FJRP159073-ES-401-Amd03_(1).pdf
PDF 473 KB Posted
- Attached to
- C-17 Refueling Hydrant System Ramp Expansion
- Solicitation number
- W91242-18-R-0002
View the file
Other files
Show 40 more
Latest 50 of 114 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CD
C
D
C
D
D
D
P
I
V
P
I
V
CD CD CD CD
C
O
UE UE UE UE UE UE UE UE UE UE UE UE
ZSO
ZSO
LSHH
LSH
LSL
LSLL
UIT
LSHH
LSH
LSL
LSLL
ZSC
ZSO
ZSC
ZSO
ZSC
ZSO
UIT
UIT
LSHH
LSH
LSL
LSLL
ZSC
ZSO
ZSC
ZSO
ZSC
JY
ZSC
ZSO
ZSC
JY
ZSC
ZSO
ZSC
JY
ZSC
ZSC
J
J
J
J
J
J
J
J
J
J
J
J
J
M
M
M
UI
UI
UI
S S
S
J
J
S c a l e
F o r
M i c r o f i l m i n g
I n c h e s
M i l l i m e t e r s date detailed checkeddesigned ofsheet sheets project contract rev.drawing file
NORTH CAROLINA AIR NATIONAL GUARD
DOUGLAS INTERNATIONAL AIRPORT
CHARLOTTE, NORTH CAROLINA
KANSAS CITY, MISSOURI
ENGINEERS ARCHITECTS & CONSULTANTS
Project No. - FJRP159073
C-17 TYPE III HYDRANT
REFUELING SYSTEM/
RAMP EXPANSION
94893
C O
P Y
R I G
H T
B U
R N
S
M c D
O N
N E
L L
E
N G
I N
E E
R I N
G
C
O M
P A
N Y
I N
C
D
2 3
C
4 5
A
B
ES401
94893ES401.DWG
ENLARGED PLAN - STORAGE TANKS
A. FANGMAN
FEBRUARY 2017 J. LITTLE
S. LACY
A1
ENLARGED PLAN - STORAGE TANKS
SCALE: 1" = 10'
N
0 10' 20'
BARTON 3500, RTU 8130, AND MODEM EQUIPMENT ASSOCIATED
WITH EXISTING ATG SYSTEM FOR TANKS 1 AND 2 SHALL REMAIN
ACTIVE DURING CONSTRUCTION. TEMPORARY RELOCATION
OUT OF AREA OF DISTURBANCE WILL BE REQUIRED. SUPPLY
TEMPORARY POWER FROM OPERATIONS BUILDING 39 AND
RE-FEED COMMUNICATIONS CABLING AS NECESSARY TO
CONNECT TO EXISTING VAREC FUELSMANAGER DEFENSE
WORKSTATION. SEE DRAWING EI505 FOR FINAL ATG
CONFIGURATION.
RELOCATE RECTIFIER 1 (TANKS 1 AND 2) PREVIOUSLY LOCATED
ALONG SOUTH CONTAINMENT WALL TO LOCATION INDICATED.
LOCATE NEW RECTIFIER 3 (HYDRANT LOOP) AT SAME LOCATION.
NOT USED.
DEMOLISH EQUIPMENT ASSOCIATED WITH EXISTING PRODUCT
SAVER TANK. REFER TO MD901 FOR TANK DEMO INFORMATION.
PROVIDE 120V, 20A OUTDOOR EXPLOSIONPROOF SINGLE-POLE
SWITCH, MOUNTED AT BASE OF TANK STAIRS. SWITCH SHALL
CONTROL LOCAL TANK'S STAIR LIGHTING ONLY.
APPROXIMATE LOCATIONS WHERE CIRCUITS FOR LEVEL
SWITCHES (FOR BOTH TANKS) AND CONTROL VALVE (FOR TANK
2) TRANSITION BELOW GRADE. THIS EQUIPMENT SHALL REMAIN
ACTIVE UNTIL TANK MODIFICATIONS BEGIN. TEMPORARILY
RE-FEED AS NECESSARY.
CIRCUITS FROM PANELBOARDS AND CIRCUITS LISTED IN
PRIMARY AND SECONDARY CIRCUIT SCHEDULE SHALL ROUTE
THRU EHH HANDHOLES. ALL OTHER CIRCUIT DESIGNATIONS
SHALL ROUTE THRU CHH HANDHOLES. MAINTAIN ADEQUATE
SEPARATION FOR INTRINSICALLY SAFE CIRCUITS AS REQUIRED
BY NEC 504.30. PROVIDE SEAL-OFFS FOR ALL CONDUITS
ENTERING/EXITING HANDHOLES EXCLUDING CONDUITS FROM
PUMP SHELTER CONTROL ROOM.
KEYED NOTES: THIS DRAWING ONLY
TANK-3
(NEW)
TANK-2
(EXISTING)
PRODUCT
RECOVERY
TANK
(NEW)
HLCV-3
8" DBB
RECEIPT
12" DBB
ISSUE
4" DBB LOW
SUCTION
12" DBB
ISSUE
4" DBB LOW
SUCTION
12" DBB
ISSUE
4" DBB LOW
SUCTION
HLCV-1
8" DBB
RECEIPT
HLCV-2
8" DBB
RECEIPT
EPDS-9 (MOUNT
TO HANDRAIL)
1"C:
C.PCP.T3.ZS2
1"C:
C.PCP.T3.ZS3
1"C:
IC.ATG.T3,
PB-32
1"C:
C.PCP.T3.ZS1
1"C:
C.PCP.T3.L (I.S)
1"C: C.MCC.T3.JY,
C.PCP.T3.ZS4
1"C:
C.PCP.T1.ZS2
1"C:
C.PCP.T1.ZS3
1"C:
IC.ATG.T1,
PB-32
1"C:
C.PCP.T1.ZS1
1"C:
C.PCP.T1.L (I.S.)
