FJRP159073-ES-502-Amd03.pdf

PDF 337 KB Posted

Attached to
C-17 Refueling Hydrant System Ramp Expansion
Solicitation number
W91242-18-R-0002
Issued by

View the file

Other files

File Type Posted
Questions_and_Answers_96-101__W91242-18-R-0002.pdf PDF
FJRP159073-CG104-Amendment_0007.pdf PDF
FJRP159073-CG103-Amendment_0007.pdf PDF
Amendment_0007.pdf PDF
33_52_43.28_Amd03.pdf PDF
Questions_and_Answers_78-95__W91242-18-R-0002.pdf PDF
Revised_33_52_80_Amendment_0006.pdf PDF
Revised_08_71_00_Amendment_0006.pdf PDF
Revised_33_52_43_Amendment_0006.pdf PDF
Revised_09_96_00_Amendment_0006.pdf PDF
Revised_09_97_13.27_Amendment_0006.pdf PDF
FJRP159073-A-201-Amendment_0006.pdf PDF
Revised_13_34_19_Amendment_0006.pdf PDF
W91242-18-R-0002_0006.pdf PDF
Revised_09_90_00_Amendment_0006.pdf PDF
FJRP159073-A-601-Amendment_0006.pdf PDF
Amendment_0005_Revised_01_45_00.pdf PDF
Amendment_0004_Section_0010_Price_Schedule.pdf PDF
Amendment_0005.pdf PDF
Questions_and_Answers_40-77__W91242-18-R-0002.pdf PDF
Revised_EXIBIT_H_Proposal_Price_Schedule_Amendment_0004.pdf PDF
Amendment_0004.pdf PDF
Questions_and_Answers_18-38__W91242-18-R-0002.pdf PDF
1._Drawings_-COVER_SHEET.pdf PDF
FJRP159073-M-002-Amd03.pdf PDF
FJRP159073-M-301-Amd03.pdf PDF
FJRP159073-GC-003-Amd03.pdf PDF
32_05_33_Amd03.pdf PDF
FJRP159073-EI-503-Amd03.pdf PDF
Exhibit_F_Small_Business_Participation_Format.pdf PDF
33_09_53_Amd03.pdf PDF
FJRP159073-MS502-Amd03.pdf PDF
FJRP159073-CS-121-Amd03.pdf PDF
FJRP159073-MS504-Amd03.pdf PDF
FJRP159073-M-401-Amd03.pdf PDF
FJRP159073-M-512-Amd03_(1).pdf PDF
33_52_43.13_Amd03.pdf PDF
FJRP159073-EP-101-Amd03.pdf PDF
Exhibit_G_-_Subcontracting_Plan_Format.pdf PDF
33_52_43.11_Amd03.pdf PDF
FJRP159073-EI-602-Amd03.pdf PDF
FJRP159073-C-511-Amd03.pdf PDF
FJRP159073-M-003-Amd03.pdf PDF
FJRP159073-MD902-Amd03.pdf PDF
FJRP159073-MS503-Amd03.pdf PDF
FJRP159073-C-510-Amd03.pdf PDF
FJRP159073-CU-121-Amd03.pdf PDF
FJRP159073-CU-224-Amd03.pdf PDF
W91242-18-R-0002_0003.pdf PDF
FJRP159073-M-502-Amd03.pdf PDF
Show 40 more

Latest 50 of 114 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

J

J

J

J

OUTLET VALVE LIMIT SWITCHES

PRODUCT RETURN PUMP

MOUNT ON WATER

DRAW-OFF SYSTEM

PIPE SUPPORTS.

WITHDRAW LINE

STRIPPING LINE

TO HANDHOLES,

SEE DRAWING ES401.

S

1. THE ENTIRE VOLUME WITHIN THE VAULT AT THE PRODUCT RECOVERY TANK SHALL BE CONSIDERED A

CLASS I, DIVISION 1, GROUP D HAZARDOUS LOCATION. ALSO THE VOLUME WITHIN A 5 FOOT RADIUS

FROM THE TOP OF THE TANK VENT SHALL BE CONSIDERED A CLASS I, DIVISION 1, GROUP D

HAZARDOUS LOCATION.

2. STUB CONDUIT UP NEXT TO CANOPY COLUMN,INSTALL SEAL-OFF AT 18" A.G., AND ROUTE CONDUIT UP

COLUMN TO CANOPY ROOF FOR CANOPY LIGHTING.

3. NEMA 3R, 480V, 3-POLE, MANUAL MOTOR STARTER WITH INTEGRAL OVERLOADS, HAND SWITCH, AND

PILOT LIGHT TO INDICATE RUNNING STATUS. MOUNT STARTER TO CANOPY COLUMN.

