FJRP159073-ES-401-Amd03_(1).pdf

PDF 473 KB Posted

Attached to
C-17 Refueling Hydrant System Ramp Expansion
Solicitation number
W91242-18-R-0002
Issued by

View the file

Other files

File Type Posted
Questions_and_Answers_96-101__W91242-18-R-0002.pdf PDF
FJRP159073-CG104-Amendment_0007.pdf PDF
FJRP159073-CG103-Amendment_0007.pdf PDF
Amendment_0007.pdf PDF
33_52_43.28_Amd03.pdf PDF
Questions_and_Answers_78-95__W91242-18-R-0002.pdf PDF
Revised_33_52_80_Amendment_0006.pdf PDF
Revised_08_71_00_Amendment_0006.pdf PDF
Revised_33_52_43_Amendment_0006.pdf PDF
Revised_09_96_00_Amendment_0006.pdf PDF
Revised_09_97_13.27_Amendment_0006.pdf PDF
FJRP159073-A-201-Amendment_0006.pdf PDF
Revised_13_34_19_Amendment_0006.pdf PDF
W91242-18-R-0002_0006.pdf PDF
Revised_09_90_00_Amendment_0006.pdf PDF
FJRP159073-A-601-Amendment_0006.pdf PDF
Amendment_0005_Revised_01_45_00.pdf PDF
Amendment_0004_Section_0010_Price_Schedule.pdf PDF
Amendment_0005.pdf PDF
Questions_and_Answers_40-77__W91242-18-R-0002.pdf PDF
Revised_EXIBIT_H_Proposal_Price_Schedule_Amendment_0004.pdf PDF
Amendment_0004.pdf PDF
Questions_and_Answers_18-38__W91242-18-R-0002.pdf PDF
1._Drawings_-COVER_SHEET.pdf PDF
FJRP159073-M-002-Amd03.pdf PDF
FJRP159073-M-301-Amd03.pdf PDF
FJRP159073-GC-003-Amd03.pdf PDF
32_05_33_Amd03.pdf PDF
FJRP159073-EI-503-Amd03.pdf PDF
Exhibit_F_Small_Business_Participation_Format.pdf PDF
33_09_53_Amd03.pdf PDF
FJRP159073-MS502-Amd03.pdf PDF
FJRP159073-CS-121-Amd03.pdf PDF
FJRP159073-MS504-Amd03.pdf PDF
FJRP159073-M-401-Amd03.pdf PDF
FJRP159073-M-512-Amd03_(1).pdf PDF
33_52_43.13_Amd03.pdf PDF
FJRP159073-EP-101-Amd03.pdf PDF
Exhibit_G_-_Subcontracting_Plan_Format.pdf PDF
33_52_43.11_Amd03.pdf PDF
FJRP159073-EI-602-Amd03.pdf PDF
FJRP159073-C-511-Amd03.pdf PDF
FJRP159073-M-003-Amd03.pdf PDF
FJRP159073-MD902-Amd03.pdf PDF
FJRP159073-MS503-Amd03.pdf PDF
FJRP159073-C-510-Amd03.pdf PDF
FJRP159073-CU-121-Amd03.pdf PDF
FJRP159073-CU-224-Amd03.pdf PDF
W91242-18-R-0002_0003.pdf PDF
FJRP159073-M-502-Amd03.pdf PDF
Show 40 more

Latest 50 of 114 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CD

C

D

C

D

D

D

P

I

V

P

I

V

CD CD CD CD

C

O

UE UE UE UE UE UE UE UE UE UE UE UE

ZSO

ZSO

LSHH

LSH

LSL

LSLL

UIT

LSHH

LSH

LSL

LSLL

ZSC

ZSO

ZSC

ZSO

ZSC

ZSO

UIT

UIT

LSHH

LSH

LSL

LSLL

ZSC

ZSO

ZSC

ZSO

ZSC

JY

ZSC

ZSO

ZSC

JY

ZSC

ZSO

ZSC

JY

ZSC

ZSC

J

J

J

J

J

J

J

J

J

J

J

J

J

M

M

M

UI

UI

UI

S S

S

J

J

S c a l e

F o r

M i c r o f i l m i n g

I n c h e s

M i l l i m e t e r s date detailed checkeddesigned ofsheet sheets project contract rev.drawing file