1"C: C.MCC.T1.JY,
C.PCP.T1.ZS4
1"C:
C.PCP.T2.ZS2
1"C:
C.PCP.T2.ZS3
1"C:
IC.ATG.T2,
PB-32
1"C:
C.PCP.T2.ZS1
1"C:
C.PCP.T2.L (I.S.)
1"C: C.MCC.T2.JY,
C.PCP.T2.ZS4
1. ALL CONDUIT IN CONTAINMENT AREA SHALL BE ROUTED
ABOVE GRADE ALONG PIPING OR DIKE WALL. PLANS MAY
NOT DIRECTLY REFLECT THIS AND ARE DIAGRAMMATIC IN
NATURE.
2. REFER TO B3 ON DRAWING ES052 FOR CONDUIT AND
EQUIPMENT INSTALLATION REQUIREMENTS.
3. REFER TO CATHODIC PROTECTION DRAWINGS FOR
EQUIPMENT REQUIREMENTS ASSOCIATED WITH THE
CATHODIC PROTECTION SYSTEM.
GENERAL NOTES: THIS DRAWING ONLY
F
F
F
F F
F
EHH-1
T2
ES502
A1
1"C:
C.MCC.EPDS9
1"C: C.MCC.EPDS7;
1"C: PA-7;
1"C: PA-39;
1"C: PB-26;
S.EHH1.EHH2;
S.CHH5.EHH2
1"C: C.MCC.EPDS8
TEMPORARY
ATG EQUIPMENT
LOCATION
SEE ES102 FOR
CONTINUATION
SEE ES102 FOR
CONTINUATION
SEE ES102 FOR
CONTINUATION
CHH-5
T2
1"C: PA-28
1"C: PA-22
PRP-1
PRP-2
PRP-3
1"C: PA-34
1"C:
PB-20
1"C: PA-43
1"C: PA-44
S.CHH5.GOE
1"C: PA-40
1"C: PA-16
1"C: PA-40
1"C: PA-43
1"C: PA-44
1"C: PB-29
1"C: PB-31
1"C: PB-33
1"C: PB-40
1"C: C.MCC.EPDS8
1"C: P.MCC.FTP1
1"C: C.MCC.FTP.FS, C.MCC.FTP.TS, C.MCC.FTP.H
1"C: C.PCP.PRT.ZSC
1"C: IC.ATG.PRT, IC.ATG.PRT.LD (I.S.)
1"C: C.MCC.PRT.L1, C.MCC.PRT.L2, C.MCC.PRT.L3 (I.S.)
S.EHH1.CW.2;
S.CHH5.CW.2;
S.EHH1.PRT
S.CHH5.PRT
S.CHH5.GOE
2-1/2"C: C.PCP.T1.ZS1, C.PCP.T1.ZS2, C.PCP.T1.ZS3,
C.PCP.T1.ZS4, C.PCP.T2.ZS1, C.PCP.T2.ZS2, C.PCP.T2.ZS3,
C.PCP.T2.ZS4, C.PCP.T3.ZS1, C.PCP.T3.ZS2, C.PCP.T3.ZS3,
C.PCP.T3.ZS4, C.PCP.PRT.ZSC
2"C: C.MCC.T1.JY, C.MCC.T2.JY, C.MCC.T3.JY, C.MCC.EPDS7,
C.MSS.EPDS8, C.MCC.EPDS9, C.MCC.FTP.H, C.MCC.FTP.TS,
C.MCC.FTP.FS
1"C: C.MCC.PRT.L1, C.MCC.PRT.L2, C.MCC.PRT.L3 (I.S.)
1"C: IC.ATG.T1, IC.ATG.T2, IC.ATG.T3
1"C: IC.ATG.PRT, IC.ATG.PRT.LD (I.S.)
1-1/2"C: C.PCP.T1.L, C.PCP.T2.L, C.PCP.T3.L (I.S.)
S.MCC.CHH5
S.PS.CHH5
S.PCP.CHH5
1"C: PA-7, PA-40, PB-20, PB-40
1"C: PA-16, PA-22, PA-28, PA-34
1"C: PA-39, PA-43
1"C: PA-44
1"C: PB-26
1"C: PB-29
1"C: PB-31
1"C: (3) PB-32
1"C: PB-33
2"C: P.MCC.FTP1
S.MCC.EHH1
S.PNLS.EHH1
DUCTBANK CALLOUTS:
1"C: PB-20
1"C: PB-20
1"C: PB-20
EL501
A4
(TYP)
F
F
F
F
F
F
F
F
F
TANK-1
(EXISTING)
1"C:
IC.ATG.UI1
1"C:
IC.ATG.UI2
1"C:
IC.ATG.UI3
F
EL501
A4
(TYP)
A
A
EPDS-8
ES502
A3
(TYP)
RECTIFIER 2
EXISTING
RECTIFIER
LOCATION
1"C: PB-29
1"C: PB-33
1"C: PB-31
RECTIFIERS
1 & 32
EXISTING ATG
EQUIPMENT
LOCATION
S.EHH1.CW.2;
S.CHH5.CW.2
S.EHH1.CW.1;
S.CHH5.CW.1
File details come from the government source that posted it.