FJRP159073-GC-003-Amd03.pdf
PDF 457 KB Posted
- Attached to
- C-17 Refueling Hydrant System Ramp Expansion
- Solicitation number
- W91242-18-R-0002
View the file
Other files
Show 40 more
Latest 50 of 114 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
S
D
PIV
CO
S
D
D
PIV
CO
H
H
T
P
G
S
G
S
S
S
S
C
E
S
EO
I
D
D
D
E
T
T
SPSP
D
D
1 STORY
METAL FRAME
BUILDING
EXISTING 1 STORY
BLOCK
BUILDING
1 STORY
BLOCK
BUILDING
MONITORING
WELL (TYP)
W
D D
W
EXISTING
MOORING
POINT (TYP)
T
D
W
D
H
E
R
C
U
L
E
B
L
V
D
H
E
R
C
U
L
E
B
L
V
D
S c a l e
F o r
M i c r o f i l m i n g
I n c h e s
M i l l i m e t e r s date detailed checkeddesigned ofsheet sheets project contract rev.drawing file
NORTH CAROLINA AIR NATIONAL GUARD
DOUGLAS INTERNATIONAL AIRPORT
CHARLOTTE, NORTH CAROLINA
KANSAS CITY, MISSOURI
ENGINEERS ARCHITECTS & CONSULTANTS
Project No. - FJRP159073
C-17 TYPE III HYDRANT
REFUELING SYSTEM/
RAMP EXPANSION
94893
C O
P Y
R I G
H T
B U
R N
M c D
O N
N E
L L
E
N G
I N
E E
R I N
G
C
O M
P A
N Y
I N
C
D
2 3
C
4 5
A
B
11/02/16 D.MUETING
A.DORMAN R.BARUTH
CONSTRUCTION - PHASE 3
GC003 0
FJRP159073-GC001.dwg
N
B1
CONSTRUCTION - PHASE 3
SCALE: 1"=100'
100' 200'0
FUTURE HANGAR
BY OTHERS
LEGEND
PHASE 3
WORK AREAS
PHASE 3
BID OPTION
PHASE 3 - CONTINUE TO CONSTRUCT
FUEL PUMP HOUSE AND FUEL TANKS
AND ALL ASSOCIATED FUELING
OPERATION SITE FEATURES.
PHASE 3 (TYP) - FINALIZE
APRON STRIPING ONCE
ALL SITE WORK HAS BEEN
COMPLETED.
PHASE 3 - REPLACE
CONCRETE APRON
PAVEMENT.
PHASE 3 - INSTALL JET
FUEL LINE FROM VALVE
VAULT TO THE EASTERN
BRAVO 2 PARKING
POSITION
CONSTRUCTION - PHASE 3 NOTES:
PHASE 3 - PAVE ACCESS ROAD
AND INSTALL APPROPRIATE
PAVEMENT MARKINGS
1. PHASING PLAN SHOWN IS CONCEPTUAL AND FOR INFORMATION ONLY. CONTRACTOR MAY
SUBMIT ALTERNATIVE PHASING PLANS FOR APPROVAL BY THE CONTRACTING OFFICER AND
THE INSTALLATION.
2. SEE DRAWING GC004 AND GC005 FOR ACCESS AND SAFETY NOTES AND ACCESS AND SAFETY
PLAN.
3. BID OPTION CONSTRUCTION ACCESS OR BASE BID. CONTRACTOR SHALL DELINEATE A
CONSTRUCTION ZONE OR WORK AREA AROUND THE PROJECT PERIMETER FOR THE ENTIRE
DURATION OF CONSTRUCTION BY USE OF EXISTING FENCES OR NEW FENCES MEETING THE
STANDARDS FOR THE NORTH CAROLINA AIR NATIONAL GUARD AS NEEDED. SIGNAGE SHALL BE
INSTALLED ON FENCING, AND OTHER BARRICADES IN ACCORDANCE WITH SPECIFICATION
SECTION 01 50 00. CONTRACTOR IS REQUIRED TO MAINTAIN CONSTRUCTION
SAFETY/SECURITY FENCES AROUND THEIR WORK AREAS TO PROTECT AGAINST DAMAGE OR
THEFT OF MATERIALS AND EQUIPMENT.
4. ALL CLEARING, GRUBBING, AND MOWING SHALL BE COMPLETED PER REQUIREMENTS OF
CHARLOTTE - DOUGLAS INTERNATIONAL AIRPORT AND THE NORTH CAROLINA AIR NATIONAL
GUARD AND SHALL BE MAINTAINED THROUGHOUT THE CONTRACT DURATION.
5. CONTRACTOR SHALL NOT CROSS ESTABLISHED AIRFIELD SECURITY PERIMETER FENCE
WITHOUT COORDINATING WITH BASE SECURITY AND AIRFIELD OPERATIONS.
6. CONTRACTOR'S SHALL MAINTAIN ADEQUATE ACCESS FOR SEMI-TRUCK DELIVERIES AND
PERSONNEL TO ALL EXISTING SITE FACILITIES THROUGHOUT CONSTRUCTION.
LOW PROFILE
BARRICADES
GC501
B3
PHASE 3 - BID OPTION
INSTALL JET FUEL LINE
FROM EASTERN BRAVO 2
PARKING POSITION TO
BRAVO 1
LOW PROFILE
BARRICADES
GC501
B3
AD
1 02/07/18 AMENDMENT 0003
AD
| 2018-02-06T07:40:00-0600 | |
| Dorman, Andrew |
File details come from the government source that posted it.