NORTH CAROLINA AIR NATIONAL GUARD

DOUGLAS INTERNATIONAL AIRPORT

CHARLOTTE, NORTH CAROLINA

KANSAS CITY, MISSOURI

ENGINEERS ARCHITECTS & CONSULTANTS

Project No. - FJRP159073

C-17 TYPE III HYDRANT

REFUELING SYSTEM/

RAMP EXPANSION

94893

C O

P Y

R I G

H T

B U

R N

S

M c D

O N

N E

L L

E

N G

I N

E E

R I N

G

C

O M

P A

N Y

I N

C

D

2 3

C

4 5

A

B

ES401

94893ES401.DWG

ENLARGED PLAN - STORAGE TANKS

A. FANGMAN

FEBRUARY 2017 J. LITTLE

S. LACY

A1

ENLARGED PLAN - STORAGE TANKS

SCALE: 1" = 10'

N

0 10' 20'

BARTON 3500, RTU 8130, AND MODEM EQUIPMENT ASSOCIATED

WITH EXISTING ATG SYSTEM FOR TANKS 1 AND 2 SHALL REMAIN

ACTIVE DURING CONSTRUCTION. TEMPORARY RELOCATION

OUT OF AREA OF DISTURBANCE WILL BE REQUIRED. SUPPLY

TEMPORARY POWER FROM OPERATIONS BUILDING 39 AND

RE-FEED COMMUNICATIONS CABLING AS NECESSARY TO

CONNECT TO EXISTING VAREC FUELSMANAGER DEFENSE

WORKSTATION. SEE DRAWING EI505 FOR FINAL ATG

CONFIGURATION.

RELOCATE RECTIFIER 1 (TANKS 1 AND 2) PREVIOUSLY LOCATED

ALONG SOUTH CONTAINMENT WALL TO LOCATION INDICATED.

LOCATE NEW RECTIFIER 3 (HYDRANT LOOP) AT SAME LOCATION.

NOT USED.

DEMOLISH EQUIPMENT ASSOCIATED WITH EXISTING PRODUCT

SAVER TANK. REFER TO MD901 FOR TANK DEMO INFORMATION.

PROVIDE 120V, 20A OUTDOOR EXPLOSIONPROOF SINGLE-POLE

SWITCH, MOUNTED AT BASE OF TANK STAIRS. SWITCH SHALL

CONTROL LOCAL TANK'S STAIR LIGHTING ONLY.

APPROXIMATE LOCATIONS WHERE CIRCUITS FOR LEVEL

SWITCHES (FOR BOTH TANKS) AND CONTROL VALVE (FOR TANK

2) TRANSITION BELOW GRADE. THIS EQUIPMENT SHALL REMAIN

ACTIVE UNTIL TANK MODIFICATIONS BEGIN. TEMPORARILY

RE-FEED AS NECESSARY.

CIRCUITS FROM PANELBOARDS AND CIRCUITS LISTED IN

PRIMARY AND SECONDARY CIRCUIT SCHEDULE SHALL ROUTE

THRU EHH HANDHOLES. ALL OTHER CIRCUIT DESIGNATIONS

SHALL ROUTE THRU CHH HANDHOLES. MAINTAIN ADEQUATE

SEPARATION FOR INTRINSICALLY SAFE CIRCUITS AS REQUIRED

BY NEC 504.30. PROVIDE SEAL-OFFS FOR ALL CONDUITS

ENTERING/EXITING HANDHOLES EXCLUDING CONDUITS FROM

PUMP SHELTER CONTROL ROOM.

KEYED NOTES: THIS DRAWING ONLY

TANK-3

(NEW)

TANK-2

(EXISTING)

PRODUCT

RECOVERY

TANK

(NEW)

HLCV-3

8" DBB

RECEIPT

12" DBB

ISSUE

4" DBB LOW

SUCTION

12" DBB

ISSUE

4" DBB LOW

SUCTION

12" DBB

ISSUE

4" DBB LOW

SUCTION

HLCV-1

8" DBB

RECEIPT

HLCV-2

8" DBB

RECEIPT

EPDS-9 (MOUNT

TO HANDRAIL)

1"C:

C.PCP.T3.ZS2

1"C:

C.PCP.T3.ZS3

1"C:

IC.ATG.T3,

PB-32

1"C:

C.PCP.T3.ZS1

1"C:

C.PCP.T3.L (I.S)

1"C: C.MCC.T3.JY,

C.PCP.T3.ZS4

1"C:

C.PCP.T1.ZS2

1"C:

C.PCP.T1.ZS3

1"C:

IC.ATG.T1,

PB-32

1"C:

C.PCP.T1.ZS1

1"C:

C.PCP.T1.L (I.S.)

1"C: C.MCC.T1.JY,

C.PCP.T1.ZS4

1"C:

C.PCP.T2.ZS2

1"C:

C.PCP.T2.ZS3

1"C:

IC.ATG.T2,

PB-32

1"C:

C.PCP.T2.ZS1

1"C:

C.PCP.T2.L (I.S.)

