FJRP159073-GC-003-Amd03.pdf

PDF 457 KB Posted

Attached to
C-17 Refueling Hydrant System Ramp Expansion
Solicitation number
W91242-18-R-0002
Issued by

View the file

Other files

File Type Posted
Questions_and_Answers_96-101__W91242-18-R-0002.pdf PDF
FJRP159073-CG104-Amendment_0007.pdf PDF
FJRP159073-CG103-Amendment_0007.pdf PDF
Amendment_0007.pdf PDF
33_52_43.28_Amd03.pdf PDF
Questions_and_Answers_78-95__W91242-18-R-0002.pdf PDF
Revised_33_52_80_Amendment_0006.pdf PDF
Revised_08_71_00_Amendment_0006.pdf PDF
Revised_33_52_43_Amendment_0006.pdf PDF
Revised_09_96_00_Amendment_0006.pdf PDF
Revised_09_97_13.27_Amendment_0006.pdf PDF
FJRP159073-A-201-Amendment_0006.pdf PDF
Revised_13_34_19_Amendment_0006.pdf PDF
W91242-18-R-0002_0006.pdf PDF
Revised_09_90_00_Amendment_0006.pdf PDF
FJRP159073-A-601-Amendment_0006.pdf PDF
Amendment_0005_Revised_01_45_00.pdf PDF
Amendment_0004_Section_0010_Price_Schedule.pdf PDF
Amendment_0005.pdf PDF
Questions_and_Answers_40-77__W91242-18-R-0002.pdf PDF
Revised_EXIBIT_H_Proposal_Price_Schedule_Amendment_0004.pdf PDF
Amendment_0004.pdf PDF
Questions_and_Answers_18-38__W91242-18-R-0002.pdf PDF
1._Drawings_-COVER_SHEET.pdf PDF
FJRP159073-M-002-Amd03.pdf PDF
FJRP159073-M-301-Amd03.pdf PDF
32_05_33_Amd03.pdf PDF
FJRP159073-EI-503-Amd03.pdf PDF
Exhibit_F_Small_Business_Participation_Format.pdf PDF
33_09_53_Amd03.pdf PDF
FJRP159073-MS502-Amd03.pdf PDF
FJRP159073-CS-121-Amd03.pdf PDF
FJRP159073-MS504-Amd03.pdf PDF
FJRP159073-M-401-Amd03.pdf PDF
FJRP159073-M-512-Amd03_(1).pdf PDF
33_52_43.13_Amd03.pdf PDF
FJRP159073-EP-101-Amd03.pdf PDF
Exhibit_G_-_Subcontracting_Plan_Format.pdf PDF
33_52_43.11_Amd03.pdf PDF
FJRP159073-EI-602-Amd03.pdf PDF
FJRP159073-C-511-Amd03.pdf PDF
FJRP159073-M-003-Amd03.pdf PDF
FJRP159073-MD902-Amd03.pdf PDF
FJRP159073-MS503-Amd03.pdf PDF
FJRP159073-C-510-Amd03.pdf PDF
FJRP159073-CU-121-Amd03.pdf PDF
FJRP159073-CU-224-Amd03.pdf PDF
W91242-18-R-0002_0003.pdf PDF
FJRP159073-M-502-Amd03.pdf PDF
Amendment_0003_Exhibit_A_Performance_Relevancy_Questionnaire_Specialized_Experience.pdf PDF
Show 40 more

Latest 50 of 114 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

S

D

PIV

CO

S

D

D

PIV

CO

H

H

T

P

G

S

G

S

S

S

S

C

E

S

EO

I

D

D

D

E

T

T

SPSP

D

D

1 STORY

METAL FRAME

BUILDING

EXISTING 1 STORY

BLOCK

BUILDING

1 STORY

BLOCK

BUILDING

MONITORING

WELL (TYP)

W

D D

W

EXISTING

MOORING

POINT (TYP)

T

D

W

D

H

E

R

C

U

L

E

B

L

V

D

H

E

R

C

U

L

E

B

L

V

D

S c a l e

F o r

M i c r o f i l m i n g

I n c h e s

M i l l i m e t e r s date detailed checkeddesigned ofsheet sheets project contract rev.drawing file

