdf PDF
33_52_43.28_Amd03.pdf PDF
Questions_and_Answers_78-95__W91242-18-R-0002.pdf PDF
Revised_33_52_80_Amendment_0006.pdf PDF
Revised_08_71_00_Amendment_0006.pdf PDF
Revised_33_52_43_Amendment_0006.pdf PDF
Revised_09_96_00_Amendment_0006.pdf PDF
Revised_09_97_13.27_Amendment_0006.pdf PDF
FJRP159073-A-201-Amendment_0006.pdf PDF
Revised_13_34_19_Amendment_0006.pdf PDF
W91242-18-R-0002_0006.pdf PDF
Revised_09_90_00_Amendment_0006.pdf PDF
FJRP159073-A-601-Amendment_0006.pdf PDF
Amendment_0005_Revised_01_45_00.pdf PDF
Amendment_0004_Section_0010_Price_Schedule.pdf PDF
Amendment_0005.pdf PDF
Questions_and_Answers_40-77__W91242-18-R-0002.pdf PDF
Revised_EXIBIT_H_Proposal_Price_Schedule_Amendment_0004.pdf PDF
Amendment_0004.pdf PDF
Questions_and_Answers_18-38__W91242-18-R-0002.pdf PDF
1._Drawings_-COVER_SHEET.pdf PDF
FJRP159073-M-002-Amd03.pdf PDF
FJRP159073-M-301-Amd03.pdf PDF
FJRP159073-GC-003-Amd03.pdf PDF
32_05_33_Amd03.pdf PDF
FJRP159073-EI-503-Amd03.pdf PDF
Exhibit_F_Small_Business_Participation_Format.pdf PDF
33_09_53_Amd03.pdf PDF
FJRP159073-MS502-Amd03.pdf PDF
FJRP159073-CS-121-Amd03.pdf PDF
FJRP159073-MS504-Amd03.pdf PDF
FJRP159073-M-401-Amd03.pdf PDF
FJRP159073-M-512-Amd03_(1).pdf PDF
33_52_43.13_Amd03.pdf PDF
FJRP159073-EP-101-Amd03.pdf PDF
Exhibit_G_-_Subcontracting_Plan_Format.pdf PDF
33_52_43.11_Amd03.pdf PDF
FJRP159073-EI-602-Amd03.pdf PDF
FJRP159073-C-511-Amd03.pdf PDF
FJRP159073-M-003-Amd03.pdf PDF
FJRP159073-MD902-Amd03.pdf PDF
FJRP159073-MS503-Amd03.pdf PDF
FJRP159073-C-510-Amd03.pdf PDF
FJRP159073-CU-121-Amd03.pdf PDF
FJRP159073-CU-224-Amd03.pdf PDF
W91242-18-R-0002_0003.pdf PDF
FJRP159073-M-502-Amd03.pdf PDF
Amendment_0003_Exhibit_A_Performance_Relevancy_Questionnaire_Specialized_Experience.pdf PDF
Show 40 more

Latest 50 of 114 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions and Answers (96‐101)

Date: 27 February 2018

Solicitation Number W91242‐18‐R‐0002

C‐17 Type III Hydrant Refueling System Ramp Expansion

Question 96: I have been reviewing the plans for the above reference project, C‐17 Type III Hydrant

Refueling System, and I was wondering it there are any cross‐sections for the gabion walls?

Answer: No additional design information is available

Question 97: Amendment 3, Paragraph 2.5.2.3. allows two pages for each item listed under bullets B through H. The information requested in Bullets D and E is quiet extensive and Offeror requests these sections allow a minimum of four pages each in order to elaborate on the requested information, including Organizational Charts and Matrixes.

Answer: The requirements in paragraph 2.5.2.3 remain unchanged at this time.

Question 98: Amendment 3, Paragraph 2.5.2.3. allows a narrative to accompany the construction schedule and is limited to 5 pages. Bullet A, under 2.5.2.3.4 Technical Approach Plan appears to be a duplicated request of a construction schedule narrative but is limited to 4 pages. Is it the intent to include a construction narrative in Sub‐Element 1 – Technical Approach Plan and also in Sub‐Element

2 – Construction Schedule?

Answer: The requirement under bullet A, paragraph 2.5.2.3 is not a duplicate request of a construction schedule. This bullet requires offerors to describe how the work will be executed from start to completion and to provide a sequence of activities which represent work through the entire project from mobilization to demobilization. This is a diferent requirement from the requirements regarding the construction schedule, which are in Section 00110 paragraph 2.5.2.3.1 and Section 00120 paragraph

2.2.4.2. Section 00110 paragraph 2.5.2.3 states: The construction schedule itself is not subject to page limits; however any narrative accompanying the construction schedule submission is limited to 5 pages, excluding tabs and indexes. What this sentence is saying is that if the offeror intends to provide a narrative along with the requirements in Section 00110 paragraph 2.5.2.3.1 and Section 00120 paragraph 2.2.4.2, then that narrative is limited to 5 pages.

Question 99: Sheet CG103 and CG104 show contour lines that are north of the fuel facility which appear to require an extensive amount of fill, however, it appears that the contour lines are not completed. We are assuming that these are in error, and should be disregarded. Please confirm.

Answer: See Amendment 0007

Question 100: Please clarify to the Offeror’s exactly how many amendments have been issued and we are to acknowledge. FBO posting on Sunday, February 25th indicates amendments 6 – 14 were posted. However, in downloading all the documents, it appears they are all part of Amendment 6 exclusively. Is this correct

Answer: A total of six amendments have been issued as of 02/26/2018. Documents posted on

02/25/2018 at 01:30 PM and labeled as Amendment 0004 thru 0013 are all attachments for

Amendment 0006. The document posted on 02/26/2018 at 10:39 AM is for Amendment 0003.

Questions and Answers (96‐101)

Date: 27 February 2018

Solicitation Number W91242‐18‐R‐0002

C‐17 Type III Hydrant Refueling System Ramp Expansion

Question 101: Due to the internal pipe coatings changes in section 33 52 80 – Liquid Fuels Pipeline

Coating System posted in Amendment 6, the Offeror must reprice all carbon steel piping to be compliant. As such, can we please have an extension to March 14th for the piping and coating suppliers to have time to revisit and quote this accurately?

Answer: The proposal due date of 07 March 2018 remains unchanged at this moment.