TO

S c a l e

F o r

M i c r o f i l m i n g

I n c h e s

M i l l i m e t e r s date detailed checkeddesigned ofsheet sheets project contract rev.drawing file

NORTH CAROLINA AIR NATIONAL GUARD

DOUGLAS INTERNATIONAL AIRPORT

CHARLOTTE, NORTH CAROLINA

KANSAS CITY, MISSOURI

ENGINEERS ARCHITECTS & CONSULTANTS

Project No. - FJRP159073

C-17 TYPE III HYDRANT

REFUELING SYSTEM/

RAMP EXPANSION

94893

C O

P Y

R I G

H T

B U

R N

S

M c D

O N

N E

L L

E

N G

I N

E E

R I N

G

C

O M

P A

N Y

I N

C

D

2 3

C

4 5

A

B

ES502

94893ES502.DWG

TANK DETAILS

A. FANGMAN

NOVEMBER 2016 J. LITTLE

S. LACY

A1

PRODUCT RECOVERY TANK ELECTRICAL PLAN VIEW

SCALE: NOT TO SCALE

NEW ALARMS AND

SENSORS TO BE

ACCESSIBLE FROM

STAIRS

1. SEE TANK DRAWINGS FOR EXACT LOCATION OF TANK EQUIPMENT.

2. WELD CONDUIT SUPPORT STRUCTURES (UNISTRUT OR EQUAL) TO TANK WALL. DO NOT WELD UNISTRUT DIRECTLY

TO TANK SHELL. USE THREADED ARC STUDS OR EQUIVALENT TO INCLUDE THREADED COUPLERS OF THE SAME

MATERIAL AS THE MATERIAL OF THE TANK SHELL.

3. SEE ES051 FOR HAZARDOUS AREA LOCATIONS.

4. IN TANK CONTAINMENT AREA ALL CONDUIT SHALL BE ROUTED ALONG PIPING OR CONTAINMENT WALL WITH

CONDUIT SUPPORT STRUCTURES. CONDUIT SHALL NOT BE ROUTED BELOW GRADE.

A3

STORAGE TANK ELECTRICAL ELEVATION

SCALE: NOT TO SCALE

INLET VALVE

LIMIT SWITCHES

J

J

FTP-1 WITH HEATER

AND MOTOR WINDING

TEMPERATURE SWITCH

OVERFILL

PREVENTION

VALVE

ATG

WATER LEVEL SWITCH

PRODUCT LEVEL SWITCHES

WDP-1

IC.ATG.Tx, PB-32

CONTINUE TO STILLWELL

FOR ATG SYSTEM

DETAIL A1, ES504

HIGH LEVEL CONTROL

VALVE SOLENOID

HIGH LEVEL CONTROL

VALVE LIMIT SWITCH

CLOSED

3/4"C: C.MCC.Tx.JY

3/4"C: C.PCP.Tx.ZS4

3/4"C: C.PCP.Tx.ZS1

JY

ZSC

ZSZS

ZS

ZS

ZS

ZS

LSLL

LSL

LSHH

LSH

1"C: (PA-22 - TANK 1) (PA-28 - TANK 2) (PA-34 - TANK 3)

1"C: C.PCP.Tx.ZS2, C.PCP.Tx.ZS3

1"C: C.PCP.Tx.L (I.S.)

1"C: IC.ATG.Tx

10' X 3/4" GALVANIZED

STEEL GND ROD (TYP)

#4/0 TW CU

GND CABLE

LSH

LSH

LSM

LSL

LSHH

J

M

M

UT

ZSC

FS

J

M

TSH

1"C: C.MCC.PRT.L3 (I.S.)

1"C: C.MCC.PRT.L1, C.MCC.PRT.L2 (I.S.)

1"C: IC.ATG.PRT (I.S.)

1"C: C.PCP.PRT.ZSC

1"C: C.MCC.FTP.TS,

C.MCC.FTP.H

1"C: C.MCC.FTP.FS

SEE A1 ON ES401 FOR

CONTINUATION

NOTES:

SEE NOTE 2

x = 1 FOR TANK 1 x = 2 FOR TANK 2 x = 3 FOR TANK 3

(TYP.)

ME

XE

TO HANDHOLES,

SEE DRAWING ES401

1"C: IC.ATG.PRT.LD (I.S.)

1"C:

PA-16

1"C: PB-40

J

IC.ATG.UIx

UI

TANK SIDE INDICATOR

(COORDINATE FINAL

PLACEMENT WITH ANG

PERSONNEL)

J

ME

J

1"C: P.MCC.FTP1

NOTES:

LEVEL SWITCH

TO BOLTED

CONNTECTION

AT TANK STAIRS

J

LOW SUCTION VALVE LIMIT SWITCHES

MANUAL MOTOR

STARTER

(SEE NOTE 3)

S.EHH1.PRT;

S.CHH5.PRT

SEAL-OFFS. AS REQUIRED.

(SEE DETAIL B3/ES052)