NORTH CAROLINA AIR NATIONAL GUARD

DOUGLAS INTERNATIONAL AIRPORT

CHARLOTTE, NORTH CAROLINA

KANSAS CITY, MISSOURI

ENGINEERS ARCHITECTS & CONSULTANTS

Project No. - FJRP159073

C-17 TYPE III HYDRANT

REFUELING SYSTEM/

RAMP EXPANSION

94893

C O

P Y

R I G

H T

B U

R N

M c D

O N

N E

L L

E

N G

I N

E E

R I N

G

C

O M

P A

N Y

I N

C

D

2 3

C

4 5

A

B

11/02/16 D.MUETING

A.DORMAN R.BARUTH

CONSTRUCTION - PHASE 3

GC003 0

FJRP159073-GC001.dwg

N

B1

CONSTRUCTION - PHASE 3

SCALE: 1"=100'

100' 200'0

FUTURE HANGAR

BY OTHERS

LEGEND

PHASE 3

WORK AREAS

PHASE 3

BID OPTION

PHASE 3 - CONTINUE TO CONSTRUCT

FUEL PUMP HOUSE AND FUEL TANKS

AND ALL ASSOCIATED FUELING

OPERATION SITE FEATURES.

PHASE 3 (TYP) - FINALIZE

APRON STRIPING ONCE

ALL SITE WORK HAS BEEN

COMPLETED.

PHASE 3 - REPLACE

CONCRETE APRON

PAVEMENT.

PHASE 3 - INSTALL JET

FUEL LINE FROM VALVE

VAULT TO THE EASTERN

BRAVO 2 PARKING

POSITION

CONSTRUCTION - PHASE 3 NOTES:

PHASE 3 - PAVE ACCESS ROAD

AND INSTALL APPROPRIATE

PAVEMENT MARKINGS

1. PHASING PLAN SHOWN IS CONCEPTUAL AND FOR INFORMATION ONLY. CONTRACTOR MAY

SUBMIT ALTERNATIVE PHASING PLANS FOR APPROVAL BY THE CONTRACTING OFFICER AND

THE INSTALLATION.

2. SEE DRAWING GC004 AND GC005 FOR ACCESS AND SAFETY NOTES AND ACCESS AND SAFETY

PLAN.

3. BID OPTION CONSTRUCTION ACCESS OR BASE BID. CONTRACTOR SHALL DELINEATE A

CONSTRUCTION ZONE OR WORK AREA AROUND THE PROJECT PERIMETER FOR THE ENTIRE

DURATION OF CONSTRUCTION BY USE OF EXISTING FENCES OR NEW FENCES MEETING THE

STANDARDS FOR THE NORTH CAROLINA AIR NATIONAL GUARD AS NEEDED. SIGNAGE SHALL BE

INSTALLED ON FENCING, AND OTHER BARRICADES IN ACCORDANCE WITH SPECIFICATION

SECTION 01 50 00. CONTRACTOR IS REQUIRED TO MAINTAIN CONSTRUCTION

SAFETY/SECURITY FENCES AROUND THEIR WORK AREAS TO PROTECT AGAINST DAMAGE OR

THEFT OF MATERIALS AND EQUIPMENT.

4. ALL CLEARING, GRUBBING, AND MOWING SHALL BE COMPLETED PER REQUIREMENTS OF

CHARLOTTE - DOUGLAS INTERNATIONAL AIRPORT AND THE NORTH CAROLINA AIR NATIONAL

GUARD AND SHALL BE MAINTAINED THROUGHOUT THE CONTRACT DURATION.

5. CONTRACTOR SHALL NOT CROSS ESTABLISHED AIRFIELD SECURITY PERIMETER FENCE

WITHOUT COORDINATING WITH BASE SECURITY AND AIRFIELD OPERATIONS.

6. CONTRACTOR'S SHALL MAINTAIN ADEQUATE ACCESS FOR SEMI-TRUCK DELIVERIES AND

PERSONNEL TO ALL EXISTING SITE FACILITIES THROUGHOUT CONSTRUCTION.

LOW PROFILE

BARRICADES

GC501

B3

PHASE 3 - BID OPTION

INSTALL JET FUEL LINE

FROM EASTERN BRAVO 2

PARKING POSITION TO

BRAVO 1

LOW PROFILE

BARRICADES

GC501

B3

AD

1 02/07/18 AMENDMENT 0003

AD

2018-02-06T07:40:00-0600
Dorman, Andrew

File details come from the government source that posted it.