1"C: C.MCC.T2.JY,

C.PCP.T2.ZS4

1. ALL CONDUIT IN CONTAINMENT AREA SHALL BE ROUTED

ABOVE GRADE ALONG PIPING OR DIKE WALL. PLANS MAY

NOT DIRECTLY REFLECT THIS AND ARE DIAGRAMMATIC IN

NATURE.

2. REFER TO B3 ON DRAWING ES052 FOR CONDUIT AND

EQUIPMENT INSTALLATION REQUIREMENTS.

3. REFER TO CATHODIC PROTECTION DRAWINGS FOR

EQUIPMENT REQUIREMENTS ASSOCIATED WITH THE

CATHODIC PROTECTION SYSTEM.

GENERAL NOTES: THIS DRAWING ONLY

F

F

F

F F

F

EHH-1

T2

ES502

A1

1"C:

C.MCC.EPDS9

1"C: C.MCC.EPDS7;

1"C: PA-7;

1"C: PA-39;

1"C: PB-26;

S.EHH1.EHH2;

S.CHH5.EHH2

1"C: C.MCC.EPDS8

TEMPORARY

ATG EQUIPMENT

LOCATION

SEE ES102 FOR

CONTINUATION

SEE ES102 FOR

CONTINUATION

SEE ES102 FOR

CONTINUATION

CHH-5

T2

1"C: PA-28

1"C: PA-22

PRP-1

PRP-2

PRP-3

1"C: PA-34

1"C:

PB-20

1"C: PA-43

1"C: PA-44

S.CHH5.GOE

1"C: PA-40

1"C: PA-16

1"C: PA-40

1"C: PA-43

1"C: PA-44

1"C: PB-29

1"C: PB-31

1"C: PB-33

1"C: PB-40

1"C: C.MCC.EPDS8

1"C: P.MCC.FTP1

1"C: C.MCC.FTP.FS, C.MCC.FTP.TS, C.MCC.FTP.H

1"C: C.PCP.PRT.ZSC

1"C: IC.ATG.PRT, IC.ATG.PRT.LD (I.S.)

1"C: C.MCC.PRT.L1, C.MCC.PRT.L2, C.MCC.PRT.L3 (I.S.)

S.EHH1.CW.2;

S.CHH5.CW.2;

S.EHH1.PRT

S.CHH5.PRT

S.CHH5.GOE

2-1/2"C: C.PCP.T1.ZS1, C.PCP.T1.ZS2, C.PCP.T1.ZS3,

C.PCP.T1.ZS4, C.PCP.T2.ZS1, C.PCP.T2.ZS2, C.PCP.T2.ZS3,

C.PCP.T2.ZS4, C.PCP.T3.ZS1, C.PCP.T3.ZS2, C.PCP.T3.ZS3,

C.PCP.T3.ZS4, C.PCP.PRT.ZSC

2"C: C.MCC.T1.JY, C.MCC.T2.JY, C.MCC.T3.JY, C.MCC.EPDS7,

C.MSS.EPDS8, C.MCC.EPDS9, C.MCC.FTP.H, C.MCC.FTP.TS,

C.MCC.FTP.FS

1"C: C.MCC.PRT.L1, C.MCC.PRT.L2, C.MCC.PRT.L3 (I.S.)

1"C: IC.ATG.T1, IC.ATG.T2, IC.ATG.T3

1"C: IC.ATG.PRT, IC.ATG.PRT.LD (I.S.)

1-1/2"C: C.PCP.T1.L, C.PCP.T2.L, C.PCP.T3.L (I.S.)

S.MCC.CHH5

S.PS.CHH5

S.PCP.CHH5

1"C: PA-7, PA-40, PB-20, PB-40

1"C: PA-16, PA-22, PA-28, PA-34

1"C: PA-39, PA-43

1"C: PA-44

1"C: PB-26

1"C: PB-29

1"C: PB-31

1"C: (3) PB-32

1"C: PB-33

2"C: P.MCC.FTP1

S.MCC.EHH1

S.PNLS.EHH1

DUCTBANK CALLOUTS:

1"C: PB-20

1"C: PB-20

1"C: PB-20

EL501

A4

(TYP)

F

F

F

F

F

F

F

F

F

TANK-1

(EXISTING)

1"C:

IC.ATG.UI1

1"C:

IC.ATG.UI2

1"C:

IC.ATG.UI3

F

EL501

A4

(TYP)

A

A

EPDS-8

ES502

A3

(TYP)

RECTIFIER 2

EXISTING

RECTIFIER

LOCATION

1"C: PB-29

1"C: PB-33

1"C: PB-31

RECTIFIERS

1 & 32

EXISTING ATG

EQUIPMENT

LOCATION

S.EHH1.CW.2;

S.CHH5.CW.2

S.EHH1.CW.1;

S.CHH5.CW.1

File details come from the government source that posted it.